0% found this document useful (0 votes)
1K views1 page

Quatation For Sub Soil Investigation

This document is a quotation for sub-soil investigation works for a proposed multi-storied residential building in Bashundhara. It provides a breakdown of the work, including mobilization and demobilization of equipment, execution of 5 bore holes to 100ft depth each, necessary field and laboratory tests, and submission of a final report. The total quoted price is 35,000 BDT, with 50% required as an advanced payment to start the field test work.

Uploaded by

SIDDIQUE SIDD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Quatation For Sub Soil Investigation

This document is a quotation for sub-soil investigation works for a proposed multi-storied residential building in Bashundhara. It provides a breakdown of the work, including mobilization and demobilization of equipment, execution of 5 bore holes to 100ft depth each, necessary field and laboratory tests, and submission of a final report. The total quoted price is 35,000 BDT, with 50% required as an advanced payment to start the field test work.

Uploaded by

SIDDIQUE SIDD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

e

73/D, Central Road, (1st Floor) Dhanmondi, Dhaka-1205, Mobile: 01552-413392,


01727-285500,
[email protected]

To,
Mr. Md. Mustafijur Rahman
BION Limited

Subject: Quotation for Sub-Soil Investigation Works for the proposed Construction of
Multi-Storied Resideatial Building at Bashundhara.

Dear Sir,
With due Respect we submit the following Quotation for above mentioned
works.

Sl
Description Quantity Rate in BDT Total Amount
.
Mobilization of equipments
and Demobilization after
completion of Field works,
Execution of wash boring 1 site
1.
including necessary field 5 bore hole L.S 35,000/=
and laboratory test and 100ft
submission of final report.

In word: (Thirty FiveThousand Taka Only) Total 35,000/=

N.B: 1stRunning advanced payment 50% for starting the Field test work.

Your Necessary Action Will highly be appreciated.

Thanking You

Yours faithfully

Managing Partner