NO.
ITEM
GENERATOR
ENGINES (YANMAR
4TNE 106T)
CHECK POINTS
ENGINE CARGO
PORTSIDE
( MITSUBISHI 6D16 )
Yes
No
Safety devices function properly.
Yes
No
Water level at Expansion Tank
Yes
No
Condition of the V - Belt
Yes
No
Measure deflection of the V - Belt ( 10 mm )
Yes
No
Yes
No
Condition The Oil and Level Oil ( Full mark )
Yes
No
Lubricating Oil Filter
Yes
No
Color of exhaust smoke
Yes
No
Sea water discharging volume
Yes
No
Air Filter
Yes
No
400
The Valve tip Clearance ( inlet 0.2 mm and
exhaust 0.45 mm )
2000
Yes
No
Condition of the Viscous Damper
2000
Yes
No
Lubricating Oil Pressure ( 280 kN/m2 / 2.5
kgf/cm2 )
Yes
No
Fuel injection nozzle opening pressure ( Mpa /
kgf/cm2 )
Yes
No
Operate satisfactorily.
Yes
No
Abnormal vibration
Yes
No
Synchronasation system
Yes
No
Output voltage
Yes
No
Operate satisfactorily.
Yes
No
Check condition and level the Engine Oil
Yes
No
Water level at expansion tank
Yes
No
Condition of the V- Belt and tension of the Vbelt ( 10 -15 mm )
Yes
No
Oil filter element
Yes
No
Fuel filter element
Yes
No
Yes
No
The Nozzle pressure and Spray ( 22 Mpa / 224
Kg/cm2 )
Yes
No
Remote control function properly.
Yes
No
Sea water discharging volume
Yes
No
Abnormal noise and vibrate
Yes
No
Exhaust color of smoke
Yes
No
Cargo Pump operate satisfactorily.
Yes
No
Clearance Valve ( inlet 0.2 mm and exhaust 0.3
mm )
CARGO SYSTEM
SATISFACTORY
Operate satisfactorily.
Condition of the Impeller water pump
ALTERNATOR
( STAMFORD
UCM274E1 )
Running
hours
1000
NO. CARGO ITEM
SYSTEM
ENGINE CARGO
PORTSIDE
( MITSUBISHI 6D16 )
CHECK POINTS
FIRE FIGHTING
ENGINE DRIVEN
( electromotor )
FIRE PUMP
BILGE & GS
SYSTEM
SATISFACTORY
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Emergency stop ECP operating satisfactorily
Yes
No
Piping in good order.
Yes
No
Operate satisfactorily.
Yes
No
Check condition and level the Engine Oil
Yes
No
Water level at expansion tank
Yes
No
Condition of the V- Belt and tension of the Vbelt ( 10 -15 mm )
Yes
No
Oil filter element
Yes
No
Fuel filter element
Yes
No
Yes
No
The Nozzle pressure and Spray ( 22 Mpa / 224
Kg/cm2 )
Yes
No
Remote control function properly.
Yes
No
Sea water discharging volume
Yes
No
Abnormal noise and vibrate
Yes
No
Exhaust color of smoke
Yes
No
Cargo Pump operate satisfactorily.
Yes
No
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Emergency stop ECP operating satisfactorily
Yes
No
Piping in good order.
Yes
No
Operate satisfactorily.
Yes
No
Sea water discharging volume
Yes
No
Abnormal noise and vibrate
Yes
No
Operate satisfactorily.
Yes
No
Abnormal noise and vibrate
Yes
No
leakage from the pump casing
Yes
No
Greasing
Yes
No
All valves operate satisfactorily.
Yes
No
Piping in good order.
Yes
No
Bilge & GS Pump operate satisfactorily.
Yes
No
No heavy corrosion and leakage.
Yes
No
Clearance Valve ( inlet 0.2 mm and exhaust 0.3
mm )
CARGO SYSTEM
Running
hours
1000
6
NO.
10
11
12
BILGE & GS
SYSTEM
ITEM
Running
hours
SATISFACTORY
All valves operate satisfactorily.
Yes
No
Piping in good order.
Yes
No
SEA WATER
Sea water cooling Pump operate satisfactorily.
COOLING SYSTEM
Yes
No
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Piping in good order.
Yes
No
Yes
No
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Piping in good order.
Yes
No
Emergency stop operating satisfactorily
Yes
No
Stripping Pump operate satisfactorily.
Yes
No
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Piping in good order.
Yes
No
Yes
No
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Piping in good order.
Yes
No
Operate satisfactorily.
Yes
No
Remote and control function properly.
Yes
No
Meters and gauges in good order.
Yes
No
No heavy corrosion and leakage.
Yes
No
All valves operate satisfactorily.
Yes
No
Operate satisfactorily.
Yes
No
Emergency stop operating satisfactorily
Yes
No
Operate satisfactorily.
Yes
No
Must be clean without rubbish or waste oil.
Yes
No
Protection covers and/or guards in good order.
Yes
No
FUEL OIL SYSTEM Fuel oil Pump operate satisfactorily.
STRIPPING
SYSTEM
DIRTY OIL SYSTEM Dirty oil Pump operate satisfactorily.
OILY WATER
SEPARATOR
PIPING
13
BLOWER P/R
14
BLOWER E/R
15
CLEANLINESS of E/R
16
CHECK POINTS
GUARDS AND
FENCING
NO.
ITEM
Chief Engineers
Date :
CHECK POINTS
Running
hours
SATISFACTORY
REMAKS
REMAKS
REMAKS
REMAKS
Technical Superintendent
Date :
NO
ITEM
Lighting in E/R
Lighting in Acc. Spaces
Lighting in working room,
steering room and other
spaces
Emergency cables
Emergency lights
Anti-explosion lights in
dangerous spaces, pump
room, battery room, paint
locker etc.
Insulating mats around
MSB
Main Switch Board
6
7
Alarms operate
satisfactorily
Level high / low alarm
operate satisfactorily
10
Chief Engineers
Date :
CHECK POINTS
SATISFACTORY
All lights in good order.
Yes
No
Protection covers or guards in good order
Yes
No
All lights in good order.
Yes
No
Protection covers or guards in good order
Yes
No
All lights in good order.
Yes
No
Protection covers or guards in good order
Yes
No
Condition in good order, no exposed wire,
heavy corrosion, especially on weather
deck.
Yes
No
All lights in good order, no broken lights.
Yes
No
Yes
No
Yes
No
All gauges and indicating light are
functioning
Yes
No
The surface of panel for excessive
warmness
Yes
No
Unusual smell
Yes
No
All cable conncetion and bus
Yes
No
Gas detector at P.R
Yes
No
Fire detector
Yes
No
Sensor CO2
Yes
No
Bilges at Engine Room
Yes
No
Bilges at Pump Room
Yes
No
Bilges at Steering Room
Yes
No
Daily Oil Tank
Yes
No
Fuel Oil Tank
Yes
No
Sewage tank
Yes
No
All lights in good order, no broken covers
and guards, tightening handles available
on board.
Available on board or insulation cement
permanently laid up on the floor.
REMAKS
Technical Superintendent
Date :