0% found this document useful (0 votes)
50 views2 pages

Mechanical Department Shift Schedule

This document outlines the shift schedule for employees in the Mechanical Department of United Cements Pvt. Ltd. in Nepal from November 2nd, 2016. It lists 5 employees - 2 engineers, 1 foreman, 1 DET, and 1 fitter - along with their shift assignments for each day of the week, using the letters A, B, C to denote the different shifts. The schedule is signed by the Head of the Mechanical Department.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

Mechanical Department Shift Schedule

This document outlines the shift schedule for employees in the Mechanical Department of United Cements Pvt. Ltd. in Nepal from November 2nd, 2016. It lists 5 employees - 2 engineers, 1 foreman, 1 DET, and 1 fitter - along with their shift assignments for each day of the week, using the letters A, B, C to denote the different shifts. The schedule is signed by the Head of the Mechanical Department.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

UNITED CEMENTS PVT. LTD.

NAUBISE-4, DHADING, NEPAL

SHIFT SCHEDULE FOR MECHANICAL DEPARTMENT


(APPLIED SINCE 2ND NOV-2016)

SR.NO.

NAME OF EMPLOYEE

DESIGNATION

SUNDAY

MONDAY

TUESDAY

WEDNESDAY

KALPESH YADAV

ENGINNER

JOYDEEP DAS

ENGINNER

SHANKER SINGH

FOREMAN

NAVAJ SHARIFF

DET

MUKESH KUMAR

FITTER

ARTMENT
THURSDAY

FRIDAY

SATURDAY

HOD
MECHANICAL DEPARTMENT

You might also like