PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
PROJECT QUALITY PLAN FOR
Cadangan Pembinaan 7 Blok Kedai/Pejabat Yang Mengandungi: i) 14 Unit Kedai Pejabat 3 Tingkat (Blok A & B) ii) 14 Unit Kedai Pejabat 2 & 3 Tingkat (Blok C & D) iii) 1 Blok Bangunan Komersil 7 Tingkat (Blok E) iv) 16 Unit Kedai Pejabat 5 Tingkat (Blok F & G) Berserta Kemudahan Tempat Letak Kenderaan 2 Tingkat Dan Kemudahan Terminal Perhentian Bas Di Aras Bawah Tanah 2, Di Atas Sebahagian Lot PT 49054, Pusat Bandar Putra Permai, Mukim Petaling, Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Tujuan Ehsan Sdn. Bhd.
(06179)
(PART 1: PLANNING STAGE)
REV 1 1st PQP DESCRIPTION PREPARED BY Calvin Sew APPROVED BY Ir. Y.H. Teoh DATE Feb 06
PREPARED
APPROVED
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
Page
TABLE OF CONTENTS
1.0 PROJECT PARTICULARS 1.1 1.2 1.3 1.4 1.5 2.0 Project Title Background of the Project Scopes Of Works Client Land Owner
3 3 3 3 3
PROJECT ORGANISATION/TEAM 2.1 2.2 2.3 2.4 2.5 Project Team Design Activities and Persons Responsible Employer Particulars List Of Consultants Authorities Involved 4 5 6 6 7 8 11
3.0 4.0
DESIGN INPUT CHECKLIST PROJECT IMPLEMENTATION PROGRAM
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
1.0 1.1 PROJECT PARTICULARS Project Title :
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
Cadangan Pembinaan 7 Blok Kedai/Pejabat Mengandungi: i) 14 Unit Kedai Pejabat 3 Tingkat (Blok A & B) ii) 14 Unit Kedai Pejabat 2 & 3 Tingkat (Blok C & D) iii) 1 Blok Bangunan Komersil 7 Tingkat (Blok E) iv) 16 Unit Kedai Pejabat 5 Tingkat (Blok F & G) Berserta Kemudahan Tempat Letak Kenderaan 2 Tingkat Dan Kemudahan Terminal Perhentian Bas Di Aras Bawah Tanah 2, Di Atas Sebahagian Lot Pt 49054, Pusat Bandar Putra Permai, Mukim Petaling, Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Tujuan Ehsan Sdn. Bhd.
1.2
Background of the : Project
The proposed development is located on part of lot PT49054, Pusat Bandar Putra Permai. The site occupies a total land area of approximately 6.05acres. It will be developed into 7 blocks of shop/office with a bus termainal. The approval for overall external infrastructure layout plans including water reticulation, sewerage reticulation, earthworks and road & drainage by relevant local authorities had been secured by Hussein & K.H Chong Jurutera Perunding (M) Sdn. Bhd. Design the overall building structural works and internal Infrastructure Works Tujuan Ehsan Sdn Bhd Tujuan Ehsan Sdn. Bhd.
1.3
Scope of Works :
1.4 1.5
Client Land Owner
: :
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
2.0 2.1
PROJECT ORGANISATION/TEAM Project Team
Project Director Ir. Teoh Yong Hoee
Project Engineer WC Loh
Design Engineer Calvin Sew
Drafting Person Khairul / Faridah
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
2.2 Design Activities and Persons Responsible
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
Design Activity Building structure and Internal infrastructure
Design By Calvin Sew
Check By WC loh
2.3
Employer Particulars
Trade
Company Name
Tel./Fax no.
Contact
Developer / Land Owner
Tujuan Ehsan Sdn Bhd
T: 03-8941 7878 F: 03-8948 1010
Mr. TS Chan Mr. Lim Han Yang Mr. SS Lee
2.4
List of Consultants
Trade
Company Name
Tel./Fax no.
Contact
Architect
Veritas Architect S/B
T: 03-2162 2300 F: 03-2162 2310
Mr.
David
Mizan
Hashim En. Ahmad Rodzanee
Planner Land Surveyor
NIL Syarikat Malaysia Jurukur
NIL T: 03-9285 5534 F: 03-9285 0430
NIL Mr. Hew
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
M&E Kotrek Konsult S/B
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005 Ir. Yip Fook Keong Mr. Lew Chee Meng Mr. Ng Kai Seng Ms. Lau NIL NIL
T: 03-5631 9606 F: 03-5638 7312
QS
Ng Kai Seng & Associates S/B
T: 03-8024 1464 F: 03-8024 1454 NIL NIL
Landscape Consortium Consultant
NIL NIL
2.5
Authorities Involved
Authorities
Majlis Perbandaran Subang Jaya (MPSJ) JKR JPS Petaling
Items to submit
Road & Drainage (Jabatan Kejuruteraan)
N/A Road & Drainage
JPP/IWK SYABAS BOMBA LLM/PLUS DOE DOSH
Internal Sewerage Reticulation System Internal Water Reticulation System N/A N/A N/A N/A
3.0
CHECKLIST FOR DESIGN INPUT REQUIREMENT
Design input shall include but not limited to Soil Investigation Report, Site Visit Report, Client and Authorities Requirements, Approved Development Plan, Survey Plan, Planner Plan and drawing from other trades.
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
Document No./ Reference No. Approved D.O: (Ref. No.: MPSJ.260/1/184 Jilid 2(68) dated 12 th August 2005)
From Whom Jururancang L&C S/B
Date Received Feb 2006
Reviewed by WC Loh/Calvin Sew
Comments (if any) This D.O approval is for the whole parcel of lot PT 49054. A new planner have to be appointed for the resubmission of D.O to Jabatan Perancang of MPSJ for the said development NIL
Survey Plan: (Plan No: NIL)
Syarikat Jurukur Malaysia Gagasan Teguh S/B Gagasan Teguh S/B
Feb 2006
WC Loh/Calvin Sew WC Loh/Calvin Sew WC Loh/Calvin Sew WC Loh/Calvin Sew
Soil Investigation Report (Report No: GT/BPP/433/2005) (Report No: GT/MP/084/2006)
Feb 2006 April 2006
Borehole Result Mackintosh Probe test
MPSJs Approved Overall Earthworks Letter (Ref.No.:MPSJ.Z2/EW/286/4/32(18) dated 28 th August 2002) JPP Approved Overall Sewerage Reticulation Letter (Ref.No.:KTAK/JPP/(03)/9/SEL.9/00/35 dated 5 th Feb 2005)
Hussein & K.H Chong Jurutera Perunding (M) S/B Hussein & K.H Chong Jurutera Perunding (M) S/B
Feb 2006
NIL
Feb 2006
WC Loh/Calvin Sew
NIL
3.0 CHECKLIST FOR DESIGN INPUT REQUIREMENT (Conts)
PUAS Approved Overall Water Reticulation Letter (Ref.No.:Bil.(4)dlm.PUAS115/17/36 vol.1 dated 31 st July 2003)
Hussein & K.H Chong Jurutera Perunding (M) S/B
Feb 2006
WC Loh/Calvin Sew
NIL
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
JPS Approved Overall Drainage Letter (Ref.No.:(15)dlm.JPS.sel.012C/9/4/616 dated 18 th August 2003) Hussein & K.H Chong Jurutera Perunding (M) S/B
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
Feb 2006
WC Loh/Calvin Sew
NIL
4.0
PROJECT IMPLEMENTATION PROGRAM
/var/www/apps/conversion/tmp/scratch_6/184035576.doc
Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd
PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005
(Refer to Attachment)