CERTIFICATE OF TRANSFER OF CHARGE
(As per [Link].122, Dt. 10.05.1998)
HEAD QUARTERS: K .R .DAM Dated:22/10/07AN
POST: Deputy Executive Engineer
SSLC&SB Sub Division No.3,
[Link]
Order under which transfer of charge is made : Vide Procs. [Link]/
SSLC&SB/ NLR/ AB/ S2/A1/E4/1053M , Dt. 22/10/2007.
RELIEVED OFFICER
1) NAME & INITIALS : Sri [Link] Basha.
(Block letters)
2) (i) If Proceeded on leave :
(a) Duration of leave :
(b) Address during leave :
(c) And place at which salary is to :
be drawn
(ii) If retiring or if proceeding on
leave preparatory to retirement, :
and if it is proposed to draw the
P.F. Money immediately, whether
application for withdrawl of P.F.
Money has been sent to the
Accountant General
(iii) If on Transfer :
(a) Post and : Deputy Executive Engineer
(b) Station to which transfer SSLC&SB Sub Division No.4,
[Link].
3) Certified that I have brought up :
to Date all the confidential
reports and handed over to my
successor for which, I am the
initiating Officer.
4) SIGNATURE :
([Link] Basha)
::2::
RELIEVING OFFICER
6) Name & Initials (Block Letters) : SRI [Link]
7) (i) Whether returning from leave : Yes
(ii) If so, place at which orders of :
Posting were received.
(iii) If not, from what : Relieved from Full Addl., charge of
the Post of the Deputy Executive
Engineer SSLC & SB Sub
Division No.3, [Link].
(a) Post :
(b) Station transferred :
© Date of relief at old station :
8) I have to certify that I have taken :
over all the confidential reports up
to date from my predecessor.
9) SIGNATURE :
If only holding charge in addition
to other duty (K.V. RAMANA)
10) (a) Official designation of : Deputy Executive Engineer
relieving officer SSLC&SB Sub Division No.3,
[Link].
(b) Name of the Officer posted if :
known
If charge is made over or received at a station other than Head Quarters,
the name of such station should also be entered.
To
[Link].
Dated: / /2007.
1. Copy submitted to the EngineerinChief (Admn.) Irrigation department,
Errummanzil, Hyderabad for favour of information.
2. Copy submitted to the EngineerinChief ,[Link].
3. Copy submitted to the Superintending Engineer, SSLC&SB Circle, Nellore for
favor of information.
4. Copy to the Asst. Pay & Accounts Officer, TGP, Nellore for information.
5. Copy to Relieving Officer, and Relieved Officer.
6. Copy to all Executive Engineers.
7. Spare copy 2nos.
CERTIFICATE OF TRANSFER OF CHARGE
(As per [Link].122, Dt. 10.05.1998)
HEAD QUARTERS: K .R .DAM Dated: /11/07AN
POST: Deputy Executive Engineer
SSLC&SB Sub Division No.3,
[Link]
Order under which transfer of charge is made : Vide Procs. [Link]/
SSLC&SB/ NLR/ AB/ S2/A1/E4/ M , Dt. /11/2007.
RELIEVED OFFICER
1) NAME & INITIALS : Sri K.V Ramana.
(Block letters)
2) (i) If Proceeded on leave : Yes
(a) Duration of leave : One month
(b) Address during leave : [Link]: 6/1044 , Sankarapuram
Kadapa, AP
(c) And place at which salary is to :
be drawn
(ii) If retiring or if proceeding on Proceeding on live
leave preparatory to retirement, :
and if it is proposed to draw the
P.F. Money immediately, whether
application for withdrawl of P.F.
Money has been sent to the
Accountant General
(iii) If on Transfer :
(c) Post and : Deputy Executive Engineer
(d) Station to which transfer SSLC&SB Sub Division No.3,
[Link].
3) Certified that I have brought up :
to Date all the confidential
reports and handed over to my
successor for which, I am the
initiating Officer.
:
4) SIGNATURE (K.V. RAMANA)
::2::
RELIEVING OFFICER
6) Name & Initials (Block Letters) :
7) (i) Whether returning from leave :
(ii) If so, place at which orders of :
Posting were received.
(iii) If not, from what : Relieved from Full Addl., charge of
the Post of the Deputy Executive
Engineer SSLC & SB Sub Division
No.3, [Link].
(a) Post :
(b) Station transferred :
© Date of relief at old station :
8) I have to certify that I have taken :
over all the confidential reports up
to date from my predecessor.
9) SIGNATURE :
If only holding charge in addition
to other duty ( )
10) (a) Official designation of : Deputy Executive Engineer
relieving officer SSLC&SB Sub Division No.3,
[Link].
(b) Name of the Officer posted if :
known
If charge is made over or received at a station other than Head Quarters,
the name of such station should also be entered.
To
[Link].
Dated: / /2007.
8. Copy submitted to the EngineerinChief (Admn.) Irrigation department,
Errummanzil, Hyderabad for favour of information.
9. Copy submitted to the EngineerinChief, [Link].
10. Copy submitted to the Superintending Engineer, SSLC&SB Circle, Nellore for
favor of information.
11. Copy to the Asst. Pay & Accounts Officer, TGP, Nellore for information.
12. Copy to Relieving Officer, and Relieved Officer.
13. Copy to all Executive Engineers.
14. Spare copy 2nos.