A S S I G N M E N T M A T E R I A L
OVERHEAD
ALLOCATION &
APPORTIONMENT
M A N A G E M E N T A C C O U N T I N G
A S S I G N M E N T M A T E R I A L
QUESTION # 1
Swatathon Inc has two production departments (A and B) and two service departments
(maintenance and stores). Details of next year’s budgeted overheads are shown below.
Total Rs.
Heat & Light 19,200
Repair costs 9,600
Machinery Depreciation 54,000
Rent & rates 38,400
Canteen 9,000
Machinery Insurance 25,000
Details of each department are as follows,
A B Maintenance Stores Total
Floor area 6,000 4,000 3,000 2,000 15,000
Machine Book Value 48 20 8 4 80
Number of employees 50 40 20 10 120
Allocated Overheads 15 20 12 5 50
REQUIRED:
a. Allocate the overheads by choosing appropriate basis.
QUESTION # 2
Sand Storm is a jobbing engineering concern which has there production departments (forming,
machine and assembly) and two service departments (maintenance and general).
The following analysis of overhead costs has been made for the year just ended.
Rs. Rs.
Rents & Rates 8,000
Power 750
Heat & Light 5,000
Depriciation
Plant 10,000
Fixtures & Fittings 250
10,250
Insurance
Plant 2,000
Building 500
2,500
26,500
Other available data are as
follows,
Fixtures Effective
Floor Plant
& Horse
Area Value
Fittings Power
Forming 2,000 25,000 1,000 40
Machines 4,000 60,000 500 90
M A N A G E M E N T A C C O U N T I N G
A S S I G N M E N T M A T E R I A L
Assembly 3,000 7,500 2,000 15
Maintenance 500 7,500 1,000 5
General 500 ‐ 500 ‐
REQUIRED:
a. Allocate the overheads by choosing appropriate basis.
b. Reapportion Maintenance and General cost on the basis of following %.
Maintenance General
Forming 20% 34%
Machines 50% 58%
Assembly 30% 8%
M A N A G E M E N T A C C O U N T I N G