Item
Description
Unit
sq.m.
265.65
sq.m.
lot
lot
Contractor to verify the quantify of
works to be undertaken.
lot
Contractor to quantify magnitude of
works undertaken.
1128
no.
273.00
sq.m.
8.00
no.
0.56
ton
64
no.
3.00
ton
no.
2.20
ton
lot
8
32
nos.
nos.
General Works
Area preparation for mobile crane and disposal
Clearing of debris & waste within intake facility area (Internal size of steel
structure, L=21m & B=12.65m)
Scaffolding and temporary support installation, erection and dismantling
Disposal of demolished/removed unnecessary materials and debris
Removal of Non-structural Components
Removal of cable trays, electrical/cable/power, miscellaneous, etc.
Removal of Roofing Sheets and associated fixing/hooks
Removal of roofing hooks (hooks attached between roofing sheet and roof
purlins; 8nos. roof purlins)
C
Removal of roofing sheets (roofing sheet dimension: 2sides @ 6.50mx21m)
Removal of Roof Purlins, X-bracings and Tensions Rods
Removal of roof tension rods including connections at end bays (2nos. on each
side per bay; Length = 6.50m)
Removal of X-bracings including end plates at middle bay (4 nos. Angle bar
5"x5"x7mm thick; approx. length 9.50m)
Loosening of connections bolts between cleats and purlins (2nos. bolt per
connection; total of 32 connections)
Removal of purlins (Channel size 16cmx7cm; length=21m; 8nos.)
Removal of Overhead Crane and Crane Beams
Removal of overhead crane and crane beam 600x150x16mm
Removal of crane rail beams (2nos. Steel Beam 45cmx16cm; Length=21m)
Removal of rafters and lateral beam supports
Rafter beam (L=6.40m,
Lateral beam (L=21m; Double angle 4x4inch 7mm thick
Lifting out of overhead crane and crane beams
Removal of platform
Removal of Bracings & Supports (Vertical/Diagonal/Horizontal)
Horizontal bracing (2L-4x4inches x 5mm thick)
Vertical bracing
Diagonal bracings
Removal of Columns
Chipping of existing concrete at the column base
Removal/Loosening of anchor bolts nuts anchor bolt size 25mm dia.)
Removal of columns (H Beam size=38cmx15.5cmx13mm thick; Ht.=9.0m)
Amount Total (US
(US $)
$)
Qty
0.049
ton
Base plate attached to column (Size 450mmx410mmx25mm thick)
0.290
ton
Disposal of Debris & Scaffolding Dismantling
Disposal of demolished/removed unnecessary materials and debris
Dismantling of scaffolding and removal of temporary supports
1
1
lot
lot
Remarks
Contractor to verify the coverage and
extent of area for mobile crane and
disposal.
Considering hook spacing of 150mm
along the roof purlin length of 21m.
Contractor to verify quantity of hooks.
Considering a tension rod diameter of
20mm. Contractor to verify quantity of
tension rod at each end bays.
Considering equivalent to
EA120x120x8 having weight of
14.7kg/m.
Considering equivalent to
CH150x75x18 having weight of
17.87kg/m.
Initial position after removal is at top of
intake facility and to be lifted outside
the intake once the overall roofing is
open.
Considering equivalent to
UB457x152x52 having weight of
52.3kg/m. Initial position after removal
is at top of intake facility and to be
lifted outside the intake once the