Calculation Cover Sheet
Calc no
DOC NO.
File
DOC NO.
Project title
GN INFILL PROJECT
Phase/CTR
Client
Calculation title
Calculation objective
MAJOR OIL
Pipeline Stability & Weight Coating Calculations
Deliverable
Page
3
Elec file location
1. To determine the on-bottom stability of various GN Ubie phase 2 pipelines in the liquefied swampy terrain and in a typical water crossing
2. If required, calculate the thickness of concrete weight coating (of density 3040 Kg/m3) to give the pipeline a negative buoyancy factor of 1.3
3. Analysis based on the worst case scenario of "decommissioned case corroded pipe empty".
Calculation method
The calculations are performed in accordance with the following general equation:
Wpipe
Wbuoy
Where
>= 1.3
Wpipe = Total weight of pipe in air
Wbuoy = Weight of water/mud displaced
Method of analysis is based on in-house spread sheet detailed in the section Method of Analysis
Basic Data & Assumptions
The following basic data and assumptions were applied:Safety Factor
= 1.3
- MAJOR OIL Requirement (Ref. 2)
Specific Gravity of swamp water
= 1.02
- Typical for Niger Delta (from Ref. 2)
Specific Gravity of river bed
water/mud
= 1.442
- Assumed (from Ref. 2)
Density of concrete
= 3040 Kg/m3
Concrete coating of less than 25mm is practically not achivable. Therefore a minimum concrete thickness of 25mm will apply where required.
Further Assumptions
g
pp
p and water swamp
p or water
1)) Effect of marine g
growth has not been considered as there is little evidence of significant
marine g
growth in the applicable
swamp
conditions.
2) Stability analysis and weight coating calculations for river crossings have been based solely on forces due to buoyancy of the river water. Forces (lift and
drag) due to river current and tidal velocities have not been considered, because the pipelines will be trenched.
3) Calculated wall thickness less corrosion allowance has been used for the weight coating analysis.
References
1
2
GN Ubie Phase II Pipeline Mechanical Design Report
MAJOR OIL Standard Pipeline and Flowline Design Manual
March 2002
Conclusions
1) On-bottom stability analysis has been carried out for the various GN Ubie phase 2A Pipelines and weight coating thicknesses have been determined
where required. Analysis and results are presented in the individual work sheets, while the recommended coating thicknesses are in the summary sheet.
2) The required Safety Factor of 1.3 - with the determined weight coating thickness - is very adequate to ensure on-bottom stability of the Pipeline under
buoyancy conditions.
3) A minimum concrete thicknessof 25mm will always be applied for all submerged pipeline river crossings as mechanical impact protection.
C01
12-Apr-11
Approved For Construction
SH
ET
KLA
A02
A01
R01
16-Feb-11
13-Jan-11
13-Dec-10
Issued for Approval
Issued for Review
Issued for Interdisciplinary Check
SH
SH
SH
ET
ET
ET
KLA
KLA
KLA
REV
DATE
DESCRIPTION
BY
CHECKED
APPROVED
Page 1 of 4
STABILITY AND WEIGHT COATING CALCULATIONS
Calculation Checklist
Calc no
DOC NO.
File
DOC NO.
Elec file location
Project title
GN INFILL PROJECT
Phase/CTR
Client
MAJOR OIL
Deliverable
Calculation title Pipeline Stability & Weight Coating Calculations
Page
4
Please check boxes for all applicable items checked or delete if not appropriate:
Calculations:
Calculation number assigned and registered
Project title shown.
Calculation title shown.
Revision history box complete and signed.
Index.
Appropriate stamp for preliminary issues.
Calculation objectives (aims) stated.
Calculation method defined or described (including formulae if relevant).
Reference made to text, standard or code. Check version/edition with that required for project.
Source of input data stated (with revision number and date if relevant).
Assumptions stated.
Summary of results or conclusions if appropriate.
For software based calculations, reference to software verification if available.
Method clear and easy to follow.
Input data correct.
Calculation arithmetically correct OR software previously verified and reference to verification checked.
Calculation result within expected limits.
Calculation tolerances stated if significant.
Units used as required by client.
Abbreviations correct.
Appropriate cross-references.
Sketches included and clearly labelled, where required.
bility a Attachments included and referenced, as required.
Any precedent calculations updated
Checking records:
Checked and annotated copy of calculation filed (use "Check Print" stamp).
Corrections made as required and calculation dated and signed on cover sheet by checker.
Revisions:
Changes clouded.
Revision history block updated.
Calculation re-checked if required.
C01
A02
A01
R01
12-Apr-11
16-Feb-11
13-Jan-11
13-Dec-10
Approved For Construction
Issued for Approval
Issued for Review
Issued for Interdisciplinary Check
SH
SH
SH
SH
ET
ET
ET
ET
KLA
KLA
KLA
KLA
REV
DATE
DESCRIPTION
BY
CHECK
APPROVED
Page 2 of 4
STABILITY AND WEIGHT COATING CALCULATIONS
Calculation Sheet
Proj No
Phase/CTR
Calc No.
DOC NO.
Project
GN INFILL PROJECT
Deliverable
Subject
Pipeline Stability and Weight Coating Calculations
Client
MAJOR OIL
Sheet
Pipeline
REV
DATE
BY
CHK
APP
C01
4/12/2011
SH
ET
KLA
PIPELINE WEIGHT COATING AND STABILITY ANALYSIS
DESCRIPTION
SYMBOLS
INPUT
PIPE OUTSIDE DIAMETER
ODpipe
in/m
DATA
WALL THICKNESS
WTpipe
mm/m
INTERNAL CORROSION ALLOWANCE
WTcorr
mm
FBE PRIMER THICKNESS
WT FBE
mm
PE ADHESIVE COATING THICKNESS
WT Adh
mm
PE 3-LAYER COATING THICKNESS
WT3LPE
mm
CONCRETE COATING THICKNESS
WTconc
mm
MARINE GROWTH THICKNESS
WTmar
mm
pipe
fbe
Kg/m
ADHESIVE COATING DENSITY
rAdh
Kg/m
COATING 3 LAYER PE DENSITY
3 LPE
Kg/m3
CONCRETE COATING DENSITY
conc
Kg/m
MARINE GROWTH DENSITY
mar
Kg/m
PRODUCT DENSITY
cont
Kg/m3
mud
water
Kg/m
SWAMP MUD DENSITY
RIVER BED WATER/MUD DENSITY
Case 2
Case 3
Case 4
Case 5
Case "n"
Values for Concrete Coating thickness obtained using Goal Seek with SG >= 1.3
FBE DENSITY
PIPE DENSITY
Case 1
UNIT
Kg/m3
3
3
3
Kg/m3
FORMULAE /METHOD OF ANALYSIS
OUTPUT
INTERNAL DIAMETER
IDpipe
DATA
OVERALL DIAMETER
ODtotal
m
2
INT. X-SECTION AREA
Apipe
PIPE X-SECTION AREA
Asteel
PIPE WEIGHT
Wpipe
Kg/m
FBE COAT WEIGHT
W FBE
Kg/m
IDpipe = ODpipe - 2 x WTpipe
ODtotal = ODpipe + 2 x WT FBE + 2 x WT Adh + 2 x WT 3LPE + 2 x WTconc
Apipe = /4 x (IDpipe)2
Apipe = /4 x ((ODpipe)2 -(IDpipe)2)
Wpipe =Apipe x Ppipe
N/m
W Fbe = /4 ((ODpipe + 2 x WT FBE)2 -(ODpipe)2) x Fbe
N/m
ADHEHSIVE COATING WEIGHT
W Adh
Kg/m
W Adh = /4 x ((ODpipe + 2 x WT FBE + 2 x WT Adh)2 - (ODpipe + 2 x WT FBE)2) x Adh
N/m
COATING 3 LAYER PE WEIGHT
W 3 LPE
Kg/m
N/m
CONCRETE COATING WEIGHT
Wconcrete
Kg/m
MARINE GROWTH WEIGHT
Wmarine
Kg/m
PRODUCT WEIGHT
Wproduct
Kg/m
Wdry
Kg/m
WEIGHT OF DISPLACED WATER
Wbuoy
Kg/m
WEIGHT OF DISPLACED MUD
Wmud
Kg/m
N/m
N/m
N/m
TOTAL WEIGHT IN AIR
N/m
N/m
WEIGHT OF PIPE IN WATER
Wsuba
Kg/m
WATER FILLED SUBMERGED WEIGHT
Wsubw
Kg/m
PRODUCT FILLED SUBMERGED WEIGHT
Wsubp
Kg/m
W3LPE = /4 ((ODpipe + 2 x WT FBE + 2 x WT Adh + 2 x WT3LPE)2 - (ODpipe + 2 x WT
FBE + 2 x WT Adh)2) x 3LPE
Wconc =P/4 x ((ODpipe + 2 x WT FBE + 2 x WT Adh + 2 x WT3LPE + 2 x WTconc)2 (ODpipe + 2 x WT FBE + 2 x WT Adh + 2 x WT 3LPE)2) x conc
Wmar = /4 ((ODpipe + 2 x WT FBE + 2 x WT Adh + 2 x WT3LPE + 2 x Wtconc+ 2 x
WTmar )2 - (ODpipe + 2 x WT FBE + 2 x WT Adh + 2 x WT 3LPE + WTconc)2) x mar
Wcont = Apipe x cont
Wdry = Wpipe + WFBE + WAdh + W3LPE + Wconc + Wmar + Wcont
Wbuoy = /4(ODtotal)2 x water
Wmud = /4(ODtotal)2 x mud
Wsuba = Wdry - Wbuoy
N/m
Wsubw = Wdry - (Wbuoy - Apipe x Pwater)
N/m
Wsubp = Wdry - (Wbuoy - Apipe x Pproduct
N/m
SPECIFIC GRAVITY OF PIPELINE IN WATER
SGwater = Wdry / Wbuoy
SGmud = Wdry / Wmud (Set to a 1.3 factor in Goal Seek as per MAJOR OIL requirement)
IF SGwater >= 1.3, NO, otherwise, YES
IF SGmud >= 1.3, NO, otherwise, YES
SGwater
1.3
SPECIFIC GRAVITY OF PIPELINE IN MUD
SGmud
1.3
CONCRETE WEIGHT COATING REQ. (WATER CRO
YES/NO
CONCRETE WEIGHT COATING REQ. (SWAMP)?
YES/NO
CONCRETE COATING THICKNESS (WATER CROSS
WTconc
mm
Recommended Concrete Coating thickness from values in Row 21 rounded to the nearest 5mm
CONCRETE COATING THICKNESS (SWAMP)
WTconc
mm
Recommended Concrete Coating thickness from values in Row 21 rounded to the nearest 5mm
Page 3 of 4
STABILITY AND WEIGHT COATING CALCULATIONS
Calculation Sheet
Proj No
Phase/CTR
Calc No.
Project
File
GN INFILL PROJECT
DOC NO.
Subject
Pipeline Stability and Weight Coating Calculations
Client
MAJOR OIL
Pipeline
12" Koroama - CPF NAG Bulkline - CS
Sheet
REV
DATE
BY
CHK
APP
C01
4/12/2011
SH
ET
KLA
PIPELINE WEIGHT COATING CALCULATIONS
DESCRIPTION
SYMBOLS
UNIT
m
Case 1
Case 2
Case3
Case4
Case3
Installed '12" Corroded 12"+ Installed '12" Corroded '12" Installed '12"
+3LPE df 0.72 3LPE DF 0.72 +3LPE DF 0.6 +3LPE DF 0.6 +3LPE DF 0.5
SWAMP
SWAMP
RIVER X
RIVER X
RIVER X
0.3239
0.3239
0.3239
0.3239
0.3239
Case4
Corroded '12"
+3LPE DF 0.5
RIVER X
0.3239
INPUT
PIPE OUTSIDE DIAMETER
ODsteel
DATA
WALL THICKNESS
WTsteel
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
INTERNAL CORROSION ALLOWANCE
WTcorr
mm
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
FBE EXTERNAL THICKNESS
WT FBE
mm
0.5000
0.5000
0.5000
0.5000
0.5000
ADHESIVE COATING THICKNESS
WT FBE
mm
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
COATING 3 LAYER PE THICKNESS
WT 3 Layer PE
mm
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
CONCRETE COATING THICKNESS
WTconc
mm
0.0000
MARINE GROWTH THICKNESS
WTmar
mm
4.8393
20.9921
0.5000
0.0000
3.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
7850.0000
7850.0000
7850.0000
7850.0000
7850.0000
7850.0000
Kg/m
FBE DENSITY
pipe
fbe
1950.0000
1950.0000
1950.0000
1950.0000
1950.0000
1950.0000
ADHESIVE COATING DENSITY
fbe
Kg/m
1400.0000
1400.0000
1400.0000
1400.0000
1400.0000
1400.0000
coat 3 LPE
conc
mar
cont
mud
water
Kg/m3
940.0000
940.0000
940.0000
940.0000
940.0000
940.0000
Kg/m
3040.0000
3040.0000
3040.0000
3040.0000
3040.0000
3040.0000
Kg/m3
0.0000
Kg/m3
1.2000
Kg/m3
1442.0000
1442.0000
1442.0000
1442.0000
1442.0000
1442.0000
1020.0000
1020.0000
1020.0000
1020.0000
1020.0000
1020.0000
STEEL DENSITY
COATING 3 LAYER PE DENSITY
CONCRETE COATING DENSITY
MARINE GROWTH DENSITY
PRODUCT DENSITY
MUD DENSITY
SWAMP WATER DENSITY
3
3
Kg/m
Kg/m
0.0000
1.2000
0.0000
1.2000
0.0000
1.2000
0.0000
1.2000
0.0000
1.2000
Pipeline Stability and Weight Coating Calculations
OUTPUT INTERNAL DIAMETER
DATA
IDsteel
OVERALL DIAMETER
ODtotal
INT. X-SECTION AREA
Apipe
2
2
#REF!
#REF!
0.3405
0.3728
#REF!
0.3309
#REF!
0.3369
#REF!
0.3309
#REF!
0.3309
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
STEEL X-SECTION AREA
Asteel
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PIPE WEIGHT
Wsteel
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
FBE COAT WEIGHT
W FBE
Kg/m
0.99
0.99
0.99
0.99
0.99
N/m
9.74
9.74
9.74
9.74
9.74
0.99
9.74
0.72
0.72
0.72
0.72
0.72
0.72
ADHEHSIVE COATING WEIGHT
W FBE
Kg/m
N/m
7.02
7.02
7.02
7.02
7.02
7.02
COATING 3 LAYER PE WEIGHT
W 3 LPE
Kg/m
2.91
2.91
2.91
2.91
2.91
2.91
N/m
28.57
28.57
28.57
28.57
28.57
28.57
CONCRETE COATING WEIGHT
Wconc
Kg/m
15.56
70.74
0.00
9.59
0.00
0.00
N/m
152.61
693.74
0.00
94.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MARINE GROWTH WEIGHT
Wmar
Kg/m
PRODUCT WEIGHT
Wcont
Kg/m
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
TOTAL WEIGHT IN AIR
Wdry
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
WEIGHT OF DISPLACED WATER
WEIGHT OF DISPLACED MUD
WEIGHT OF PIPE IN WATER
Wmud
Wsuba
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
Kg/m
92.90
111.36
87.69
90.90
87.69
87.69
N/m
911.31
1092.42
860.24
891.73
860.24
860.24
Kg/m
131.33
157.43
123.97
128.51
123.97
123.97
N/m
1288.34
1544.39
1216.15
1260.66
1216.15
1216.15
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
WATER FILLED SUBMERGED WEIGHT
Wsubw
Kg/m
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PRODUCT FILLED SUBMERGED WEIGHT
Wsubp
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
SPECIFIC GRAVITY OF PIPELINE IN WATER SG Water
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
SPECIFIC GRAVITY OF PIPELINE IN MUD
Is Wsubp >0.25*Wdry (for River Crossings)? (RE
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
SG Mud
Page 4 of 4
STABILITY AND WEIGHT COATING CALCULATIONS