Daftar Belanja Proyek Furniture

This document is a list of purchases for a project to create a 1st floor office. It details 30 line items with descriptions, quantities, units of measure, specifications, and unit prices for materials such as plywood, laminate, tiles, locks, and other hardware. The total project cost is Rp 7,500,000. This purchase list provides an itemized breakdown of materials and their costs for the 1st floor office renovation project.

Uploaded by

Alunar Hart
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
383 views18 pages

Daftar Belanja Proyek Furniture

This document is a list of purchases for a project to create a 1st floor office. It details 30 line items with descriptions, quantities, units of measure, specifications, and unit prices for materials such as plywood, laminate, tiles, locks, and other hardware. The total project cost is Rp 7,500,000. This purchase list provides an itemized breakdown of materials and their costs for the 1st floor office renovation project.

Uploaded by

Alunar Hart
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Title : Daftar Belanja Proyek

Project : Pandan Group 1st Floor Office


Location : Jl. Simp.Darmo Permai Selatan XI/12
phone +62.856.480.25888
e-mail [email protected] Date Deal : 18 April 2013
Jl. Siwalankerto Tengah No. 66 | Surabaya | East Java
Nilai Proyek : Rp 7.500.000

No Description Volume Satuan Spesification Harga Satuan (Rp)


1 2 3 4 5 6

A Work Area 1st Floor Alt 1 Ruang


A.01 Plywood 12mm (Semi) 4 unit Nota 1 tanggal 20 April 2013 Rp 132,000
A.02 Plywood 9mm (semi) 3 unit Nota 1 tanggal 20 April 2013 Rp 102,500
A.03 Plywood 6mm (semi) 2 unit Nota 1 tanggal 20 April 2013 Rp 67,000
A.04 Lem 168 1 blek Nota 1 tanggal 20 April 2013 Rp 345,000
A.05 Lem Fox Putih 1 unit Nota 1 tanggal 20 April 2013 Rp 10,000
A.06 Ongkir 1 unit Nota 1 tanggal 20 April 2013 Rp 20,000
A.07 Skrup Dry 6x11/4 1 unit Nota 1 tanggal 20 April 2013 Rp 7,500
A.08 HPL TH 327H (impressa grande) 7 unit Nota 2 tanggal 22 April 2013 Rp 115,000
A.09 HPL TH 022AA (smoke grey) 2 unit Nota 2 tanggal 22 April 2013 Rp 97,500
A.10 Ongkir 1 unit Nota 2 tanggal 22 April 2013 Rp 20,000
A.11 Plywood 9mm (semi) 1 unit Nota 3 tanggal 24 April 2013 Rp 102,500
A.12 Plywood 6mm (semi) 1 unit Nota 3 tanggal 24 April 2013 Rp 67,000
A.13 HPL TH 022AA (smoke grey) 1 unit Nota 3 tanggal 24 April 2013 Rp 97,500
A.14 F25 1 pack Nota 3 tanggal 24 April 2013 Rp 27,000
A.15 F30 1 pack Nota 3 tanggal 24 April 2013 Rp 30,000
A.16 Ongkir 1 unit Nota 3 tanggal 24 April 2013 Rp 20,000
A.17 Total nota 1 Nota 4 tanggal 24 April 2013 Rp 25,000
A.18 Thinner SPL 1 ltr Nota 5 tanggal 26 April 2013 Rp 9,500
A.19 Isolasi 1 unit Nota 6 tanggal 27 April 2013 Rp 5,000
A.20 FS 240 1 unit Nota 6 tanggal 27 April 2013 Rp 3,000
A.21 Cat altex 1 kg Nota 7 tanggal 28 April 2013 Rp 18,500
A.22 Skrup gypsum 1 pack Nota 7 tanggal 28 April 2013 Rp 4,000
A.23 kuas 1 Nota 7 tanggal 28 April 2013 Rp 4,500
A.24 skrup s8x 30 unit Nota 7 tanggal 28 April 2013 Rp 400
A.25 Thinner SPL 1 unit Nota 8 tanggal 3 Mei 2013 Rp 12,000
A.26 Isolasi bery tebal 1 unit Nota 8 tanggal 3 Mei 2013 Rp 5,000
A.27 HPL TH 327H (impressa grande) 1 unit Nota 9 tanggal 25 April 2013 Rp 115,000
A.28 Gromet Putih 3 unit Nota 10 tanggal 3 Mei 2013 Rp 2,500
A.29 Ongkos Tukang 1 Nota 11 tanggal 4 Mei 2013 Rp 2,400,000
A.30 Ongkos Kirim Pick Up 1 Nota 11 tanggal 4 Mei 2013 Rp 125,000

Laba bersih
Page : 01 / 03

Jumlah Harga (Rp)


7

Rp 528,000
Rp 307,500
Rp 134,000
Rp 345,000
Rp 10,000
Rp 20,000
Rp 7,500
Rp 805,000
Rp 195,000
Rp 20,000
Rp 102,500
Rp 67,000
Rp 97,500
Rp 27,000
Rp 30,000
Rp 20,000
Rp 25,000
Rp 9,500
Rp 5,000
Rp 3,000
Rp 18,500
Rp 4,000
Rp 4,500
Rp 12,000
Rp 12,000
Rp 5,000
Rp 115,000
Rp 7,500
Rp 2,400,000
Rp 125,000
Rp 5,462,000

Rp2,038,000
Title
Project
Location
phone +62.856.480.25888
e-mail [email protected] Date Deal
Jl. Siwalankerto Tengah No. 66 | Surabaya | East Java
Nilai Proyek

No Description Volume Satuan


1 2 3 4

A File Storage Ruang


A.01 Plywood 12mm (Semi) 9 unit
A.02 Melaminto putih dof 11 unit
A.03 Plywood 6mm (semi) 3 unit
A.04 Lem 168 1 blek
A.05 HPL TH005AA Yellow Sunshine 5 Unit
A.06 HPL TH366H 3 Unit
A.07 Engsel Sendok Lurus 21 set
A.08 Drawer Lock Huben 181 21 unit
A.09 Plat Kunci L 21 unit
A.10 Baukas Skrup 3 unit
A.11 Gantungan 2 unit
A.12 Melaminto putih dof 3 unit
A.13 HPL Taco TH 366H 1 unit
A.14 Engsel Sendok Semi Bungkuk 1 set
A.15 Ongkir nota 3 1 unit
A.16 Mata Bor 35mm 1 unit
A.17 Engsel Sendok Semi Bungkuk 6 set
A.18 Uniken 6mm 1 unit
A.19 JF 6x1/2 1 bungkus
A.20 Kertas Gosok 1 lbr
A.21 Lancer.... 1 unit
A.22 Thinner SPL 1 unit
A.23 Kaca 1 set
A.24 Engsel Kaca T86 8 unit
A.25 Kunci laci kaca Digao 407 Single 8 unit
A.26 Handle Huben TPS 3210 156-90 17 unit
A.27 Handle Huben TPS 3210 188-128 4 unit
A.28 Th A Spa bintang 1 kg
A.29 A Fs 240/2 360/1 3 lbr
A.30 Drewel 6x2 1 pack
A.31 Lem Rajawali 1 unit
A.32 Kabel Eterna 1m 3 m
A.33 Isolasi listrik unibel 1 unit
A.34 ...Bon menyusul? 1
A.35 Ongkos kirim meubel ke PU Wiyung 1
A.36 Ongkos Tukang 1
: Daftar Belanja Proyek
: File Storage PU Wiyung
: Jl. Raya Menganti Wiyung
: 22 Maret 2013. DONE: 13 April 2013 Page : 01 / 03
: Rp 8.515.000

Spesification Harga Satuan (Rp) Jumlah Harga (Rp)


5 6 7

Nota 1 tanggal 26 Maret 2013 Rp 132,000 Rp 1,188,000


Nota 1 tanggal 26 Maret 2013 Rp 87,500 Rp 962,500
Nota 1 tanggal 26 Maret 2013 Rp 67,000 Rp 201,000
Nota 1 tanggal 26 Maret 2013 Rp 345,000 Rp 345,000
Nota 1 tanggal 26 Maret 2013 Rp 97,500 Rp 487,500
Nota 1 tanggal 26 Maret 2013 Rp 115,000 Rp 345,000
Nota 1 tanggal 26 Maret 2013 Rp 5,000 Rp 105,000
Nota 1 tanggal 26 Maret 2013 Rp 5,000 Rp 105,000
Nota 1 tanggal 26 Maret 2013 Rp 500 Rp 10,500
Nota 2 tanggal 3 April 2013 Rp 4,000 Rp 12,000
Nota 2 tanggal 3 April 2013 Rp 3,000 Rp 6,000
Nota 3 tanggal 4 April 2013 Rp 87,500 Rp 262,500
Nota 3 tanggal 4 April 2013 Rp 115,000 Rp 115,000
Nota 3 tanggal 4 April 2013 Rp 5,000 Rp 5,000
Nota 3 tanggal 4 April 2013 Rp 15,000 Rp 15,000
Nota 4 tanggal 2 April 2013 Rp 55,000 Rp 55,000
Nota 4 tanggal 2 April 2013 Rp 5,000 Rp 30,000
Nota 4 tanggal 2 April 2013 Rp 20,000 Rp 20,000
Nota 4 tanggal 2 April 2013 Rp 6,000 Rp 6,000
Nota 5 tanggal 3 April 2013 Rp 7,500 Rp 7,500
Nota 5 tanggal 3 April 2013 Rp 7,000 Rp 7,000
Nota 5 tanggal 3 April 2013 Rp 9,500 Rp 9,500
Nota 6 tanggal 3 April 2013 Rp 120,000 Rp 120,000
Nota 7 tanggal 4 April 2013 Rp 9,000 Rp 72,000
Nota 7 tanggal 4 April 2013 Rp 11,500 Rp 92,000
Nota 7 tanggal 4 April 2013 Rp 6,500 Rp 110,500
Nota 7 tanggal 4 April 2013 Rp 8,000 Rp 32,000
Nota 8 tanggal 1 April 2013 Rp 30,000 Rp 30,000
Nota 8 tanggal 1 April 2013 Rp 3,500 Rp 10,500
Nota 8 tanggal 1 April 2013 Rp 10,000 Rp 10,000
Nota 8 tanggal 1 April 2013 Rp 10,000 Rp 10,000
Nota 9 tanggal 13 April 2013 Rp 3,900 Rp 11,700
Nota 9 tanggal 13 April 2014 Rp 7,000 Rp 7,000
Direkapan balik nota 2 Rp 120,000 Rp 120,000
Sewa Pick Up car Rp 125,000 Rp 125,000
Borongan (seharusnya per m2 Rp 450.000) Rp 2,750,000 Rp 2,750,000

Rp 7,800,700

Laba bersih Rp714,300


Title : Daftar Belanja Proyek
Project : Wardrobe (2 pcs)
Location : Jl. Taman Sidoarjo
phone +62.856.480.25888
e-mail [email protected] Date Deal : 01 Mei 2013
Jl. Siwalankerto Tengah No. 66 | Surabaya | East Java
Nilai Proyek : Rp 7.000.000

No Description Volume Satuan Spesification


1 2 3 4 5

A Bahan total 2 unit Wardrobe Unit


A.01 Plywood 15mm (Semi) 3 unit Nota 1 tanggal 6 Mei 2013
A.02 Plywood 12mm (Semi) 5 unit Nota 1 tanggal 6 Mei 2013
A.03 Plywood 9mm (semi) 1 unit Nota 1 tanggal 6 Mei 2013
A.04 Plywood 6mm (semi) 3 unit Nota 1 tanggal 6 Mei 2013
A.05 Plywood 3mm (semi) 1 unit Nota 1 tanggal 6 Mei 2013
A.06 Lem fox putih 2 blek Nota 1 tanggal 6 Mei 2013
A.07 HPL TH 014AA Light Grey 3 unit Nota 1 tanggal 6 Mei 2013
A.08 HPL TH 353 H nice oak 10 unit Nota 1 tanggal 6 Mei 2013
A.09 Ongkir 1 unit Nota 1 tanggal 6 Mei 2013
A.10 Engsel Sendok Semi Bungkuk 6 set Nota 1 tanggal 6 Mei 2013
A.11 Engsel Sendok Bagus (bungkuk) 6 set Nota 1 tanggal 6 Mei 2013
A.12 Drawer Lock Huben 138 8 unit Nota 1 tanggal 6 Mei 2013
A.13 Plat Drawer lock 8 set Nota 1 tanggal 6 Mei 2013
A.14 Handrail laci 40cm 2 set Nota 2 tanggal 11 Mei 2013
A.15 Thinner, cat 1 unit
A.16 Stainless Steel gantungan 2 m Nota 2 tanggal 13 Mei 2013
A.17 Bracket gantungan 2 set Nota 2 tanggal 13 Mei 2013
A.18 Handle 6 unit Nota 2 tanggal 11 Mei 2013
A.19 HPL TH 353 H nice oak 2 unit Nota 2 tanggal 13 Mei 2013
A.20 Ongkos tukang 1
A.21 Ongkos kirim Pick Up 1
Page : 01 / 01

Harga Satuan (Rp) Jumlah Harga (Rp)


6 7

Rp 165,000 Rp 495,000
Rp 132,000 Rp 660,000
Rp 102,500 Rp 102,500
Rp 67,000 Rp 201,000
Rp 46,000 Rp 46,000
Rp 10,000 Rp 20,000
Rp 97,500 Rp 292,500
Rp 115,000 Rp 1,150,000
Rp 20,000 Rp 20,000
Rp 5,000 Rp 30,000
Rp 16,000 Rp 96,000
Rp 7,000 Rp 56,000
Rp 1,500 Rp 12,000
Rp 8,000 Rp 16,000
Rp 200,000 Rp 200,000
Rp 25,000 Rp 50,000
Rp 20,000 Rp 40,000
Rp 9,000 Rp 54,000
Rp 115,000 Rp 230,000
Rp 2,000,000 Rp 2,000,000
Rp 150,000 Rp 150,000

Rp 5,426,000
Title : Daftar Belanja Proyek
Project : Dining-kitchen Abah Heri
Location : Desa Sendang Bulu 46 Kendung
phone +62.856.480.25888
e-mail [email protected] Date Deal : 21 Mei 2013
Jl. Siwalankerto Tengah No. 66 | Surabaya | East Java
Nilai Proyek :

No Description Volume Satuan Spesification


1 2 3 4 5

A Kitchen and Dining Ruang


A.01 Plywood 15mm (Semi) 2 unit
A.02 Plywood 12mm (Semi) 4 unit
A.03 Plywood 9mm (semi) 6 unit
A.04 Plywood 6mm 2 unit
A.05 Lem 168 1 blek
A.06 Lem Fox Putih 2 unit
A.07 Ongkir 1 unit
A.08 Granit 2.35m' 1 set
A.09 HPL Setaa Cherry H2505 10 unit
A.10 HPL TH 002G (Pearl White) 2 unit
A.11 Melaminto putih dof 5 unit
A.12 Engsel Semi Bungkuk 12 set
A.13 Pegas Hidrolis 10 2 set
A.14 Handle 20cm 8 unit
A.15 Handle 30cm 2 unit
A.16 Wallpaper kitchen dkk 26 roll 1 set
A.17 Bracket TV 1 unit
A.18 Horizontal Blind 80x200 3 unit
A.19 Thinner S dkk 1 ltr
A.20 Mata Bor 1 unit
A.21 Kaca bevelled 1 set
A.22 Ongkos Tukang 1
A.23 Ongkos Kirim Pick Up 1
46 Kendung
Page : 01 / 01

Harga Satuan (Rp) Jumlah Harga (Rp)


6 7

Rp 160,000 Rp 320,000
Rp 127,500 Rp 510,000
Rp 97,500 Rp 585,000
Rp 75,000 Rp 150,000
Rp 335,000 Rp 335,000
Rp 10,000 Rp 20,000
Rp 20,000 Rp 20,000
Rp 1,650,000 Rp 1,650,000
Rp 110,000 Rp 1,100,000
Rp 80,000 Rp 160,000
Rp 83,000 Rp 415,000
Rp 5,000 Rp 60,000
Rp 25,000 Rp 50,000
Rp 8,000 Rp 64,000
Rp 10,500 Rp 21,000
Rp 3,750,000 Rp 3,750,000
Rp 159,000 Rp 159,000
Rp 138,000 Rp 414,000
Rp 100,500 Rp 100,500
Rp 141,000 Rp 141,000
Rp 50,000 Rp 50,000
Rp 4,400,000 Rp 4,400,000
Rp 150,000 Rp 150,000
Rp 14,304,500
Title : Daftar Belanja Proyek
Project : Kitchen Rohandi
Location : Menganti
phone +62.856.480.25888
e-mail [email protected] Date Deal :
Jl. Siwalankerto Tengah No. 66 | Surabaya | East Java
Nilai Proyek :

No Description Volume Satuan Spesification


1 2 3 4 5

A Kitchen and Dining Ruang


A.01 Plywood 15mm (Semi) 5 unit
A.02 Plywood 12mm (Semi) 7 unit
A.03 Plywood 9mm (semi) 3 unit
A.04 Plywood 6mm 2 unit
A.05 Lem 168 1 blek
A.06 Lem Fox Putih 2 unit
A.07 Ongkir 1 unit
A.08 Granit 2.15m'+1.85m' 4 m'
A.09 HPL Setaa Cherry H2505 10 unit
A.11 Melaminto putih dof 6 unit
A.12 Engsel Semi Bungkuk 15 set
A.13 Pegas Hidrolis 10 2 set
A.14 Handle 20cm 0 unit
A.15 Handle 30cm 0 unit
A.16 Kitchen Hood 1 set
A.19 Thinner S dkk 1 ltr
A.22 Ongkos Tukang 1
A.23 Ongkos Kirim Pick Up 1
Page : 01 / 01

Harga Satuan (Rp) Jumlah Harga (Rp)


6 7

Rp 160,000 Rp 800,000
Rp 127,500 Rp 892,500
Rp 97,500 Rp 292,500
Rp 75,000 Rp 150,000
Rp 335,000 Rp 335,000
Rp 10,000 Rp 20,000
Rp 20,000 Rp 20,000
Rp 750,000 Rp 3,000,000
Rp 110,000 Rp 1,100,000
Rp 83,000 Rp 498,000
Rp 5,000 Rp 75,000
Rp 25,000 Rp 50,000
Rp 8,000 Rp -
Rp 10,500 Rp -
Rp 925,000 Rp 925,000
Rp 100,500 Rp 100,500
Rp 4,400,000 Rp 4,400,000
Rp 150,000 Rp 150,000
Rp 12,008,500