COMBINED CONCRETE AGGREGATE GRADATION
PROJECT DESCRI PTI ON
SAMPLE INFORMATION
Project ID.
Contract
Sampled By:
Highway
County
Date:
Description
Time:
Contractor
Sample No.
Contractor
Highway
Description
Date
Est. of PCC for dayCounty
Sample Number
Time
Determination of Combined Aggregate Gradation (% Passing)
Aggregate Batched Proportions:
Course Aggregate #2 (C.A. #2) =
Course Aggregate #1 (C.A. #1) =
0.0%
Fine Aggregate (F.A.) =
Plant Site Aggregate Samples (% Passing)
C.A. #2
Size
C.A. #1
Calculate Combined Gradation (% Passing)
F.A.
C.A. #2
C.A. #1
F.A.
Combined
2" (50 mm)
0.0%
0.0%
0.0%
0.0%
1 1/2" (37.5 mm)
0.0%
0.0%
0.0%
0.0%
1" (25 mm)
0.0%
0.0%
0.0%
0.0%
3/4" (19 mm)
0.0%
0.0%
0.0%
0.0%
3/8" (9.5 mm)
0.0%
0.0%
0.0%
0.0%
#4 (4.75 mm)
0.0%
0.0%
0.0%
0.0%
#8 (2.36 mm)
0.0%
0.0%
0.0%
0.0%
#16 (1.16 mm)
0.0%
0.0%
0.0%
0.0%
#30 (0.6 mm)
0.0%
0.0%
0.0%
0.0%
#50 (0.3 mm)
0.0%
0.0%
0.0%
0.0%
#100 (0.15 mm)
0.0%
0.0%
0.0%
0.0%
#200 (0.075 mm)
0.00%
0.00%
0.00%
0.00%
Determination of Specification Limits for Combined Aggregate Gradation (% Passing)
C.A. #2
C.A. #1
F.A.
Combined
Sieve
Size
Spec.
2"
100.0
1 1/2" 90.0
20.0
1"
LCL
UCL
Spec.
- 100.0
0.0
0.0
LCL
UCL
Spec.
LCL
UCL
LCL
UCL
100.0
0.0
100.0
0.0
100.0
0.0
100.0
0.0
0.0
0.0
100.0
0.0
0.0
0.0
100.0
0.0
0.0
0.0
55.0
0.0
0.0
3/4"
0.0
15.0
0.0
0.0
90.0
- 100.0
0.0
0.0
3/8"
0.0
5.0
0.0
0.0
20.0
55.0
0.0
0.0
0.0
0.0
#4
0.0
5.0
0.0
0.0
0.0
10.0
0.0
0.0
90.0
- 100.0
0.0
0.0
0.0
0.0
#16
0.0
5.0
0.0
0.0
0.0
5.0
0.0
0.0
45.0
80.0
0.0
0.0
0.0
0.0
#50
0.0
5.0
0.0
0.0
0.0
5.0
0.0
0.0
10.0
30.0
0.0
0.0
0.0
0.0
#100
0.0
5.0
0.0
0.0
0.0
5.0
0.0
0.0
2.0
10.0
0.0
0.0
0.0
0.0
#200 0.00
1.50
0.00
0.00
0.00
1.50
0.00
0.00
0.00
3.50
0.00
0.00
0.00
0.00
LCL = Lower Control Limit
UCL = Upper Control Limit
100.0
0.0
0.0
100.0
0.0
CMM 4-15-42 WS3012
SUMMARY OF COMBINED AGGREGATE GRADATION SPECIFICATION LIMITS
PERCENT PASSING
Combined
Combined
Concrete
Concrete
Gradation
Gradation
Pavement
Structure
Sieve
Combined
Combined
Combined
% Retained
% Between
QMP Spec
QMP Spec
Size
LCL
Gradation
UCL
On Sieve
Sieves
% Passing
% Passing
2" (50 mm)
0.0
0.0%
0.0
100.0%
100%
100%
1 1/2" (37.5 mm)
0.0
0.0%
0.0
100.0%
0.0%
1" (25 mm)
0.0
0.0%
0.0
100.0%
0.0%
3/4" (19 mm)
0.0
0.0%
0.0
100.0%
0.0%
3/8" (9.5 mm)
0.0
0.0%
0.0
100.0%
0.0%
#4 (4.75 mm)
0.0
0.0%
0.0
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
0.0%
#8 (2.36 mm)
#16 (1.16 mm)
0.0
0.0%
0.0
0.0%
#30 (0.6 mm)
#50 (0.3 mm)
0.0
0.0%
0.0
100.0%
0.0%
#100 (0.15 mm)
0.0
0.0%
0.0
100.0%
0.0%
#200 (0.075 mm)
0.0
0.00%
0.0
100.00%
0.00%
< or = 89%
< or = 42%*
< or = 42%**
< or = 2.3%
< or = 2.3%
* 47 % if coarse material is composed completely of crushed stone or recycled concrete.
LCL = Lower Control Limit
** 47 % if coarse material is composed completely of crushed stone.
UCL = Upper Control Limit
CMM 4-15-42 WS3012
COMBINED CONCRETE AGGREGATE GRADATION
PROJECT DESCRI PT I ON
SAMPLE INFORMATION
Project ID.
Contract
Sampled By:
Highway
County
Date:
Description
Time:
Contractor
Sample No.
Determination of Combined Aggregate Gradation (% Passing)
Aggregate Batched Proportions:
Course Aggregate #2 (C.A. #2) =
30.0%
Course Aggregate #1 (C.A. #1) =
30.0%
Fine Aggregate (F.A.) =
40.0%
Plant Site Aggregate Samples (% Passing)
C.A. #2
Size
C.A. #1
100.0%
Calculate Combined Gradation (% Passing)
F.A.
C.A. #2
C.A. #1
F.A.
Combined
2" (50 mm)
100.0%
100.0%
100.0%
30.0%
30.0%
40.0%
100.0%
1 1/2" (37.5 mm)
95.0%
100.0%
100.0%
28.5%
30.0%
40.0%
98.5%
1" (25 mm)
32.0%
100.0%
100.0%
9.6%
30.0%
40.0%
79.6%
3/4" (19 mm)
12.0%
97.0%
100.0%
3.6%
29.1%
40.0%
72.7%
3/8" (9.5 mm)
3.0%
27.0%
100.0%
0.9%
8.1%
40.0%
49.0%
#4 (4.75 mm)
3.0%
6.0%
96.0%
0.9%
1.8%
38.4%
41.1%
#8 (2.36 mm)
2.0%
2.0%
87.0%
0.6%
0.6%
34.8%
36.0%
#16 (1.16 mm)
2.0%
1.0%
73.0%
0.6%
0.3%
29.2%
30.1%
#30 (0.6 mm)
2.0%
1.0%
42.0%
0.6%
0.3%
16.8%
17.7%
#50 (0.3 mm)
2.0%
1.0%
16.0%
0.6%
0.3%
6.4%
7.3%
#100 (0.15 mm)
2.0%
1.0%
4.0%
0.6%
0.3%
1.6%
2.5%
#200 (0.075 mm)
1.50%
1.00%
3.00%
0.45%
0.30%
1.20%
1.95%
Determination of Specification Limits for Combined Aggregate Gradation (% Passing)
C.A. #2
C.A. #1
F.A.
Combined
Sieve
Size
Spec.
2"
100.0
1 1/2" 90.0
20.0
1"
LCL
UCL
Spec.
30
- 100.0
27.0
30.0
LCL
UCL
Spec.
LCL
UCL
LCL
UCL
100.0
30.0
100.0
40.0
100.0
30.0
100.0
40.0
97.0
100.0
100.0
40.0
76.0
86.5
100.0
40.0
67.0
74.5
55.0
6.0
16.5
3/4"
0.0
15.0
0.0
4.5
90.0
- 100.0
27.0
30.0
3/8"
0.0
5.0
0.0
1.5
20.0
55.0
6.0
16.5
46.0
58.0
#4
0.0
5.0
0.0
1.5
0.0
10.0
0.0
3.0
90.0
- 100.0
36.0
40.0
36.0
44.5
#16
0.0
5.0
0.0
1.5
0.0
5.0
0.0
1.5
45.0
80.0
18.0
32.0
18.0
35.0
#50
0.0
5.0
0.0
1.5
0.0
5.0
0.0
1.5
10.0
30.0
4.0
12.0
4.0
15.0
#100
0.0
5.0
0.0
1.5
0.0
5.0
0.0
1.5
2.0
10.0
0.8
4.0
0.8
7.0
#200 0.00
1.50
0.00
0.45
0.00
1.50
0.00
0.45
0.00
3.50
0.00
1.40
0.00
2.30
LCL = Lower Control Limit
UCL = Upper Control Limit
100.0
30.0
100.0
100.0
40.0
CMM 4-15-42 WS3012
SUMMARY OF COMBINED AGGREGATE GRADATION SPECIFICATION LIMITS
PERCENT PASSING
Combined
Combined
Concrete
Concrete
Gradation
Gradation
Pavement
Structure
Sieve
Combined
Combined
Combined
% Retained
% Between
QMP Spec
QMP Spec
Size
LCL
Gradation
UCL
On Sieve
Sieves
% Passing
% Passing
2" (50 mm)
100.0
100.0%
100.0
0.0%
100%
100%
1 1/2" (37.5 mm)
97.0
98.5%
100.0
1.5%
1.5%
1" (25 mm)
76.0
79.6%
86.5
20.4%
18.9%
3/4" (19 mm)
67.0
72.7%
74.5
27.3%
6.9%
3/8" (9.5 mm)
46.0
49.0%
74.5
51.0%
23.7%
#4 (4.75 mm)
36.0
41.1%
44.5
58.9%
7.9%
64.0%
5.1%
69.9%
5.9%
82.3%
12.4%
92.7%
10.4%
36.0%
#8 (2.36 mm)
#16 (1.16 mm)
18.0
30.1%
35.0
17.7%
#30 (0.6 mm)
#50 (0.3 mm)
4.0
7.3%
15.0
#100 (0.15 mm)
0.8
2.5%
7.0
97.5%
4.8%
#200 (0.075 mm)
0.0
1.95%
2.3
98.05%
0.55%
< or = 89%
< or = 42%*
< or = 42%**
< or = 2.3%
< or = 2.3%
* 47 % if coarse material is composed completely of crushed stone or recycled concrete.
LCL = Lower Control Limit
** 47 % if coarse material is composed completely of crushed stone.
UCL = Upper Control Limit
Contractor
Highway
Project
Description
Date
Est. of PCC for dayContract
County
Sample Number
COMBINED AGGREGATE
GRADATION
Time