ASIAN AUTOMOTIVE STEELS
12.08.10
Customer request
Development
CONTRACT
REVIEW
Marketing
Development
Customer RFQ
product documents
delivery requirements (customer statement)
Customer
Credit Check
Credit Critera failed
Marketing
Credit / Audit Report
Project risk assessment
Vendor information
RFQ vendor
SGM / GM authorization
outsource
Vendor RFQ
Vendor feedback
No go
Request Customer
Specific Requiremen
Preliminary RFQ
analysis
Quotation
reject,
Counter
proposal
Development
Manufacturing
Purchasing
Engineering
CSR
Statement of Deliverables (internal RFQ form)
Preliminary process flow
APQP checklist
Draft APQP organization chart
Vendor
preliminary
proposals
Technical
feasibility
Reject
APQP team counter
proposal
Accept:
Team Feasibility Commitment
m/c cycle time
Costing assumption
Preliminary planning
Development
Project Development Costing
Manufacturing costing
Preliminary project schedule
Project FS
Accounts
FS documents
Document compilation
Quotation analysis, Proposal
Quotation letter
Marketing
Change
request
Management
support
Marketing
GM, SGM Endorsement
Inform customer
Close project order
MD/COO
approval
Change
request
Marketing
Signed quotation
Project Authorization
RFQ rejection
memo
Document submission
Marketing
Customer quotation forms, packaging
Delivery/Acceptance document
Project close
No
reject letter
from customer
Customer
accept?
Record in quotation file
LOI / LOA
Quotation file
Product Design &
Development
File: Procedure [Link]
Page 1
Marketing
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
CONTRACT AMMENDMENT
& VA/VE
Engineering change
proposal
Customer ECN/ change
product documents
delivery requirements
Technical concept
study
Technical feasibility evidence
Preliminary
Go/No Go
Counter
Proposal
GM endorsement, customer endorsement
Commercial Feasibility not OK
Team feasibility commitment not OK
Commercial feasibility
study
Commercial Feasibility study OK
Team Feasibility commitment OK
Start decision
proceed
outsource
Not feasible
RFQ approved vendor
Vendor RFQ
Vendor feedback
Vendor proposals
Preliminary planning
Preliminary process analysis
Project Development Costing
Manufacturing costing
Preliminary project schedule
Project feasibility study
Change
request
Document compilation
Analysis documents
Preliminary quotation
Quotation Letter
Counter proposal
Change
request
GM
endorsement
Counter propose
Forward to MD
MD/SGM
endorsement
Counter proposal
Signed quotation
Project Authorization
Trasmit to customer
Confirmation of receipt
Customer
accept?
LOI / LOA/ PPA ammendment
product
development
File: Procedure [Link]
Page 2
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
PRODUCT DESIGN & VALIDATION
LOI /
Customer authorization
Yes, resourcing /
localization
Design
document
avail?
No, new design
product validation req
Sample
available?
no
Customer liaison
Correspondents, minutes
Customer product
specs, stds avail?
Customer needs
analysis
yes
No / incomplete
Customer
requirements
Reverse engineering
Yes; drawing, spec, testing std
revise
Quality Requirement
analysis
Product specification
proposal
Bill of materials
incoming material requrement
process requirements
Specification list
Product design /
verification
manual calculations
FEA output
product design drawing
proto pfmea, control plan
testing list
approval
Customer-approved
PIS, testing list
Product validation
Test planning/design
Testing
Test eqpt, method
documentation
requirement
requirement
Test document
preparation
product
std
Prototype part,
interfaces
purchase / mfg
Sample
purchase
documents
Testing arrangement
equipment prep
Product analysis
QFD / DFMEA
QFD, DFMEA
form
(Specifications
not compatible,
emerging
Requirements)
Product
Change
Request
sample parts
Fitting, performance
analysis
Fitting trial checksheet
Testing checksheets
Status reports
inspection
checksheet
template
Prototype testing,
analysis
Sample
testing
results
Spec
review /
DQCM
PRODUCT SPECIFICATIONS
Product drawing (comp & assy)
Testing specification,
Part Inspection Standard
Packaging specification
Product
document
release
File: Procedure [Link]
Page 3
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
PRODUCT DOCUMENT RELEASE
Product specification
product document
draft / update/ correction
draft drawing
document log update
update drawing log
change request
customer
EC approval
req?
yes
EC Request
no
(customer
preliminary document
review)
approve for final submission
final document preparation
final document
document
check - approve
signed document
document submission
proof of delivery
contract
ammendment
req?
customer
endorsement
yes
customer-approved document
Document Control
Contract Ammendment
no
Process development
planning
File: Procedure [Link]
Page 4
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
PROCESS DEVELOPMENT PLANNING
LOI / LOA +
Product Specifications
Process requirement
analysis
Process flow diagram
PFMEA
Special Process characteristics
Sourcing plan
Production
Process, inspection
planning
Production Control Plan
Pre-launch Control Plan
Factory layout,
manpower plan
Material, component
sourcing
Engineering
Development Analysis
DevelopmentInspection
/ test eqpt spec MSA plan
Development process flow
Process validation plan
Prelaunch control plan
Equipment Specifications
Development project
planning
Testing inst
development/acq
analysis
Test eqpt requirement /
devp plan
Production m/c requistion /eng development plan
Development Project schedule,
resource requirement, cost estimate
Final proposal
preparation / revision
Change
request
Project Proposal
Management
review
change
request
Authorization to proceed
Confirmed project plan
Transmit final proposal
to customer
management approved proposal
Customer
review
Process
Development &
Validation
File: Procedure [Link]
Page 5
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
PROCESS DEVELOPMENT & VALIDATION
Authorization to proceed
PROCESS VALIDATION
ENGINEERING DEVELOPMENT
Inst purchase/ devp /
mod / training
Eqpt purchase/devp/
mod
Vendor selection
A9 checking aids
inspection jig
Purchasing records
Vendor LOI
checksheet
confirmation
Equipment testing /
checksheets
product
characteristic
ng
test
equipment
fail
VENDOR DEVELOPMENT
mc
ng Agreement
not possible
Equip testing checksheet
Part inspection
standard devp
Vendor drawing
Draft PIS
Eqpt
testing
Approved checksheets
Hard tooling
Product
samples
arbitration
Equip / test reports
Change
terms
Vendor
Devp
failed
Vendor inspection agreement
development contract / LOA
approved quality checksheets
Line trials
line operation status OK
improvement areas
Vendor development
line improvement
Vendor progress reports
Product testing
Dimensional inspection
report, AAR, testing report
Product evaluation
improvement
needed
Vendor monitoring
Line trials
Child
part
ng
sample submission
Sample approval
Vendor evaluation sample
Child part testing
preliminary
PFMEA update
Module testing results
Child part
evaluation
Child part approval
pp appointment
satisfactory
RPN
Vendor PP
Vendor pp summary
Approval Record
master parts
MASS
PRODUCTION
PREPARATION
Subsupplier
PQCM
sign-off
Vendor PQCM
signed vendor PSW
minutes PQCM
Vendor LOA,
draft PPA
draft LOA, PPA
contract nego
term agreement
Vendor PPA
File: Procedure [Link]
Page 6
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
MASS PRODUCTION PREPARATION
process development
review prelaunch
control plan
updated prelaunch, production control plan
list equipment, instrument, work instruction, QC checksheets, manpower
list material & child part ordering
prelaunch preparation
meeting
prelaunch checksheet updata
QC checksheet
preparation
prelaunch, production
work instruction
preparation
equipment servicing,
instrument MSA
prelaunch production
planning
prelaunch material
order
preparation
monitoring
not ready
prelaunch checksheet complete
prelaunch briefing
small batch
trial production
product, process data
minor
issues
product
audit
process ok
line production
confirmation trial
product, process data
product
audit
major issues
process ok
Process
Development
line run at rate
Quality Council
Enquiry
Customer PQCM/PCPN Sign-off
PQP Summary & Sign-off
Production part
documentation
compilation
correction
request
File: Procedure [Link]
APQP records
Project Exit Review
PPAP, Pqcm report
minutes
PQCM
Quality document
update
PSW Sign off
project file document update
product quality standard update
Early production
containment
Project APQP doc
QMS update
Page 7
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
KAIZEN / PROCESS IMPROVEMENT
SCHEDULED
PRODUCTION
Improvement
needed?
Operational problem
Production
QC report
no
Quality
problems?
Quality problem
Improvement possible
Problem analysis
Kaizen request for
proposals
Improvement
ideas
Kaizen submission
Additional Testing /
data gathering
Kaizen
Evaluation
Proposal accepted
Test reports,
data analysis
Project planning
Kaizen proposal
Minutes
project schedule
Modification
Tooling / mc redesign,
fabrication
Problem
description
Temp rigging,
work inst
Temporary production
rigging, work inst
Process ref update
m/c maintenance log update
Off-line testing
m/c maintenance log update
Problem
resolved?
Target achieved
Supervised
production
Statistical data
PFMEA updates
process improvement activities update
SPC data update
Acceptable?
improvement
project close
File: Procedure [Link]
Kaizen award
presentation
Page 8
Prepared: AG
ASIAN AUTOMOTIVE STEELS
12.08.10
PROJECT GO/NO-GO DECISION
Volume commitment
Material
cost quotation
Dev cost
estimate
Compute costs / pc,
capital investment
Process cost
estimate
Standard costing sheets
Marginal cost meet
customer price?
No
Yes
Management
prerogative
No
Full costing meet
customer price?
Yes
Project Authorization Memo
4TH down & 20
GO FOR IT!
Quotation issue
Inform customer NG
File: Procedure [Link]
Page 9
Prepared: AG