This document provides calculations to determine the appropriate air blower for backwashing filters at the Taiping Headworks. It calculates that a minimum of 2007.5 cubic meters per hour and maximum of 2649.9 cubic meters per hour of air is required based on the filter area and minimum and maximum air scour rates. A safety factor of 10% is added. An air blower with a capacity of 2649.9 cubic meters per hour at a pressure of 14.4 meters is selected. Pipe losses and ejector sizing are also calculated.

Uploaded by

ewanz89
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
4K views10 pages

Air Blower

This document provides calculations to determine the appropriate air blower for backwashing filters at the Taiping Headworks. It calculates that a minimum of 2007.5 cubic meters per hour and maximum of 2649.9 cubic meters per hour of air is required based on the filter area and minimum and maximum air scour rates. A safety factor of 10% is added. An air blower with a capacity of 2649.9 cubic meters per hour at a pressure of 14.4 meters is selected. Pipe losses and ejector sizing are also calculated.

Uploaded by

ewanz89
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

BW PERUNDING SDN. BHD.

COMPANY NO. 27875 P

CALCULATION SHEET
JOB:

TAIPING HEADWORK

PART OF WORK:
GROUP:

M&E

DATE:

1/12/2009

CONTRACT NO.:

MIG

CHECKED BY:

WNWA

Filter backwash Air scour


WNWA

ASSISTANT:
FILE:

\\SERVER_1\engineer\ENG11-NMT\NMT 2010\15 Nov 2010\Calculation\[AIR BLOWER Calculation.xl

To determine the air blower size for back washing of the filter.
No of filter to be backwashed at one time
Rate of air scour =

50
60

m3/m2/hr (Min)
m3/m2/hr (Max)

Air Scour Pressure=

0.35

bar

Filter Length =
Filter Width =
Filter area =

5.5
7.3
40.15

m
m
m2

Therefore for MAX rate,the air required


Add 10% safety factor

Therefore for MIN rate,the air required


Add 10% safety factor

Air blower level


=
Highest air blower pipes =
Total static
=
=

no

(Separate Air Water Wash System)

3.5 m

2409 m3/hr
=
2649.9 m3/hr
= 736.0833 l/s

1558.5 cfm

44.17 m3/min

= 2007.5 m3/hr
= 2208.25 m3/hr
= 613.4028 l/s

1298.7 cfm

36.80 m3/min

117.15 m
125.6 m
8.45 m
0.828431 bar

Pressure required min with 20% for losses and static loss
= 1.414118 bar
=
14.4 meter head
Air Blower Selected:

2649.9 m3/hr

14.4

20.5047 psi

meter head

BW PERUNDING SDN. BHD.(COMPANY NO. 27875 P)


CALCULATION SHEET
JOB:

Taiping Headwork Air Blower Pressure Calculation

PART OF WORK:
GROUP:
DATE:

1.0

CONTRACT NO.:

Air Blower Calculations


ASSISTANT:

18/Mar/15

FILE:

CHECKED BY:

\\SERVER_1\engineer\ENG11-NMT\NMT 2010\15 Nov 2010\Calculation\[AIR BLOWER Calculation.xlsx]Air Blower Sizing

To determine the Air Blower Capacity:


* No. of filter to be backwashed at the same time

No.

(Separate Air Water Wash System)


* Rate of air scour

50

m3/m2/hr

(Min)

60

m /m /hr

(Max)

(Refer to the MWA's guideline)


* Air Scour Pressure
=
0.35
=
3.5
* Filter area:
Filter Length
Filter Width

=
=

Filter Area

5.5
7.3

bar
m

m
m

40.15 m2

* For maximum rate,the air required


Add 10% safety factor
For minimum rate,the air required
Add 10% safety factor

.: Therefore, the capacity of air blower

2.0

= 2409.00 m3/hr
= 2649.9 m3/hr
= 736.0833 l/s
= 2007.50 m3/hr
= 2208.25 m3/hr
= 613.4028 l/s
2649.9 m3/hr

Air Blower Pressure Calculation:


* At ambient suction condition
Suction Pressure

Blower Capacity

C
=
32
= 305.15 K
= 1013.25 milibar abs
3
= 2649.9 m /hr

Ambient Air Density

1.160

kg/m3

Ambient Air Kinematic Viscosity

0.00

m /s

Suction Pressure

(How do you get this?)

* At operating condition
Discharge Pressure

Discharge Flow Rate

C
=
71
= 344.15 K
= 1450.00 milibar abs
3
= 1930.48 m /hr

Discharge Air Density

1.472

kg/m3

Discharge Air Kinematic Viscosity

0.00

m /s

Assume Discharge Pressure

(How do you get this?)

* Static condition
(Refer to the drawings)

Also,

Rw

Qs / Q1

where

Qs
Q1

Suction flow
Motive water flow

Hence,

Qs

Qs

#REF! m3/min

= ### l/s

Q1

#REF! m3/min

= ### l/s

V1

1.0

#REF! mm

.:
Let

Volume ratio

Q1

m/s

No of hoppers per bay, n

Q2

Q1 / n

Q2

#REF! m3/min

V2

1.0

#REF!

and
.:
Let

say

200 mm

3
+ Qs
= ### l/s

m/s
mm

say

150 mm (ID)

Area of pipe = 0.017671 m2


V2
= #REF! m/s
Motive water velocity VN

(2g (H1-Hs))0.5

m/s

at nozzle
.: Nozzle diameter

0.0

#REF!

m/s
mm

CHECK:
1 N/mm2
1 psi
10m head
1 psi
1 m of head

3.0

=
=
=
=
=

145 psi
0.006897 N/mm2
0.09807 N/mm2
0.703227 m head
1.422015 psi

Ejector Sizing

To calculate the duty of the sand ejector pumpset,


Discharge pipe diameter
= 100.00 mm
Lower end level of discharge channel =
-1
m EL
Top level of discharge pipe =
7.5 m EL
Discharge static head =
8.5 m
=
Assume discharge back pressure of =

10.0

12.09 psi

From the Performance Curve, at discharge back pressure of


data are obtained.

10.0

Motive water flow rate =

39.0

m3/hr

Total agitation flow rate =

11.0

m3/hr

Suction flow rate =


Motive water pressure =

17.0
44.0

m3/hr
m

Motive water flow per eductor =


Nos. of eductor =

50.0
2

m3/hr

m, the following

Hence,

Motive water flow for all eductors =


Eductor discharge flow rate =

4.0

100.0 m3/hr
56.0

m3/hr

Motive Water Pipe Loss


William-Hazen's Formula:

Hf

10.666 x C (-1.85) x D (-4.87) x Q (1.85) x L

Flow Rate Size Velocity


Q
D
(m /s)
3

1 Motive Water Pipe Loss


Suction Pipe:

(m)

(m/s)

Length
L

William

(m)

Hazen

Qty

a) Pipe Loss

0.028

0.2

0.89

Flow Rate Size Velocity


Q
D

Fitting Loss:
a) 90 deg bend
b)
c)

4.0

(m3/s)

(m)

(m/s)

0.028

0.2

0.89

90

Length
L

William

(m)

Hazen

90

Qty

Motive Water Pump


Provide 2 No. pumps (1 duty / 1 standby)
Motive Water Pump capacity required =
Allow for 5% fitting losses =

#REF! l/s
#REF! l/s

Let Motive Water Pump capacity =

25.10 l/s

0.00
61.5

Inlet pressure =
Let Pump Head =

psi
m

90.36 m3/hr
0.0

Check pipeworks
Length of mains =
Allow for 5% fitting losses =
Flow rate in l/sec =
Flow rate in m3/sec
Pipe diameter
Pipeline velocity
Hazen William C value
Head loss
Total back pressure

=
=
=
=
=
=

30
m
31.5 m
25.10 l/sec
0.0251
200
0.77
110
0.14
8.64

m3/sec
mm
m/sec
m
m

f.i.d=

204 mm

= 12.28451 psi
FAIL!