0% found this document useful (0 votes)
47 views1 page

Campus Plan Action Items Overview

This document outlines an implementation model and action items for a campus plan with items grouped under consultation, open space, land/buildings, and travel & parking. Key actions include informing neighbors of studies and plans, conducting environmental and transportation demand management studies, enhancing pathways and entries, developing a village centre and faculty housing, acquiring additional lands, and establishing plans for stormwater management and sustainable practices. Progress will be reviewed in 3-5 years with short and long-term action items determined for 2004/2005.

Uploaded by

Funmi Fabiyi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Campus Plan Action Items Overview

This document outlines an implementation model and action items for a campus plan with items grouped under consultation, open space, land/buildings, and travel & parking. Key actions include informing neighbors of studies and plans, conducting environmental and transportation demand management studies, enhancing pathways and entries, developing a village centre and faculty housing, acquiring additional lands, and establishing plans for stormwater management and sustainable practices. Progress will be reviewed in 3-5 years with short and long-term action items determined for 2004/2005.

Uploaded by

Funmi Fabiyi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Campus Plan Action Items Implementation Model

CONSULTATION In Progress
1 Inform/Update Neighbours 11. Impact Studies 13. Annual 5 Year Capital Plan 14. Liaise Local Govt 23. Stormwater Management Plan 22. Acquire Additional Lands 25. TDM Study/Report & Implementation Plan

OPEN SPACE

LAND/BUILDINGS

TRAVEL & PARKING

4. Work with Local Municipalities 5. CDC Review

To Commence 2004/05
2. Collaborative Planning Process

6. More Environmental Study 7. Restoration Projects

16. Village Centre 18. SW Quadrant 20. Sust. Practices

26. Way-Finding Study

Implementation Plans to be determined in 2004/05


8. Perimeter Enhancement 9. Pathways 10. Campus Entries

12. Outdoor Recreation 15. Faculty Housing 17. CJVI Lands 19. Sustainability Office 21. Plan Monitoring

24. BC Transit 27. Ring Road 28. Parking Lots 29. Parking Plan 30. Bicycle Storage

3. Review in 3-5 years Moratorium

November 2003

You might also like