0% found this document useful (0 votes)
98 views4 pages

Survey Lab Equipment Status Report

e wq32rwiury3we;oruq3w p8eewa wewoywewq[9 ewie7r]we3rowe br=e3wr buewor3weuroewro8ewew r0e3wr e3w8;pr3we8p rewp9p9rwe3r]-qrw3qlriwe pr3wr ]0qwr qpiew'[priwqr q'8er q'p

Uploaded by

anon_295219564
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views4 pages

Survey Lab Equipment Status Report

e wq32rwiury3we;oruq3w p8eewa wewoywewq[9 ewie7r]we3rowe br=e3wr buewor3weuroewro8ewew r0e3wr e3w8;pr3we8p rewp9p9rwe3r]-qrw3qlriwe pr3wr ]0qwr qpiew'[priwqr q'8er q'p

Uploaded by

anon_295219564
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Department of Civil Engineering

Survey Lab – Current Status

Working
Name of the Name of the Available
S. No. Condition Required Repair
Experiment Equipment (Y/N)
(Y/N)
Survey of an area
by chain survey Chain/Tape, Cross Unable to fit both
1
(Closed traverse) Staff, Ranging Rods, pieces & Painting
& plotting Pegs/Arrows Y Y
Chain/Tape, Cross
2 Chaining across Staff, Ranging Rods,
obstacles Pegs/Arrows Y Y
Determination of Service required for
distance between Compass, Tripod
Compass. Needle is
3 two inaccesible stand, Plumb Bob,
points using Ranging Rods, not functioning.
compass Arrows, Chain/Tape Y Y Prism is to be fitted.
Surveying of a
given area by
prismatic
4 compass (Closed Compass, Tripod
traverse) and stand, Plumb Bob,
plotting after Ranging Rods,
adjustment. Arrows, Chain/Tape Y Y
Radiation method, Screws are required
intersection Plane table with stand,
5
methods by plane Instrument box, Plumb
to connect table and
Table survey Bob Y Y tripod.
Two point and
three point Plane table with stand,
6
problems in plane Instrument box, Plumb
table survey. Bob Y Y
Plane table with stand,
7 Traversing by Instrument box, Plumb
plane table survey Bob Y Y
Dumpy level, Tripod
stand, Ranging rods,
Repair of tripod stand
8 Fly leveling Levelling staff,
to be done.
(differential Chain/Tape, Plumb
leveling) bob Y Y
Dumpy level, Tripod
stand, Ranging rods,
9 An exercise of Levelling staff,
L.S. and C.S. and Chain/Tape, Plumb
plotting. bob Y Y
Dumpy level, Tripod
stand, Ranging rods,
10 Levelling staff,
Two exercises on Chain/Tape, Plumb
contouring. bob Y Y
Study of
theodolite in detail
– practice for Theodolite, Tripod Multiple problems
11 Y Y
measurement of stand, Plumb Bob with the Theodolite
horizontal and
vertical angles
Measurement of
Theodolite, Tripod
horizontal angles
stand, Plumb Bob,
12 by method of Y Y
Chain/Tape, Levelling
repetition and
Staff, Ranging rods
reiteration
Trigonometric
Theodolite, Tripod
Leveling –
stand, Plumb Bob,
13 Heights and Y Y
Chain/Tape, Levelling
distance problem
Staff, Ranging rods
(Two Exercises)
Heights and
distance using Tacheometer, Tripod
Principles of stand, Plumb Bob,
14 Y Y
tachometric Chain/Tape, Levelling
surveying (Two Staff, Ranging rods
Exercises)
Theodolite,
Curve setting –
Chain/Tape, Cross
different methods. Y Y
staff, Arrows, Ranging
(Two Exercises)
rods
Setting out works Cross staff, Arrows,
15 for buildings & Ranging rods, Y Y
pipe lines Chain/Tape
Total station, Tripod
Determination of
stand, Prism, Prism
16 area using total Y Y
rod, Chain,Tape,
station
Ranging rods
Total station, Tripod
Traversing using stand, Prism, Prism
17 Y Y
total station rod, Chain,Tape,
Ranging rods
Total station, Tripod
Contouring using stand, Prism, Prism
18 Y Y
total station rod, Chain,Tape,
Ranging rods
Total station, Tripod
Determination of
stand, Prism, Prism
19 remote height Y Y
rod, Chain,Tape,
using Total station
Ranging rods
Distance,
gradient, Diff. Total station, Tripod
height between stand, Prism, Prism
20 Y Y
too inaccesible rod, Chain,Tape,
points using total Ranging rods
station

Study of
theodolite in detail
– practice for Theodolite, Tripod
21 Y Y
measurement of stand, Plumb Bob
horizontal and
vertical angles
Department of Civil Engineering

Survey Lab – New Purchase (Including Furniture)

Name of the
S. No. Quantity Unit Rate Amount
Equipment

Measuring Tapes (30


1 2 750 1500.00
m)

2 Pegs 20 200 4000.00

3 Ceiling Fans 2 1500 3000.00

4 Tube Light 1 1000 1000.00

Total (Rs) 9500.00

You might also like