ERECTION of Pelton Turbine
Vinod Kr. Sanatoo 08/08/2007
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ubansiri PGR-6 - 22/01/2013 - P 2
Agenda
1. Lower Housing 2. Spiral Distributor 3. Roof Cover 4. Pit Liner 5. Lower Cone 6. Nozzles 7. Runner wheel 8. Guide Bearing 9. MIV
ubansiri PGR-6 - 22/01/2013 - P 3
ubansiri PGR-6 - 22/01/2013 - P 4
General view
ubansiri PGR-6 - 22/01/2013 - P 5
Runner removal platform
ubansiri PGR-6 - 22/01/2013 - P 6
Turbine Housing
ubansiri PGR-6 - 22/01/2013 - P 7
Distributor Part 1
ubansiri PGR-6 - 22/01/2013 - P 8
ubansiri PGR-6 - 22/01/2013 - P 9
Distributor Part 2
ubansiri PGR-6 - 22/01/2013 - P 10
Distributor Parts 1 & 2
ubansiri PGR-6 - 22/01/2013 - P 11
Lowering Distributor Part 3
ubansiri PGR-6 - 22/01/2013 - P 12
Distributor Parts 1 , 2 & 3
ubansiri PGR-6 - 22/01/2013 - P 13
Lowering Distributor Part 4
ubansiri PGR-6 - 22/01/2013 - P 14
Distributor Parts 1 , 2 ,3 & 4
ubansiri PGR-6 - 22/01/2013 - P 15
Welding holder
ubansiri PGR-6 - 22/01/2013 - P 16
Defects in parent metal
ubansiri PGR-6 - 22/01/2013 - P 17
Parent Metal defects
ubansiri PGR-6 - 22/01/2013 - P 18
Heating Arrangements
ubansiri PGR-6 - 22/01/2013 - P 19
DPT
ubansiri PGR-6 - 22/01/2013 - P 20
Welding
ubansiri PGR-6 - 22/01/2013 - P 21
Erection of distributor Flange Cones
ubansiri PGR-6 - 22/01/2013 - P 22
Housing Roof on service Bay
ubansiri PGR-6 - 22/01/2013 - P 23
Lowering of Housing Roof
ubansiri PGR-6 - 22/01/2013 - P 24
Lowering of Housing Roof
ubansiri PGR-6 - 22/01/2013 - P 25
Housing roof
ubansiri PGR-6 - 22/01/2013 - P 26
Housing Roof Installed
ubansiri PGR-6 - 22/01/2013 - P 27
Distributor & Housing Roof
ubansiri PGR-6 - 22/01/2013 - P 28
Blank flange for Pressure Test
ubansiri PGR-6 - 22/01/2013 - P 29
Blank flange for Pressure Test
ubansiri PGR-6 - 22/01/2013 - P 30
Distributor Pressure Test
ubansiri PGR-6 - 22/01/2013 - P 31
Distributor Pressure Test
ubansiri PGR-6 - 22/01/2013 - P 32
Embedded Pips
ubansiri PGR-6 - 22/01/2013 - P 33
Cone Support
ubansiri PGR-6 - 22/01/2013 - P 34
Central Cone
ubansiri PGR-6 - 22/01/2013 - P 35
Central Cone
ubansiri PGR-6 - 22/01/2013 - P 36
Lowering of central cone and Cone support
ubansiri PGR-6 - 22/01/2013 - P 37
Central cone and Cone support
ubansiri PGR-6 - 22/01/2013 - P 38
Central cone and Cone support stored in Pit
ubansiri PGR-6 - 22/01/2013 - P 39
Concreting
ubansiri PGR-6 - 22/01/2013 - P 40
Concreting
ubansiri PGR-6 - 22/01/2013 - P 41
PH general View
ubansiri PGR-6 - 22/01/2013 - P 42
PH general View
ubansiri PGR-6 - 22/01/2013 - P 43
Turbine Housing
ubansiri PGR-6 - 22/01/2013 - P 44
Horizontality of Bearing Support
ubansiri PGR-6 - 22/01/2013 - P 45
Adjusting Horizontality of Bearing Support
ubansiri PGR-6 - 22/01/2013 - P 46
Turbine Guide Bearing (Shell Type) in 2 Parts
ubansiri PGR-6 - 22/01/2013 - P 47
Bearing Assembly with Bearing support
ubansiri PGR-6 - 22/01/2013 - P 48
Guide Bearing and Bearing Support
ubansiri PGR-6 - 22/01/2013 - P 49
Turbine Shaft
ubansiri PGR-6 - 22/01/2013 - P 50
Tilting of Turbine Shaft
ubansiri PGR-6 - 22/01/2013 - P 51
Lowering Guide bearing for trial assembly
ubansiri PGR-6 - 22/01/2013 - P 52
Leakage Test of Rotating Sump ( Oil Tank)
ubansiri PGR-6 - 22/01/2013 - P 53
Turbine Guide Bearing
ubansiri PGR-6 - 22/01/2013 - P 54
Bearing and Shaft assembly
ubansiri PGR-6 - 22/01/2013 - P 55
Lowering Turbine shaft and bearing assembly
ubansiri PGR-6 - 22/01/2013 - P 56
Turbine shaft being lowered in to Pit.
ubansiri PGR-6 - 22/01/2013 - P 57
Turbine Shaft In the Pit On special supports.
ubansiri PGR-6 - 22/01/2013 - P 58
Turbine Shaft In the Pit On special supports.
ubansiri PGR-6 - 22/01/2013 - P 59
Horizontality of Turbine Shaft By CAYERE Method
ubansiri PGR-6 - 22/01/2013 - P 60
Preparation for Nozzle adjustment.
ubansiri PGR-6 - 22/01/2013 - P 61
Dummy Nozzle
ubansiri PGR-6 - 22/01/2013 - P 62
Adjustment of Nozzles.
ubansiri PGR-6 - 22/01/2013 - P 63
Nozzle adjustment
ubansiri PGR-6 - 22/01/2013 - P 64
Machining of False Flange
ubansiri PGR-6 - 22/01/2013 - P 65
Nozzle Erection
ubansiri PGR-6 - 22/01/2013 - P 66
Nozzle Erection
ubansiri PGR-6 - 22/01/2013 - P 67
Checking Real Nozzle
ubansiri PGR-6 - 22/01/2013 - P 68
Pinning of False Flange
ubansiri PGR-6 - 22/01/2013 - P 69
Support for Magnetic base Drilling Machine
ubansiri PGR-6 - 22/01/2013 - P 70
Pelton Runner
ubansiri PGR-6 - 22/01/2013 - P 71
Lowering of Runner
ubansiri PGR-6 - 22/01/2013 - P 72
Servomotor for Runner Erection
ubansiri PGR-6 - 22/01/2013 - P 73
Runner Erection servomotor
ubansiri PGR-6 - 22/01/2013 - P 74
RUNNER ERECTION
ubansiri PGR-6 - 22/01/2013 - P 75
Runner Erection
ubansiri PGR-6 - 22/01/2013 - P 76
Hydraulic diagram for Runner erection servomotor
ubansiri PGR-6 - 22/01/2013 - P 77
Runner installed
ubansiri PGR-6 - 22/01/2013 - P 78
Removal of Runner lifting Disc
ubansiri PGR-6 - 22/01/2013 - P 79
Nozzle and Runner
ubansiri PGR-6 - 22/01/2013 - P 80
Nozzle and Runner
ubansiri PGR-6 - 22/01/2013 - P 81
view of Nozzle from U/S in the direction of flow
ubansiri PGR-6 - 22/01/2013 - P 82
Turbine shaft and bearing
ubansiri PGR-6 - 22/01/2013 - P 83
Break jet alignment
ubansiri PGR-6 - 22/01/2013 - P 84
Rotor In Pit
ubansiri PGR-6 - 22/01/2013 - P 85
Tur and Gen Shaft Coupling
ubansiri PGR-6 - 22/01/2013 - P 86
Checking residual elongation of Studs
ubansiri PGR-6 - 22/01/2013 - P 87
Shaft Line Run out
ubansiri PGR-6 - 22/01/2013 - P 88
Turbine Pit
ubansiri PGR-6 - 22/01/2013 - P 89
Tur pit and piping
ubansiri PGR-6 - 22/01/2013 - P 90