0% found this document useful (0 votes)
56 views6 pages

Rate Analysis for Brickwork and Plaster

1. The document provides a rate analysis for standard and wire-cut brickwork, plastering, and painting of walls for ground, first, and second floors. 2. It includes quantities, rates, and total costs for materials and labor for each item and floor. For example, the total cost for 10 sqm of standard brickwork in the ground floor is Rs. 17,995.90. 3. A cost comparison table shows that the total cost per sqm is lowest for wire-cut brickwork compared to standard brickwork for all floors. For example, in the ground floor it is Rs. 2,776.84 per sqm for wire-cut brickwork vs Rs. 3,

Uploaded by

chanakawid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views6 pages

Rate Analysis for Brickwork and Plaster

1. The document provides a rate analysis for standard and wire-cut brickwork, plastering, and painting of walls for ground, first, and second floors. 2. It includes quantities, rates, and total costs for materials and labor for each item and floor. For example, the total cost for 10 sqm of standard brickwork in the ground floor is Rs. 17,995.90. 3. A cost comparison table shows that the total cost per sqm is lowest for wire-cut brickwork compared to standard brickwork for all floors. For example, in the ground floor it is Rs. 2,776.84 per sqm for wire-cut brickwork vs Rs. 3,

Uploaded by

chanakawid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

1

RATE ANALYSIS
DESCRIPTION OF THE WORK

ITEM

Standard Brickwork

DESCRIPTION OF ITEM

UNIT

QUANTITY

RATE (Rs)

Data for standard brickwork in 1:6 cement sand mortar in 220mm thick walls in g

Labor

Material

Labor

Material

Material

Labour

Material

Labour

Skilled Labor (SK)


Unskilled Labour(U/SK)
Allow 3% on labour for tools
Allow 3% on scaffolding
Cement
Sand
Bricks (1000 s)
(A) Total cost for brick work

Day
Day

2.40
4.05

1,000.00
800.00

50kg Bags
m3
Nos

3.25
0.60
1.25

750.00
1,800.00
6,800.00

Data for 15mm thick to walls in 1:1:5 lime-cement-sand mortar finished smooth w
(Internally)
Skilled Labor (SK)
Day
1.61
1,000.00
Unskilled Labour(U/SK)
Day
1.61
800.00
Allow 2.5% on labour for tools
Allow 2.5% on scaffolding
Cement
50kg Bags
Sand
m3
Lime
m3
(b1) Cost for internal Plaster
Use 90% of cost of internal plaster rate for external wall
(B) Total cost for plaster

0.86
0.21
0.04

750.00
1,800.00
7,600.00

Data for Painting.


Paint internal walls with primer and two coats of emulation Paint
Primer
Lts
0.75
372.00
Emulsion Paint
Lts
1.51
412.00
Unskilled Labour(U/SK)
Day
Allow 3% on labour for tools & scaffolding
(c1) Cost for internal paint

2.00

Paint external walls with two coats of external emulation Paint


Emulsion Paint
Lts
1.51
Unskilled Labour(U/SK)
Day
Allow 3% on labour for tools & scaffolding

1.00

800.00

460.00
800.00

(C) Total cost for painting


=
=

1. Total cost to complete 10 m2 in ground floor (A+B+C)


Cost for 1 m2
2. Total cost to complete 10 m2 in first floor (( A+B)*1.05+C*1.03))
Cost for 1 m2

=
=

3.

Total cost to complete 10 m2 in second floor ( A*1.07+B*1.1+C*1.06)) =


Cost for 1 m2

RATE ANALYSIS
DESCRIPTION OF THE WORK
ITEM

Wire cut Brickwork

DESCRIPTION OF ITEM

UNIT

QUANTITY

RATE (Rs)

Data for standard brickwork in 1:6 cement sand mortar in 220mm thick walls in g

Labor

Material

Skilled Labor (SK)


Unskilled Labour(U/SK)
Allow 3% on labour for tools
Allow 3% on scaffolding
Cement
Sand
Bricks (1000 s)
(D) Total cost for brick work

Day
Day

2.40
4.05

1,000.00
800.00

50kg Bags
m3
Nos

2.70
0.55
1.20

750.00
1,800.00
9,880.00

Total cost to complete 10 m2 in ground floor (D+b1+c1)


4. Cost for 1 m

Total cost to complete 10 m2 in first floor (( D+b1)*1.05+c1*1.03))

5. Cost for 1 m2

Total cost to complete 10 m2 in first floor ( D*1.07+b1*1.1+c1*1.06)

6. Cost for 1 m

Cost Comparison Table

Standared brickwork

Wire-Cut
brickwork

Ground Floor

3,036.64

2,7

First Floor

3,180.34

2,9

Second floor

3,270.05

2,9

k
AMOUNT (Rs)
cement sand mortar in 220mm thick walls in ground floor (10 m 2)
2,400.00
3,240.00
169.20
169.20
2,437.50
1,080.00
8,500.00
17,995.90

17,995.90

1:5 lime-cement-sand mortar finished smooth with putty floating,(10m2)


1,610.00
1,288.00
72.45
72.45
645.00
378.00
304.00
4,369.90
3,932.91
8,302.81

4,369.90
8,302.81

279.00
622.12
1,600.00
48.00
2,549.12

2,549.12

694.60
800.00
24.00
1,518.60
4,067.72

4,067.72

30,366.43
3,036.64

3,036.64

31,803.40
3,180.34

3,180.34

32,700.49
3,270.05

3,270.05

k
AMOUNT (Rs)
cement sand mortar in 220mm thick walls in ground floor (10 m 2)
2,400.00
3,240.00
169.20
169.20
2,025.00
990.00
11,856.00
20,849.40

20,849.40

27,768.42
2,776.84

2,776.84

29,105.86
2,910.59

2,910.59

29,817.82
2,981.78

ost Comparison Table


Wire-Cut
brickwork
2,776.84
2,910.59
2,981.78

2,981.78