HOUSEKEEPING SCHEDULE
Qualification : Bread and Pastry Station Workshop
Production NC II area
Area / Section : Practical work area Tools / Baking
Eqpt. tools
In - Charge : Aileen Collantes Services
Respo Schedule for the Month of May
nsible Daily Every Weekly Every Mont Remarks
ACTIVITIES
other 15th hly
Person Day Day
1. Sweep and mop the Traine Activity
floor. es/jani should
tors(in be done
the during
absenc and
e of after
the the
trainee practica
s) l work
to avoid
acciden
t.
2. Maintain the Traine Activity
cleanliness of the es/ should
practical workshop janitor’ be done
area’s surrounding. s in after
charge using
the
equipm
ent.
3. Arrange and clean Traine
the working tables es/
and chairs according janitor’
to floor plan/ lay s in
out. charge
4. Clean and Traine Activity
check/inspect the es/ should
ventilation of the janitor be done
‘s in after
charge using
workshop area the
equipment: work
station.
Keep the air
conditioning
free from
dust and
rust.
Check if the
drainage is
okay.
5. Proper waste Traine
disposal( observe es/
proper waste janitor’
segregation) s in
charge
6. Clean ad check the Traine
computer set. es
7. Clean and check the Traine
comfort room: es/jani
tor in
Check charge
if the
floor
is dry.
Drain
age
syste
m is
functi
onal.
Fauce
t
have
enou
gh
water
suppl
y.
Light
is
functi
onal.
8. Clean, dry and free Traine
the baking tools and es/jani
equipment from tor in
dust. charge
9. Arrange the baking Traine
tools according to its es/jani
classification. tors in
the
charge
10. Check/inspect the Traine
tools if there is es/jani
damages/loses after tors in
using. the
charge
Inspected by: Carla L. Mabal Reported to: Faye Approved by:
Barrameda
Date: October
Date : October 19,2018
20,2018
HOUSEKEEPING INSPECTION CHECKLIST
Qualification : Bread and Pastry Production NC II
Area / Section : Practical work area
In - Charge : Aileen Cellona
YES NO CRITERIA
1. Are the floors swept and mopped?
2. Does the cleanliness of the workshop surroundings
properly maintained?
3. Are the working tables cleaned and arranged
according to floor plan/lay out?
4. Are the workshop ventilation cleaned and checked?
5. Are the waste/disposable garbage disposed
properly?
6. Are the computer set are cleaned and checked?
7. Are the comfort room cleaned and checked?
8. Are the tools and equipment are cleaned, dry and
free from dust?
9. Are the baking tools arranged according to its
classification?
10. Are the equipment check and inspect if there is
damages/loses after using?
EQUIPMENT MAINTENANCE SCHEDULE
Equipment Type : Gas range with oven
Property Code / Number : BPP #143
Location : Practical work area
Schedule for the Month of _________________
Respo Daily Every We Every Mont Remarks
ACTIVITIES nsible other ekly 15th hly
person Day Day
1. Check the oven Train Activityis done
racks are level. ees before using
equipment
2. Run the Train Check the
equipment for at ees warranty and
least 5-10 minutes after service
and observe if assistance
there’s an from dealer
abnormal
operation, if there
is repair or send to
the technician.
3. Regularly wipe the Train Activity is
surface with hot ees done before
water and using the
detergent. equipment
4. Check the oven Train Activity is
door close tightly. ees done before
using the
equipment
5. To clean the train Activity is
burner; take the ees done after
burners apart to using the
soak and then equipment.
clean them
thoroughly in
warm, soapy
water.
Prepared by: Noted:
Carla L. Mabal _________________
Trainer Supervisor
MAINTENANCE INSPECTION CHECKLIST
Equipment Type : Gas range with oven
Property Code / Number : BPP#143
Location : Practical work area
In - Charge : Aileen Collantes
YES NO INSPECTION ITEMS
1. Is the oven racks are level?
2. Is the equipment warmed up for 5-10 minutes and
observed abnormal operation?
3. Is the surface wipe regularly with hot water and
detergent?
4. Is the oven door closed tightly?
5. Is the burner soak and clean them thoroughly in
warm, soapy water?
Prepared by: Noted:
Carla L. Mabal _________________
Trainer Supervisor
BREAKDOWN / REPAIR REPORT
Breakdown / Repair Report # 099
Property ID Number ONHS-01
Descriptive Name Gas range with oven
Location Practical work area
Findings: It is not heating to Recommendation:
the correct temperature.
1. Repair and parts replacement.
2. Cleaning and refurbishing.
Inspected by: Carla L. Reported to: Aileen Collantes
Mabal
Date : October 16,2018 Date: October 17,2018
Assigned to : Faye
Received Assignment : Bianca Uganda
Barrameda
Assigned by : Carlo
Assignee : Ray cuedo
Fuentes
Date : October 19,2018 Date : October 20,2018
Subsequent Action Taken: Recommendation:
Cleaning and parts Parts replacement of gas range with oven:
replacement. 1. Magnetron tube
2. Light bulb color temperature(neutral 3500-
4099 k)
By: Lucia Villanueva Reported to: Joan Tyler
Date : October 21,2018 Date: October 22, 2018
TAG-OUT BILL
DANGER/CAUTION TAG-OUT INDEX AND RECORD AUDITS
LOG DATE TYPE DESCRIPTION DATE
SERIAL ISSUED ( (System Components, Test COMPLETED
Danger/Caution) reference ,etc.
BP2015- July 23, Caution Gas range with oven(It is October
01 2015 not heating to the correct 19,2018
temperature.)
Prepared by: Approved:
Carla L. Mabal
Trainer Supervisor
WORK REQUEST
Unit No. Description: Gas range with oven
BPP#01
Observation: it not is heating to the right temperature.
1. Repair and parts replacement.
2. Cleaning and refurbishing.
Parts replacement of gas range with oven:
1. Magnetron tube
2. Light bulb color temperature(neutral 3500-4099 k)
Prepared by: Approved:
Carla L. Mabal ____________________
Trainer Supervisor
WASTE SEGREGATION LIST
Qualification : Bread and Pastry Production NC II
Area / Section : Practical work area
In – Charge : Aileen Collantes
WASTE SEGREGATION METHOD
GENERAL / ACCUMULATED WASTES
Recycle Compose Dispose
1. Egg shell
2. Disposable Hand Gloves
3. Face mask
4. Fruit and vegetables peelings
5. Waste packaging materials
6. Empty oil bottle
7. Broken items
8. Tin cans, plastic wrapper and
cellophane
9. Left over ingredients like
flour, sugar and flavoring
10. Waste papers and tissue
papers
PURCHASE REQUEST
City of Legaspi
(Name of Institution)
Department: DepEd- Legaspi PR no. 002 Date: 08/24/2015
SAI no. N/A N/A
Section: Orosite National high ALOBS no. Date:
School
Item Unit of Estimated Estimated
Item Description
No. Quantity Issue Unit Cost Cost
1 1 Pc. Gas range with oven 27,995.80 27,995.80
Purpose:
Replacement of new equipment.
Requested by: Cash availability: Approved by:
Signature:
Printed Name:
Designation:
10
Workshop Layout: Bread and Pastry Production 156 sq. m. L=15, W=10
Institutional Assessment
Laboratory
Computer
Area
Support service area
Learning resource area 15 sq.m
5
Activity Matrix
Learning
Resource area
15
Contextual
Learning Lab.
Lecture/Demo Area 40 sq.m
Progress chart/Achievement chart
Laboratory/Practical area 40sq.m
8
Tools/equipment
mixer
Oven
Quality Trainers Distance
Control Resource area Learning Area
Legend:
Garbage bin
Fire extinguisher Medicine kit
restroom Table/chair