Natural Gas Hydrogen Production Cost Analysis

This document provides a cost sheet for a natural gas distributed reforming plant with a design capacity of 1500 kg of hydrogen per day and a 70% capacity factor. Key details include a startup year of 2005, production of 1050 kg of hydrogen per day, and natural gas and electricity usage of 1.9 MJ/kg and 0.38 kWh/kg respectively. Capital costs are provided for production, compression, storage, dispensing and other areas, along with fixed operating costs including labor, maintenance, taxes and overhead. Variable costs include natural gas, electricity, water and other raw materials.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
237 views4 pages

Natural Gas Hydrogen Production Cost Analysis

This document provides a cost sheet for a natural gas distributed reforming plant with a design capacity of 1500 kg of hydrogen per day and a 70% capacity factor. Key details include a startup year of 2005, production of 1050 kg of hydrogen per day, and natural gas and electricity usage of 1.9 MJ/kg and 0.38 kWh/kg respectively. Capital costs are provided for production, compression, storage, dispensing and other areas, along with fixed operating costs including labor, maintenance, taxes and overhead. Variable costs include natural gas, electricity, water and other raw materials.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
  • Cost Sheet Overview
  • Capital Investment
  • Fixed and Variable Costs

Natural Gas Distributed Reforming Cost Sheet

Title:
Authors:
Contact Info:
Organization:
Date:
Plant Design Capacity (kg/day):
1500
Capacity Factor (%)
70%
H2 proctiond (kg/day)
Basis: Current, Advanced, or Longer Term Current
Start-up Year:
2005
Conversion Technology:
Based on Number of Plants Installed per Year
500
Production System Natural Gas Consumption (KJ Feedstock
(LHV)/kg of H2)
Production Unit Hydrogen Efficiency (%)
Production Electricity Consumption (kWhe/kg of H2)
Production H2 Leak (%)
Production Step Efficiency (%)
Compression, Storage and Dispensing Electricity Consumption
(kWhe/kg of H2)
Compression, Storage and Dispensing H2 Leak (%)
Compression, Storage and Dispensing Step Efficiency (%)
Total System Efficiency (%)
Process water consumption (L/kg of H2)
2005
Reference Year $
10%
After-tax Real IRR (%)
Depreciation Type
Depreciation Schedule Length (years)
20
Analysis period (years)
20
Plant life (years)
1.90%
Inflation rate (%)
6%
State Taxes (%)
35%
Federal Taxes (%)
38.90%
Total Tax Rate (%)
100%
% Equity Financing
Length of Construction Period (years) << 1
50%
% of Revenues During Start-up year (%)
100%
% of Variable Operating Costs During Start-up (%)
100%
% of Fixed Operating Costs During Start-up (%)
0%
Salvage value (% of total capital investment)
0%
Decommissioning costs (% of depreciable capital investment)

CAPITAL INVESTMENT (Inputs REQUIRED in Year 2005 $)


Production: Major Items

Unistalled

Installation
Factor
Installed

Unistalled

Installation
Factor
Installed

Balance of Plant
Total Production Initial Capital Investment (Depreciable)
Compression/Storage/Dispensing: Major items
Production: Major Items
(Add in lines as appropriate)
H2 Compressor Subsystem
Storage Subsystem
Dispenser System
Overall Control and Safety Equipment

Balance of Plant
Total Compression/Storage/Dispensing Initial Capital
Investment (Depreciable)
Replacement Capital
Total Direct Capital Investment (Depreciable) ($)

Indirect Depreciable Capital


Site Preparation ($)
Engineering & design ($)
Process contingency ($)
Project contingency ($)
Other (Depreciable) capital ($)
One-time Licensing Fees ($)
Up-Front Permitting Costs ($)
TOTAL DEPRECIABLE CAPITAL COSTS ($)

TOTAL NONDEPRECIABLE CAPITAL COSTS ($)


TOTAL CAPITAL INVESTMENT ($)

FIXED O&M COSTS (Inputs REQUIRED in Year 2005


Dollars)
Production Unit Labor required (Hours/year)
Production Unit Labor cost ($/man-hr)
Production Unit Labor cost ($/year)
Storage/Dispensing Labor required (Hours/Year))
Storage/Dispensing Labor cost ($/man-hr)
Storage/Dispensing Labor cost ($/year)
Overhead and G&A rate (% of total labor costs)
Overhead and G&A ($/year)
Property tax and insurance rate (% of total capital investment)
Property taxes and insurance ($/year)
Land Rent ($/year)
Licensing, Permits and Fees ($/year)
Production Maintenance and Repairs ($/year)
Forecourt Maintenance and Repairs ($/year)
Other Fees ($/year)
Other Fixed O&M Costs ($/year)

TOTAL FIXED O&M COSTS ($/year)


VARIABLE PRODUCTION COSTS (at 100% capacity,
startup year cost, year 2005 dollars)
Feedstock Costs
Type of natural gas feedstock used
Natural gas feedstock consumption (Nm 3/kg of H2)
Natural gas feedstock cost in startup year ($/Nm3)
Natural gas feedstock cost in startup year ($/year)
Process water feedstock consumption (L of water/kg of H2)
Process water feedstock cost in startup year ($/L)
Process water feedstock cost in startup year ($/year)
Other Raw Material Costs ($/year)
Additional Raw Material Costs (add details as needed in rows
below)
TOTAL OTHER RAW MATERIAL COSTS ($/year)
Utility Costs
Type of electricity utility used
Use H2A electricity utility cost? (Enter yes or no)
Electricity utility consumption (kWh/kg H2)
Electricity utility cost in startup year ($/kWh)
Electricity utility cost in startup year ($/year)
Other Variable O&M Costs
Waste Treatment Costs ($/year)
Solid Waste Disposal Costs ($/year)
Other variable operating costs (e.g. non-feedstock fuels,
environmental surcharges) ($/year)
Royalties ($/year)

TOTAL OTHER VARIABLE O&M COSTS ($/year)


TOTAL VARIABLE PRODUCTION COSTS ($/year)
WORKING CAPITAL (% of yearly change in operating costs)

Natural Gas Distributed Reforming Cost Sheet
Title:
Authors:
Contact Info:
Organization:
Date:
Plant Design Capacity (kg
CAPITAL INVESTMENT (Inputs REQUIRED in Year 2005 $)
Production: Major Items
Unistalled
Installed
Balance of Plant
Total Produ
TOTAL NONDEPRECIABLE CAPITAL COSTS ($)
TOTAL CAPITAL INVESTMENT ($)
Production Unit Labor required (Hours/year)
Production Un
TOTAL OTHER VARIABLE O&M COSTS ($/year)
TOTAL VARIABLE PRODUCTION COSTS ($/year)
WORKING CAPITAL (% of yearly change in opera