Du Toan Tieng Anh - Reference
Du Toan Tieng Anh - Reference
Structural Works
Page 1
Detail description & specification of work Unit
Page 2
Detail description & specification of work Unit
Electrical Works in
1 Distribution Panel Board set Bng in tng
2-36W Flourescent Lighting Fixture
2 n tut i 2x35W, treo cch trn
w/Suspention set
1-18W Flourescent Lighting Fixture
3 n tut n 1x18W treo cch trn
w/Suspention set
1-18W Flourescent Lighting Fixture
4
w/Surface Mounted set
5 Ceiling Fan 1400mm piece Qut trn 1,4m
6 Socket set cm
7 Lighting Switch, One Gang Flush Mounted cm n lp chm
set
Lighting Switch, Two Gangs Flush
8 cng tc
Mounted set
Ceiling Fan Switch, Multi-speed Control
9 Hp s qut trn lp ni
Flush Mounted set
10 PVC Conduit P20 set ng ghen in
11 Wire BV-2.5 set Dy 2,5
12 Wire BV-1.5 set Dy 1,5
13 Switch Box set cng tc
14 Lighting Connection Box set Hp ni in
15 Lightning Rod w/Pool (L=3000) set Kim thu st
16 PVC Conduit P32 set ng ghen nha
17 Steel Earthing Bar LH2*13 m Thp tip a
18 Lightning Terminal Box m Hp ni dy chng st
19 Candecent Light m
(2) T-M
Structural Works
8 Non slip tile for Stair Nosing m Gch chng trn mt bc thang
Miscellaneous work Lt vt
Page 4
Detail description & specification of work Unit
Page 5
Detail description & specification of work Unit
Total price
Page 6
Bill of quantity
No Item Cng vic
A Temporary work Cng vic ph tr
(1) Preparation Chun b hin trng
1-1 Temporary road Lm ng vo
1-2 Survey & setting out nh v cng trnh
(2) Temporary facilities Cng trnh tm
2-1 Fence & gate Ro tm
2-2 Site Office Vn phng cng trng
2-3 Labor quarter Ln tri cng nhn
2-4 Store Kho
2-5 Toilet Nh v sinh
2-6 Scaffolding Gio
(3) Machineries & tools My - thit b
3-1 Machineries My
3-2 Tools Dng c
(4) Temporary power & water in nc phc v thi cng
4-1 Electricity in
4-2 Water Nc
(5) Test Th nghim vt liu
5-1 Concrete compression test Th nghim b tng
5-2 Steel bar tensile test Th nghim thp
(6) Safety An ton lao ng
6-1 Safety measure Bin php
6-2 Safety sign Bin bo ATL
6-3 Security guard Bo v cng trnh
(7) Transportation Vn chuyn
Gi cc vn chuyn nhng loi cha tnh vo n
7-1 Transportation
gi gc
(8) others Cng tc khc
Total price
Bill of quantity
No
Item Cng vic
Stt
Page 4
A Temporary work Cng vic ph tr
(1) Preparation Chun b hin trng
1-1 Temporary road Lm ng vo
1-2 Survey & setting out nh v cng trnh
(2) Temporary facilities Cng trnh tm
2-1 Fence & gate Ro tm
2-2 Site Office Vn phng cng trng
2-3 Labor quarter Ln tri cng nhn
2-4 Store Kho
2-5 Toilet Nh v sinh
2-6 Scaffolding Gio
(3) Machineries & tools My - thit b
3-1 Machineries My
3-2 Tools Dng c
(4) Temporary power & water in nc phc v thi cng
4-1 Electricity in
4-2 Water Nc
(5) Test Th nghim vt liu
5-1 Concrete compression test Th nghim b tng
5-2 Steel bar tensile test Th nghim thp
(6) Safety An ton lao ng
6-1 Safety measure Bin php
6-2 Safety sign Bin bo ATL
6-3 Security guard Bo v cng trnh
(7) Transportation Vn chuyn
Gi cc vn chuyn nhng loi cha tnh vo n
7-1 Transportation
gi gc
(8) others Cng tc khc
Total price
Bill of quantity
No Item Cng vic
A Temporary work Cng vic ph tr
(1) Preparation Chun b hin trng
1-1 Temporary road Lm ng vo
1-2 Survey & setting out nh v cng trnh
Page 5
(2) Temporary facilities Cng trnh tm
2-1 Fence & gate Ro tm
2-2 Site Office Vn phng cng trng
2-3 Labor quarter Ln tri cng nhn
2-4 Store Kho
2-5 Toilet Nh v sinh
2-6 Scaffolding Gio
(3) Machineries & tools My - thit b
3-1 Machineries My
3-2 Tools Dng c
(4) Temporary power & water in nc phc v thi cng
4-1 Electricity in
4-2 Water Nc
(5) Test Th nghim vt liu
5-1 Concrete compression test Th nghim b tng
5-2 Steel bar tensile test Th nghim thp
(6) Safety An ton lao ng
6-1 Safety measure Bin php
6-2 Safety sign Bin bo ATL
6-3 Security guard Bo v cng trnh
(7) Transportation Vn chuyn
Gi cc vn chuyn nhng loi cha tnh vo n
7-1 Transportation
gi gc
(8) others Cng tc khc
Total price
Page 6
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
(1) (2) (3) (3) 2-4C 2-4C
A Structural Works - TQ-5S
1 Exvacation for Foundation o mng m3 402 72,146 29,002,838
F1: 2*(2,15+5,6+0,5)*1,3 = 21,45
F2: (19,35+0,5+0,75+1)*1,3*3,4 = 95,472
(5,6-1,7-1,9+1,5+2,2-1,9)*1,3*2*3,4 = 33,592
(1,5+2,2-1,9)*4*1,3*3,4 = 31,824
F3: (19,35+1+1)*1,3*3,8 = 105,469
2 Leveling Concrete M150 B tng lt mng M150 m3 26.8 94,386 2,529,545
F1: 1,2*(5,6-1,2-1,4+2,2+1)*2*0,15 = 2,232
F2: (1+2,2-1,4)*4*0,15*2,6 = 2,808
(5,6-1,2-1,4)*2*0,15*2,6 = 2,34
(19,35+0,6+0,85)*2,6*0,15 = 8,112
F3: (19,35+0,6+0,85)*1*0,15*3 = 9,36
FG2: (5,6-1,2-1,4)*2*0,42*0,06 = 0,151
FG4: (19,35+0,21)*0,42*0,06 = 0,493
3 Sand layer Ct tn nn m3 52 33,923 1,763,996
4 Rebar for Foundation Thp mng tn 4.4 763,011 3,357,248
5 Foundation Concrete M200 B tng mng m3 58.5 176,531 10,327,064
y mng
F1: 1*(5,6-1,2-1,4+2,2+1)*2*,25 = 3,1
F2: (1+2,2-1,4)*4*0,25*2,4 = 4,32
(5,6-1,2-1,4)*2*0,25*2,4 = 3,6
(19,35+0,6+0,85)*2,4*,25 = 12,48
F3: (19,35+0,6+0,85)*1*,25*2,8 = 14,56
FG2: (5,6-1,2-1,4)*2*0,42*0,05 = 0,126
FG4: (19,35+,21)*0,42*0,05 = 0,411
tng mng
FG1: (19,35-0,3*12)*1,05*0,21 = 3,473
FG2: (5,6-0,3)*2*0,5*0,21 = 1,113
FG3: (5,6-0,3)*4*1,05*0,21 = 4,675
FG4: (19,35-0,21*7)*0,4*0,21 = 1,502
FG5: (2,15-0,3)*6*0,95*0,21 = 2,214
Page 7
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
6 Back filling Lp t sau khi lm mng m3 110 41,643 4,580,730
Solid Brick Wall With Double
7 Xy tng mng dy 33 m2 60,000 0
Plastering(t=300)
8 Rebar for Column Thp ct, t 3.25 1,039,744 3,379,168
9 Steel Column Ct thp 100x100x2,3 cai 300,000 0
10 Column Concrete B tng ct m3 12.6 320,773 4,041,740
c1: 7,85*0,3*0,3*4 = 2,826
c2; 8*0,3*0,3*7,85 = 5,652
c3: 6*7,85*0,21*0,3 = 2,967
11 Beam Concrete B tng dm, bu ca, treo bng m3 33.6 261,673 8,792,213
G1: (19,35-0,3*7)*2*0,5*0,21+(45,1-
0,3*7)*2*0,45*0,21 = 11,75
G2: (5,6-0,3)*4*0,6*0,21+(5,6-0,3)*6*0,5*0,21 = 6,01
G3: (5,6-0,3)*2*0,6*0,21+(5,6-0,3)*2*0,5*0,21 =
G4: (19,35-0,21*7)*0,4*0,21+(45,1-0,21*7)*0,35*0,21
= 4,709
G5: (2,15-0,3)*6*0,4*0,21+(2,15-0,3)*8*0,35*0,21 =
2,02
P1: 4*0,6*0,21*1,23 = 0,62
P2: 2*0,21*0,21*1,23 = 0,108
CS1: 3,8*4*0,6*0,1 = 0,912
3,8*4*,11*,22 = 0,368
B1 c: 4,233*2*0,21*0,21*2 = 0,747
Bc ging
5,6*0,2*0,3*2*4 = 2,688
bu ca v lan can
19,35*0,2*0,12*2 = 0,929
12 Rebar for Beam Thp dm ging t 4.98 1,126,290 5,608,924
Hollow Brick Wall With Double
13 Tng xy dy 220 m2 255 50,000 12,750,000
Plastering(t=200)
14 Crashed stone 1x2 (t=150) Lp lt nn ( dm) m3 22.5 94,386 2,123,685
15 POLYETHYLELENE Tm nha lt nn m2 158 2,000 316,000
16 Ground Floor Concrete B tng nn tng 1, bc cp m2 26.5 120,013 3,180,345
(19,35+0,21)*(7,75+0,21)*0,12 = 18,684
Page 8
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
Bc tam cp;
4,15+0,12*0,9 = 4,258
2,15*0,9*0,12*2 = 0,464
17 Gravel layer Ct m nn+va lt m3 58 94,386 5,474,388
18 Outside Steps Xy Bc tam cp cc loi+lan can m3 13.8 134,606 1,857,563
1,2*(26,95-0,3*7)*0,22 = 6,56
4,155*0,145*0,9 = 0,542
4,15*0,145*0,6 = 0,361
4,15*0,145*0,3 = 0,181
2,15*0,145*0,9*2 = 0,561
2,15*0,145*0,6*2 = 0,374
2,15*0,145*0,3*2 = 0,187
(26,95-0,3*5-4,15)*0,335*0,22 = 1,57
1,27*0,2*1,13*2 = 0,574
0,78*0,2*0,985*2*2 = 0,615
trt bc tam cp, lan can bc thang
1,2*(26,95-2,1)*2 = 59,64
(4,15+0,145)*0,3 = 1,289
(2,35+0,145)*0,3*2 = 1,497
(26,95-0,3*7)*0,335*2 = 16,65
1,27*2*1,13 = 2,87
22*(0,157+0,27)*2,07 = 19,446
0,78*2*0,985*2 = 3,073
22*(0,157+0,27)*1,45 = 13,621
19 Rebar for Slab Thp sn, t 6.85 1,126,290 7,715,087
20 Slab Concrete B tng sn m3 29.6 198,024 5,861,510
S1: (5,6-0,21)*(3,8-0,21)*5*0,12 = 11,61
(5,6-0,21)*(4,15-0,21)*0,12 = 2,548
S2: (5,6-0,21)*(3,8-0,21)*4*0,12 = 9,288
S3: (2,15-0,21)*(3,8-0,21)*4*0,12 = 3,343
(2,15-0,21)*(4,15-0,21)*0,12 = 0,917
21 Staircase Concrete B tng cu thang m3 8.5 220,637 1,875,415
B2: 4,15*0,5*0,3 = 0,623
Page 9
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
B2A: 4,15*0,5*0,21 = 0,436
CN: 4,15*0,12*2,35 = 1,17
CT:4,15*0,12*1,28 = 0,637
Bc thang
4,07*2,35*0,18+2,36*2,35*0,18 = 2,72
0,245*0,15*2,35*22/2 = 0,95
Cn thang
(4,07+2,36)*2*0,12*1,1 = 1,698
Form Works for
22 Cp pha sn, ct, dm, mng m2 1003.8 30,998 31,115,792
Slab\Column\Beam\Foundation
-Mng
y mng
F1: 1*(5,6-1,2-1,4+2,2+1)*2 = 0,124
F2: (1+2,2-1,4)*4*2,4 = 17,28
(5,6-1,2-1,4)*2*2,4 = 14,4
(19,35+0,6+0,85)*2,4 = 49,92
F3: (19,35+0,6+0,85)*1*2,8 = 58,24
FG2: (5,6-1,2-1,4)*4*0,42 = 0,05
FG4: (19,35+0,21)*0,42 = 8,215
Tng mng
FG1: (19,35-0,3*12)*1,05*2 = 33,075
FG2: (5,6-0,3)*2*0,5*2 = 10,6
FG3: (5,6-0,3)*4*1,05 = 22,26
FG4: (19,35-0,21*7)*0,4 = 7,152
FG5: (2,15-0,3)*6*0,95 = 10,545
Ct
7,85*(0,3+0,3)*2*4 = 37,68
C2: 8*0,3*4*7,85 = 75,36
C3: 6*7,85*(0,21+0,3)*2 = 48,042
P3: 2*3,9*(0,3+0,21) = 3,978
Dm
G1: (19,35*(0,5*2+0,21)*2) = 46,827
19,35*(0,45*2+0,21)*2 = 42,957
G2: 5,3*4*(0,6*2+0,21) = 29,892
Page 10
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
5,3*4*(0,5*2+0,21) = 25,652
G3: 5,3*2*(0,6*2+0,21) = 14,946
5,3*2*(0,5*2+0,21) = 12,826
G4: 19,35*(0,4*2+0,21) = 19,544
19,35*(0,35*2+0,21) = 17,609
G5: 2,15*(0,4*2+0,21)*6 = 13,029
2,15*(0,35*2+0,21)*6 = 11,739
P1: 4*(0,6*2+0,21*2)*1,23 = 7,97
P2: 2*0,21*4*1,23 = 2,066
CS1: 3,8*4*0,6*0,1 = 0,912
3,8*4*(0,11*2+0,22) = 6,688
B1: 4,233*2*(0,21*4)*2 = 14,223
Sn
S1: (5,6-0,21)*(3,8-0,21)*4 = 77,4
(5,6-0,21)*(4,15-0,21) = 21,237
S2: (5,6-0,21)*(3,8-0,21)*4 = 77,4
S3: (2,15-0,21)*(3,8-0,21)*4 = 27,858
(2,15-0,21)*(4,15-0,21) = 7,644
Cu thang
B2: 4,15*(0,5*2+0,3) = 5,395
B2A: 4,15*(0,5*2+0,21) = 5,022
CN: 4,15*2,045 = 8,487
CT: 4,15*1,28 = 5,312
Bc thang
(4,233*1,995)+(2,36*1,995) = 13,153
Cn thang
(4,233+2,36)*2*1,1 = 14,505
4,233*1,99*2 = 16,847
23 Form Works for Slab G dn lt sn m2 214 3,500 749,000
24 Polished Terrazzo Lt Granit nn sn, bc ging Terrazzo m2 262 45,000 11,790,000
Cement Mortar Steel Trowel Finish Trt VXM tng, ct, dm ging bng bn xoa st,
25
(t=15) for Wall/Column/Girder dy 15 m2 750 9,290 6,967,500
Cement Mortar Steel Trowel Finish
26 Trt tng VXM bng bn xoa st, dy 10 m2 750 9,290 6,967,500
(t=10) for Wall//Column/Girder
Page 11
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
27 Cement Mortar Steel Trowel Finish Trt VXM chn tng bng bn xoa st, bc tam cp m2 135 12,133 1,637,955
Trn b tng khng trt, ch sa ch phng bng VXM,
28 Exposed Concrete Slab\Beam
sn nc m2 559 12,500 6,987,500
29 P.C Terrazzo for Stair Case Tread/Riser Granit mt, c bc thang c sn m2 41 45,000 1,845,000
30 Stelel handrail D42 S.O.P Lan can tay vn cu thang ng thp D42 m 11.5 25,000 287,500
31 Concrete louver blocks Tm chp BT c li chng cn trng m2 8 25,000 200,000
32 P.C Screen Block Tng lp tm XM rng c sn (hoa BT) m2 7.5 25,000 187,500
33 Steel Beam Steel, Steel Perlin Steel V ko, x g thp mi t 4.1 5,668,557 23,241,084
34 Color Al-Zn Plated Steel Sheet for Roof Tn mu lp mi m2 229 7,500 1,717,500
Color Al-Zn Plated Steel Sheet for Ridge
35 p nc, dim mi bng tn m 98 5,000 490,000
Capping/Flashing/Fascia
Ceiling Board/Perforated Ceiling Board
36 tm trn thch cao, sn nc m 99.49 35,500 3,531,895
A.E.P
Ceiling : Exposesd for
37 Sn nc tng, ct, dm ging m2 750 6,430 4,822,500
Wall/Column/Girder
Alminum Jalousie w/Glass Blades(Clear
39
Glass t=6) for Window 1190*2050(W*H) set 100,000 0
Alminum Jalousie w/Glass Blades(Clear
40
Glass t=6) for Window 1290*2050(W*H) set 100,000 0
Alminum Jalousie w/Glass Blades(Clear Ca s chp khung nhm, lam knh dy 6mm, ca c
41
Glass t=6) for Window 1145*2050(W*H) kch thc bng 1145x2050 (rngxcao) set 16 100,000 1,600,000
Alminum Jalousie w/Glass Blades(Clear Ca s chp khung nhm, lam knh dy 6mm, ca c
42
Glass t=6) for Window 1200*2050(W*H) kch thc bng 1200x2050 (rngxcao) set 8 100,000 800,000
43 Phu thu sn c Xiphng cai 4 13,138 52,552
Wood Panel Door w/Wooden Frame
44 Ca set 100,000 0
S.O.P 900*2815(W*H)
Wood Panel Door w/Wooden Frame
45 Ca set 5 100,000 500,000
S.O.P 900*2765(W*H)
Wood Panel Door w/Wooden Frame
46 Ca set 4 100,000 400,000
S.O.P 900*2670(W*H)
47 PVC Pipe 100 ng nha m 32 8,905 284,960
48 Pebbles/Bricks for Rainwater Trench set 4 200,000 800,000
Electrical Works in 0
1 Distribution Panel Board Bng in tng set 1 36,316 36,316
2 Automat 100AF/50AT 3fa Automat 100AF/50AT 3fa 1 36,316 36,316
3 Automat 2 fa Automat 2 fa 12 21,700 260,400
Page 12
Bill of Quantity
TQ-5S THUONG AM
Detail description & specification of Labor & tool
Detail description & specification of work Unit Quantity
work unit rate amount
4 Wire Cp ngun 60 36,316 2,178,960
2-36W Flourescent Lighting Fixture
5 n tut i 2x36W, treo cch trn set 30 31,500 945,000
w/Suspention
1-18W Flourescent Lighting Fixture
6 n tut n 1x18W treo cch trn set 4 22,500 90,000
w/Suspention
2-36W Flourescent Lighting Fixture
7 n tut i 2x36W treo st trn set 8 31,500 252,000
w/Surface Mounted
1-18W Flourescent Lighting Fixture
8 n tut n 1x18W treo st trn piece 8 22,500 180,000
w/Surface Mounted
9 Ceiling Fan 1400mm Qut trn 1,4m set 8 36,316 290,528
10 Socket cm set 12 9,849 118,188
Lighting Switch, Two Gangs Flush
11 Cng tc set 15 9,849 147,735
Mounted
12 PVC Conduit P90 ng lun dy fi 70 m 70 17,977 1,258,390
13 PVC Conduit P20 ng ghen in m 500 9,849 4,924,500
14 Wire BV-2.5 Dy 2,5 m 900 1,707 1,536,300
15 Wire BV-1.5 Dy 1,5 m 420 1,707 716,940
16 Lighting Connection Box Hp ni in set 4 0
17 Lightning Rod w/Pool (L=3000) Kim thu st set 4 103,182 412,728
18 Steel Earthing Bar LH2*13 Thp tip a set 4 250,000 1,000,000
19 Lightning Terminal Box Hp ni dy chng st set 0
0
Page 13
Bill of Quantity
Detail description & Detail description & specification
Page 7
Detail description &
Detail description & specification of work
specification of work
Cement Mortar Steel Trowel
2 Lng nn XM, dng bn xoa st (dy 40mm)
Finish (t=40)
Si t thm
Gch Block
Cement Mortar Steel Trowel
3 Finish (t=20) A.E.P for Trt VXM chn tng bng bn xoa st, dy 20 cao 200,
Baseboard
Cement Mortar Steel Trowel
4 Trt VXM chn tng bng bn xoa st, dy 20 cao 200,
Finish (t=20) for Baseboard
Cement Mortar Steel Trowel
5 Finish (t=15) for Trt VXM tng, ct, dm ging bng bn xoa st, dy 15
Wall/Column/Girder
Cement Mortar Steel Trowel
6 Finish (t=10) for Trt tng VXM bng bn xoa st, dy 10
Wall//Column/Girder
Cement Mortar Steel Trowel
Trt VXM chn tng bng bn xoa st, bc tam cp
Finish
Trn thch cao
Np g p sn ko c KT
Exposed Concrete
7 Trn b tng khng trt, ch sa ch phng bng VXM, sn nc
Slab\Beam
P.C Terrazzo for Stair Case
8 Granit mt, c bc thang c sn
Tread/Riser
Stelel handrail D42 S.O.P Lan can tay vn cu thang ng thp D42
Concrete louver blocks Tm chp BT c li chng cn trng
Tm chp thong trn mi
Tm ln mi bng st tm
9 P.C Screen Block Tng lp tm XM rng c sn (hoa BT)
Steel Beam Steel, Steel
V ko, x g thp mi
Perlin Steel
Color Al-Zn Plated Steel
10 Tn mu lp mi
Sheet for Roof
Color Al-Zn Plated Steel
11 Sheet for Ridge p nc, dim mi bng tn
Capping/Flashing/Fascia
Ceiling Board/Perforated
12 tm trn thch cao, sn nc
Ceiling Board A.E.P
Ceiling : Exposesd for
Sn nc tng, ct, dm ging
Wall/Column/Girder
Page 8
Detail description &
Detail description & specification of work
specification of work
Sn st thp cc loi
(4) T-L
Structural Works
1 Exvacation for Foundation o mng
2 Gravel layer Lp lt , si
3 Leveling Concrete B tng lt
4 Back filling Tn nn
5 Banking K
6 Foundation Concrete B tng mng
7 Form Works for foudation coppha mng
8 Rebar for foundation Thp mng
Concrete
forFloor\Column\BeamSt
9 air B tng sn, ct, dm, cu thang
Form Works for
10 Floor\Column\BeamStair coppha sn, ct, dm, cu thang
Rebar for
11 Floor\Column\BeamStair Thp sn, ct, dm, cu thang
12 Miscellaneous Concrete B tng lt vt khc
13 Solid Brick work for stool Xy mng gch c
14 Hollow Brick Wall t=210 Xy tng 210 bng gch rng
15 Hollow Brick Wall t=100 Xy tng 100 bng gch rng
16 Gravel for barm
Finishing Works Hon thin
Polished Terrazzo Cast-in-
1 site (t=40) for Floor Lng Granit nn ti ch dy 40
2 Glass Divider Knh chia
Polished Terrazzo Cast-in-
3 site (t=30) Lng Granit ti ch dy 30
Cement Mortar Steel Trowel
Lng nn VXM dy 30 bng bn soa st
4 Finish (t=30) for Floor
Page 11
Detail description &
Detail description & specification of work
specification of work
Cement Mortar Steel Trowel
5 Finish (t=20) for Wall Trt tng VXM, dy 20
Cement Mortar Steel Trowel
6 Finish (t=20) A.E.P Sn tng 1 lp lt, 2 lp ph khng b
P.C Terrazzo for Stair
7 Nosing Tm Granit c sn lm mi bc thang
8 Nosing Gch chng trn mt bc thang
Waterproof Mortar Steel
9 Trowel Finish Va chng thm
Color Al-Zn Plated Steel
10 Sheet for Roof Tn lp mi
Color Al-Zn Plated Steel
Sheet for Ridge
11 Capping/Flashing/Fascia Tn p nc, dim mi
Steel Perlin Steel Channel
12 100*50*20*3.2 X g thp
Frame w/Paint
13 950*1650(W*H) Ca st c khun, sn
Wood Panel Door and
Ca g c khun, sn
14 Frame w/Paint
Miscellaneous work Lt vt
1 Manhole cover 600 Lp h ga
2 Scupper Khe h thot nc
3 Louver block210*210 Hoa BT
4 SUS tank (1 ps ) B nc Inox
5 Grating 500*900 Ghi gang
6 PVC vent. Pipe (50 ng thng hi
7 terrazzo 1190*900 Granit c sn
8 Pictographic Sign 200*200 Biu tng ( WC c bng hnh phn bit nam, n)
Electrical Works in
1-18W Flourescent Lighting
1 n tut n 1x18W treo cch trn
Fixture w/Surface Mounted
Lighting Switch, One Gang
2 cm n lp chm
Flush Mounted
3 PVC Conduit P20 ng ghen nha d20
4 Wire BV-2.5 Dy 2,5
5 Wire BV-1.5 Dy 1,5
6 Switch Box cng tc
7 Lighting Connection Box Hp ni
Page 12
Detail description &
Detail description & specification of work
specification of work
8 Lightning Terminal Box Hp ni tip t
Plumbing Works Nc
1 Tank5.0t(SUS) B inox 5 tn ( INOX Sn H nm ngang 5m3)
2 Steel Foot Gi b
3 Valve25BV Van d25
4 Wall Faucet20BV van d20
Pipe for Water Supply
5 ng cp nc
25A(VP)
Pipe for Water Supply
6 ng cp nc
20A(VP)
7 Fitting Ph kin
8 Floor Drain with Trap50A Phu thu sn c Xiphng
9 Floor Drain with Trap40A Phu thu sn c Xiphng
Pipe for Sewage
10 ng thot nc thi
Water100A(PVC)
Pipe for Sewage
11 ng thot nc thi
Water80A(PVC)
Pipe for Sewage
12 ng thot nc thi
Water50A(PVC)
Pipe for Sewage
13 ng thot nc thi
Water40A(PVC)
14 Fitting 50A(PVC) Ph kin
PIPE FOR VENTILATION
15 ng thng hi
100A(VP)
16 Fitting 100A(VP) Ph kin
17 Cap for Ventilation100A(VP) np ng thng hi
18 Water Closet B x
19 Urinal H tiu
20 Drainage Basin H ga
(5) SOAK PIT H thm nc thi t b pht
Page 13