0% found this document useful (0 votes)
188 views1 page

Pilecap Design

This document provides design details for pilecap C10 including load calculations, pile reactions, bending moments, steel reinforcement requirements, beam shear calculations, and punching shear checks. The document contains technical specifications and calculations to BS 8110:2005 standards.

Uploaded by

mdelacua2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views1 page

Pilecap Design

This document provides design details for pilecap C10 including load calculations, pile reactions, bending moments, steel reinforcement requirements, beam shear calculations, and punching shear checks. The document contains technical specifications and calculations to BS 8110:2005 standards.

Uploaded by

mdelacua2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project Spreadsheets to BS 8110 The Concrete Centre

Client BigBucks PLC Made by Date Page


Location Pilecap C10 Rod 24-Jul-17 28
6 Pile Cap
PILECAP DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC82.xls v 4.1 on CD 2006 TCC - - P2000

Cap load = 101.2 kN OVERTURNING MOMENTS - kNm characteristic


DEAD IMPOSED WIND
Mx 19.2 5.3 2.1
My 23.4 10.7 5.3
PILE REACTIONS kN
PILE 1 PILE 2 PILE 3 PILE 4 PILE 5 PILE 6
Gk + Qk 141.2 153.8 147.8 160.3 154.3 166.9 .
Gk + Qk +Wk 144.2 157.9 151.8 165.5 159.4 173.0 .
.4Gk + 1.6Qk 204.0 222.2 213.6 231.8 223.2 241.3
Gk + 1.4Wk 112.6 124.0 118.6 129.9 124.5 135.9 .
(Gk+Qk+Wk) 172.2 188.5 181.3 197.6 190.3 206.7

BENDING MOMENTS - kNm


1.4Gk + 1.6Qk Gk + 1.4Wk 1.2(Gk+Qk+Wk)
My v of col 511.5 283.9 432.9
My ^ of col 557.5 312.4 476.5 (including tolerance)
My < of col 400.5 222.3 339.9
My > of col 434.5 243.6 370.6

E-W STEEL BOTTOM TOP N-S STEE BOTTOM TOP


16 16 16 16
M = 434.5 0.0 M = 557.5 0.0 K' = 0.1558
b = 3300 3300 b = 2000 2000 min As = 0.13%
d = 551.0 576.0 d = 567.0 592.0
K = 0.0124 0.0000 K = 0.0248 0.0000
z = 523.5 547.2 z = 538.7 562.4
As = 1909 0 As = 2380 0
Provide 2789 0 Provide 2380 0
No = 14 8 No = 12 5
As prov = 2815 1608 As prov = 2413 1005
fs = 226 8 H16 T2 fs = 329 5 H16 T1
Max clear S = 284.0 Max clear S = 284.0
Min clear S = 25.0 Min clear S = 25.0
Clear S = 227.1 Clear S = 153.1
14 H16 B2 12 H16 B1

BEAM SHEAR Critical section is 112.5 mm from pile centres


EW (NS plane) 12 links
V = 695.3 v = 0.3824 As% = 0.155 .
av = 362.5 1.5d/av = 0.8655 (v - vc)b = 1320.0
No of legs = 8 Spacing = 275 8 Legs H12 @ 275 LINKS
NS (EW plane)
V = 464.6 v = 0.4097 As% = 0.213 .
av = 937.5 vc = 0.4221 (v - vc)b = 800.0
No of legs = 5 Spacing = 300 5 Legs H12 @ 300 LINKS

PUNCHING Column Face No other critical section


V= 1194.4 = 6504 d ave = 559
v= 1.257 v = 0.000 av = 537.5
v max = 4.733 ok 1.5d/av = 0.627 ok

You might also like