Test Pack Flow Chart

The document outlines the flow chart for the unit test pack process between MMG Engineering, MMG Construction, MESAR Construction, and SCEC Engineering. It shows the steps of preparing the test pack, revising drawings, conducting line checks with punch lists, clearing punch items, and final sign off and release.

Uploaded by

Hum Hum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

Test Pack Flow Chart

The document outlines the flow chart for the unit test pack process between MMG Engineering, MMG Construction, MESAR Construction, and SCEC Engineering. It shows the steps of preparing the test pack, revising drawings, conducting line checks with punch lists, clearing punch items, and final sign off and release.

Uploaded by

Hum Hum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • PO Unit/Test Pack Flowchart: This page presents a comprehensive flowchart detailing the test pack preparation steps and approval processes within PO Unit engineering and construction contexts.

PO UNIT-TEST PACK FLOW CHART

MMG Engineering

MMG Construction

MMG QA/QC

MESAR QA/QC

MESAR Const.

SCEC Engg.

Latest Drwg. Confirmation


by system wise

TP Book Preparation
Green
File
After Change Revised Drwgs in TP

Latest Drwgs to be change in TP


MESAR TP
Const.

Immediately send to
MESAR QA/QC

With Transmittal / Without Punch List

Yellow
File

MESAR TP

LINE CHECK

Contrl.
QA/QC

Copy to PMT

LINE
CHECK

MESAR QA/QC PDF

File.

LINE CHECK

Punch List

Punch List

MESAR TP
Const.

Welding
Summary
Sheets

Line Check with PMT

MESAR TP
Const.

Sign off
MMG TP

MESAR TP

Contrl.

No " HT" Punch Items

Contrl.

QA/QC

QA/QC

Yes " HT" Punch Items


MMG TP

Contrl.

FIN & Test Confirmation

QA/QC

With "HT" Punch Items (1)

"HT" Punch List

"HT" Punch List

"HT" Punch item Clearance

MESAR TP
Const.

Line Check with PMT "HT Items"

With "HT" Punch Items (2)

MESAR TP
Const.

Sign off
MMG TP

MESAR TP

Contrl.

Contrl.

QA/QC

No " HT" Punch Items

QA/QC

MMG TP

Contrl.

QA/QC

Re-instatement

MMG
Contsruction

FIN & Test Confirmation


Immediately send to
MESAR Const.

Original Test Pack

MESAR TP
Const.

"HTA" Punch
List

" HTA" Punch Item Clearance (Only Copy)


Line Check with PMT for "HTA"

With "HTA" Punch Items (Only Copy)

MMG TP

Contrl.
QA/QC

Release for
Painting &
Insulation

No "HTA" Punch items

MESAR TP
Const.

Sign Off

PO UNIT-TEST PACK FLOW CHART
e
MMG Engineering
MMG Construction
MMG QA/QC
MESAR QA/QC
After Change Revised Drwgs in TP
MESAR

You might also like