CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING:
N Drawing N
7.- WATER TREATMENT AREA
Line Id
Page Spool
SW
I/D
DATE: 03-11-2014
25%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw Cut Assemb Weld
P6-422-540
W5 GBB 01BR210V
0.75
0.5
1.25
P6-422-540
W5 GBB 01BR210V
0.6
0.4
0.8
P6-422-540
W5 GBB 01BR210V
0.75
0.5
1.25
P6-422-540
W5 GBB 01BR901V
0.6
0.4
0.8
P6-422-540
W5 GBB 01BR905V
10
10
1.5
2.5
P6-422-540
W5 GBB 01BR907V
0.45
0.3
0.6
0.75
P6-422-540
W5 GBB 01BR908V
0.6
0.4
0.8
P6-422-540
W5 GBB 01BR909V
0.3
0.2
0.4
0.5
P6-422-540
W5 GBB 01BR910V
0.3
0.2
0.4
0.5
10
P6-422-540
W5 GBB 01BR911V
10
0.9
0.6
1.2
1.5
11
P6-422-540
W5 GBB 01BR913V
11
0.75
0.5
1.25
12
P6-422-540
W5 GBB 01BR921V
12
10
10
1.5
2.5
13
P6-422-540
W5 GBB 01BR922V
13
0.75
0.5
1.25
14
P6-422-540
W5 GBB 01BR923V
14
0.75
0.5
1.25
15
P6-422-540
W5 GCB 01BR201V
15
10.5
10.5 1.575 1.05
2.1
2.625
16
P6-422-540
W5 GCB 01BR201V
16
13.5
13.5 2.025 1.35
2.7
3.375
17
P6-422-540
W5 GCB 01BR901V
17
24
24
3.6
2.4
4.8
18
P6-422-540
W5 GCB 01BR902V
18
1.05
0.7
1.4
1.75
19
P6-422-540
W5 GCK 01BR101V
19
20
20
20
P6-422-540
W5 GCK 01BR101V
20
26
26
3.9
2.6
5.2
6.5
21
P6-422-540
W5 GCK 01BR101V
21
24
24
3.6
2.4
4.8
22
P6-422-540
W5 GCK 01BR101V
22
20
20
23
P6-422-540
W5 GCK 01BR901V
23
0.45
0.3
0.6
0.75
24
P6-422-540
W5 GHA 01BR126V
24
0.9
0.6
1.2
1.5
25
P6-422-540
W5 GHA 01BR127V
25
12
12
1.8
1.2
2.4
26
P6-422-540
W5 GHA 01BR127V
26
13
13
1.95
1.3
2.6
3.25
27
P6-422-540
W5 GHA 01BR137V
27
1.2
0.8
1.6
28
P6-422-540
W5 GHA 01BR901V
28
0.3
0.2
0.4
0.5
29
P6-422-540
W5 GHA 01BR902V
29
0.3
0.2
0.4
0.5
30
P6-422-540
W5 GHA 01BR903V
30
JMS
0.6
0.4
0.8
PIPE )
: 03-11-2014
20%
10%
Total Total
Inspect Deliv Point
4.5
90%
0.8
3.6
90%
4.5
90%
0.8
3.6
90%
90%
0.6
2.7
90%
2.8
70%
0.4
1.8
90%
0.4
1.8
90%
1.2
5.4
90%
4.5
90%
90%
4.5
90%
4.5
90%
2.1
9.45
90%
2.7
12.15 90%
10.8
45%
1.4
6.3
90%
18
90%
5.2
23.4
90%
4.8
21.6
90%
18
90%
2.1
70%
1.2
5.4
90%
2.4
10.8
90%
2.6
11.7
90%
1.6
7.2
90%
1.4
70%
1.8
90%
0.4
0.8
3.6
90%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 5.- FGD/ED AREA
Page Spool
DATE: 23-11-2014
SW
SS
I/D
I/D SW+SS Draw. Cut. Assemb
TOTAL
15%
10%
20%
25%
Drawing N
Line Id
P6-422-528
FE5 LBG 92BR941
62
0.3
0.2
0.4
0.5
P6-422-528
FE5 LBG 92BR942
63
0.75
0.5
1.25
P6-422-528
FE5 PAB 11BR105
64
7.5
7.5
1.125
0.75
1.5
P6-422-528
FE5 PGA 01BR443
65
4.75
4.75 0.7125 0.475
P6-422-528
FE5 PGA 01BR444
66
8.75
8.75 1.3125 0.875
P6-422-528
FE5 PGA 01BR444
67
12
12
1.8
P6-422-528
FE5 PGA 01BR449
68
18
18
P6-422-528
FE5 PGA 01BR449
69
P6-422-528
FE5 PGA 01BR909
70
0.9
0.6
1.2
10
P6-422-528
FE5 PGA 02BR443
71
18
18
2.7
1.8
11
P6-422-528
FE5 PGA 02BR443
72
1.2
12
P6-422-528
FE5 PGA 02BR902
73
13
P6-422-528
FE5 QEB 01BR342
74
14
P6-422-528
FE5 QEB 01BR380
75
15
P6-422-528
FE5 QEB 01BR380
76
16
P6-422-528
FE5 QEB 01BR381
77
17
P6-422-528
FE5 QEB 01BR382
78
17
17
18
P6-422-528
FE5 QEB 01BR383
79
19
P6-422-528
FE5 QEB 01BR384
80
20
P6-422-528
FE5 QEB 01BR385
81
21
P6-422-528
FE5 QEB 01BR388
82
11
11
1.65
22
P6-422-528
FE5 QEB 01BR388
83
23
P6-422-528
FE5 QEB 01BR389
84
24
P6-422-528
FE5 QEB 01BR393
85
25
P6-422-528
FE5 QEB 01BR393
86
26
P6-422-528
FE5 QEB 01BR393
87
27
P6-422-528
FE5 QEB 01BR394
88
28
P6-422-528
FE5 QEB 01BR399
29
P6-422-528
30
P6-422-528
Weld /
NPT
20%
10%
Total
Inspect Deliv. Point
Total
%
1.4
70%
4.5
90%
1.875
1.5
6.75
90%
0.95
1.1875
0.95
4.275
90%
1.75
2.1875
1.75
7.875
90%
1.2
2.4
2.4
10.8
90%
2.7
1.8
3.6
4.5
3.6
16.2
90%
0.9
0.6
1.2
1.5
1.2
5.4
90%
1.5
1.2
5.4
90%
3.6
4.5
3.6
16.2
90%
0.8
1.6
1.6
7.2
90%
0.9
0.6
1.2
1.5
1.2
5.4
90%
1.2
0.8
1.6
5.6
70%
34
36
5.4
5.4
15%
18
20
15%
1.5
12
2.025
15%
2.55
2.55
15%
1.05
1.05
15%
1.2
1.2
15%
2.925
15%
1.1
2.75
25%
0.9
0.6
1.5
25%
1.2
0.8
25%
5.625
15%
13.5 2.025
19.5 19.5 2.925
7.5
30
37.5 5.625
30
30
4.5
4.5
15%
32
36
5.4
5.4
15%
1.35
0.9
2.25
25%
89
11
11
1.65
1.1
2.2
2.75
2.2
1.1
11
100%
FE5 QEB 01BR399
90
1.05
0.7
1.4
1.75
1.4
0.7
100%
FE5 QEB 01BR399
91
10
10
1.5
2.5
10
100%
TWR
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 5.- FGD/ED AREA
Page Spool
DATE: 23-11-2014
SW
SS
TOTAL
I/D
I/D
SW+SS Draw. Cut. Assemb
15%
10%
20%
25%
20%
10%
Total
Total
Drawing N
Line Id
P6-422-528
FE5 QEB 01BR934
92
1.35
0.9
1.8
2.25
1.8
0.9
100%
P6-422-528
FE5 QEB 01BR934
93
0.6
0.4
0.8
0.8
0.4
100%
P6-422-528
FE5 QEB 01BR936
94
0.3
0.2
0.4
0.5
0.4
0.2
100%
P6-422-528
FE5 QEB 01BR937
95
0.6
0.4
0.8
0.8
0.4
100%
P6-422-528
FE5 QFB 01BR360
96
18
22
3.3
2.2
4.4
5.5
4.4
2.2
22
100%
P6-422-528
FE5 QFB 01BR360
97
16
16
2.4
1.6
3.2
3.2
1.6
16
100%
P6-422-528
FE5 QFB 01BR360
98
20
22
3.3
2.2
4.4
5.5
4.4
2.2
22
100%
P6-422-528
FE5 QFB 01BR361
99
13.5
13.5
2.025
1.35
2.7
3.375
2.7
1.35
13.5
100%
P6-422-528
FE5 QFB 01BR365
100
18
18
2.7
1.8
3.6
4.5
3.6
1.8
18
100%
10
P6-422-528
FE5 QFB 01BR366
101
15
15
2.25
1.5
3.75
1.5
15
100%
11
P6-422-528
FE5 QEB 01BR348 102
26
30
4.5
7.5
30
100%
12
P6-422-528
FE5 QEB 01BR385 103
1.35
0.9
1.8
2.25
1.8
0.9
100%
13
P6-422-528
FE5 QEB 01BR385 104
18
18
2.7
1.8
3.6
4.5
3.6
1.8
18
100%
14
P6-422-528
FE5 QEB 01BR385 105
0.9
0.6
1.2
1.5
1.2
0.6
100%
15
P6-422-528
FE5 QFB 01BR385
106
0.9
0.6
1.2
1.5
1.2
0.6
100%
16
P6-422-528
FE5 QFB 01BR385
107
0.3
0.2
0.4
0.5
0.4
0.2
100%
17
P6-422-528
FE5 QFB 01BR385
108
0.9
0.6
1.2
1.5
1.2
0.6
100%
18
P6-422-528
FE5 QFB 01BR385
109
1.05
0.7
1.4
1.75
1.4
0.7
100%
19
P6-422-528
FE5 QFB 01BR385
110
0.9
0.6
1.2
1.5
1.2
0.6
100%
20
P6-422-528
FE5 QFB 01BR387
111
0.75
0.5
1.25
0.5
100%
21
P6-422-528
FE5 QFB 01 BR389 112
27
27
4.05
2.7
5.4
6.75
5.4
2.7
27
100%
22
P6-422-528
FE5 QFB 01BR389
113
19.5
19.5
2.925
1.95
3.9
4.875
3.9
1.95
19.5
100%
23
P6-422-528
FE5 QFB 01BR389
114
17.5
17.5
2.625
1.75
3.5
4.375
3.5
1.75
17.5
100%
24
P6-422-528
FE5 QFB 01BR391
115
1.2
0.8
1.6
1.6
0.8
100%
25
P6-422-528
FE5 QFB 01BR391
116
0.9
0.6
1.2
1.5
1.2
0.6
100%
26
P6-422-528
FE5 QFB 01BR395
117
0.3
0.2
0.4
0.5
0.4
0.2
100%
27
P6-422-528
FE5 QFB 01BR396 118
30
30
4.5
7.5
30
100%
28
P6-422-528
FE5 QFB 01BR397 119
0.3
0.2
0.4
0.5
0.4
0.2
100%
29
P6-422-528
FE5 QFB 01BR398 120
15
15
2.25
1.5
3.75
1.5
15
100%
30
P6-422-528
FE5 QFB 01BR399 121
24
24
3.6
2.4
4.8
4.8
2.4
24
100%
TWR
Weld /
NPT
Inspect Deliv. Point
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 2.- MACHINE HOUSE
Page Spool
DATE: 22-02-2015
SW
SS
I/D
I/D SW+SS Draw. Cut. Assemb
TOTAL
15%
10%
20%
25%
20%
10%
Total Total
Drawing N
Line Id
P6-422-522
05 PGA 02BR920
721
0.6
0.4
0.8
2.8
70%
P6-422-522
05 PGE 01BR801
722
0.6
0.4
0.8
2.8
70%
P6-422-522
05 PGE 01BR901
723
0.6
0.4
0.8
2.8
70%
P6-422-522
05 PGE 01BR902
724
0.9
0.6
1.2
1.5
4.2
70%
P6-422-522
05 PGE 01BR903
725
0.9
0.6
1.2
1.5
4.2
70%
P6-422-522
05 PGE 01BR904
726
0.6
0.4
0.8
2.8
70%
P6-422-522
05 PGE 02BR801
727
0.6
0.4
0.8
2.8
70%
P6-422-522
05 PGE 02BR901
728
0.6
0.4
0.8
2.8
70%
P6-422-522
05 PGE 02BR902
729
0.9
0.6
1.2
1.5
4.2
70%
10
P6-422-522
05 PGE 02BR903
730
0.9
0.6
1.2
1.5
4.2
70%
11
P6-422-522
05 PGE 02BR904
731
0.6
0.4
0.8
2.8
70%
12
P6-422-522
05 PGE 02BR905
732
38
38
5.7
3.8
7.6
9.5
26.6
70%
13
P6-422-522
05 PGE 02BR905
733
26
26
3.9
2.6
5.2
6.5
18.2
70%
14
P6-422-522
05 PGE 02BR905
734
1.35
0.9
1.8
2.25
6.3
70%
15
P6-422-522
05 QEA 01BR104
735
0.9
0.6
1.2
1.5
4.2
70%
16
P6-422-522
05 QEA 01BR104
736
10
10
1.5
2.5
70%
17
P6-422-522
05 QEA 01BR104
737
12
12
1.8
1.2
2.4
8.4
70%
18
P6-422-522
05 QEA 01BR105
738
0.9
0.6
1.2
1.5
1.2
0.6
100%
19
P6-422-522
05 QEA 01BR105
739
10
10
1.5
2.5
10
100%
20
P6-422-522
05 QEA 01BR105
740
12
12
1.8
1.2
2.4
2.4
1.2
12
100%
21
P6-422-522
05 QEA 01BR106
741
0.9
0.6
1.2
1.5
1.2
0.6
100%
22
P6-422-522
05 QEA 01BR106
742
10
10
1.5
2.5
10
100%
23
P6-422-522
05 QEA 01BR106
743
12
12
1.8
1.2
2.4
2.4
1.2
12
100%
24
P6-422-522
05 QEA 01BR211
744
1.35
0.9
1.8
2.25
1.8
0.9
100%
25
P6-422-522
05 QEA 01BR212
745
10
10
1.5
2.5
10
100%
26
P6-422-522
05 QEA 01BR213
746
10
10
1.5
2.5
10
100%
27
P6-422-522
05 QEA 01BR214
747
1.35
0.9
1.8
2.25
1.8
0.9
100%
28
P6-422-522
05 QEA 01BR301
748
0.15
0.1
0.2
0.25
0.2
0.1
100%
29
P6-422-522
05 QEA 01BR302
749
0.15
0.1
0.2
0.25
0.2
0.1
100%
30
P6-422-522
05 QEA 01BR303
750
0.15
0.1
0.2
0.25
0.2
0.1
100%
Weld /
NPT
Inspect Deliv. Point
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 2.- MACHINE HOUSE
Page Spool
SW
SS
DATE: 22-02-20
TOTAL
15%
10%
20%
25%
Drawing N
Line Id
P6-422-522
05 QEA 01BR901
751
11
11
1.65
1.1
2.2
2.75
P6-422-522
05 QEA 01BR903
752
0.75
0.5
1.25
P6-422-522
05 QEA 01BR904
753
0.3
0.2
0.4
0.5
P6-422-522
05 QEA 01BR907
754
1.2
0.8
1.6
P6-422-522
05 QEA 01BR908
755
0.75
0.5
1.25
P6-422-522
05 QEA 01BR909
756
11
11
1.65
1.1
2.2
2.75
P6-422-522
05 QEA 01BR911
757
1.2
0.8
1.6
P6-422-522
05 QEA 01BR912
758
0.75
0.5
1.25
P6-422-522
05 QEA 01BR913
759
10
10
1.5
2.5
10
P6-422-522
05 QEA 01BR914
760
0.75
0.5
1.25
11
P6-422-522
05 QEA 01BR921
761
1.35
0.9
1.8
2.25
12
P6-422-522
05 QEA 01BR922
762
1.35
0.9
1.8
2.25
13
P6-422-522
05 QEA 01BR923
763
14
14
2.1
1.4
2.8
3.5
14
P6-422-522
05 QEA 01BR924
764
14
14
2.1
1.4
2.8
3.5
15
P6-422-522
05 QEA 01BR925
765
14
14
2.1
1.4
2.8
3.5
16
P6-422-522
05 QEA 01BR926
766
14
14
2.1
1.4
2.8
3.5
17
P6-422-522
05 QEB 01BR204
767
14
14
2.1
1.4
2.8
3.5
18
P6-422-522
05 QEB 01BR208
768
14
14
2.1
1.4
2.8
3.5
19
P6-422-522
05 QEB 01BR209
769
1.05
0.7
1.4
1.75
20
P6-422-522
05 QEB 01BR252
770
16
16
2.4
1.6
3.2
21
P6-422-522
05 QEB 01BR274
771
16
16
2.4
1.6
3.2
22
P6-422-522
05 QEB 01BR276
772
11
11
1.65
1.1
2.2
2.75
23
P6-422-522
05 QEB 01BR276
773
1.35
0.9
1.8
2.25
24
P6-422-522
05 QEB 01BR277
774
13
13
1.95
1.3
2.6
3.25
25
P6-422-522
05 QEB 01BR282
775
14
14
2.1
1.4
2.8
3.5
26
P6-422-522
05 QEB 01BR282
776
16
16
2.4
1.6
3.2
27
P6-422-522
05 QEB 01BR283
777
0.9
0.6
1.2
1.5
28
P6-422-522
05 QEB 01BR284
778
1.05
0.7
1.4
1.75
29
P6-422-522
05 QEB 01BR285
779
16
16
2.4
1.6
3.2
30
P6-422-522
05 QEB 01BR285
780
18
18
2.7
1.8
3.6
4.5
I/D
I/D SW+SS Draw. Cut. Assemb
Weld /
NPT
TWR
PIPE )
: 22-02-2015
20%
10%
Total Total
Inspect Deliv. Point
2.2
1.1
7.7
70%
3.5
70%
1.4
70%
5.6
70%
3.5
70%
11
100%
5.6
70%
3.5
70%
70%
3.5
70%
1.8
0.9
100%
1.8
0.9
100%
2.8
1.4
14
100%
2.8
1.4
14
100%
2.8
1.4
14
100%
2.8
1.4
14
100%
2.8
1.4
14
100%
2.8
1.4
14
100%
1.4
0.7
100%
3.2
1.6
16
100%
3.2
1.6
16
100%
2.2
1.1
11
100%
1.8
0.9
100%
2.6
1.3
13
100%
2.8
1.4
14
100%
3.2
1.6
16
100%
1.2
0.6
100%
1.4
0.7
100%
3.2
1.6
16
100%
3.6
1.8
18
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 2.- MACHINE HOUSE
Page Spool
SW
I/D
SS
I/D
DATE: 22-02-201
TOTAL
15%
10%
20%
25%
20%
Drawing N
Line Id
P6-422-522
05 QEB 01BR285
781
15
15
2.25
1.5
3.75
P6-422-522
05 QEB 01BR291
782
0.6
0.4
0.8
0.8
P6-422-522
05 QEB 01BR292
783
14
14
2.1
1.4
2.8
3.5
2.8
P6-422-522
05 QEB 01BR292
784
12
12
1.8
1.2
2.4
2.4
P6-422-522
05 QEB 01BR293
785
1.05
0.7
1.4
1.75
1.4
P6-422-522
05 QEB 01BR294
786
16
16
2.4
1.6
3.2
3.2
P6-422-522
05 QEB 01BR295
787
14
14
2.1
1.4
2.8
3.5
2.8
P6-422-522
05 QEB 01BR901
788
18
18
2.7
1.8
3.6
4.5
3.6
P6-422-522
05 QEB 01BR903
789
0.6
0.4
0.8
0.8
10
P6-422-522
05 QEB 01BR904
790
0.6
0.4
0.8
0.8
11
P6-422-522
05 QEB 01BR905
791
16
16
2.4
1.6
3.2
3.2
12
P6-422-522
05 QEB 01BR905
792
18
18
2.7
1.8
3.6
4.5
3.6
13
P6-422-522
05 QEB 01BR906
793
14
14
2.1
1.4
2.8
3.5
2.8
14
P6-422-522
05 QEB 01BR907
794
14
14
2.1
1.4
2.8
3.5
2.8
15
P6-422-522
05 QFA 01BR901
795
10
10
1.5
2.5
16
P6-422-522
05 QFA 01BR903
796
1.2
0.8
1.6
1.6
17
P6-422-522
05 QFA 01BR904
797
1.35
0.9
1.8
2.25
1.8
18
P6-422-522
05 QFA 01BR905
798
0.9
0.6
1.2
1.5
1.2
19
P6-422-522
05 QFA 01BR906
799
0.9
0.6
1.2
1.5
1.2
20
P6-422-522
05 QFA 01BR907
800
0.9
0.6
1.2
1.5
1.2
21
P6-422-522
05 QFA 01BR908
801
0.9
0.6
1.2
1.5
1.2
22
P6-422-522
05 QFA 01BR909
802
1.35
0.9
1.8
2.25
1.8
23
P6-422-522
05 QFA 01BR910
803
0.9
0.6
1.2
1.5
1.2
24
P6-422-522
05 QFA 01BR911
804
1.35
0.9
1.8
2.25
1.8
25
P6-422-522
05 QFA 01BR912
805
0.9
0.6
1.2
1.5
1.2
26
P6-422-522
05 QFA 01BR913
806
1.35
0.9
1.8
2.25
1.8
27
P6-422-522
05 QFA 01BR914
807
1.35
0.9
1.8
2.25
1.8
28
P6-422-522
05 QFA 01BR915
808
1.35
0.9
1.8
2.25
1.8
29
P6-422-522
05 QFA 01BR916
809
1.35
0.9
1.8
2.25
1.8
30
P6-422-522
05 QFA 01BR917
810
11
11
1.65
1.1
2.2
2.75
2.2
SW+SS Draw. Cut. Assemb Weld. Inspect
TWR
E)
2-2015
10%
Total
Deliv. Point
Total
%
1.5
15
100%
0.4
100%
1.4
14
100%
1.2
12
100%
0.7
100%
1.6
16
100%
1.4
14
100%
1.8
18
100%
0.4
100%
0.4
100%
1.6
16
100%
1.8
18
100%
1.4
14
100%
1.4
14
100%
10
100%
0.8
100%
0.9
100%
0.6
100%
0.6
100%
0.6
100%
0.6
100%
0.9
100%
0.6
100%
0.9
100%
0.6
100%
0.9
100%
0.9
100%
0.9
100%
0.9
100%
1.1
11
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 2.- MACHINE HOUSE
Page Spool
SW
SS
DATE: 22-02-20
TOTAL
15%
Drawing N
Line Id
P6-422-522
05 QFA 01BR918
811
14
14
P6-422-522
05 QFB 01BR204
812
28.5
28.5
P6-422-522
05 QFB 01BR204
813
22.5
22.5
P6-422-522
05 QFB 01BR206
814
19
19
2.85
P6-422-522
05 QFB 01BR207
815
14
14
P6-422-522
05 QFB 01BR208
816
P6-422-522
05 QFB 01BR212
817
P6-422-522
05 QFB 01BR213
818
P6-422-522
05 QFB 01BR218
10
P6-422-522
11
I/D
I/D
10%
20%
SW+SS Draw. Cut. Assemb
2.1
1.4
25%
Weld /
NPT
2.8
3.5
4.275 2.85
5.7
7.125
3.375 2.25
4.5
5.625
1.9
3.8
4.75
2.1
1.4
2.8
3.5
0.15
0.1
0.2
0.25
0.15
0.1
0.2
0.25
0.15
0.1
0.2
0.25
819
11
11
1.65
1.1
2.2
2.75
05 QFB 01BR218
820
10
10
1.5
2.5
P6-422-522
05 QFB 01BR219
821
11
11
1.65
1.1
2.2
2.75
12
P6-422-522
05 QFB 01BR219
822
10
10
1.5
2.5
13
P6-422-522
05 QFB 01BR220
823
11
11
1.65
1.1
2.2
2.75
14
P6-422-522
05 QFB 01BR220
824
10
10
1.5
2.5
15
P6-422-522
05 QFB 01BR223
825
15
15
2.25
1.5
3.75
16
P6-422-522
05 QFB 01BR223
826
14
14
2.1
1.4
2.8
3.5
17
P6-422-522
05 QFB 01BR223
827
17
17
2.55
1.7
3.4
4.25
18
P6-422-522
05 QFB 01BR223
828
15
15
2.25
1.5
3.75
19
P6-422-522
05 QFB 01BR224
829
19
19
2.85
1.9
3.8
4.75
20
P6-422-522
05 QFB 01BR225
830
15
15
2.25
1.5
3.75
21
P6-422-522
05 QFB 01BR231
831
12
12
1.8
1.2
2.4
22
P6-422-522
05 QFB 01BR231
832
1.35
0.9
1.8
2.25
23
P6-422-522
05 QFB 01BR232
833
13
13
1.95
1.3
2.6
3.25
24
P6-422-522
05 QFB 01BR233
834
0.15
0.1
0.2
0.25
25
P6-422-522
05 QFB 01BR242
835
21
21
3.15
2.1
4.2
5.25
26
P6-422-522
05 QFB 01BR260
836
28
28
4.2
2.8
5.6
27
P6-422-522
05 QFB 01BR260
837
32
32
4.8
3.2
6.4
28
P6-422-522
05 QFB 01BR263
838
13
13
1.95
1.3
2.6
3.25
29
P6-422-522
05 QFB 01BR264
839
0.15
0.1
0.2
0.25
30
P6-422-522
05 QFB 01BR265
840
13
13
1.95
1.3
2.6
3.25
TWR
PIPE )
E: 22-02-2015
20%
10%
Total Total
Inspect Deliv. Point
2.8
1.4
14
100%
5.7
2.85
28.5
100%
4.5
2.25
22.5
100%
3.8
1.9
19
100%
2.8
1.4
14
100%
0.2
0.1
100%
0.2
0.1
100%
0.2
0.1
100%
2.2
1.1
11
100%
10
100%
2.2
1.1
11
100%
10
100%
2.2
1.1
11
100%
10
100%
1.5
15
100%
2.8
1.4
14
100%
3.4
1.7
17
100%
1.5
15
100%
3.8
1.9
19
100%
1.5
15
100%
2.4
1.2
12
100%
1.8
0.9
100%
2.6
1.3
13
100%
0.2
0.1
100%
4.2
2.1
21
100%
5.6
2.8
28
100%
6.4
3.2
32
100%
2.6
1.3
13
100%
0.2
0.1
100%
2.6
1.3
13
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 2.- MACHINE HOUSE
Page Spool
SW
I/D
DATE: 22-02-201
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
Drawing N
Line Id
P6-422-522
05 QFB 01BR267
841
0.15
0.1
0.2
0.25
0.2
P6-422-522
05 QFB 01BR271
842
21
21
3.15
2.1
4.2
5.25
4.2
P6-422-522
05 QFB 01BR271
843
12
12
1.8
1.2
2.4
2.4
P6-422-522
05 QFB 01BR272
844
0.15
0.1
0.2
0.25
0.2
P6-422-522
05 QFB 01BR273
845
0.15
0.1
0.2
0.25
0.2
P6-422-522
05 QFB 01BR274
846
15
15
2.25
1.5
3.75
P6-422-522
05 QFB 01BR274
847
0.9
0.6
1.2
1.5
1.2
P6-422-522
05 QFB 01BR275
848
10
10
1.5
2.5
P6-422-522
05 QFB 01BR275
849
1.2
0.8
1.6
1.6
10
P6-422-522
05 QFB 01BR276
850
0.15
0.1
0.2
0.25
0.2
11
P6-422-522
05 QFB 01BR901
851
0.3
0.2
0.4
0.5
0.4
P6-422-522
05 QFB 01BR902
852
0.15
0.1
0.2
0.25
0.2
13
P6-422-522
05 QFB 01BR903
853
19
19
2.85
1.9
3.8
4.75
3.8
14
P6-422-522
05 QFB 01BR905
854
13
13
1.95
1.3
2.6
3.25
2.6
15
P6-422-522
05 QFB 01BR906
855
13
13
1.95
1.3
2.6
3.25
2.6
16
P6-422-522
05 QJA 02BR101
856
15
15
2.25
1.5
17
P6-422-522
05 QJA 02BR101
857
10.5
18
P6-422-522
05 QJA 02BR111
858
11
11
1.65
1.1
19
P6-422-522
05 QJA 02BR111
859
10
10
1.5
20
P6-422-522
05 QJA 02BR121
860
10.5
10.5 1.575 1.05
21
P6-422-522
05 QJA 02BR122
861
13.5
13.5 2.025 1.35
22
P6-422-522
05 QJA 02BR123
862
12.5
12.5 1.875 1.25
23
P6-422-522
05 QJA 02BR131
863
13.5
13.5 2.025 1.35
24
P6-422-522
05 QJA 02BR131
864
11.5
11.5 1.725 1.15
25
P6-422-522
05 QJA 02BR132
865
10
10
1.5
26
P6-422-522
05 QJA 02BR133
866
12
12
1.8
1.2
27
P6-422-522
05 QJA 02BR134
867
14
14
2.1
1.4
28
P6-422-522
05 QUA 01BR901
868
18
18
2.7
1.8
29
P6-422-522
05 QUA 01BR901
869
14
14
2.1
1.4
30
P6-422-522
05 QUA 01BR902
870
0.6
0.4
10.5 1.575 1.05
TWR
E)
2-2015
10%
Total Total
Deliv. Point
0.1
100%
2.1
21
100%
1.2
12
100%
0.1
100%
0.1
100%
1.5
15
100%
0.6
100%
90%
0.8
100%
0.1
100%
0.2
100%
0.1
100%
1.9
19
100%
1.3
13
100%
1.3
13
100%
3.75
25%
2.625 25%
2.75
25%
2.5
25%
2.625 25%
3.375 25%
3.125 25%
3.375 25%
2.875 25%
2.5
25%
25%
3.5
25%
4.5
25%
3.5
25%
25%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 2.- MACHINE HOUSE
SS
I/D
TOTAL
15%
10%
20%
25%
20%
Drawing N
P6-422-522
05 SGA 02BR901 871
0.9
0.6
1.2
1.5
1.2
P6-422-522
05 SGA 02BR901 872
0.9
0.6
1.2
1.5
1.2
P6-422-522
05 SGA 02BR909 873
0.6
0.4
0.8
0.8
P6-422-522
05 SGA 02BR910 874
0.75
0.5
1.25
P6-422-522
05 SGA 02BR911 875
0.75
0.5
1.25
P6-422-522
05 SGA 02BR911 876
0.45
0.3
0.6
0.75
0.6
P6-422-522
05 SGA 02BR912 877
0.6
0.4
0.8
0.8
P6-422-522
05 SGA 02BR914 878
0.75
0.5
1.25
P6-422-522
05 SGA 02BR915 879
0.9
0.6
1.2
1.5
1.2
10
P6-422-522
05 SGA 02BR916 880
1.2
0.8
1.6
1.6
11
P6-422-522
05 SGA 02BR917 881
1.2
0.8
1.6
1.6
12
P6-422-522
05 SGC 01BR111 882
0.9
0.6
1.2
1.5
1.2
13
P6-422-522
05 SGC 01BR111 883
11
11
1.65
1.1
2.2
2.75
2.2
14
P6-422-522
05 SGC 01BR111 884
1.2
0.8
1.6
1.6
15
P6-422-522
05 SGC 01BR111 885
1.05
0.7
1.4
1.75
1.4
16
P6-422-522
05 SGC 01BR111 886
1.05
0.7
1.4
1.75
1.4
17
P6-422-522
05 SGC 01BR301 887
0.75
0.5
1.25
18
P6-422-522
05 SGC 01BR302 888
0.6
0.4
0.8
0.8
19
P6-422-522
05 SGC 01BR303 889
1.05
0.7
1.4
1.75
1.4
20
P6-422-522
05 SGC 01BR304 890
0.9
0.6
1.2
1.5
1.2
21
P6-422-522
05 SGC 01BR801 891
0.3
0.2
0.4
0.5
0.4
22
P6-422-522
05 SGC 01BR902 892
1.35
0.9
1.8
2.25
1.8
23
P6-422-522
05 SGC 01BR903 893
0.75
0.5
1.25
24
P6-422-522
05 SGC 01BR904 894
0.9
0.6
1.2
1.5
1.2
25
P6-422-522
05 HJF 30BR111
895
16
16
2.4
1.6
26
P6-422-522
05 HJF 30BR111
896
1.35
0.9
27
P6-422-522
05 SGC 01BR905 897
0.9
0.6
1.2
1.5
1.2
28
P6-422-522
05 SGC 01BR906 898
0.9
0.6
1.2
1.5
1.2
29
P6-422-522
05 SGC 01BR907 899
0.6
0.4
0.8
0.8
30
P6-422-522
05 SGC 01BR908 900
0.6
0.4
0.8
0.8
31
P6-422-522
05 QEA 01BR905 913
11
1.65
1.1
2.2
2.75
2.2
TOTAL
Page Spool
SW
I/D
Material Galv.
Line Id
DATE: 22-02-2015
11
SW+SS Draw. Cut. Assemb Weld. Inspect
2801 6362 1226 7588
TWR
Material A335 P22
Material Grado C
Material Grado B
Material A335 P11
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.6
100%
0.6
100%
0.4
100%
0.5
100%
0.5
100%
0.3
100%
0.4
100%
0.5
100%
0.6
100%
0.8
100%
0.8
100%
0.6
100%
1.1
11
100%
0.8
100%
0.7
100%
0.7
100%
0.5
100%
0.4
100%
0.7
100%
0.6
100%
0.2
100%
0.9
100%
0.5
100%
0.6
100%
25%
2.25
25%
0.6
100%
0.6
100%
0.4
100%
0.4
100%
1.1
11
100%
6488
85%
Material Inoxidable
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
SS
TOTAL
15%
10%
20%
I/D SW+SS Draw. Cut. Assemb
25%
20%
Weld /
NPT
Inspect
P6-422-525 B5 HHM 10BR903 301
12
12
1.8
1.2
2.4
P6-422-525 B5 HHM 10BR903 302
13
13
1.95
1.3
2.6
3.25
P6-422-525 B5 HHM 10BR904 303
0.15
0.1
0.2
0.25
P6-422-525 B5 HHM 10BR905 304
0.15
0.1
0.2
0.25
P6-422-525 B5 HHM 10BR906 305
11
11
1.65
1.1
2.2
2.75
P6-422-525 B5 HHM 10BR906 306
10
10
1.5
2.5
P6-422-525 B5 HHM 10BR907 307
0.15
0.1
0.2
0.25
P6-422-525 B5 HHM 10BR908 308
0.3
0.2
0.4
0.5
P6-422-525
B5 HJF 30BR102
309
16
16
2.4
1.6
3.2
10 P6-422-525
B5 HJF 30BR105
310
0.75
0.5
1.25
11 P6-422-525
B5 HJF 30BR111
311
14
14
2.1
1.4
2.8
3.5
12 P6-422-525
B5 HJF 30BR111
312
11
11
1.65
1.1
2.2
2.75
13 P6-422-525
B5 HJF 30BR111
313
12
12
1.8
1.2
2.4
14 P6-422-525
B5 HJF 30BR112
314
0.3
0.2
0.4
0.5
15 P6-422-525
B5 HJF 30BR801
315
0.15
0.1
0.2
0.25
16 P6-422-525
B5 HJF 30BR802
316
0.15
0.1
0.2
0.25
17 P6-422-525
B5 HJF 30BR803
317
0.3
0.2
0.4
0.5
18 P6-422-525
B5 HJF 30BR804
318
0.15
0.1
0.2
0.25
19 P6-422-525
B5 HJF 30BR901
319
0.6
0.4
0.8
20 P6-422-525
B5 HJF 30BR907
320
0.45
0.3
0.6
0.75
21 P6-422-525
B5 HJF 30BR908
321
1.05
0.7
1.4
1.75
22 P6-422-525
B5 HJF 30BR908
322
1.2
0.8
1.6
23 P6-422-525
B5 HJF 30BR909
323
13
13
1.95
1.3
2.6
3.25
24 P6-422-525
B5 HJF 30BR910
324
12
12
1.8
1.2
2.4
25 P6-422-525
B5 HJF 30BR911
325
10
10
1.5
2.5
26 P6-422-525
B5 HJN 10BR101
326
15
15
2.25
1.5
3.75
27 P6-422-525
B5 HJN 10BR101
327
10
10
1.5
2.5
28 P6-422-525
B5 HJN 10BR102
328
12
12
1.8
1.2
2.4
2.4
29 P6-422-525
B5 HJN 10BR102
329
15
15
2.25
1.5
3.75
30 P6-422-525
B5 HJN 10BR102
330
15
15
2.25
1.5
3.75
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
8.4
70%
9.1
70%
0.7
70%
0.7
70%
7.7
70%
70%
0.7
70%
1.4
70%
11.2
70%
3.5
70%
9.8
70%
7.7
70%
8.4
70%
1.4
70%
0.7
70%
0.7
70%
1.4
70%
0.7
70%
2.8
70%
2.1
70%
4.9
70%
5.6
70%
9.1
70%
8.4
70%
70%
1.5
15
100%
10
100%
1.2
12
100%
1.5
15
100%
1.5
15
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
DATE: 22-02-2015
SW
I/D
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 HJN 10BR103
331
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 HJN 10BR104
332
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 HJN 10BR105
333
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 HJN 10BR106
334
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 HJN 10BR801
335
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 HJN 10BR802
336
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 HJN 10BR803
337
0.3
0.2
0.4
0.5
0.4
P6-422-525
B5 HJN 10BR901
338
16
16
2.4
1.6
3.2
3.2
P6-422-525
B5 HJN 10BR901
339
10
10
1.5
2.5
10 P6-422-525
B5 HLA 02BR801
340
14
2.1
1.4
2.8
3.5
11 P6-422-525
B5 HLA 02BR802
341
0.15
12 P6-422-525
B5 HLA 05BR801
342
0.15
13 P6-422-525
B5 HLA 05BR802
343
0.45
0.3
0.6
0.75
14 P6-422-525
B5 HLA 05BR803
344
0.45
0.3
0.6
0.75
15 P6-422-525
B5 HLA 05BR804
345
0.15
16 P6-422-525
B5 HLA 05BR805
346
0.75
0.5
1.25
17 P6-422-525
B5 HLA 05BR806
347
0.45
0.3
0.6
0.75
18 P6-422-525
B5 HLA 05BR807
348
0.15
19 P6-422-525
B5 HLA 08BR801
349
0.15
0.1
0.2
0.25
20 P6-422-525
B5 HLC 01BR901
350
0.3
0.2
0.4
0.5
21 P6-422-525
B5 HLC 01BR902
351
0.75
0.5
1.25
22 P6-422-525
B5 HNA 03BR801
352
0.15
0.1
0.2
0.25
23 P6-422-525
B5 HNF 01BR801
353
10
10
1.5
2.5
24 P6-422-525
B5 HNF 01BR802
354
10
10
1.5
2.5
25 P6-422-525
B5 HSA 01BR101
355
34
34
5.1
3.4
6.8
8.5
26 P6-422-525
B5 HSA 01BR101
356
24.5
24.5
4.9
6.125
27 P6-422-525
B5 HSA 01BR102
357
16
16
2.4
1.6
3.2
28 P6-422-525
B5 HSA 01BR801
358
0.3
0.2
0.4
0.5
29 P6-422-525
B5 HSA 01BR802
359
0.15
30 P6-422-525
B5 HSA 01BR803
360
0.15
14
3.675 2.45
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.1
100%
0.1
100%
0.1
100%
0.1
100%
0.1
100%
0.1
100%
0.2
100%
1.6
16
100%
10
100%
9.8
70%
0.15
0.15
2.1
70%
2.1
70%
0.15
3.5
70%
2.1
70%
0.15
0.7
70%
1.4
70%
3.5
70%
0.7
70%
70%
70%
23.8
70%
17.15
70%
11.2
70%
1.4
70%
0.15
0.15
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 PGA 01BR942
721
0.6
P6-422-525
B5 PGA 01BR943
722
0.6
P6-422-525
B5 PGA 01BR944
723
0.6
P6-422-525
B5 PGA 02BR408
724
23
23
3.45
P6-422-525
B5 PGA 02BR425
725
14
14
2.1
P6-422-525
B5 PGA 02BR426
726
11.5
11.5
1.725
P6-422-525
B5 PGA 02BR427
727
8.5
8.5
1.275
P6-422-525
B5 PGA 02BR428
728
10.5
10.5
1.575
P6-422-525
B5 PGA 02BR429
729
0.6
10 P6-422-525
B5 PGA 02BR430
730
1.35
11 P6-422-525
B5 PGA 02BR431
731
19.5
19.5
2.925
12 P6-422-525
B5 PGA 02BR431
732
21
21
3.15
13 P6-422-525
B5 PGA 02BR431
733
19.5
19.5
2.925
14 P6-422-525
B5 PGA 02BR932
734
0.3
15 P6-422-525
B5 PGA 02BR933
735
0.3
16 P6-422-525
B5 PGA 02BR941
736
0.75
17 P6-422-525
B5 QEB 01BR310
737
20
20
18 P6-422-525
B5 QEB 01BR311
738
22
22
3.3
2.2
4.4
5.5
4.4
19 P6-422-525
B5 QEB 01BR311
739
1.2
0.8
1.6
1.6
20 P6-422-525
B5 QEB 01BR312
740
10
10
1.5
2.5
21 P6-422-525
B5 QEB 01BR313
741
12
12
1.8
1.2
2.4
2.4
22 P6-422-525
B5 QEB 01BR313
742
11
11
1.65
1.1
2.2
2.75
2.2
23 P6-422-525
B5 QEB 01BR314
743
13
13
1.95
1.3
2.6
3.25
2.6
24 P6-422-525
B5 QEB 01BR315
744
12
12
1.8
1.2
2.4
2.4
25 P6-422-525
B5 QEB 01BR315
745
1.35
0.9
1.8
2.25
1.8
26 P6-422-525
B5 QEB 01BR316
746
13
13
1.95
1.3
2.6
3.25
2.6
27 P6-422-525
B5 QEB 01BR317
747
12
12
1.8
1.2
2.4
2.4
28 P6-422-525
B5 QEB 01BR317
748
1.35
0.9
1.8
2.25
1.8
29 P6-422-525
B5 QEB 01BR318
749
13
13
1.95
1.3
2.6
3.25
2.6
30 P6-422-525
B5 QEB 01BR319
750
12
12
1.8
1.2
2.4
2.4
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.6
15%
0.6
15%
0.6
15%
3.45
15%
2.1
15%
1.725
15%
1.275
15%
1.575
15%
0.6
15%
1.35
15%
2.925
15%
3.15
15%
2.925
15%
0.3
15%
0.3
15%
0.75
15%
20
100%
2.2
22
100%
0.8
100%
10
100%
1.2
12
100%
1.1
11
100%
1.3
13
100%
1.2
12
100%
0.9
100%
1.3
13
100%
1.2
12
100%
0.9
100%
1.3
13
100%
1.2
12
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 QEB 01BR319
751
1.35
0.9
1.8
2.25
1.8
P6-422-525
B5 QEB 01BR320
752
13
13
1.95
1.3
2.6
3.25
2.6
P6-422-525
B5 QEB 01BR321
753
12
12
1.8
1.2
2.4
2.4
P6-422-525
B5 QEB 01BR321
754
12
12
1.8
1.2
2.4
2.4
P6-422-525
B5 QEB 01BR322
755
16
16
2.4
P6-422-525
B5 QEB 01BR322
756
1.2
0.8
1.6
1.6
P6-422-525
B5 QEB 01BR323
757
11
11
1.65
1.1
2.2
2.75
2.2
P6-422-525
B5 QEB 01BR323
758
1.35
0.9
1.8
2.25
1.8
P6-422-525
B5 QEB 01BR324
759
0.75
0.5
1.25
10 P6-422-525
B5 QEB 01BR325
760
0.75
0.5
1.25
11 P6-422-525
B5 QEB 01BR326
761
10
10
1.5
12 P6-422-525
B5 QEB 01BR327
762
16
16
2.4
1.6
3.2
3.2
13 P6-422-525
B5 QEB 01BR328
763
0.75
14 P6-422-525
B5 QEB 01BR329
764
1.35
0.9
1.8
2.25
1.8
15 P6-422-525
B5 QEB 01BR330
765
20
20
16 P6-422-525
B5 QEB 01BR330
766
1.35
0.9
1.8
2.25
1.8
17 P6-422-525
B5 QEB 01BR330
767
1.2
0.8
1.6
1.6
18 P6-422-525
B5 QEB 01BR331
768
0.9
0.6
1.2
1.5
1.2
19 P6-422-525
B5 QEB 01BR332
769
0.9
0.6
20 P6-422-525
B5 QEB 01BR333
770
18
18
2.7
1.8
21 P6-422-525
B5 QEB 01BR333
771
0.9
0.6
1.2
1.5
1.2
22 P6-422-525
B5 QEB 01BR334
772
1.05
0.7
1.4
1.75
1.4
23 P6-422-525
B5 QEB 01BR335
773
1.35
0.9
1.8
2.25
1.8
24 P6-422-525
B5 QEB 01BR336
774
10
10
1.5
2.5
25 P6-422-525
B5 QEB 01BR336
775
0.9
0.6
1.2
1.5
1.2
26 P6-422-525
B5 QEB 01BR336
776
1.35
0.9
1.8
2.25
1.8
27 P6-422-525
B5 QEB 01BR336
777
1.35
0.9
1.8
2.25
1.8
28 P6-422-525
B5 QEB 01BR337
778
0.6
0.4
0.8
0.8
29 P6-422-525
B5 QEB 01BR338
779
1.05
0.7
1.4
1.75
1.4
30 P6-422-525
B5 QEB 01BR338
780
0.6
0.4
0.8
0.8
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.9
100%
1.3
13
100%
1.2
12
100%
1.2
12
100%
2.4
15%
0.8
100%
1.1
11
100%
0.9
100%
0.5
100%
0.5
100%
1.5
15%
16
100%
0.75
15%
0.9
100%
20
100%
0.9
100%
0.8
100%
0.6
100%
1.5
25%
4.5
25%
0.6
100%
0.7
100%
0.9
100%
10
100%
0.6
100%
0.9
100%
0.9
100%
0.4
100%
0.7
100%
0.4
100%
1.6
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 QEB 01BR338
781
0.75
0.5
1.25
P6-422-525
B5 QEB 01BR338
782
0.75
0.5
1.25
P6-422-525
B5 QEB 01BR338
783
1.35
0.9
1.8
2.25
1.8
P6-422-525
B5 QEB 01BR338
784
0.6
0.4
0.8
0.8
P6-422-525
B5 QEB 01BR339
785
0.6
0.4
0.8
0.8
P6-422-525
B5 QEB 01BR345
786
15
15
2.25
1.5
3.75
P6-422-525
B5 QEB 01BR345
787
0.9
0.6
1.2
1.5
1.2
P6-422-525
B5 QEB 01BR351
788
1.2
0.8
1.6
1.6
P6-422-525
B5 QEB 01BR354
789
13
13
1.95
1.3
2.6
3.25
2.6
10 P6-422-525
B5 QEB 01BR355
790
1.35
0.9
1.8
2.25
1.8
11 P6-422-525
B5 QEB 01BR356
791
11
11
1.65
1.1
2.2
2.75
2.2
12 P6-422-525
B5 QEB 01BR360
792
14
14
2.1
1.4
2.8
3.5
2.8
13 P6-422-525
B5 QEB 01BR360
793
1.35
0.9
1.8
2.25
1.8
14 P6-422-525
B5 QEB 01BR361
794
1.05
0.7
1.4
1.75
1.4
15 P6-422-525
B5 QEB 01BR362
795
1.2
0.8
1.6
1.6
16 P6-422-525
B5 QEB 01BR363
796
16
16
2.4
1.6
3.2
3.2
17 P6-422-525
B5 QEB 01BR363
797
11
11
1.65
1.1
2.2
2.75
2.2
18 P6-422-525
B5 QEB 01BR370
798
11
11
1.65
1.1
2.2
2.75
2.2
19 P6-422-525
B5 QEB 01BR377
799
16
16
2.4
1.6
3.2
3.2
20 P6-422-525
B5 QEB 01BR377
800
1.35
0.9
1.8
2.25
1.8
21 P6-422-525
B5 QEB 01BR378
801
10
10
1.5
2.5
22 P6-422-525
B5 QEB 01BR379
802
15.5
15.5
3.1
3.875
3.1
23 P6-422-525
B5 QEB 01BR379
803
10
10
2.5
24 P6-422-525
B5 QEB 01BR387
804
9.5
9.5
1.9
2.375
1.9
25 P6-422-525
B5 QEB 01BR387
805
1.2
0.8
1.6
1.6
26 P6-422-525
B5 QEB 01BR390
806
18
18
2.7
1.8
3.6
4.5
3.6
27 P6-422-525
B5 QEB 01BR390
807
34
34
5.1
3.4
6.8
8.5
6.8
28 P6-422-525
B5 QEB 01BR390
808
18.5
18.5
3.7
4.625
3.7
29 P6-422-525
B5 QEB 01BR390
809
15
15
2.25
1.5
3.75
30 P6-422-525
B5 QEB 01BR395
810
13
13
1.95
1.3
2.6
3.25
2.6
2.325 1.55
1.5
1.425 0.95
2.775 1.85
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.5
100%
0.5
100%
0.9
100%
0.4
100%
0.4
100%
1.5
15
100%
0.6
100%
0.8
100%
1.3
13
100%
0.9
100%
1.1
11
100%
1.4
14
100%
0.9
100%
0.7
100%
0.8
100%
1.6
16
100%
1.1
11
100%
1.1
11
100%
1.6
16
100%
0.9
100%
10
100%
1.55
15.5
100%
10
100%
0.95
9.5
100%
0.8
100%
1.8
18
100%
3.4
34
100%
1.85
18.5
100%
1.5
15
100%
1.3
13
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 QEB 01BR395
811
1.2
0.8
1.6
1.6
P6-422-525
B5 QEB 01BR396
812
15
15
2.25
1.5
3.75
P6-422-525
B5 QEB 01BR396
813
13
13
1.95
1.3
2.6
3.25
2.6
P6-422-525
B5 QEB 01BR397
814
16
16
2.4
1.6
3.2
3.2
P6-422-525
B5 QEB 01BR397
815
0.75
0.5
1.25
P6-422-525
B5 QEB 01BR398
816
18
18
2.7
1.8
3.6
4.5
3.6
P6-422-525
B5 QEB 01BR398
817
12
12
1.8
1.2
2.4
2.4
P6-422-525
B5 QEB 01BR401
818
13
13
1.95
1.3
P6-422-525
B5 QEB 01BR402
819
10.5
10.5
1.575 1.05
10 P6-422-525
B5 QEB 01BR403
820
14.5
14.5
2.175 1.45
11 P6-422-525
B5 QEB 01BR404
821
14.5
14.5
2.175 1.45
12 P6-422-525
B5 QEB 01BR405
822
14.5
14.5
2.175 1.45
13 P6-422-525
B5 QEB 01BR406
823
0.9
0.6
14 P6-422-525
B5 QEB 01BR406
824
12
12
1.8
1.2
15 P6-422-525
B5 QEB 01BR408
825
0.9
0.6
16 P6-422-525
B5 QEB 01BR409
826
14.5
14.5
2.175 1.45
17 P6-422-525
B5 QEB 01BR410
827
14.5
14.5
2.175 1.45
18 P6-422-525
B5 QEB 01BR411
828
14.5
14.5
2.175 1.45
19 P6-422-525
B5 QEB 01BR412
829
0.9
0.6
20 P6-422-525
B5 QEB 01BR412
830
12
12
1.8
1.2
21 P6-422-525
B5 QEB 01BR413
831
0.9
0.6
22 P6-422-525
B5 QEB 01BR414
832
14.5
14.5
2.175 1.45
2.9
3.625
2.9
23 P6-422-525
B5 QEB 01BR415
833
14.5
14.5
2.175 1.45
24 P6-422-525
B5 QEB 01BR416
834
14.5
14.5
2.175 1.45
25 P6-422-525
B5 QEB 01BR417
835
0.9
0.6
26 P6-422-525
B5 QEB 01BR417
836
12
12
1.8
1.2
2.4
2.4
27 P6-422-525
B5 QEB 01BR915
837
19
19
2.85
1.9
3.8
4.75
3.8
28 P6-422-525
B5 QEB 01BR916
838
0.3
0.2
0.4
0.5
0.4
29 P6-422-525
B5 QEB 01BR917
839
0.6
0.4
0.8
0.8
30 P6-422-525
B5 QFB 01BR310
840
32
32
4.8
3.2
6.4
6.4
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.8
100%
1.5
15
100%
1.3
13
100%
1.6
16
100%
0.5
100%
1.8
18
100%
1.2
12
100%
3.25
25%
2.625
25%
3.625
25%
3.625
25%
3.625
25%
1.5
25%
25%
1.5
25%
3.625
25%
3.625
25%
3.625
25%
1.5
25%
25%
1.5
25%
14.5
100%
3.625
25%
3.625
25%
1.5
25%
1.2
12
100%
1.9
19
100%
0.2
100%
0.4
100%
3.2
32
100%
1.45
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 QFB 01BR310
841
0.9
0.6
1.2
1.5
1.2
P6-422-525
B5 QFB 01BR310
842
20
20
P6-422-525
B5 QFB 01BR311
843
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 QFB 01BR312
844
0.3
0.2
0.4
0.5
0.4
P6-422-525
B5 QFB 01BR313
845
0.3
0.2
0.4
0.5
0.4
P6-422-525
B5 QFB 01BR315
846
0.3
0.2
0.4
0.5
0.4
P6-422-525
B5 QFB 01BR316
847
14
14
2.1
1.4
2.8
3.5
2.8
P6-422-525
B5 QFB 01BR317
848
0.6
0.4
0.8
0.8
P6-422-525
B5 QFB 01BR318
849
20
20
10 P6-422-525
B5 QFB 01BR318
850
10
10
1.5
2.5
11 P6-422-525
B5 QFB 01BR318
851
10
10
1.5
2.5
12 P6-422-525
B5 QFB 01BR319
852
0.15
0.1
0.2
0.25
13 P6-422-525
B5 QFB 01BR321
853
0.15
0.1
0.2
0.25
14 P6-422-525
B5 QFB 01BR322
854
0.15
0.1
0.2
0.25
15 P6-422-525
B5 QFB 01BR323
855
0.15
0.1
0.2
0.25
16 P6-422-525
B5 QFB 01BR330
856
21
21
3.15
2.1
4.2
5.25
4.2
17 P6-422-525
B5 QFB 01BR330
857
12
12
1.8
1.2
2.4
2.4
18 P6-422-525
B5 QFB 01BR331
858
0.9
0.6
1.2
1.5
1.2
19 P6-422-525
B5 QFB 01BR332
859
13
13
1.95
1.3
2.6
3.25
2.6
20 P6-422-525
B5 QFB 01BR333
860
14
14
2.1
1.4
2.8
3.5
2.8
21 P6-422-525
B5 QFB 01BR334
861
11
11
1.65
1.1
2.2
2.75
2.2
22 P6-422-525
B5 QFB 01BR335
862
12
12
1.8
1.2
2.4
2.4
23 P6-422-525
B5 QFB 01BR335
863
1.2
0.8
1.6
1.6
24 P6-422-525
B5 QFB 01BR340
864
22
22
3.3
2.2
4.4
5.5
4.4
25 P6-422-525
B5 QFB 01BR340
865
13
13
1.95
1.3
26 P6-422-525
B5 QFB 01BR340
866
19
19
2.85
1.9
3.8
4.75
3.8
27 P6-422-525
B5 QFB 01BR341
867
1.35
0.9
1.8
2.25
1.8
28 P6-422-525
B5 QFB 01BR344
868
16
16
2.4
1.6
3.2
3.2
29 P6-422-525
B5 QFB 01BR344
869
17
17
2.55
1.7
3.4
4.25
3.4
30 P6-422-525
B5 QFB 01BR349
870
0.45
0.3
0.6
0.75
0.6
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.6
100%
0.2
18.2
91%
0.1
100%
0.2
100%
0.2
100%
0.2
100%
1.4
14
100%
0.4
100%
20
100%
10
100%
10
100%
0.7
70%
0.7
70%
0.7
70%
0.7
70%
2.1
21
100%
1.2
12
100%
0.6
100%
1.3
13
100%
1.4
14
100%
1.1
11
100%
1.2
12
100%
0.8
100%
2.2
22
100%
3.25
25%
1.9
19
100%
0.9
100%
1.6
16
100%
1.7
17
100%
0.3
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-2015
25%
20%
SS TOTAL 15% 10% 20%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 QFB 01BR351
871
0.45
0.3
0.6
0.75
0.6
P6-422-525
B5 QFB 01BR352
872
12
12
1.8
1.2
2.4
2.4
P6-422-525
B5 QFB 01BR352
873
1.35
0.9
1.8
2.25
1.8
P6-422-525
B5 QFB 01BR353
874
10
10
1.5
2.5
P6-422-525
B5 QFB 01BR354
875
17
17
2.55
1.7
3.4
4.25
3.4
P6-422-525
B5 QFB 01BR355
876
0.15
0.1
0.2
0.25
0.2
P6-422-525
B5 QFB 01BR356
877
1.35
0.9
1.8
2.25
1.8
P6-422-525
B5 QFB 01BR357
878
16
16
2.4
1.6
3.2
3.2
P6-422-525
B5 QFB 01BR357
879
10
10
1.5
10 P6-422-525
B5 QFB 01BR358
880
1.05
0.7
1.4
1.75
1.4
11 P6-422-525
B5 QFB 01BR359
881
10
10
1.5
2.5
12 P6-422-525
B5 QFB 01BR359
882
0.9
0.6
1.2
1.5
1.2
13 P6-422-525
B5 QFB 01BR362
883
18
18
2.7
1.8
3.6
4.5
3.6
14 P6-422-525
B5 QFB 01BR362
884
10
10
1.5
2.5
15 P6-422-525
B5 QFB 01BR367
885
0.45
0.3
0.6
0.75
0.6
16 P6-422-525
B5 QFB 01BR368
886
0.15
0.1
0.2
0.25
0.2
17 P6-422-525
B5 QFB 01BR369
887
0.15
0.1
0.2
0.25
0.2
18 P6-422-525
B5 QFB 01BR370
888
1.2
0.8
1.6
1.6
19 P6-422-525
B5 QFB 01BR371
889
0.3
0.2
0.4
0.5
0.4
20 P6-422-525
B5 QFB 01BR372
890
13
13
1.95
1.3
2.6
3.25
2.6
21 P6-422-525
B5 QFB 01BR373
891
16
16
2.4
1.6
3.2
3.2
22 P6-422-525
B5 QFB 01BR374
892
13
13
1.95
1.3
2.6
3.25
2.6
23 P6-422-525
B5 QFB 01BR374
893
1.05
0.7
1.4
1.75
1.4
24 P6-422-525
B5 QFB 01BR375
894
11
11
1.65
1.1
2.2
2.75
2.2
25 P6-422-525
B5 QFB 01BR375
895
13
13
1.95
1.3
2.6
3.25
2.6
26 P6-422-525
B5 QFB 01BR375
896
15
15
2.25
1.5
3.75
27 P6-422-525
B5 QFB 01BR375
897
12
12
1.8
1.2
2.4
2.4
28 P6-422-525
B5 QFB 01BR376
898
16
16
2.4
1.6
3.2
3.2
29 P6-422-525
B5 QFB 01BR376
899
11
11
1.65
1.1
2.2
2.75
2.2
30 P6-422-525
B5 QFB 01BR376
900
0.9
0.6
1.2
1.5
1.2
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.3
100%
1.2
12
100%
0.9
100%
10
100%
1.7
17
100%
0.1
100%
0.9
100%
1.6
16
100%
2.5
25%
0.7
100%
10
100%
0.6
100%
1.8
18
100%
10
100%
0.3
100%
0.1
100%
0.1
100%
0.8
100%
0.2
100%
1.3
13
100%
1.6
16
100%
1.3
13
100%
0.7
100%
1.1
11
100%
1.3
13
100%
1.5
15
100%
1.2
12
100%
1.6
16
100%
1.1
11
100%
0.6
100%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
DATE: 22-02-2015
SW
I/D
P
20%
25%
20%
SS TOTAL 15%
I/D SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 QFB 01BR377
901
13
13
1.95
1.3
2.6
3.25
2.6
P6-422-525
B5 QFB 01BR378
902
18
18
2.7
1.8
3.6
4.5
3.6
P6-422-525
B5 QFB 01BR378
903
1.2
0.8
1.6
1.6
P6-422-525
B5 QFB 01BR379
904
1.05
0.7
P6-422-525
B5 QFB 01BR380
905
12
12
1.8
1.2
2.4
2.4
P6-422-525
B5 QFB 01BR382
906
0.9
0.6
1.2
1.5
1.2
P6-422-525
B5 QFB 01BR383
907
13
13
1.95
1.3
2.6
3.25
2.6
P6-422-525
B5 QFB 01BR390
908
12
12
1.8
1.2
2.4
2.4
P6-422-525
B5 QFB 01BR801
909
0.9
0.6
1.2
1.5
1.2
10 P6-422-525
B5 QFB 01BR911
910
18
18
2.7
1.8
3.6
4.5
3.6
11 P6-422-525
B5 QFB 01BR913
911
0.3
0.2
0.4
0.5
0.4
12 P6-422-525
B5 QFB 01BR914
912
0.6
0.4
0.8
0.8
13 P6-422-525
B5 QFB 01BR915
913
12
12
1.8
14 P6-422-525
B5 QFB 01BR915
914
11
11
1.65
15 P6-422-525
B5 QFB 01BR915
915
1.2
16 P6-422-525
B5 QFB 01BR916
916
1.35
17 P6-422-525
B5 QJA 01BR102
917
4.5
4.5
0.675
18 P6-422-525
B5 QJA 01BR103
918
0.15
19 P6-422-525
B5 QJA 01BR801
919
0.15
20 P6-422-525
B5 QJA 01BR901
920
0.15
21 P6-422-525
B5 QJA 02BR101
921
10.5
10.5
1.575
22 P6-422-525
B5 QJA 03BR101
922
13.5
13.5
2.025
23 P6-422-525
B5 QJA 03BR101
923
13.5
13.5
2.025
24 P6-422-525
B5 QJA 03BR101
924
18
18
2.7
25 P6-422-525
B5 QJA 03BR101
925
16.5
16.5
2.475
26 P6-422-525
B5 QJA 03BR121
926
1.5
1.5
0.225
27 P6-422-525
B5 QJA 03BR131
927
0.9
0.6
1.2
1.5
28 P6-422-525
B5 QJA 04BR101
928
12.5
12.5
1.875
29 P6-422-525
B5 QJA 04BR101
929
10
10
1.5
30 P6-422-525
B5 QJA 04BR101
930
10
10
1.5
TWR
PE )
2-2015
10%
Total
Deliv. Point
Total
%
1.3
13
100%
1.8
18
100%
0.8
100%
1.75
25%
1.2
12
100%
0.6
100%
1.3
13
100%
1.2
12
100%
0.6
100%
1.8
18
100%
0.2
100%
0.4
100%
1.8
15%
1.65
15%
1.2
15%
1.35
15%
0.675
15%
0.15
8%
0.15
8%
0.15
8%
1.575
15%
2.025
15%
2.025
15%
2.7
15%
2.475
15%
0.225
15%
4.2
70%
1.875
15%
1.5
15%
1.5
15%
CONTROL PREFABRICATION PIPING ( SMALL PIPE )
ISOMETRIC DRAWING: 3.- BOILER
N Drawing N
Line Id
Page Spool
SW
I/D
DATE: 22-02-201
SS
I/D
TOTAL
15%
10%
20%
25%
20%
SW+SS Draw. Cut. Assemb Weld. Inspect
P6-422-525
B5 SGA 02BR902
931
0.9
0.6
1.2
1.5
1.2
P6-422-525
B5 SGA 02BR903
932
0.6
0.4
0.8
0.8
P6-422-525
B5 SGA 02BR907
933
0.75
0.5
1.25
TOTAL
2686 6110 1744 7854
TWR
Material Grado B
Material Grado C
Material A335 P11
Material Inoxidable
Material A335 P22
Material Galvanizado
PE )
2-2015
10%
Total
Deliv. Point
Total
%
0.6
100%
0.4
100%
0.5
100%
5947
76%