INPUT DATA
BUILDING DATA
Ground Floor Area
M2
Typical Floor Area
M2
No.of Floors (Ground+Typical)
MATRIAL PRICE DATA
Sand
M3
Gravel
M3
Cement
Ton
Steel Reinforcement
Ton
Masonry (25*12*6) cm
1000Block
NOTE Material Price
Shown are just for guide you can change them
All result without earthworks cost
0
0
0
30
100
850
4800
400
OUTPUT DATA
Ground Floor Concrete Works
Ground Floor Finishing Works
Total Ground Floor Cost
EGP
EGP
EGP
Typical Floor Concrete Works
Typical Floor Finishing Works
Total Typical Floor Cost
EGP
EGP
EGP
Total Cost Concrete Works
Total Cost Finishing Works
Total Cost Concrete+Finishing
EGP
EGP
EGP
NOTE Finshing include
(Masonry-Internal Plaster-Wood frames-Plumbing
conduits-Electricity main cables, main distribution board
,conduit without wires)
NOTE Concrete
Up to 6 floors , Isolated Footings system is used
More than 6 floors, Raft Foundation system is used