Bill of Quantity: Nama Proyek Lokasi / Seksi Referensi Gambar

This document is a bill of quantity for a construction project to make a hole in PB 1 LT 2. It includes three sections - work preparation with items like mobilization and safety equipment, demolition work removing an existing floor totaling 6.06 square meters, and miscellaneous work. The second section lists the materials needed, totaling over 1,300 kilograms of steel including beams, plates, and fittings. A 10% overhead is included for both the labor and material sections. The total cost for the labor, materials and overhead is then calculated and presented.

Uploaded by

Nomi Kusuma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Bill of Quantity: Nama Proyek Lokasi / Seksi Referensi Gambar

This document is a bill of quantity for a construction project to make a hole in PB 1 LT 2. It includes three sections - work preparation with items like mobilization and safety equipment, demolition work removing an existing floor totaling 6.06 square meters, and miscellaneous work. The second section lists the materials needed, totaling over 1,300 kilograms of steel including beams, plates, and fittings. A 10% overhead is included for both the labor and material sections. The total cost for the labor, materials and overhead is then calculated and presented.

Uploaded by

Nomi Kusuma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

BILL OF QUANTITY

NAMA PROYEK PEMBUATAN LUBANG PB 1 LT 2


LOKASI / SEKSI PB 1 LT 2 / FORGING 1
REFERENSI GAMBAR S1900827

NO ITEM UNIT QTY UNIT PRICE TOTAL PRICE


I JASA
A PEKERJAAN PERSIAPAN
1. Mod Demob Ls 1.00 Rp -
2. Safety protection ( Terpal , APD , Helmet , dll ) Ls 1.00 Rp -
Sub Total - A Rp -
B PEKERJAAN BONGKARAN
1. Cutting existing lantai m1 6.06 Rp -
2. Bobok existing lantai tebal 150mm m2 2.30 Rp -
Sub Total - B Rp -
C PEKERJAAN LAIN - LAIN
1. Transport cost Ls 1.00 Rp -
2. Tool charge Ls 1.00 Rp -
3. Cleaning area & buang puing Ls 1.00 Rp -
Sub Total - C Rp -

TOTAL JASA ( Sub Total A + B + C ) Rp -


Over Head 10% Rp -
TOTAL JASA Rp -

II MATERIAL
A PEMBUATAN LUBANG PB 1 LT 2

1. WF 350x175x7x11 ( Full size ) kg 595.20 Rp -

2. UNP 140x60x7 ( Full size ) kg 194.00 Rp -

3. Siku 70x70x7t ( Full size ) kg 88.56 Rp -

4. Siku 40x40x4t ( Full size ) kg 14.50 Rp -

5. Plat tebal 10mm kg 233.50 Rp -

6. Plat tebal 8mm kg 187.00 Rp -

7. Plat tebal 6mm kg 140.00 Rp -

8. Handle Ø16mm Pcs 6.00 Rp -

9. HTB M16xL60mm Pcs 48.00 Rp -

10. Painting zinchromate + KF-157 kg 913.76 Rp -

11. Finishing grouting ex. SIKA Ls 1.00 Rp -


Sub Total - A Rp -
B LAIN - LAIN
1. Miscellaneous material Ls 1.00 Rp -
2. Consumable material Ls 1.00 Rp -
Sub Total - B Rp -

TOTAL MATERIAL ( Sub Total A + B ) Rp -


Over Head 10% Rp -
TOTAL MATERIAL Rp -

GRAND TOTAL ( MATERIAL + JASA ) Rp -

ROUNDED Rp -