Dadri-Khurja Railway Bridge Design
Dadri-Khurja Railway Bridge Design
YARDS, INTEGRATION WITH IR EXISTING RAILWAY SYSTEM AND TESTING & COMMISSIONING ON DESIGN-BUILD LUMP
SUM BASIS FOR DADRI - KHURJA SECTION OF EASTERN DEDICATED FREIGHT CORRIDOR
DADRI TO KHURJA
From Km. 1413.856 to Km. 1367.000
GAD BRIDGES
EMPLOYER
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED
(A GOVERNMENT OF INDIA ENTERPRISES)
1 of
MINISTRY OF15
RAILWAYS
COUNTRY : INDIA
CONTENTS BRIDGE DRAWING (CONTRACT PACKAGE 302) CONTENTS BRIDGE DRAWING (CONTRACT PACKAGE 302)
SL. NO. DESCRIPTION DRAWING NO. REVISION NO. REMARKS SL. NO. DESCRIPTION DRAWING NO. REVISION NO. REMARKS
1 GAD FOR MAJOR BRIDGE NO. D-KRJ 26 AECOM/302/MJR/D-KRJ 26 R0 31
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29
30
2 of 15
Contract Package: 302
DADRI TO KHURJA
From Km 1413.856 to 1367.000
3 of 15
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO NEW KRJ JN.
FROM CH: 1413.856 TO CH: 1367.000
4 of 15
AECOM/302/MJR/D-KRJ 26
NOTES:-
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO NEW KRJ JN.
FROM CH: 1413.856 TO CH: 1367.000
5 of 15
AECOM/302/MJR/D-KRJ 26
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO NEW KRJ JN.
FROM CH: 1413.856 TO CH: 1367.000
6 of 15
AECOM/302/MJR/176 DN
NOTES:-
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO NEW KRJ JN.
FROM CH: 1413.856 TO CH: 1367.000
7 of 15
AECOM/302/MJR/176 DN
TO KHURJA TO DADRI
NOTES:-
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO KHURJA
FROM CH: 1413.856 TO CH: 1367.000
8 of 15
CROSS-SECTION OF ABUTMENT AT Z-Z'
AECOM/302/MJR/207
NOTES:-
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO KHURJA
FROM CH: 1413.856 TO CH: 1367.000
9 of 15
AECOM/302/MJR/211
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO KHURJA
FROM CH: 1413.856 TO CH: 1367.000
10 of 15
AECOM/302/MJR/211
Contract Package: 302
DADRI TO KHURJA
From Km 1413.856 to 1367.000
11 of 15
TO KHURJA TO DADRI
NOTES:-
INDICATIVE DRAWING
NOTE:-
1. THIS DRAWING DEPICTS GA OF MINOR BRIDGE OF SPAN
1x4x4 AND IS MEANT ONLY FOR THE GUIDANCE OF THE
BIDDER. ALL THE MINOR BRIDGES SHALL BE DESIGNED EASTERN CORRIDOR
BY THE CONTRACTOR AS PER THE GUIDELINES
DADRI TO KHURJA
PROVIDED IN BID DOCUMENT AND SHALL BE GOT
FROM CH: 1413.856 TO CH: 1367.000
X
APPROVED FROM THE ENGINEER.
2. BRIDGES IN STATION YARDS SHALL BE DESIGNED TO CONTRACT PACKAGE - 302
CATER TO THE NUMBER OF TRACKS SHOWN IN
RESPECTIVE STATION YARD. TYPICAL DRAWING OF MINOR BRIDGE
SPAN 1 X 4.00 X 4.00M
Y
12 of 15
Contract Package: 302
DADRI TO KHURJA
From Km 1413.856 to 1367.000
13 of 15
NOTES:-
TO KHURJA TO DADRI
1. ALL DIMENSIONS ARE IN mm AND ALL LEVELS IN METERS UNLESS OTHERWISE
SPECIFIED.
2. DO NOT SCALE, FOLLOW THE WRITTEN DIMENSIONS ONLY.
3. a) CODES TO BE FOLLOWED (WITH LATEST CORRECTIONS SLIP) IN ORDER OF
PREFERENCE:-
i) IRS BRIDGE RULES.
ii) IRS CONCRETE BRIDGE CODE.
iii) IRS BRIDGE SUBSTRUCTURE AND FOUNDATION CODE.
iv) RELEVANT BIS CODES.
b) LOADING TO BE FOLLOWED IS D.F.C. LOADING (32.5 TON AXLE LOAD)
4. HIGH YIELD STRENGTH DEFORMED (HYSD) / THERMO MECHANICAL TREATED (TMT) BARS
OF GRADE Fe - 500 SATISFYING THE REQUIREMENT OF IS: 1786-1985 SHALL BE USED AS
REINFORCEMENT.
5. BACK FILL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE SUB-STRUCTURE AND
FOUNDATION CODE.
DETAIL OF `X' 6. ALL DIMENSION AND LEVEL SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
7. DEPTH AND SIZE OF FOUNDATION, LENGTH OF RETURN WALL AND LEVELS SHALL BE
DECIDED BASED ON SITE CONDITION (TYPE OF STRATA AND GROUND LEVEL).
8. THIS GAD IS TENTATIVE AND IS MEANT ONLY FOR GUIDANCE OF THE BIDDER. ALL THE
ENGINEERING DETAILS ARE TO BE DESIGNED BY THE CONTRACTOR AS PER SITE
CONDITIONS/DIMENSIONS SHALL BE APPROVED BY DFCCIL.
9. TOP SURFACE AND SIDE OF BOX SHALL BE GIVEN TWO COATS OF COAL TAR OR BITUMEN
CONFORMING TO IS: 3070-1965 BEFORE FILLING OF EARTH.
10. WEEP HOLES SHALL BE OF 75mm DIA. PVC PIPE STAGGERED @ 1000mm C/C
HORIZONTALLY AND VERTICALLY THROUGH RETURN WALL/ABUTMENT
11. WEEP HOLES OF 75mm DIA. PVC PIPES @ 1000mm C/C SHOULD BE PROVIDED IN EARTH/
BALAST RETAINER.
12. DRAINAGE OF DECK SHALL BE PROVIDED 1 IN 40 (CROSS SLOPE) VIDE CLAUSE 15.2.2.1 OF
IRS CONCRETE BRIDGE CODE.
13. TOP OF SLAB/BOX SHALL HAVE A WEARING COURSE OF 1 IN 40 TOWARDS OUTER SIDE
FOR PROPER DRAINAGE.
14. WORK SCHEME SHALL BE SUCH THAT ADJACENT IR TRACK IS NOT AFFECTED IN
ANYWAY. HOWEVER, IF IT IS INESCAPABLE THE ENGINEER WILL DECIDE THE IMPOSITION
DETAIL OF `Y' 15.
OF TEMPORARY SPEED RESTRICTION.
THE EXISTING TRACK SHALL BE PROTECTED BEFORE EXECUTION OF WORK. DESIGN OF
SUCH PROTECTION WORK SHALL BE DONE BY THE CONTRACTOR AND SHALL BE
APPROVED BY THE SITE ENGINEER.
16. THE DIFFERENCE BETWEEN PROPOSED RAIL LEVEL (RL) & PROPOSED FORMATION LEVEL
(FL) HAS BEEN ASSUMED AS 730mm.
17. PROPER OUTLETS ON D/S SIDE FOR DRAINAGE OF DISCHARGE IS TO BE ENSURED.
18. SUITABLE DRAIN HAS TO BE PROVIDED BETWEEN THE IR AND DFC FORMATIONS AND THE
WING WALLS SHOULD HAVE PROVISION FOR DISCHARGE OF FLOW FROM THESE DRAINS.
19. SAFE BEARING CAPACITY OF SOIL SHALL BE CONFIRMED BY SUITABLE METHOD BEFORE
CONSTRUCTION WORK. IT SHALL BE GREATER THAN MAXIMUM FOUNDATION PRESSURE.
20. BED SLOPE SHALL BE ADJUSTED AS PER THE SITE CONDITIONS IT SHOULD BE KEPT
MINIMUM AS 1:100.
21. THE GAD SHOULD SATISFY THE LATEST APPROVED SCHEDULE OF DIMENSION FOR DFCC.
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO KHURJA
FROM CH: 1413.856 TO CH: 1367.000
X
CONTRACT PACKAGE - 302
TYPICAL DRAWING OF RUB
SPAN 1 X 5.5 X 4.5M
Y
14 of 15
NOTES:-
TO KHURJA TO DADRI
1. ALL DIMENSIONS ARE IN mm AND ALL LEVELS IN METERS UNLESS OTHERWISE
SPECIFIED.
2. DO NOT SCALE, FOLLOW THE WRITTEN DIMENSIONS ONLY.
3. a) CODES TO BE FOLLOWED (WITH LATEST CORRECTIONS SLIP) IN ORDER OF
PREFERENCE:-
i) IRS BRIDGE RULES.
ii) IRS CONCRETE BRIDGE CODE.
iii) IRS BRIDGE SUBSTRUCTURE AND FOUNDATION CODE.
iv) RELEVANT BIS CODES.
b) LOADING TO BE FOLLOWED IS D.F.C. LOADING (32.5 TON AXLE LOAD)
4. HIGH YIELD STRENGTH DEFORMED (HYSD) / THERMO MECHANICAL TREATED (TMT) BARS
OF GRADE Fe - 500 SATISFYING THE REQUIREMENT OF IS: 1786-1985 SHALL BE USED AS
REINFORCEMENT.
5. BACK FILL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE SUB-STRUCTURE AND
FOUNDATION CODE.
DETAIL OF `X' 6. ALL DIMENSION AND LEVEL SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
7. DEPTH AND SIZE OF FOUNDATION, LENGTH OF RETURN WALL AND LEVELS SHALL BE
DECIDED BASED ON SITE CONDITION (TYPE OF STRATA AND GROUND LEVEL).
8. THIS GAD IS TENTATIVE AND IS MEANT ONLY FOR GUIDANCE OF THE BIDDER. ALL THE
ENGINEERING DETAILS ARE TO BE DESIGNED BY THE CONTRACTOR AS PER SITE
CONDITIONS/DIMENSIONS SHALL BE APPROVED BY DFCCIL.
9. TOP SURFACE AND SIDE OF BOX SHALL BE GIVEN TWO COATS OF COAL TAR OR BITUMEN
CONFORMING TO IS: 3070-1965 BEFORE FILLING OF EARTH.
10. WEEP HOLES SHALL BE OF 75mm DIA. PVC PIPE STAGGERED @ 1000mm C/C
HORIZONTALLY AND VERTICALLY THROUGH RETURN WALL/ABUTMENT
11. WEEP HOLES OF 75mm DIA. PVC PIPES @ 1000mm C/C SHOULD BE PROVIDED IN EARTH/
BALAST RETAINER.
12. DRAINAGE OF DECK SHALL BE PROVIDED 1 IN 40 (CROSS SLOPE) VIDE CLAUSE 15.2.2.1 OF
IRS CONCRETE BRIDGE CODE.
13. TOP OF SLAB/BOX SHALL HAVE A WEARING COURSE OF 1 IN 40 TOWARDS OUTER SIDE
FOR PROPER DRAINAGE.
14. WORK SCHEME SHALL BE SUCH THAT ADJACENT IR TRACK IS NOT AFFECTED IN
ANYWAY. HOWEVER, IF IT IS INESCAPABLE THE ENGINEER WILL DECIDE THE IMPOSITION
DETAIL OF `Y' OF TEMPORARY SPEED RESTRICTION.
15. THE EXISTING TRACK SHALL BE PROTECTED BEFORE EXECUTION OF WORK. DESIGN OF
SUCH PROTECTION WORK SHALL BE DONE BY THE CONTRACTOR AND SHALL BE
APPROVED BY THE SITE ENGINEER.
16. THE DIFFERENCE BETWEEN PROPOSED RAIL LEVEL (RL) & PROPOSED FORMATION LEVEL
(FL) HAS BEEN ASSUMED AS 730mm.
17. PROPER OUTLETS ON D/S SIDE FOR DRAINAGE OF DISCHARGE IS TO BE ENSURED.
18. SUITABLE DRAIN HAS TO BE PROVIDED BETWEEN THE IR AND DFC FORMATIONS AND THE
WING WALLS SHOULD HAVE PROVISION FOR DISCHARGE OF FLOW FROM THESE DRAINS.
19. SAFE BEARING CAPACITY OF SOIL SHALL BE CONFIRMED BY SUITABLE METHOD BEFORE
CONSTRUCTION WORK. IT SHALL BE GREATER THAN MAXIMUM FOUNDATION PRESSURE.
20. BED SLOPE SHALL BE ADJUSTED AS PER THE SITE CONDITIONS IT SHOULD BE KEPT
MINIMUM AS 1:100.
21. THE GAD SHOULD SATISFY THE LATEST APPROVED SCHEDULE OF DIMENSION FOR DFCC.
INDICATIVE DRAWING
EASTERN CORRIDOR
DADRI TO KHURJA
FROM CH: 1413.856 TO CH: 1367.000
X
CONTRACT PACKAGE - 302
TYPICAL DRAWING OF RUB
SPAN 1 X 7.5 X 5.5M
Y
15 of 15