0% found this document useful (0 votes)
525 views6 pages

Rate Analsis Chapter No. 5 (Morter)

The document provides detailed information on the dry material requirements for various types of mortar mixes, including ratios of cement, lime, and sand for both 100 cubic feet and one cubic meter of wet mortar. It also outlines the quantities of materials needed for different masonry types, such as brick and stone, including considerations for wastage. Additionally, it includes notes on the conversion of material volumes to weights for cement and lime products.

Uploaded by

M HAFEEZ RAJA
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
525 views6 pages

Rate Analsis Chapter No. 5 (Morter)

The document provides detailed information on the dry material requirements for various types of mortar mixes, including ratios of cement, lime, and sand for both 100 cubic feet and one cubic meter of wet mortar. It also outlines the quantities of materials needed for different masonry types, such as brick and stone, including considerations for wastage. Additionally, it includes notes on the conversion of material volumes to weights for cement and lime products.

Uploaded by

M HAFEEZ RAJA
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

MORTAR

Dry Material Required for Dry Material Required for


100 Cft. Wet (Ready) Mortar One Cum Wet (Ready) Mortar

S. No. Ratio of Mortar Cement Lime Cement Lime Sand


(50 Kg) Putty Sand (50 Kg.) Putty Cum.
Bag Cft. Cft. Bag. Cum
1 2 3 4 5 6 7 8

1 Cement : Sand
1 : 2 33.48 82 11.83 0.82
1 : 3 23.11 85 8.16 0.85
1 : 4 18.37 90 6.49 0.90
1 : 5 14.70 90 5.19 0.90
1 : 6 13.61 100 4.81 1.00
1 : 7 11.68 100 4.12 1.00
1 : 8 10.21 100 3.61 1.00

2 Cement : Lime : Sand


1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.90
1 : 1 : 7 10.70 13.1 92 3.78 0.13 0.92
1 : 1 : 8 9.39 11.5 92 3.32 0.12 0.92
1 : 1 : 9 8.52 10.44 94 3.00 0.10 0.94
1 : 1 : 10 7.67 9.4 94 2.71 0.09 0.94
1 : 2 : 8 9.19 22.5 90 3.25 0.23 0.90
1 : 2 : 9 8.16 20.0 90 2.88 0.20 0.90
1 : 2 : 10 7.67 18.8 94 2.71 0.19 0.94
1 : 2 : 12 6.39 15.66 94 2.26 0.16 0.94
1 : 3 : 12 6.26 23.0 92 2.21 0.23 0.92
1 : 3 : 14 5.47 20.1 94 1.93 0.20 0.94
1 : 3 : 16 4.82 17.7 94 1.70 0.18 0.94
1 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85

3 Lime : Sand
1 : 2 43 86 0.43 0.86
1 : 3 31 93 0.31 0.93

Page - 1 C:\SCH-RATE\ANALY\36330507.xls/ZAK
MORTAR
Dry Material Required for 100 Cft. Dry Material Required for
Wet (Ready) Mortar one M3 Wet (Ready) Mortar
S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi Cinder
No. (Putty) (Putty)
Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3
1 2 3 4 5 6 7 3 4 5 6 7

4 Mud 135 1.35

5 Lime : Surkhi
2 : 3 49.00 - 73.5 - 0.49 - 0.74 -
1 : 2 40.75 - 81.5 - 0.41 - 0.82 -
1 : 3 30.30 - 91.0 - 0.30 - 0.91 -

6 Lime : Sand : Surkhi


1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41

7 Lime : Cinder
1 : 1 57.0 - 57.0 - 0.57 - - 0.57

Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft)
masonry (including wastage): masonry ( including wastage) :

1 Brick Masonry :
a) Mud Mortar 35.00 Cft 0.35 M3
b) Cement, Sand 25.00 Cft 0.25 M3
c) Cement, Lime (Putty) Sand 25.00 Cft 0.25 M3
d) Lime (Putty) Sand 25.00 Cft 0.25 M3

2 Stone Masonry :
a) Random rubble, uncoursed
i) Foundation and Plinth 45.00 Cft 0.45 M3
ii) Superstructure 40.00 Cft 0.40 M3
iii) Coursed 35.00 Cft 0.35 M3
b) Ashlar Block in course or Scabled
masonry. 30.00 Cft 0.30 M3
c) Ashlar fine masonry 20.00 Cft 0.20 M3

Notes (1) Cement 1 Cft. = 40.8233 Kg


(2) Unslaked lime 1.7 Cft. = 37.3242 Kg
(3) Slaked lime 2.5 Cft. = 37.3242 Kg
(4) Quick lime 40 Kg Will yield 2.6 Cft. lime putty.

Page - 2+1 C:\SCH-RATE\ANALY\/36330507.xlsZAK


MORTAR
Quantity of bricks and wet mortar required for 1 (M³) of Brick Masonry.

Volume of one brick (nominal) 225x112.50x75 = 1,898,437.50 mm³


Volume of one brick (actual) 215x102.50x65 = 1,432,457.50 mm³

Volume of Mortar per brick. mm³

No. of brick per Cubic Metre


= 1 x 1,000,000,000 = 527
1,898,437.5

Wastage 5% = 27
Total 554
Say 555

Volume of Mortar for 1 Cum of brick masonry 466,000.00 x 527 = 0.246 M³


1,000,000,000.00
Wastage 20% 0.050 M³
Total 0.296 M³
Say 0.3 M³

Page - 3+1 C:\SCH-RATE\ANALY\/36330507.xlsZAK


MORTAR
Quantity of Dry materials for Various Mortars Per 100 Cft.

Mix. (Vol)

C L S Sand
0 1 2 86
0 1 3 93
1 1 6 90
1 1 7 92
1 1 8 92
1 2 8 90
1 2 9 90
1 2 10 94
1 2 12 94
1 3 12 92
1 3 14 94
1 3 16 94
1 ¼ 3 85
1 0 2 82
1 0 3 85
1 0 4 90
1 0 5 90
1 0 6 100
1 0 7 100
1 0 8 100

Page - 4+1 C:\SCH-RATE\ANALY\/36330507.xlsZAK


MORTAR

Sr. No. Ratio of mortar


Sand
Cft
1 2 5

1 Cement, Sand
1 : 2 82
1 : 3 85
1 : 4 90
1 : 5 90
1 : 6 100
1 : 7 100
1 : 8 100

2 Cement, lime sand


1 : 1 : 6 90
1 : 1 : 7 92
1 : 1 : 8 92
1 : 1 : 9 94
1 : 1 : 10 94
1 : 2 : 8 90
1 : 2 : 9 90
1 : 2 : 10 94
1 : 2 : 12 94
1 : 3 : 12 92
1 : 3 : 14 94
1 : 3 : 16 94
1 : ¼ : 3 85

3 Lime, sand
1 : 2 86
1 : 3 93

Page - 5+1 C:\SCH-RATE\ANALY\/36330507.xlsZAK


Sr. No. Ratio of morta Cinder
Cft
1 2 7

4 Mad

5 Lime, Surkhi
2 : 3
1 : 2
1 : 3

6 Lime, sand, surkhi


1 : 1 : 1

7 Lime, cinder 57.00


1 : 1

Wet mortar required for 100 Cft masonry (including wastage)


1 Brick
a)
b)
c)
d)

2 Stone masonry
a)

b)

c)

Notes: (1)
(2)
(3)
(4)

Page - 6+1 C:\SCH-RATE\ANALY\/36330507.xlsZAK