0% found this document useful (0 votes)
59 views64 pages

Harga Upah dan Material Konstruksi

The document lists material prices and labor rates for various construction activities. It includes hourly rates for construction supervisors and workers in sections A-C. Section D lists prices per kilogram for various steel materials. Sections E-I outline prices per unit for wood, tiles, roofing materials, and other construction supplies. Section J provides prices for plumbing fixtures and fittings. The entire document serves as a price list for construction materials and labor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views64 pages

Harga Upah dan Material Konstruksi

The document lists material prices and labor rates for various construction activities. It includes hourly rates for construction supervisors and workers in sections A-C. Section D lists prices per kilogram for various steel materials. Sections E-I outline prices per unit for wood, tiles, roofing materials, and other construction supplies. Section J provides prices for plumbing fixtures and fittings. The entire document serves as a price list for construction materials and labor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

HARGA DASAR UPAH DAN MATERIAL :

NO URAIAN KEGIATAN SATUAN HARGA

A Kepala tukang kontruksi

1 Kepala tukang kayu 1 O.H Rp 50,000.00

2 Kepala tukang besi 1 O.H Rp 50,000.00

3 Kepala tukang batu 1 O.H Rp 50,000.00

4 Kepala tukang 1 O.H Rp 50,000.00

5 Mandor 1 O.H Rp 60,000.00

B TUKANG KONTRUKSI

1 Tukang kayu 1 O.H Rp 45,000.00

2 Tukang besi 1 O.H Rp 45,000.00

3 Tukang batu 1 O.H Rp 45,000.00

4 Tukang 1 O.H Rp 45,000.00

C PEMBANTU TUKANG KONTRUKSI

1 Pekerja / buruh tak trampil 1 O.H Rp 35,000.00

2 Operator mesin 1 O.H Rp 30,000.00

3 Pekerja kasar 1 O.H Rp 30,000.00

No NAMA ALAT SATUAN HARGA

1 Sewa concrete mixer (minimal 3 jam ) 0.50 M3 Jam Rp 50,000.00

2 Sewa concrete pump ( minimal 3 jam ) Jam Rp 25,000.00

3 Sewa vibrator Jam Rp 27,000.00

4 Sewa welding set ( minimal 5 jam ) Jam Rp 30,000.00

5 Sewa alat bantu Jam Rp 1,100.00

6 Sewa crane 30 ton ( minimal 8 jam ) Jam Rp 225,000.00

7 Sewa hammer tiang pancang ( minimal 8 jam ) Jam Rp 185,000.00

8 Sewa Compresor Jam Rp 35,000.00

A SEMEN

1 Semen PC (Portland Cement) 40 kg Semen Gresik Sak Rp 48,000.00

2 Semen PC (Portland Cement) 50 kg Semen Gresik Sak Rp 54,000.00

3 Semen berwarna 1 Kg Rp 7,500.00

B BATU PECAH MESIN

1 Batu pecah mesin 1 / 2Cm 1 M3 Rp 230,000.00

2 Batu pecah mesin 2 / 3Cm 1 M3 Rp 170,000.00

3 Batu kali pecah 15 / 20 Cm 1 M3 Rp 130,100.00

4 Batu merah uk. 23 x 10.50 x 5.50Cm 1 Bh Rp 500.00

5 Batu kali pecah 15 / 20 Cm 1 M3 Rp 130,100.00

Genteng Karang Pilang / Wisma 1 Buah Rp 5,000.00

C PASIR

1 Pasir cor 1 M3 Rp 130,000.00

2 Pasir pasang 1 M3 Rp 120,000.00

3 Pasir urug 1 M3 Rp 115,000.00

4 Sirtu 1 M3 Rp 60,000.00

5 Air /air tawar 2 Ltr Rp 13.00

D LOGAM BAJA

1 Besi beton ulir 1 Kg Rp 8,000.00

2 Besi polos 1 Kg Rp 8,000.00

3 Kawat ikat ( bendrat) 1 Kg Rp 14,000.00

4 Besi WF 400 X 200 X 8 X 13 1 Kg Rp 8,500.00

5 Besi C 150 x 58 x 12 x 3 1 Kg Rp 8,500.00

6 Besi plat 1 Kg Rp 8,500.00

7 Besi Siku 70.70.9 1 Kg Rp 8,500.00

8 Elektroda Baja 1 Kg Rp 23,000.00

9 Paku 1 Kg Rp 17,000.00

10 Pipa galvanis medium A Ø6" t= 5mm 1 M1 Rp 280,000.00

11 Pipa galvanis medium A Ø2" t= 2mm 1 M1 Rp 80,000.00

12 Pipa howlo 4 x 6 t= 1,8mm 1 M1 Rp 26,000.00

13 Pipa howlo 4 x 4 t= 1,2mm 1 M1 Rp 17,500.00

14 Pipa howlo 2 x 2 t= 1,2mm 1 M1 Rp 14,500.00

15 Angker Ø25mm L= 60Cm 1 Bh Rp 33,000.00

16 Baut HTB Ø16mm 1 Bh Rp 8,800.00

17 Baut gording HTB Ø12mm 1 Bh Rp 11,000.00

18 Kontra moor Ø22mm 1 Bh Rp 38,500.00

19 Kontra moor Ø16mm 1 Bh Rp 29,150.00

20 Angker Ø16 1 Bh Rp 2,750.00


NO URAIAN KEGIATAN SATUAN HARGA

21 Pipa galvanis medium B Ø 2" 1 1M Rp 64,500.00

22 Pipa galvanis medium A Ø 2,5" 1 1M Rp 80,000.00

23 Pipa galvanis medium B Ø 2,5" 1 1M Rp 73,000.00

24 Pipa galvanis medium A Ø 6" 1 Kg Rp 11,750.00

25 Pipa galvanis medium A Ø 4" 1 Kg Rp 14,300.00

26 Sok drat Ø 2" 1 Bh. Rp 17,500.00

27 Sok drat Ø 2,5" 1 Bh. Rp 33,600.00

28 Keni Ø 2" 1 Bh. Rp 22,500.00

29 Keni Ø 2,5" 1 Bh. Rp 42,000.00

30 Sealtape 1 rol Rp 6,000.00

E KAYU

1 Kayu meranti bekisting 1 M3 Rp 2,400,000.00

2 Kayu meranti ( papan 2/20 ) 1 M3 Rp 2,800,000.00

3 Kayu meranti ( Usuk 5/7 ) 1 M3 Rp 2,600,000.00

4 Kayu meranti 6 / 12 1 M3 Rp 3,000,000.00

5 Kayu kamper ( Usuk 5/7 ) 1 M3 Rp 3,800,000.00

6 kayu kamper ( reng 3/5 ) 1 M3 Rp 3,700,000.00

7 Papan kamper 4/30 1 M3 Rp 6,000,000.00

8 Papan kamper 3/10 1 M3 Rp 6,050,000.00

F TIANG PANCANG

1 Tiang pancang type B Ø40Cm 1 M1 Rp 315,000.00

2 Tiang pancang type B Ø30Cm 1 M1 Rp 215,000.00

G KERAMIK

1 Keramik 40 x 40Cm Kw. I ( Platinum ) 1 M2 Rp 49,000.00

2 Keramik 20 x 20Cm Kw. I ( Platinum ) 1 M2 Rp 38,000.00

3 Keramik 20 x 25Cm Kw. I ( Platinum ) 1 M2 Rp 37,500.00

4 Platinum 40X40 ( tangga/exterior ) t. 9mm 1 M2 Rp 58,000.00

5 Tegel Plint Keramik warna/motif ( 10X40 Cm ) 1 BH Rp 12,000.00

H GENTENG KARANG PILANG

1 Genteng Bambe 1 Bh Rp 4,345.00

2 Genteng wuwung 1 Bh Rp 8,690.00

3 Genteng kompres 1 Bh Rp 8,580.00

I BAHAN LAINYA

1 Minyak begisting 1 Ltr Rp 4,800.00

2 Sambungan tiang pancang Ø40Cm 1 Titik Rp 25,000.00

3 Memecah kepala tiang pancang Ø40Cm 1 Titik Rp 30,000.00

4 Plamur tembok 1 Kg Rp 14,025.00

5 Dempul 1 Kg Rp 12,500.00

6 Kertas gosok 1 Lbr Rp 3,500.00

7 Lem 1 Kg Rp 13,200.00

J Material sanitasi

1 Wastafel American Standart 1 Bh Rp 317,875.00

2 Mono blok/Kloset duduk lengkap + stopkran 1 Bh Rp 1,600,000.00

3 Bak Urinoir lengkap 1 Bh Rp 880,000.00

4 Floor drain 1 Bh Rp 55,000.00

5 Kran untuk WC Ø1/2" 1 Bh Rp 55,000.00

6 Kran air ( sanei ) 1 Bh Rp 55,000.00

7 Pipa / slang spiral saluran kran 1 Bh Rp 15,000.00

8 Roll TBA 1 Roll Rp 3,000.00

9 Watermoor 1 Bh Rp 15,000.00

10 Sifon wasser 1 Set Rp 85,000.00

11 Knee 1 Bh Rp 9,500.00

12 U Gutter U300/300-600 (K 350 ; Besi 130 Kg) (Fabrikasi) 1 m Rp 245,000.00

13 Cover 400x600x80 (K 350 ; Besi 160 Kg) (Fabrikasi) 1 m Rp 155,000.00

K MATERIAL PINTU DAN JENDELA

1 Kusen aluminium 4" ex indalex 1 M1 Rp 88,500.00

Slimar aluminium 2.5" ex indalex 1 M1 Rp 53,500.00

2 Daun pintu dauble lapis sungkai 65 x 200 1 Bh Rp 440,000.00

3 Daun pintu shaft 60 x 150 1 Buah Rp 400,000.00

4 Daun pintu aluminium KM/WC 80 x 200 1 Buah Rp 450,000.00

5 Kaca t= 5 mm 1 M2 Rp 60,000.00

6 Kaca t= 6 mm 1 M2 Rp 85,000.00

7 Kaca t= 8 mm 1 M2 Rp 100,000.00
NO URAIAN KEGIATAN SATUAN HARGA

8 Kaca Gravier 1 M2 Rp 275,000.00

9 Kaca Stainglass 1 M2 Rp 345,000.00

10 Daun jendela / bovenlist 60 x 80 / slimar 1 Buah Rp 244,667.50

11 Karet 1 M1 Rp 1,250.00

L AKSESORIS

1 Kunci pintu dauble SES komplet 1 Bh Rp 185,000.00

2 Kunci pintu silinder KM / WC 1 Bh Rp 65,000.00

3 Kunci pintu shaft 1 Bh Rp 17,500.00

4 Engsel pintu 1 Bh Rp 17,500.00

5 Engsel frection stay bovenlicth 1 Bh Rp 20,000.00

6 Grendel rambuncis 1 Bh Rp 17,500.00

7 Engsel jendela 1 Bh Rp 24,750.00

8 Kait / Hak angin 1 Bh Rp 35,000.00

9 Grendel tanam 1 Bh Rp 45,000.00

10 Handle aluminium 1 Unit Rp 45,000.00

11 Handle biasa pintu shaft 1 Bh Rp 8,800.00

12 Paku skrup 1 Bh Rp 150.00

13 Paku beton 1 Kg Rp 22,500.00

14 Kawat ayam 1 M2 Rp 29,500.00

M CAT

1 Cat tembok catilax 1 Kg Rp 14,500.00

2 Cat tembok watershiell 1 Kg Rp 64,960.00

3 Cat besi Emco 1 Kg Rp 41,800.00

4 Meni besi 1 Kg Rp 15,000.00

5 Minyak cat 1 Ltr Rp 9,500.00

6 Minyak bekisting 1 Ltr Rp 4,500.00

7 Meni kayu 1 Kg Rp 15,500.00

8 Plamir tembok 1 Kg Rp 14,500.00

9 Plamir kayu 1 Kg Rp 15,500.00

N PELAPIS

1 Kalsiboard t. = 4.5 mm 1 Lbr Rp 67,500.00

2 Kalsiboard t. = 6mm 1 Lbr Rp 96,500.00

3 Kalsiboard t. = 12mm 1 Lbr Rp 165,000.00

4 Kalsiboard t. = 9mm 1 Lbr Rp 104,500.00

5 Gypsum t. = 9 mm 1 Lbr Rp 50,000.00

6 Gypsum t. = 12 mm 1 Lbr Rp 66,000.00

7 Metal Stud 40 x 34 x 0.5 1 Ljr Rp 30,800.00

8 Triplek uk 120 x 240 x 4mm 1 Lbr Rp 48,500.00

9 Triplek uk 120 x 240 x 6mm 1 Lbr Rp 65,000.00

10 Triplek uk 120 x 240 x 9 mm 1 Lbr Rp 95,000.00

11 Sunkai/Megatex Uk 90 x 210 x 2.4mm 1 Lbr Rp 85,000.00

12 Lis profil gypsum 1 M Rp 12,000.00

13 Waterprofing 1 Kg Rp 37,000.00

14 Slimar aluminium daun pintu kaca uk.80 x 200Cm 1 Bh Rp 528,000.00

15 Krepyak / sunscreen aluminium 1 M2 Rp 341,000.00

16 Kaca glass blok 1 Bh Rp 15,400.00

17 Roster 1 Bh Rp 16,500.00

18 Pipa / slang spiral u/. Wastafel 1 Bh Rp 16,500.00

19 Watermoor 1 Bh Rp 16,500.00

20 Knee 1 Bh Rp 10,780.00

21 Sifon 1 Bh Rp 93,500.00

22 Angker Ø16 1 Bh Rp 2,750.00

23 Papan kamper 3/10 1 M2 Rp 430,000.00

24 Lem kayu 1 Kg Rp 22,500.00

25 Metal furing 1 Ljr Rp 35,000.00

26 U clam 1 Bh Rp 950.00

27 Chanel 1 Bh Rp 1,500.00

28 Wall angel / lis 1 M1 Rp 15,400.00

29 Kompon 1 Pls Rp 52,800.00

30 textletape 1 Bh Rp 13,750.00

31 Raut drat 1 Bh Rp 3,750.00

32 Skrup kalsiboard 1 Bh Rp 150.00

33 Alluminiumfoil 1.2 mm ( doubleside ) 1 Bh Rp 22,500.00

34 Hollow aluminium 1 Ljr Rp 35,000.00

35 Sunscreen 1 Bh Rp 374,000.00

36 Sealent 1 Tube Rp 22,500.00

37 Politur Mowilex 1 Ltr. Rp 260,000.00


NO URAIAN KEGIATAN SATUAN HARGA

38 Cerlak 1 Kg Rp 95,800.00

39 Clear Doof 1 Kg Rp 47,500.00

40 Coumpond 1 Kaleng Rp 45,000.00

41 Lem Plamir /Rajawali 1 Kg Rp 9,500.00

42 Pewarna 1 sachet Rp 900.00

43 Politur 1 Kg Rp 45,000.00

44 Shanding 1 Kg Rp 160,000.00

45 Wood Filler 1 Kg Rp 32,500.00

46 Thinner A 1 Liter Rp 17,500.00

47 Coolter 1 Liter Rp 8,500.00

48 Serat fiber 1 M2 Rp 2,750.00

Roman 30X30 ( exterior ) t. 6mm 1 M2 Rp 50,500.00

Roman 30X30 ( interior ) t. 6mm 1 M2 Rp 52,000.00

Roman 33X33 ( exterior ) t. 6mm 1 M2 Rp 75,750.00

Roman 33X33 ( interior ) t. 9mm 1 M2 Rp 89,125.00

Roman 40X40 ( exterior ) t. 6mm 1 M2 Rp 79,250.00

Roman 40X40 ( interior ) t. 6mm 1 M2 Rp 82,625.00

Platinum 40X40 ( exterior ) t. 9mm 1 M2 Rp 63,625.00

Platinum 40X40 ( interior ) t. 9mm 1 M2 Rp 52,000.00

Platinum 30X30 ( exterior ) t. 9mm 1 M2 Rp 50,500.00

Platinum 30X30 ( interior ) t. 9mm 1 M2 Rp 50,125.00

Asia Tile 40X40 ( exterior ) t. 9mm 1 M2 Rp 48,625.00

Asia Tile 40X40 ( interior ) t. 9mm 1 M2 Rp 50,000.00

Asia Tile 30X30 ( exterior ) t. 6mm 1 M2 Rp 45,000.00

Asia Tile 30X30 ( interior ) t. 6mm 1 M2 Rp 42,625.00

GRANITO NIRO :

Exterior T. 10MM ( 40x40 CM ) 1 M2 Rp 188,500.00

Interior T. 10MM ( 40x40 CM ) 1 M2 Rp 179,062.50

Exterior T. 10MM ( 60x60 CM ) 1 M2 Rp 233,000.00

Interior T. 10MM ( 60x60 CM ) 1 M2 Rp 233,000.00

Exterior T. 10MM ( 30x30 CM ) 1 M2 Rp 163,000.00

Interior T. 10MM ( 30x30 CM ) 1 M2 Rp 163,000.00

Closed Duduk American Standart 1 Bh Rp 1,968,375.00

Wastafel American Standart 1 Bh Rp 317,875.00

Closed Duduk Toto 1 Bh Rp 2,399,000.00

Closed Jongkok Toto ( Besar ) 1 Bh Rp 386,750.00

Closed Jongkok Toto ( Kecil ) 1 Bh Rp 189,375.00

Closed Duduk INA 1 Bh Rp 1,176,500.00

Wastafel Toto Besar 1 Bh

Wastafel Toto Kecil 1 Bh

Wastafel American Standart Besar 1 Bh Rp 317,875.00

Wastafel American Standart Kecil 1 Bh

Urinior INA 1 Bh Rp 1,319,500.00

Urinior TOTO 1 Bh Rp 1,577,125.00

Grendel tanam :

Ukuran 5" 1 set Rp 31,375.00

Ukuran 8.5" 1 set Rp 36,875.00

Ukuran 12" 1 set Rp 40,625.00

Ukuran 16" 1 set Rp 59,375.00

Ukuran 20" 1 set Rp 99,375.00

Bak tempat cuci stainlis 40X60 1 Bh Rp 2,499,250.00

Bak tempat cuci stainlis 40X80 1 Bh Rp 2,716,250.00

Bak tempat cuci stainlis Double ( Royal ) 1 Bh Rp 553,125.00

Bak tempat cuci stainlis Single ( Royal ) 1 Bh Rp 379,375.00

Handle pintu besar stainless doff 1 set Rp 153,125.00

Kunci lengkap ( Belleza) 1 set Rp 347,250.00

Genteng Glazurr :

KIA 1 Bh Rp 5,500.00

KANMURI 1 Bh Rp 11,000.00

M CLASS 1 Bh Rp 10,000.00

Bubungan glazurr

KIA 1 Bh Rp 14,000.00

KANMURI 1 Bh Rp 14,250.00

M CLASS 1 Bh Rp 8,000.00
NO URAIAN KEGIATAN SATUAN HARGA

Hak angin Solid 1 set Rp 62,500.00

Engsel Solid 3 skr 1 set Rp 25,000.00

Engsel Solid 4 skr 1 set Rp 32,000.00

Engsel Solid 5 skr 1 set Rp 69,500.00

Grendel rambuncis 1 set Rp 14,000.00

Pintu Alluminium&kusen 1 Bh Rp 595,750.00

Asbes gel bsr 100X305X6mm 1 Lbr Rp 123,000.00

Kalsiplank :

Ukuran 30X240X16mm 1 Lbr Rp 80,000.00

Ukuran 120X240X8mm 1 Lbr Rp 226,000.00

Gypsum :

120X240X9mm 1 Lbr Rp 62,000.00

Catylac dulux 25 Kg Rp 430,500.00

Catylac dulux 1 Kg Rp 17,220.00

Cat kayu emco 1 Kg Rp 61,125.00

Cat kayu mowilex 1 Kg Rp 70,250.00

Cat dulux weathershild 25 Kg Rp 1,689,875.00

1 Kg Rp 67,595.00

Cat weathercoat 3 Kg Rp 186,875.00

1 Kg Rp 74,750.00

Melamine impra 1 Ltr Rp 45,750.00

Rp 67,595.00
Pengukuran dan Pembuatan Bauwplank m1
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 270.00
Kepala Tukang Kayu 0.010 O.H Rp 50,000.00 Rp 450.00
Tukang Kayu 0.100 O.H Rp 45,000.00 Rp 4,050.00
Pekerja / Buruh Tak Terampil 0.100 O.H Rp 35,000.00 Rp 3,150.00
Jumlah: Rp 7,920.00
Bahan:
Kayu Meranti (Papan 2/20) 0.007 m3 Rp 2,800,000.00 Rp 48,546.00
Kayu Meranti (Usuk 5/7) 0.012 m3 Rp 2,400,000.00 Rp 11,592.00
Paku biasa 2" - 5" 0.020 Kg Rp 23,000.00 Rp 84,000.00
Jumlah: Rp 144,138.00
Nilai HSPK : Rp 152,058.00

Pembersihan m2
Upah:
Mandor 0.025 O.H Rp 60,000.00 Rp 1,500.00
Pekerja / Buruh Tak Terampil 0.050 O.H Rp 35,000.00 Rp 1,750.00
Jumlah: Rp 3,250.00
Nilai HSPK : Rp 3,250.00

Pembuangan Bekas Bongkaran m2


Upah:
Pekerja / Buruh Tak Terampil 0.167 O.H Rp 35,000.00 Rp 5,833.33
Jumlah: Rp 5,833.33
Sewa Peralatan:
Sewa Truk (min 5 Jam) 0.167 O.H Rp 65,000.00 Rp 10,833.33
Jumlah: Rp 10,833.33
Nilai HSPK : Rp 16,666.67

Pembuangan Bekas Bongkaran m3


Upah:
Pekerja / Buruh Tak Terampil 0.250 O.H Rp 35,000.00 Rp 8,750.00
Jumlah: Rp 8,750.00
Sewa Peralatan:
Sewa Truk (min 5 Jam) 0.250 O.H Rp 65,000.00 Rp 16,250.00
Jumlah: Rp 16,250.00
Nilai HSPK : Rp 25,000.00

Pembongkaran Dinding Tembok Dengan Pembersihan m2

Upah:
Mandor 0.050 O.H Rp 60,000.00 Rp 3,000.00
Tenaga Kasar 1.000 O.H Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 38,000.00
Nilai HSPK : Rp 38,000.00

Pembongkaran Dinding Tembok Dengan Pembersihan m2


Upah:
Mandor 0.050 O.H Rp 60,000.00 Rp 3,000.00
Pekerja/Buruh Tak Terampil 1.000 O.H Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 38,000.00
Nilai HSPK : Rp 38,000.00

Pembongkaran Beton m3 ANALISIS BOW


Upah:
Mandor 0.400 O.H Rp 60,000.00 Rp 24,000.00
Pekerja Terampil 4.000 O.H Rp 35,000.00 Rp 140,000.00
Jumlah: Rp 164,000.00
Nilai HSPK : Rp 164,000.00

Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata m2 SNI 6897:2008 (6.9)
Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 765.00
Kepala Tukang Batu 0.010 O.H Rp 50,000.00 Rp 425.00
Tukang Batu 0.100 O.H Rp 45,000.00 Rp 3,825.00
Tenaga Kasar 0.300 O.H Rp 35,000.00 Rp 8,925.00
Jumlah: Rp 13,940.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.230 Zak Rp 48,000.00 Rp 11,040.00
Pasir Pasang 0.043 m3 Rp 120,000.00 Rp 5,160.00
Batu Bata Merah uk 22 x 11 x 4.5 cm 70.000 Buah Rp 500.00 Rp 35,000.00
Jumlah: Rp 51,200.00
Nilai HSPK : Rp 65,140.00

Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm m2 SNI 2837:2008 (6.2)


Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 765.00
Kepala Tukang Batu 0.015 O.H Rp 50,000.00 Rp 637.50
Tukang Batu 0.150 O.H Rp 45,000.00 Rp 5,737.50
Tenaga Kasar 0.300 O.H Rp 35,000.00 Rp 8,925.00
Jumlah: Rp 16,065.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.204 Zak Rp 48,000.00 Rp 9,815.04
Pasir Pasang 0.020 m3 Rp 120,000.00 Rp 2,400.00
Jumlah: Rp 12,215.04
Nilai HSPK : Rp 28,280.04
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm m2 SNI 2837:2008 (6.3)
Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 765.00
Kepala Tukang Batu 0.015 O.H Rp 50,000.00 Rp 637.50
Tukang Batu 0.150 O.H Rp 45,000.00 Rp 5,737.50
Tenaga Kasar 0.300 O.H Rp 35,000.00 Rp 8,925.00
Jumlah: Rp 16,065.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.156 Zak Rp 48,000.00 Rp 7,464.96
Pasir Pasang 0.023 m3 Rp 120,000.00 Rp 2,760.00
Jumlah: Rp 10,224.96
Nilai HSPK : Rp 26,289.96
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm m2 SNI 2837:2008 (6.4)
Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 765.00
Kepala Tukang Batu 0.015 O.H Rp 50,000.00 Rp 637.50
Tukang Batu 0.150 O.H Rp 45,000.00 Rp 5,737.50
Tenaga Kasar 0.300 O.H Rp 35,000.00 Rp 8,925.00
Jumlah: Rp 16,065.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.125 Zak Rp 48,000.00 Rp 5,990.40
Pasir Pasang 0.024 m3 Rp 120,000.00 Rp 2,880.00
Jumlah: Rp 8,870.40
Rp 24,935.40

Pasang Benangan 1 Pc: 2Ps m SNI 2837:2008 (6.20)


Upah:
Mandor 0.004 O.H Rp 60,000.00 Rp 204.00
Kepala Tukang Batu 0.040 O.H Rp 50,000.00 Rp 1,700.00
Tukang Batu 0.400 O.H Rp 45,000.00 Rp 15,300.00
Tenaga Kasar 0.080 O.H Rp 35,000.00 Rp 2,380.00
Jumlah: Rp 19,584.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.010 Zak Rp 48,000.00 Rp 480.00
Pasir Pasang 0.013 m3 Rp 120,000.00 Rp 1,560.00
Jumlah: Rp 2,040.00
Nilai HSPK : Rp 21,624.00
Plesteran Ciprat 1 Pc : 2PS m2 SNI 2837:2008 (6.23)
Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 765.00
Kepala Tukang Batu 0.010 O.H Rp 50,000.00 Rp 425.00
Tukang Batu 0.100 O.H Rp 45,000.00 Rp 3,825.00
Tenaga Kasar 0.300 O.H Rp 35,000.00 Rp 8,925.00
Jumlah: Rp 13,940.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.086 Zak Rp 48,000.00 Rp 4,147.20
Pasir Pasang 0.006 m3 Rp 120,000.00 Rp 720.00
Jumlah: Rp 4,867.20
Nilai HSPK : Rp 18,807.20
Kol-Kolan m
Upah:
Tukang Batu 0.057 O.H Rp 45,000.00 Rp 2,565.00
Jumlah: Rp 2,565.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.010 Zak Rp 48,000.00 Rp 480.00
Pasir Pasang 0.002 m3 Rp 120,000.00 Rp 240.00
Jumlah: Rp 720.00
Nilai HSPK : Rp 3,285.00
Pekerjaan Acian m2 SNI DT 2837:2008 (6.27)
Upah:
Mandor 0.010 O.H Rp 60,000.00 Rp 510.00
Kepala Tukang Batu 0.010 O.H Rp 50,000.00 Rp 425.00
Tukang Batu 0.100 O.H Rp 45,000.00 Rp 3,825.00
Tenaga Kasar 0.200 O.H Rp 35,000.00 Rp 5,950.00
Jumlah: Rp 10,710.00
Bahan:
Semen portland (50 kg) 0.065 Zak Rp 48,000.00 Rp 3,120.00
Jumlah: Rp 3,120.00
Nilai HSPK : Rp 13,830.00

Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud m2 SNI 2002 Pekerjaan Kayu (6.56)
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Kayu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pembantu Tukang 0.150 O.H Rp 35,000.00 Rp 4,200.00
Jumlah: Rp 25,800.00
Bahan:
Rangka Metal Stud 0.015 m3 Rp 4,262,050.00 Rp 65,635.57
Gypsum Tebal 12 mm 1.000 Lembar Rp 66,000.00 Rp 66,000.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 135,835.57
Nilai HSPK : Rp 161,635.57

Pemasangan Partisi Double Kalsiboard 6 mm Rangka Metal Stud 1.000 M2


Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Kayu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pekerja/Buruh Tak Terampil 0.150 O.H Rp 35,000.00 Rp 4,200.00
Jumlah: Rp 25,800.00
Bahan:
Rangka Metal Stud 2.400 M2 Rp 19,500.00 Rp 46,800.00
Nilai HSPK Rp 72,600.00
Bahan:
Double Kalsiboard 6 mm 1.000 Lembar Rp 96,500.00 Rp 96,500.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 100,700.00
Nilai HSPK Rp 126,500.00
Bahan:
Triplek 6 mm ( lapisan dasar megatek ) 1.000 Lembar Rp 65,000.00 Rp 65,000.00
Megatex 3 mm 1.000 Lembar Rp 85,000.00 Rp 85,000.00
Lem kuning 0.200 Ltr. Rp 13,200.00 Rp 2,640.00
Jumlah: Rp 152,640.00
Nilai HSPK Rp 178,440.00

Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud m2 SNI 2002 Pekerjaan Kayu (6.56)
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Kayu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pekerja/Buruh Tak Terampil 0.150 O.H Rp 35,000.00 Rp 4,200.00
Jumlah: Rp 25,800.00
Bahan:
Rangka Metal Stud 0.015 m3 Rp 4,262,050.00 Rp 67,698.40
Gypsum Tebal 12 mm 1.000 Lembar Rp 66,000.00 Rp 66,000.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 137,898.40
Nilai HSPK : Rp 163,698.40
Pengangkutan Tanah keluar Proyek m3
Upah:
Pekerja / Buruh Tak Terampil 0.250 O.H Rp 35,000.00 Rp 8,750.00
Jumlah: Rp 8,750.00
Sewa Peralatan:
Sewa Dump Truck 5 T (min 5 jam) 0.250 Jam Rp 65,000.00 Rp 16,250.00
Jumlah: Rp 16,250.00
Nilai HSPK : Rp 25,000.00
Penggalian Tanah untuk Konstruksi m3 SNI DT 91-0006-2007 (6.2)
Upah:
Mandor 0.045 O.H Rp 60,000.00 Rp 2,700.00
Pekerja / Buruh Tak Terampil 0.900 O.H Rp 35,000.00 Rp 31,500.00
Jumlah: Rp 34,200.00
Nilai HSPK : Rp 34,200.00
Penggalian Tanah Keras m3 SNI DT 91-0006-2007 (6.4)
Upah:
Mandor 0.032 O.H Rp 60,000.00 Rp 1,920.00
Pekerja / Buruh Tak Terampil 1.000 O.H Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 36,920.00
Nilai HSPK : Rp 36,920.00

Pengurugan Pasir (PADAT) m3 SNI DT 91-0006-2007 (6.11)


Upah:
Mandor 0.010 O.H Rp 60,000.00 Rp 600.00
Pekerja Terampil 0.300 O.H Rp 35,000.00 Rp 10,500.00
Jumlah: Rp 11,100.00
Bahan:
Pasir Urug 1.200 m3 Rp 115,000.00 Rp 138,000.00
Jumlah: Rp 138,000.00
Nilai HSPK : Rp 149,100.00
Pengurugan Sirtu (PADAT) m3 SNI DT 91-0006-2007 (6.15)
Upah:
Mandor 0.025 O.H Rp 60,000.00 Rp 1,500.00
Pekerja Terampil 0.250 O.H Rp 35,000.00 Rp 8,750.00
Jumlah: Rp 10,250.00
Bahan:
Tasirtu/ Sirtu 1.200 m3 Rp 60,000.00 Rp 72,000.00
Jumlah: Rp 72,000.00
Nilai HSPK : Rp 82,250.00
Pemasangan Batu Kali Belah Kosongan (aanstamping)
m3 SNI DT 91-0007-2007 (6.9)
Upah:
Mandor 0.039 O.H Rp 60,000.00 Rp 1,872.00
Kepala Tukang Batu 0.039 O.H Rp 50,000.00 Rp 1,560.00
Tukang Batu 0.390 O.H Rp 45,000.00 Rp 14,040.00
Pekerja/Buruh Tak Terampil 0.780 O.H Rp 35,000.00 Rp 21,840.00
Jumlah: Rp 39,312.00
Bahan:
Batu Kali Belah 15/20 cm 1.200 m3 Rp 130,100.00 Rp 156,120.00
Pasir Urug 0.432 m3 Rp 115,000.00 Rp 49,680.00
Jumlah: Rp 205,800.00
Nilai HSPK : Rp 245,112.00
Pemasangan Batu Kali Kosongan tebal 20 cm m3
Upah:
Mandor 0.017 O.H Rp 60,000.00 Rp 816.00
Kepala Tukang Batu 0.015 O.H Rp 50,000.00 Rp 600.00
Tukang Batu 0.150 O.H Rp 45,000.00 Rp 5,400.00
Pekerja/Buruh Tak Terampil 0.350 O.H Rp 35,000.00 Rp 9,800.00
Jumlah: Rp 16,616.00
Bahan:
Batu Kali Belah 15/20 cm 1.200 m3 Rp 130,100.00 Rp 156,120.00
Jumlah: Rp 156,120.00
Nilai HSPK : Rp 172,736.00

Pekerjaan Pasangan Batu Kali Belah 15/20 cm (1 Pc : 5 Ps) m3 SNI DT 91-0007-2007 (6.6)
Tenaga:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Batu 0.060 O.H Rp 50,000.00 Rp 2,400.00
Tukang Batu 0.600 O.H Rp 45,000.00 Rp 21,600.00
Pekerja/Buruh Tak Terampil 1.500 O.H Rp 35,000.00 Rp 42,000.00
Jumlah: Rp 69,600.00
Bahan:
Semen portland (50kg) 2.720 Zak Rp 54,000.00 Rp 146,880.00
Pasir Pasang 0.544 m3 Rp 120,000.00 Rp 65,280.00
Batu Kali Belah 15/20 cm 1.100 m3 Rp 130,100.00 Rp 143,110.00
Jumlah: Rp 355,270.00
Nilai HSPK : Rp 424,870.00

Pekerjaan Bekisting Sloof m2 SNI DT 91-0008-2007 (6.21)


Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 7,950.00
Kepala Tukang kayu 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 213,630.00
Bahan:
Kayu meranti bekisting 0.045 m3 Rp 2,400,000.00 Rp 27,000.00
Paku Usuk 0.300 Kg Rp 17,000.00 Rp 1,275.00
Minyak Bekisting 0.100 ltr Rp 4,800.00 Rp 120.00
Jumlah: Rp 28,395.00
Nilai HSPK : Rp 242,025.00

Pekerjaan Beton K-300 m3 SNI DT 91-0008-2007 (6.9)


Tenaga:
Mandor 0.083 O.H Rp 60,000.00 Rp 3,984.00
Kepala Tukang Batu 0.028 O.H Rp 50,000.00 Rp 1,120.00
Tukang batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Pekerja / Buruh Tak Terampil 1.650 O.H Rp 35,000.00 Rp 46,200.00
Jumlah: Rp 61,204.00
Bahan:
Semen portland (40kg) 10.325 Zak Rp 48,000.00 Rp 495,600.00
Pasir Beton 0.426 m3 Rp 130,000.00 Rp 55,331.25
Batu Pecah Mesin 1/2 cm 0.537 m3 Rp 230,000.00 Rp 123,594.74
Air (biaya air tawar) 215.000 Liter Rp 13.00 Rp 2,795.00
Jumlah: Rp 677,320.99
Nilai HSPK : Rp 738,524.99

Pekerjaan Pembesian dengan besi beton (polos/ulir) kg SNI DT 91-0008-2007 (6.17)


Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 24.00
Kepala Tukang Besi 0.001 O.H Rp 50,000.00 Rp 35.00
Tukang Besi 0.007 O.H Rp 45,000.00 Rp 315.00
Pekerja / Buruh Tak Terampil 0.007 O.H Rp 35,000.00 Rp 245.00
Jumlah: Rp 619.00
Bahan:
Besi Beton (polos/ulir) 1.050 Kg Rp 8,000.00 Rp 8,400.00
Kawat Beton 0.015 Kg Rp 14,000.00 Rp 210.00
Jumlah: Rp 8,610.00
Nilai HSPK : Rp 9,229.00

Beton bertulang K-300 dengan memakai besi 150 Kg


Pekerjaan pembesian 150.000 Kg Rp 9,229.00 Rp 500,000.00
Acuan untuk beton struktur ( begisting ) 1.000 M3 Rp 242,025.00 Rp 1,000,000.00
Pekerjaan beton bersetruktur K-300 1.000 M3 Rp 738,524.99 Rp 300,000.00
Pembongkaran begisting dan penyiraman beton 1.000 O.H Rp 48,600.00 Rp 30,000.00
Jumlah Rp 1,830,000.00
Nilai HSPK Rp 1,830,000.00

Pekerjaan Kolom Praktis (11 x 11 cm) m1 SNI DT 91-0008-2007 (6.35)


Tenaga:
Mandor 0.009 O.H Rp 60,000.00 Rp 540.00
Kepala Tukang Besi 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Besi 0.020 O.H Rp 45,000.00 Rp 900.00
Tukang Batu 0.020 O.H Rp 45,000.00 Rp 900.00
Tukang Kayu 0.020 O.H Rp 45,000.00 Rp 900.00
Pekerja / Buruh Tak Terampil 0.180 O.H Rp 35,000.00 Rp 6,300.00
Jumlah: Rp 9,840.00
Bahan:
Semen portland (40kg) 0.100 Zak Rp 48,000.00 Rp 4,800.00
Pasir Beton 0.006 m3 Rp 130,000.00 Rp 780.00
Batu Pecah Mesin 1/2 cm 0.009 m3 Rp 230,000.00 Rp 2,070.00
Besi Beton (polos/ulir) 3.000 Kg Rp 8,000.00 Rp 24,000.00
Kawat Beton 0.450 Kg Rp 14,000.00 Rp 6,300.00
Kayu meranti bekisting 0.002 m3 Rp 2,400,000.00 Rp 1,200.00
Paku Usuk 0.010 Kg Rp 17,000.00 Rp 170.00
Jumlah: Rp 39,320.00
Nilai HSPK : Rp 49,160.00
Pekerjaan Ring Balk (10x15) cm m1 SNI DT 91-0008-2007 (6.36)
Tenaga:
Mandor 0.015 O.H Rp 60,000.00 Rp 900.00
Kepala Tukang Besi 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Besi 0.033 O.H Rp 45,000.00 Rp 1,485.00
Tukang Batu 0.033 O.H Rp 45,000.00 Rp 1,485.00
Tukang Kayu 0.033 O.H Rp 45,000.00 Rp 1,485.00
Pekerja / Buruh Tak Terampil 0.297 O.H Rp 35,000.00 Rp 10,395.00
Jumlah: Rp 16,250.00
Bahan:
Semen portland (40kg) 0.138 Zak Rp 48,000.00 Rp 6,600.00
Pasir Beton 0.009 m3 Rp 130,000.00 Rp 1,170.00
Batu Pecah Mesin 1/2 cm 0.015 m3 Rp 230,000.00 Rp 3,450.00
Besi Beton (polos/ulir) 3.600 Kg Rp 8,000.00 Rp 28,800.00
Kawat Beton 0.050 Kg Rp 14,000.00 Rp 700.00
Kayu meranti bekisting 0.003 m3 Rp 2,400,000.00 Rp 1,800.00
Paku Usuk 0.020 Kg Rp 17,000.00 Rp 340.00
Jumlah: Rp 42,860.00
Nilai HSPK : Rp 59,110.00

Pengurugan Tanah Kembali untuk Konstruksi m3 SNI DT 91-0006-2007 (6.9)


Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 900.00
Pekerja / Buruh Tak Terampil 0.300 O.H Rp 35,000.00 Rp 12,000.00
Jumlah: Rp 12,900.00
Nilai HSPK : Rp 12,900.00

Mengapur dinding tembok baru sampai baik 3X m2


Upah:
Kepala Tukang Cat 0.001 O.H Rp 50,000.00 Rp 50.00
Tukang Cat 0.010 O.H Rp 45,000.00 Rp 450.00
Pekerja/Buruh Tak Terampil 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 2,600.00
Bahan:
Kapur Gamping 0.001 m3 Rp 80,000.00 Rp 249.81
Jumlah: Rp 249.81
Nilai HSPK : Rp 2,849.81

Cat Tembok 1.000 M2


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 135.00
Kepala tukang batu 0.008 O.H Rp 50,000.00 Rp 337.50
Tukang cat 0.075 O.H Rp 45,000.00 Rp 3,037.50
Pekerja 0.500 O.H Rp 35,000.00 Rp 15,750.00
Jumlah Rp 19,260.00
Bahan
Cat Tembok 0.300 Kg Rp 14,500.00 Rp 3,915.00
Plamir tembok 0.050 Kg Rp 14,500.00 Rp 652.50
Kertas gosok no.150 0.250 Lbr Rp 3,500.00 Rp 787.50
Jumlah Rp 5,355.00
Nilai HSPK Rp 24,615.00

Cat Tembok weather shield 1.000 M2


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 135.00
Kepala tukang batu 0.008 O.H Rp 50,000.00 Rp 337.50
Tukang cat 0.075 O.H Rp 45,000.00 Rp 3,037.50
Pekerja 0.500 O.H Rp 35,000.00 Rp 15,750.00
Jumlah Rp 19,260.00
Bahan
Cat Tembok weather shield 0.300 Kg Rp 64,960.00 Rp 17,539.20
Plamir tembok 0.050 Kg Rp 14,500.00 Rp 652.50
Kertas gosok no.150 0.250 Lbr Rp 3,500.00 Rp 787.50
Jumlah Rp 18,979.20
Nilai HSPK Rp 38,239.20

Plamur Tembok m2 Tabel 1 Pt - T - 38 - 2000 - C


Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 60.00
Kepala Tukang Cat 0.003 O.H Rp 50,000.00 Rp 150.00
Tukang Cat 0.030 O.H Rp 45,000.00 Rp 1,350.00
Pekerja/Buruh Tak Terampil 0.020 O.H Rp 35,000.00 Rp 700.00
Jumlah: Rp 2,260.00
Bahan:
Plamur Tembok 0.100 Kg Rp 14,500.00 Rp 1,450.00
Kertas Gosok no 150 0.500 Lembar Rp 3,500.00 Rp 1,750.00
Jumlah: Rp 3,200.00
Nilai HSPK : Rp 5,460.00
Pengecatan Dasar Meni Besi m2 SNI 2002 Pekerjaan Pengecatan (6.20)
Upah:
Mandor 0.010 O.H Rp 60,000.00 Rp 600.00
Kepala Tukang Cat 0.020 O.H Rp 50,000.00 Rp 1,000.00
Tukang Cat 0.200 O.H Rp 45,000.00 Rp 9,000.00
Pekerja/Buruh Tak Terampil 0.020 O.H Rp 35,000.00 Rp 700.00
Jumlah: Rp 11,300.00
Bahan:
Cat Meni (besi/kayu) 0.100 Kg Rp 15,000.00 Rp 1,500.00
Kuas 0.010 Bh Rp 14,000.00 Rp 140.00
Jumlah: Rp 1,640.00
Nilai HSPK : Rp 12,940.00

Pengecatan Tembok Lama (1 lapis cat dasar,2 lapis cat penutup) m2 SNI 2002 Pekerjaan Pengecatan (6.15)

Upah:
Mandor 0.003 O.H Rp 60,000.00 Rp 150.00
Kepala Tukang Cat 0.004 O.H Rp 50,000.00 Rp 210.00
Tukang Cat 0.042 O.H Rp 45,000.00 Rp 1,890.00
Pekerja/Buruh Tak Terampil 0.028 O.H Rp 35,000.00 Rp 980.00
Jumlah: Rp 3,230.00
Bahan:
Dempul Tembok (cat Dasar) 0.120 Kg Rp 12,500.00 Rp 1,500.00
Cat Tembok Luar 0.180 Kg Rp 64,960.00 Rp 11,692.80
Jumlah: Rp 13,192.80
Nilai HSPK : Rp 16,422.80

Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) m3 SNI DT 91-0008-2007 (6.33)
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,000.00 Rp 403,200.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 230,000.00 Rp 186,300.00
Besi Beton (polos/ulir) 150.000 Kg Rp 8,000.00 Rp 1,200,000.00
Kawat Beton 2.250 Kg Rp 14,000.00 Rp 31,500.00
Kayu meranti bekisting 0.240 m3 Rp 2,400,000.00 Rp 144,000.00
Kayu Kamper balok 3/5 0.160 m3 Rp 3,700,000.00 Rp 148,000.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 24.000 Batang Rp 12,000.00 Rp 72,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 17,000.00 Rp 54,400.00
Minyak Bekisting 1.600 ltr Rp 4,800.00 Rp 7,680.00
Jumlah: Rp 2,383,780.00
Nilai HSPK : Rp 2,649,880.00
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) m3 SNI DT 91-0008-2007 (6.34)
Tenaga:
Mandor 0.283 O.H Rp 60,000.00 Rp 13,584.00
Kepala Tukang Besi 0.323 O.H Rp 50,000.00 Rp 12,920.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.560 O.H Rp 45,000.00 Rp 56,160.00
Pekerja / Buruh Tak Terampil 5.650 O.H Rp 35,000.00 Rp 158,200.00
Jumlah: Rp 301,164.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,000.00 Rp 403,200.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 230,000.00 Rp 186,300.00
Besi Beton (polos/ulir) 210.000 Kg Rp 8,000.00 Rp 1,680,000.00
Kawat Beton 3.000 Kg Rp 14,000.00 Rp 42,000.00
Kayu meranti bekisting 0.250 m3 Rp 2,400,000.00 Rp 150,000.00
Kayu Kamper balok 3/5 0.105 m3 Rp 3,700,000.00 Rp 97,125.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 14.000 Batang Rp 12,000.00 Rp 42,000.00
Plywood tebal 9 mm 2.500 lembar Rp 95,000.00 Rp 59,375.00
Paku Usuk 3.000 Kg Rp 17,000.00 Rp 51,000.00
Minyak Bekisting 1.200 ltr Rp 4,800.00 Rp 5,760.00
Jumlah: Rp 2,786,960.00
Nilai HSPK : Rp 3,088,124.00

Pemasangan Tegel Keramik 40x40 cm (Motif/Warna Gelap) m2 SNI DT 91-0012-2007 (6.11) & (6.35)

Upah:
Mandor 0.035 O.H Rp 60,000.00 Rp 1,680.00
Kepala Tukang Batu 0.035 O.H Rp 50,000.00 Rp 1,400.00
Tukang Batu 0.350 O.H Rp 45,000.00 Rp 12,600.00
Pekerja/Buruh Tak Terampil 0.700 O.H Rp 35,000.00 Rp 19,600.00
Jumlah: Rp 35,280.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.196 Zak Rp 54,000.00 Rp 10,584.00
Semen Berwarna Yiyitan 1.300 Kg Rp 7,500.00 Rp 9,750.00
Pasir Pasang 0.045 m3 Rp 120,000.00 Rp 5,400.00
Tegel Keramik 40x40 (motif/warna gelap) 1.061 m2 Rp 51,700.00 Rp 54,843.36
Jumlah: Rp 80,577.36
Nilai HSPK : Rp 115,857.36
Pemasangan Tegel Keramik 20x25 cm (Dinding) m2 SNI DT 91-0012-2007 (6.54)

Upah:
Mandor 0.045 O.H Rp 60,000.00 Rp 2,160.00
Kepala Tukang Batu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Batu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pekerja/Buruh Tak Terampil 0.900 O.H Rp 35,000.00 Rp 25,200.00
Jumlah: Rp 45,360.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.186 Zak Rp 54,000.00 Rp 10,044.00
Semen Berwarna Yiyitan 1.940 Kg Rp 7,500.00 Rp 14,550.00
Pasir Pasang 0.018 m3 Rp 120,000.00 Rp 2,160.00
Tegel Keramik 20 x 25 Cm (dinding) 1.050 m2 Rp 37,500.00 Rp 39,375.00
Jumlah: Rp 66,129.00
Nilai HSPK : Rp 111,489.00

Pemasangan Plafond Rangka Plafon Metal Furing m2


Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 4,500.00
Kepala Tukang Kayu 0.025 O.H Rp 50,000.00 Rp 1,250.00
Pekerja/Buruh Tak Terampil 0.150 O.H Rp 35,000.00 Rp 5,250.00
Tukang Kayu 0.250 O.H Rp 45,000.00 Rp 11,250.00
Jumlah: Rp 22,250.00
Bahan:
Besi Hollow 40/40 0.750 m' Rp 17,500.00 Rp 13,125.00
Besi Hollow 20/20 2.000 m' Rp 14,500.00 Rp 29,000.00
Kalsiboard EG Uk.240 x 120 x 9 mm 0.382 Lembar Rp 104,500.00 Rp 53,924.28
Skrup 4.000 Buah Rp 150.00 Rp 600.00
Jumlah: Rp 96,649.28
Nilai HSPK : Rp 118,899.28
Pemasangan Plafond Rangka Plafon Metal Furing m2
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 4,500.00
Kepala Tukang Kayu 0.025 O.H Rp 50,000.00 Rp 1,250.00
Pembantu Tukang 0.150 O.H Rp 35,000.00 Rp 5,250.00
Tukang Kayu 0.250 O.H Rp 45,000.00 Rp 11,250.00
Jumlah: Rp 22,250.00
Bahan:
Besi Hollow 40/40 0.750 m' Rp 17,500.00 Rp 13,125.00
Besi Hollow 20/20 2.000 m' Rp 14,500.00 Rp 29,000.00
Kalsiboard EG Uk.240 x 120 x 9 mm 0.382 Lembar Rp 104,500.00 Rp 39,908.55
Paku Asbes Skrup 4 4.000 Buah Rp 150.00 Rp 600.00
Jumlah: Rp 82,633.55
Nilai HSPK : Rp 104,883.55

Pemasangan Kusen Alumunium Profil 4" m1 SNI DT 91-0014-2007 (6.11)


Upah:
Mandor 0.002 O.H Rp 60,000.00 Rp 132.60
Kepala Tukang Kayu 0.004 O.H Rp 50,000.00 Rp 215.00
Tukang Kayu 0.043 O.H Rp 35,000.00 Rp 1,505.00
Pekerja Terampil 0.043 O.H Rp 45,000.00 Rp 1,935.00
Jumlah: Rp 3,787.60
Bahan:
Aluminium Putih Uk. 4 x 10, Profil 4" 1.100 m1 Rp 88,500.00 Rp 97,350.00
Skrup/Ripet 2.000 Buah Rp 150.00 Rp 300.00
Sealent 0.060 tube Rp 22,500.00 Rp 1,350.00
Jumlah: Rp 99,000.00
Nilai HSPK : Rp 102,787.60
Pemasangan Slimar Alumunium Profil 3/8 " m1 SNI DT 91-0014-2007 (6.11)
Upah:
Mandor 0.002 O.H Rp 60,000.00 Rp 132.60
Kepala Tukang Kayu 0.004 O.H Rp 50,000.00 Rp 215.00
Tukang Kayu 0.043 O.H Rp 35,000.00 Rp 1,505.00
Pekerja Terampil 0.043 O.H Rp 45,000.00 Rp 1,935.00
Jumlah: Rp 3,787.60
Bahan:
Slimar Alumunium 3/8 1.100 m1 Rp 53,500.00 Rp 58,850.00
Sealent 0.060 tube Rp 22,500.00 Rp 1,350.00
Skrup/Ripet 2.000 Buah Rp 150.00 Rp 300.00
Jumlah: Rp 60,500.00
Nilai HSPK : Rp 64,287.60

Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud m2 SNI 2002 Pekerjaan Kayu (6.56)
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 4,050.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 2,025.00
Tukang Kayu 0.450 O.H Rp 35,000.00 Rp 14,175.00
Pekerja/Buruh Tak Terampil 0.150 O.H Rp 45,000.00 Rp 6,075.00
Jumlah: Rp 26,325.00
Bahan:
Rangka Metal Stud 0.015 m3 Rp 4,262,050.00 Rp 67,698.40
Gypsum Tebal 12 mm 1.000 Lembar Rp 66,000.00 Rp 66,000.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 137,898.40
Nilai HSPK : Rp 164,223.40

SNI 2002 Pekerjaan Kunci dan Kaca


Pemasangan Kaca Mati tebal 6 mm m2
(6.17)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 45.00
Kepala Tukang Kayu 0.015 O.H Rp 50,000.00 Rp 750.00
Tukang Kayu 0.150 O.H Rp 35,000.00 Rp 5,250.00
Pekerja/Buruh Tak Terampil 0.015 O.H Rp 45,000.00 Rp 675.00
Jumlah: Rp 6,720.00
Bahan:
Kaca Polos Tebal 6 mm 1.100 m2 Rp 85,000.00 Rp 93,500.00
Jumlah: Rp 93,500.00
Nilai HSPK : Rp 100,220.00

SNI 2002 Pekerjaan Kunci dan Kaca


Pemasangan Kaca Mati tebal 8 mm m2
(6.17)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 45.00
Kepala Tukang Kayu 0.015 O.H Rp 50,000.00 Rp 750.00
Tukang Kayu 0.150 O.H Rp 35,000.00 Rp 5,250.00
Pekerja/Buruh Tak Terampil 0.015 O.H Rp 45,000.00 Rp 675.00
Jumlah: Rp 6,720.00
Bahan:
Kaca Polos Tebal 8 mm 1.100 m2 Rp 100,000.00 Rp 110,000.00
Jumlah: Rp 110,000.00
Nilai HSPK : Rp 116,720.00

SNI 2002 Pekerjaan Kunci dan Kaca


Pemasangan Kaca Gravier m2
(6.5)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 45.00
Kepala Tukang Kayu 0.015 O.H Rp 50,000.00 Rp 750.00
Tukang Kayu 0.150 O.H Rp 35,000.00 Rp 5,250.00
Pekerja/Buruh Tak Terampil 0.015 O.H Rp 45,000.00 Rp 675.00
Jumlah: Rp 6,720.00
Bahan:
Kaca Gravier 1.100 m2 Rp 275,000.00 Rp 302,500.00
Jumlah: Rp 302,500.00
Nilai HSPK : Rp 309,220.00
SNI 2002 Pekerjaan Kunci dan Kaca
Pemasangan Kaca Stainglass m2
(6.5)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 45.00
Kepala Tukang Kayu 0.015 O.H Rp 50,000.00 Rp 750.00
Tukang Kayu 0.150 O.H Rp 35,000.00 Rp 5,250.00
Pekerja/Buruh Tak Terampil 0.050 O.H Rp 45,000.00 Rp 2,250.00
Jumlah: Rp 8,295.00
Bahan:
Kaca Stainglass 1.100 m2 Rp 345,000.00 Rp 379,500.00
Jumlah: Rp 379,500.00
Nilai HSPK : Rp 387,795.00

SNI 2002 Pekerjaan Kunci dan Kaca


Pemasangan Kunci Tanam Kecil Buah
(6.2)
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 300.00
Kepala Tukang Kayu 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Kayu 0.500 O.H Rp 35,000.00 Rp 17,500.00
Pembantu Tukang 0.010 O.H Rp 45,000.00 Rp 450.00
Jumlah: Rp 18,750.00
Bahan:
Kunci Tanam 1.000 Buah Rp 17,500.00 Rp 17,500.00
Jumlah: Rp 17,500.00
Nilai HSPK : Rp 36,250.00
SNI 2002 Pekerjaan Kunci dan Kaca
Pemasangan Kunci Tanam Besar 2x Putar kuningan Buah
(6.2)
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 300.00
Kepala Tukang Kayu 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Kayu 0.500 O.H Rp 35,000.00 Rp 17,500.00
Pembantu Tukang 0.010 O.H Rp 45,000.00 Rp 450.00
Jumlah: Rp 18,750.00
Bahan:
Kunci Tanam Besar 2x Putar (kuningan) 1.000 Buah Rp 185,000.00 Rp 185,000.00
Jumlah: Rp 185,000.00
Nilai HSPK : Rp 203,750.00
SNI 2002 Pekerjaan Kunci dan Kaca
Pemasangan Engsel H (stel) Stel
(6.5)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 45.00
Kepala Tukang Kayu 0.015 O.H Rp 50,000.00 Rp 750.00
Tukang Kayu 0.150 O.H Rp 35,000.00 Rp 5,250.00
Pembantu Tukang 0.015 O.H Rp 45,000.00 Rp 675.00
Jumlah: Rp 6,720.00
Bahan:
Engsel H 1.000 stel Rp 17,500.00 Rp 17,500.00
Jumlah: Rp 17,500.00
Nilai HSPK : Rp 24,220.00
SNI 2002 Pekerjaan Kunci dan Kaca
Pemasangan Engsel Kuningan Untuk Jendela Stel
(6.6)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 30.00
Kepala Tukang Kayu 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Kayu 0.100 O.H Rp 35,000.00 Rp 3,500.00
Pembantu Tukang 0.010 O.H Rp 45,000.00 Rp 450.00
Jumlah: Rp 4,480.00
Bahan:
Engsel Kuningan 1.000 stel Rp 25,000.00 Rp 25,000.00
Jumlah: Rp 25,000.00
Nilai HSPK : Rp 29,480.00
SNI 2002 Pekerjaan Kunci dan Kaca
Pemasangan Engsel Kuningan Untuk Pintu Stel
(6.5)
Upah:
Mandor 0.001 O.H Rp 60,000.00 Rp 45.00
Kepala Tukang Kayu 0.015 O.H Rp 50,000.00 Rp 750.00
Tukang Kayu 0.150 O.H Rp 35,000.00 Rp 5,250.00
Pembantu Tukang 0.015 O.H Rp 45,000.00 Rp 675.00
Jumlah: Rp 6,720.00
Bahan:
Engsel Kuningan (untuk Pintu) 1.000 stel Rp 69,500.00 Rp 69,500.00
Jumlah: Rp 69,500.00
Nilai HSPK : Rp 76,220.00
Pemasangan Grendel Buah
Upah:
Tukang Kayu 0.120 O.H Rp 45,000.00 Rp 5,400.00
Pembantu Tukang 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 7,500.00
Bahan:
Grendel Biasa (besar) 1.000 Buah Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 35,000.00
Nilai HSPK : Rp 42,500.00
Pemasangan Grendel Biasa (Kecil) Buah
Upah:
Tukang Kayu 0.120 O.H Rp 45,000.00 Rp 5,400.00
Pembantu Tukang 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 7,500.00
Bahan:
Grendel Biasa (kecil) 1.000 Buah Rp 22,300.00 Rp 22,300.00
Jumlah: Rp 22,300.00
Nilai HSPK : Rp 29,800.00
Pemasangan Grendel Biasa (Besar) Buah
Upah:
Tukang Kayu 0.120 O.H Rp 45,000.00 Rp 5,400.00
Pembantu Tukang 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 7,500.00
Bahan:
Grendel Panjang 1.000 Buah Rp 67,100.00 Rp 67,100.00
Jumlah: Rp 67,100.00
Nilai HSPK : Rp 74,600.00
Pemasangan Grendel Tanam Buah
Upah:
Tukang Kayu 0.140 O.H Rp 45,000.00 Rp 6,300.00
Pembantu Tukang 0.080 O.H Rp 35,000.00 Rp 2,800.00
Jumlah: Rp 9,100.00
Bahan:
Grendel Tanam 1.000 Buah Rp 45,000.00 Rp 45,000.00
Jumlah: Rp 45,000.00
Nilai HSPK : Rp 54,100.00
Pemasangan Grendel Kuningan/ Croum (Kecil) Buah
Upah:
Tukang Kayu 0.120 O.H Rp 45,000.00 Rp 5,400.00
Pembantu Tukang 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 7,500.00
Bahan:
Grendel Tanam 1.000 Buah Rp 67,100.00 Rp 67,100.00
Jumlah: Rp 67,100.00
Nilai HSPK : Rp 74,600.00
Pemasangan Grendel Espanyolet Buah
Upah:
Tukang Kayu 0.140 O.H Rp 45,000.00 Rp 6,300.00
Pembantu Tukang 0.080 O.H Rp 35,000.00 Rp 2,800.00
Jumlah: Rp 9,100.00
Bahan:
Espanyolet 1.000 Buah Rp 62,500.00 Rp 62,500.00
Jumlah: Rp 62,500.00
Nilai HSPK : Rp 71,600.00
Pemasangan Hak Angin (Sikutan) Stel
Upah:
Tukang Kayu 0.140 O.H Rp 45,000.00 Rp 6,300.00
Pembantu Tukang 0.080 O.H Rp 35,000.00 Rp 2,800.00
Jumlah: Rp 9,100.00
Bahan:
Hak Angin (sikutan biasa) 1.000 Buah Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 35,000.00
Nilai HSPK : Rp 44,100.00
Pemasangan Hak Angin Sikutan (kuningan) Buah
Upah:
Tukang Kayu 0.120 O.H Rp 45,000.00 Rp 5,400.00
Pembantu Tukang 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 7,500.00
Bahan:
Hak Angin kuningan Lurus Maju/Mundur 1.000 Buah Rp 62,500.00 Rp 62,500.00
Jumlah: Rp 62,500.00
Nilai HSPK : Rp 70,000.00
Pemasangan Hak Angin 4 mm (Lurus) Stel
Upah:
Tukang Kayu 0.140 O.H Rp 45,000.00 Rp 6,300.00
Pembantu Tukang 0.080 O.H Rp 35,000.00 Rp 2,800.00
Jumlah: Rp 9,100.00
Bahan:
Hak Angin 4 mm (lurus biasa) 1.000 Buah Rp 4,500.00 Rp 4,500.00
Jumlah: Rp 4,500.00
Nilai HSPK : Rp 13,600.00
Pemasangan Hak Angin Lurus (Bisa Disetel Maju/Mundur) Buah
Upah:
Tukang Kayu 0.120 O.H Rp 45,000.00 Rp 5,400.00
Pembantu Tukang 0.060 O.H Rp 35,000.00 Rp 2,100.00
Jumlah: Rp 7,500.00
Bahan:
Hak Angin Lurus Kuningan (bisa Disetel Maju/Mundur) 1.000 Buah Rp 19,920.00 Rp 19,920.00
Jumlah: Rp 19,920.00
Nilai HSPK : Rp 27,420.00

Daun Pintu Teakwood m2 SNI 2002 Pekerjaan Kayu (6.20)


Upah:
Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
Kepala Tukang Kayu 0.200 O.H Rp 50,000.00 Rp 10,000.00
Tukang Kayu 2.000 O.H Rp 45,000.00 Rp 90,000.00
Pembantu Tukang 0.600 O.H Rp 35,000.00 Rp 21,000.00
Jumlah: Rp 122,800.00
Bahan:
Teakwood uk. 122x244x3 mm 1.000 lembar Rp 85,000.00 Rp 85,000.00
Kayu Kamper (slimar ) 0.020 m3 Rp 6,435,000.00 Rp 126,126.00
Lem Kayu 0.300 kg Rp 22,500.00 Rp 6,750.00
Paku Klem (No 4) 0.300 Doz Rp 10,400.00 Rp 3,120.00
Jumlah: Rp 220,996.00
Nilai HSPK : Rp 343,796.00

Pelapisan Waterproofing m2
Upah:
Mandor 0.003 O.H Rp 60,000.00 Rp 150.00
Kepala Tukang Cat 0.008 O.H Rp 50,000.00 Rp 375.00
Tukang Cat 0.075 O.H Rp 45,000.00 Rp 3,375.00
Tenaga Kasar 0.050 O.H Rp 35,000.00 Rp 1,750.00
Jumlah: Rp 5,650.00
Bahan:
Waterproofing 0.350 Kg Rp 44,000.00 Rp 15,400.00
Serat Fiber 1.000 m2 Rp 2,750.00 Rp 2,750.00
Jumlah: Rp 18,150.00
Nilai HSPK : Rp 23,800.00

SNI 2002 Pekerjaan Pengecatan


Pengecatan Dasar Meni Besi m2
(6.20)
Upah:
Mandor 0.010 O.H Rp 60,000.00 Rp 600.00
Kepala Tukang Cat 0.020 O.H Rp 50,000.00 Rp 1,000.00
Tukang Cat 0.200 O.H Rp 45,000.00 Rp 9,000.00
Tenaga Kasar 0.020 O.H Rp 35,000.00 Rp 700.00
Jumlah: Rp 11,300.00
Bahan:
Cat Meni (besi) 0.100 Kg Rp 16,500.00 Rp 1,650.00
Kuas 0.010 Bh Rp 14,000.00 Rp 140.00
Jumlah: Rp 1,790.00
Nilai HSPK : Rp 13,090.00

Pekerjaan Rangka Kuda - kuda WF Kg SNI 7393:2008 (6.2)


Upah:
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala Tukang 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Las 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pembantu tukang 0.060 O.H Rp 35,000.00 Rp 1,050.00
Jumlah: Rp 2,880.00
Bahan:
Besi Profil WF 1.150 Kg Rp 9,250.00 Rp 10,637.50
Jumlah: Rp 10,637.50
Nilai HSPK : Rp 13,517.50
PEKERJAAN PABRIKASI BAJA
Pabrikasi dan pemasangan baja WF : Kg 1.000 Kg
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 30,000.00 Rp 2,100.00
Jumlah Rp 6,105.00
Bahan :
Besi propil WF < 200 mm s/d 400 mm 1.100 Kg Rp 9,250.00 Rp 10,175.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 14,775.00
Nilai HSPK Rp 20,880.00
Harga Satuan Jadi
Angker Ø25mm 1.000 Bh Rp 33,000.00 Rp 33,000.00
Nilai HSPK Rp 33,000.00

Angker Ø25mm 1.000 Bh Rp 26,500.00 Rp 26,500.00


Nilai HSPK Rp 26,500.00

Baut HTB Ø16mm 1.000 Bh Rp 8,800.00 Rp 8,800.00


Nilai HSPK Rp 8,800.00

Baut gording HTB Ø12mm 1.000 Bh Rp 11,000.00 Rp 11,000.00


Nilai HSPK Rp 11,000.00

Penggantung gording Ø12mm 1.000 Kg Rp 9,800.00 Rp 9,800.00


Nilai HSPK Rp 9,800.00

Ikatan angin Ø16mm 1.000 Kg Rp 9,800.00 Rp 9,800.00


Nilai HSPK Rp 9,800.00

Kontramoor Ø22mm 1.000 Bh Rp 38,500.00 Rp 38,500.00


Nilai HSPK Rp 38,500.00

Kontramoor Ø16mm 1.000 Bh Rp 29,150.00 Rp 29,150.00


Nilai HSPK Rp 29,150.00

Trek stang Ø22mm 1.000 Kg Rp 9,800.00 Rp 9,800.00


Nilai HSPK Rp 9,800.00

Pemasangan gording C 125 x 50 x 20 x 3,2


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Besi profil C 145 x 58 x 10 x 3,2 1.100 Kg Rp 9,250.00 Rp 10,175.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 14,775.00
Nilai HSPK Rp 20,670.00

Pabrikasi dan pemasangan baja L 70.70.7 1.000 Kg


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Besi propil L 70.70.9 1.100 Kg Rp 10,250.00 Rp 11,275.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 15,875.00
Nilai HSPK Rp 21,770.00

Pabrikasi dan pemasangan baja L 70.70.7 1.000 Kg


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Pipa Ø 2 " 1.100 Kg Rp 64,500.00 Rp 70,950.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 75,550.00
Nilai HSPK Rp 81,445.00
Penyambungan plat baja 1.000 Kg
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,500.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,400.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 6,320.00
Bahan :
Besi plat 1.100 Kg Rp 9,850.00 Rp 10,835.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 15,435.00
Nilai HSPK Rp 21,755.00

Pemasang rangka atap Galvalume Uk 0.8 mm m2


Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 240.00
Kepala Tukang besi 0.010 O.H Rp 50,000.00 Rp 400.00
Tukang besi 0.100 O.H Rp 45,000.00 Rp 3,600.00
Pembantu tukang 0.400 O.H Rp 35,000.00 Rp 11,200.00
Jumlah: Rp 15,440.00
Bahan:
Rangka Galvalume uk 0.8mm 1.100 m2 Rp 95,000.00 Rp 104,500.00
Jumlah: Rp 104,500.00
Nilai HSPK : Rp 119,940.00
Pemasang rangka atap Galvalume Tebal 0.5 mm m2
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 240.00
Kepala Tukang besi 0.010 O.H Rp 50,000.00 Rp 400.00
Tukang besi 0.100 O.H Rp 45,000.00 Rp 3,600.00
Pembantu tukang 0.400 O.H Rp 35,000.00 Rp 11,200.00
Jumlah: Rp 15,440.00
Bahan:
Rangka Galvalume uk 0.5mm 1.100 m2 Rp 80,000.00 Rp 88,000.00
Jumlah: Rp 88,000.00
Nilai HSPK : Rp 103,440.00
Pemasang rangka atap Galvalume Tebal 0.8 mm m2
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 240.00
Kepala Tukang besi 0.010 O.H Rp 50,000.00 Rp 400.00
Tukang besi 0.100 O.H Rp 45,000.00 Rp 3,600.00
Pembantu tukang 0.400 O.H Rp 35,000.00 Rp 11,200.00
Jumlah: Rp 15,440.00
Bahan:
Rangka Galvalume uk 0.8mm 1.100 m2 Rp 95,000.00 Rp 104,500.00
Jumlah: Rp 104,500.00
Nilai HSPK : Rp 119,940.00
Pemasang rangka atap Galvalume Campuran m2
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 240.00
Kepala Tukang besi 0.010 O.H Rp 50,000.00 Rp 400.00
Tukang besi 0.100 O.H Rp 45,000.00 Rp 3,600.00
Pembantu tukang 0.400 O.H Rp 35,000.00 Rp 11,200.00
Jumlah: Rp 15,440.00
Bahan:
Rangka Galvalume campuran 1.100 m2 Rp 90,000.00 Rp 99,000.00
Jumlah: Rp 99,000.00
Nilai HSPK : Rp 114,440.00

Pekerjaan Beton K-300 m3 SNI DT 91-0008-2007 (6.9)


Tenaga:
Mandor 0.083 O.H Rp 60,000.00 Rp 4,980.00
Kepala Tukang Batu 0.028 O.H Rp 50,000.00 Rp 1,400.00
Tukang batu 0.275 O.H Rp 45,000.00 Rp 12,375.00
Pekerja / Buruh Tak Terampil 1.650 O.H Rp 35,000.00 Rp 57,750.00
Jumlah: Rp 76,505.00
Bahan:
Semen portland (40kg) 10.325 Zak Rp 48,500.00 Rp 500,762.50
Pasir Beton 0.426 m3 Rp 130,000.00 Rp 55,331.25
Batu Pecah Mesin 1/2 cm 0.537 m3 Rp 254,000.00 Rp 136,491.58
Air (biaya air tawar) 215.000 Liter Rp 13.00 Rp 2,795.00
Jumlah: Rp 695,380.33
Nilai HSPK : Rp 771,885.33

kg SNI DT 91-0008-2007 (6.17)


Pekerjaan Pembesian dengan besi beton (polos/ulir)

Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 24.00
Kepala Tukang Besi 0.001 O.H Rp 50,000.00 Rp 35.00
Tukang Besi 0.007 O.H Rp 45,000.00 Rp 315.00
Pekerja / Buruh Tak Terampil 0.007 O.H Rp 35,000.00 Rp 245.00
Jumlah: Rp 619.00
Bahan:
Besi Beton (polos/ulir) 1.050 Kg Rp 9,800.00 Rp 10,290.00
Kawat Beton 0.015 Kg Rp 17,500.00 Rp 262.50
Jumlah: Rp 10,552.50
Nilai HSPK : Rp 11,171.50

Pekerjaan Bekisting Sloof m2 SNI DT 91-0008-2007 (6.21)


Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 15,900.00
Kepala Tukang kayu 0.262 O.H Rp 50,000.00 Rp 13,100.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 58,500.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 185,500.00
Jumlah: Rp 273,000.00
Bahan:
Kayu meranti bekisting 0.045 m3 Rp 3,080,000.00 Rp 34,650.00
Paku Usuk 0.300 Kg Rp 14,500.00 Rp 1,087.50
Minyak Bekisting 0.100 ltr Rp 2,750.00 Rp 275.00
Jumlah: Rp 36,012.50
Nilai HSPK : Rp 309,012.50

Pekerjaan Bekisting Kolom m2 SNI DT 91-0008-2007 (6.22)


Tenaga:
Mandor 0.033 O.H Rp 60,000.00 Rp 1,584.00
Kepala Tukang kayu 0.033 O.H Rp 50,000.00 Rp 1,320.00
Tukang Kayu 0.330 O.H Rp 45,000.00 Rp 11,880.00
Pekerja / Buruh Tak Terampil 0.660 O.H Rp 35,000.00 Rp 18,480.00
Jumlah: Rp 33,264.00
Bahan:
Kayu meranti bekisting 0.040 m3 Rp 3,080,000.00 Rp 30,800.00
Paku Usuk 0.400 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekisting 0.200 ltr Rp 2,750.00 Rp 137.50
Kayu Kamper balok 3/5 0.015 m3 Rp 4,675,000.00 Rp 17,531.25
Dolken kayu gelam dia 8-10 cm, panjang 4m 2.000 Batang Rp 12,000.00 Rp 6,000.00
Plywood tebal 9 mm 0.350 lembar Rp 95,000.00 Rp 8,312.50
Jumlah: Rp 68,581.25
Nilai HSPK : Rp 101,845.25
Pekerjaan Bekisting Balok m2 SNI DT 91-0008-2007 (6.23)
Tenaga:
Mandor 0.033 O.H Rp 60,000.00 Rp 1,584.00
Kepala Tukang kayu 0.033 O.H Rp 50,000.00 Rp 1,320.00
Tukang Kayu 0.330 O.H Rp 45,000.00 Rp 11,880.00
Pekerja / Buruh Tak Terampil 0.660 O.H Rp 35,000.00 Rp 18,480.00
Jumlah: Rp 33,264.00
Bahan:
Kayu meranti bekisting 0.040 m3 Rp 3,080,000.00 Rp 30,800.00
Paku Usuk 0.400 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekisting 0.200 ltr Rp 2,750.00 Rp 550.00
Kayu Kamper balok 3/5 0.018 m3 Rp 4,675,000.00 Rp 21,037.50
Dolken kayu gelam dia 8-10 cm, panjang 4m 2.000 Batang Rp 12,000.00 Rp 6,000.00
Plywood tebal 9 mm 0.350 lembar Rp 95,000.00 Rp 8,312.50
Jumlah: Rp 72,500.00
Nilai HSPK : Rp 105,764.00
Pekerjaan Bekisting Lantai m2 SNI DT 91-0008-2007 (6.24)
Tenaga:
Mandor 0.033 O.H Rp 60,000.00 Rp 1,584.00
Kepala Tukang kayu 0.033 O.H Rp 50,000.00 Rp 1,320.00
Tukang Kayu 0.330 O.H Rp 45,000.00 Rp 11,880.00
Pekerja / Buruh Tak Terampil 0.660 O.H Rp 35,000.00 Rp 18,480.00
Jumlah: Rp 33,264.00
Bahan:
Kayu meranti bekisting 0.040 m3 Rp 3,080,000.00 Rp 30,800.00
Paku Usuk 0.400 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekisting 0.200 ltr Rp 2,750.00 Rp 550.00
Kayu Kamper balok 3/5 0.015 m3 Rp 4,675,000.00 Rp 17,531.25
Dolken kayu gelam dia 8-10 cm, panjang 4m 6.000 Batang Rp 12,000.00 Rp 18,000.00
Plywood tebal 9 mm 0.350 lembar Rp 95,000.00 Rp 8,312.50
Jumlah: Rp 80,993.75
Nilai HSPK : Rp 114,257.75
Pekerjaan Bekisting Dinding m2 SNI DT 91-0008-2007 (6.25)
Tenaga:
Mandor 0.033 O.H Rp 60,000.00 Rp 1,584.00
Kepala Tukang kayu 0.033 O.H Rp 50,000.00 Rp 1,320.00
Tukang Kayu 0.330 O.H Rp 45,000.00 Rp 11,880.00
Pekerja / Buruh Tak Terampil 0.660 O.H Rp 35,000.00 Rp 18,480.00
Jumlah: Rp 33,264.00
Bahan:
Kayu meranti bekisting 0.030 m3 Rp 3,080,000.00 Rp 23,100.00
Paku Usuk 0.400 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekisting 0.200 ltr Rp 2,750.00 Rp 550.00
Kayu Kamper balok 3/5 0.020 m3 Rp 4,675,000.00 Rp 23,375.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 3.000 Batang Rp 12,000.00 Rp 9,000.00
Plywood tebal 9 mm 0.350 lembar Rp 95,000.00 Rp 8,312.50
Jumlah: Rp 70,137.50
Nilai HSPK : Rp 103,401.50
Pekerjaan Bekisting Tangga m2 SNI DT 91-0008-2007 (6.26)
Tenaga:
Mandor 0.033 O.H Rp 60,000.00 Rp 1,584.00
Kepala Tukang kayu 0.033 O.H Rp 50,000.00 Rp 1,320.00
Tukang Kayu 0.330 O.H Rp 45,000.00 Rp 11,880.00
Pekerja / Buruh Tak Terampil 0.660 O.H Rp 35,000.00 Rp 18,480.00
Jumlah: Rp 33,264.00
Bahan:
Kayu meranti bekisting 0.030 m3 Rp 3,080,000.00 Rp 23,100.00
Paku Usuk 0.400 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekisting 0.150 ltr Rp 2,750.00 Rp 412.50
Kayu Kamper balok 3/5 0.015 m3 Rp 4,675,000.00 Rp 17,531.25
Dolken kayu gelam dia 8-10 cm, panjang 4m 2.000 Batang Rp 12,000.00 Rp 6,000.00
Plywood tebal 9 mm 0.350 lembar Rp 95,000.00 Rp 8,312.50
Jumlah: Rp 61,156.25
Nilai HSPK : Rp 94,420.25
Pekerjaan Pondasi Beton Bertulang (135 kg besi + Bekisting) ( Poer m3 SNI DT 91-0008-2007 (6.28)
1 )
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 135.000 Kg Rp 9,800.00 Rp 1,323,000.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.200 m3 Rp 3,080,000.00 Rp 154,000.00
Paku Usuk 1.500 Kg Rp 14,500.00 Rp 21,750.00
Minyak Bekisting 0.400 ltr Rp 2,750.00 Rp 1,100.00
Jumlah: Rp 2,222,565.00
Nilai HSPK : Rp 2,488,665.00

Pekerjaan Pondasi Beton Bertulang (168 kg besi + Bekisting) ( Poer m3 SNI DT 91-0008-2007 (6.28)
2 )
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 168.000 Kg Rp 9,800.00 Rp 1,646,400.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.200 m3 Rp 3,080,000.00 Rp 154,000.00
Paku Usuk 1.500 Kg Rp 14,500.00 Rp 21,750.00
Minyak Bekisting 0.400 ltr Rp 2,750.00 Rp 1,100.00
Jumlah: Rp 2,545,965.00
Nilai HSPK : Rp 2,812,065.00
m3 SNI DT 91-0008-2007 (6.29)
Pekerjaan Sloof 30X40 Beton Bertulang (216 kg besi + Bekisting)

Tenaga:
Mandor 0.283 O.H Rp 60,000.00 Rp 13,584.00
Kepala Tukang Besi 0.323 O.H Rp 50,000.00 Rp 12,920.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.560 O.H Rp 45,000.00 Rp 56,160.00
Pekerja / Buruh Tak Terampil 5.650 O.H Rp 35,000.00 Rp 158,200.00
Jumlah: Rp 301,164.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 216.000 Kg Rp 9,800.00 Rp 2,116,800.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.270 m3 Rp 3,080,000.00 Rp 207,900.00
Paku Usuk 2.000 Kg Rp 14,500.00 Rp 29,000.00
Minyak Bekisting 0.600 ltr Rp 2,750.00 Rp 1,650.00
Jumlah: Rp 3,091,190.00
Nilai HSPK : Rp 3,392,354.00
m3 SNI DT 91-0008-2007 (6.31)
Pekerjaan Balok 20X40 Beton Bertulang (164 kg besi + Bekisting)

Tenaga:
Mandor 0.318 O.H Rp 60,000.00 Rp 15,264.00
Kepala Tukang Besi 0.333 O.H Rp 50,000.00 Rp 13,320.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,084.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 164.000 Kg Rp 9,800.00 Rp 1,607,200.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,918,365.00
Nilai HSPK : Rp 3,244,449.00
m3 SNI DT 91-0008-2007 (6.31)
Pekerjaan Balok 30X50 Beton Bertulang (186 kg besi + Bekisting)

Tenaga:
Mandor 0.318 O.H Rp 60,000.00 Rp 15,264.00
Kepala Tukang Besi 0.333 O.H Rp 50,000.00 Rp 13,320.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,084.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 164.000 Kg Rp 9,800.00 Rp 1,607,200.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,918,365.00
Nilai HSPK : Rp 3,244,449.00

m3 SNI DT 91-0008-2007 (6.31)


Pekerjaan Balok 40X60 Beton Bertulang (164 kg besi + Bekisting)

Tenaga:
Mandor 0.318 O.H Rp 60,000.00 Rp 15,264.00
Kepala Tukang Besi 0.333 O.H Rp 50,000.00 Rp 13,320.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,084.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 164.000 Kg Rp 9,800.00 Rp 1,607,200.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,918,365.00
Nilai HSPK : Rp 3,244,449.00

m3 SNI DT 91-0008-2007 (6.32)


Pekerjaan Kolom 50X50 Beton Bertulang (133 kg besi + Bekisting)

Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.265 O.H Rp 50,000.00 Rp 10,600.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.400 O.H Rp 35,000.00 Rp 151,200.00
Jumlah: Rp 269,020.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 133.000 Kg Rp 9,800.00 Rp 1,303,400.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.120 m3 Rp 4,675,000.00 Rp 140,250.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 32.000 Batang Rp 12,000.00 Rp 96,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,626,065.00
Nilai HSPK : Rp 2,895,085.00

m3 SNI DT 91-0008-2007 (6.33)


Pekerjaan Dinding Beton Bertulang (69 kg besi + Bekisting)

Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 69.000 Kg Rp 9,800.00 Rp 676,200.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.240 m3 Rp 3,080,000.00 Rp 184,800.00
Kayu Kamper balok 3/5 0.160 m3 Rp 4,675,000.00 Rp 187,000.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 24.000 Batang Rp 12,000.00 Rp 72,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 1,960,015.00
Nilai HSPK : Rp 2,226,115.00

m1 SNI DT 91-0008-2007 (6.35)


Pekerjaan Kolom Praktis (11 x 11 cm)

Tenaga:
Mandor 0.009 O.H Rp 60,000.00 Rp 540.00
Kepala Tukang Besi 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Besi 0.020 O.H Rp 45,000.00 Rp 900.00
Tukang Batu 0.020 O.H Rp 45,000.00 Rp 900.00
Tukang Kayu 0.020 O.H Rp 45,000.00 Rp 900.00
Pekerja / Buruh Tak Terampil 0.180 O.H Rp 35,000.00 Rp 6,300.00
Jumlah: Rp 9,840.00
Bahan:
Semen portland (40kg) 0.100 Zak Rp 48,500.00 Rp 4,850.00
Pasir Beton 0.006 m3 Rp 130,000.00 Rp 780.00
Batu Pecah Mesin 1/2 cm 0.009 m3 Rp 254,000.00 Rp 2,286.00
Besi Beton (polos/ulir) 3.000 Kg Rp 9,800.00 Rp 29,400.00
Kawat Beton 0.450 Kg Rp 17,500.00 Rp 7,875.00
Kayu meranti bekisting 0.002 m3 Rp 3,080,000.00 Rp 1,540.00
Paku Usuk 0.010 Kg Rp 14,500.00 Rp 145.00
Jumlah: Rp 46,876.00
Nilai HSPK /1M¹ Rp 56,716.00

Pekerjaan Ring Balk (10x15) cm m1 SNI DT 91-0008-2007 (6.36)


Tenaga:
Mandor 0.015 O.H Rp 60,000.00 Rp 900.00
Kepala Tukang Besi 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Besi 0.033 O.H Rp 45,000.00 Rp 1,485.00
Tukang Batu 0.033 O.H Rp 45,000.00 Rp 1,485.00
Tukang Kayu 0.033 O.H Rp 45,000.00 Rp 1,485.00
Pekerja / Buruh Tak Terampil 0.297 O.H Rp 35,000.00 Rp 10,395.00
Jumlah: Rp 16,250.00
Bahan:
Semen portland (40kg) 0.138 Zak Rp 48,500.00 Rp 6,668.75
Pasir Beton 0.009 m3 Rp 130,000.00 Rp 1,170.00
Batu Pecah Mesin 1/2 cm 0.015 m3 Rp 254,000.00 Rp 3,810.00
Besi Beton (polos/ulir) 3.600 Kg Rp 9,800.00 Rp 35,280.00
Kawat Beton 0.050 Kg Rp 17,500.00 Rp 875.00
Kayu meranti bekisting 0.003 m3 Rp 3,080,000.00 Rp 2,310.00
Paku Usuk 0.020 Kg Rp 14,500.00 Rp 290.00
Jumlah: Rp 50,403.75
Nilai HSPK /1M¹ Rp 66,653.75

Pembongkaran Beton m3 ANALISIS BOW


Upah:
Mandor 0.400 O.H Rp 60,000.00 Rp 24,000.00
Pekerja Terampil 4.000 O.H Rp 35,000.00 Rp 140,000.00
Jumlah: Rp 164,000.00
Nilai HSPK : Rp 164,000.00

Pekerjaan Besi & Baja


Pekerjaan Pemasangan Besi Profil Kg SNI DT 91-0014-2007 (6.1)
Tenaga:
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala Tukang 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Las 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pekerja / Buruh Tak Terampil 0.060 O.H Rp 35,000.00 Rp 1,050.00
Jumlah: Rp 2,880.00
Bahan:
Besi Profil (Baja Konstruksi) 1.150 Kg Rp 12,500.00 Rp 14,375.00
Jumlah: Rp 14,375.00
Nilai HSPK : Rp 17,255.00
cm SNI DT 91-0014-2007 (6.5)
Pekerjaan Pengelasan dengan las listrik

Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 12.00
Kepala Tukang 0.000 O.H Rp 50,000.00 Rp 10.00
Tukang Besi 0.002 O.H Rp 45,000.00 Rp 90.00
Pekerja / Buruh Tak Terampil 0.004 O.H Rp 35,000.00 Rp 140.00
Jumlah: Rp 252.00
Bahan:
Electrode Las 0.040 kg Rp 23,000.00 Rp 920.00
Solar 0.030 liter Rp 4,500.00 Rp 135.00
Minyak Pelumas 0.004 liter Rp 2,750.00 Rp 11.00
Jumlah: Rp 1,066.00
Nilai HSPK : Rp 1,318.00
Pekerjaan Perakitan Besi kg SNI DT 91-0014-2007 (6.3)
Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 3.00
Kepala Tukang 0.000 O.H Rp 50,000.00 Rp 0.50
Tukang Besi 0.001 O.H Rp 45,000.00 Rp 45.00
Pekerja / Buruh Tak Terampil 0.001 O.H Rp 35,000.00 Rp 35.00
Jumlah: Rp 83.50
Bahan:
Solar 0.010 liter Rp 4,500.00 Rp 45.00
Minyak Pelumas 0.001 liter Rp 2,750.00 Rp 2.75
Jumlah: Rp 47.75
Sewa Peralatan:
Sewa Alat Bantu (1 Set @ 3 Alat) 0.008 jam Rp 1,100.00 Rp 8.80
Jumlah: Rp 8.80
Nilai HSPK : Rp 140.05
Total HSPK : Rp 18,713.05

Kg SNI DT 91-0014-2007 (6.1)


Pekerjaan Pemasangan Baut Mur Baja

Tenaga:
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala Tukang 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Las 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pekerja / Buruh Tak Terampil 0.060 O.H Rp 35,000.00 Rp 1,050.00
Jumlah: Rp 2,880.00
Bahan:
Besi Profil (Baja Konstruksi) 1.150 Kg Rp 12,500.00 Rp 14,375.00
Jumlah: Rp 14,375.00
Nilai HSPK : Rp 17,255.00

PEKERJAAN PABRIKASI BAJA


Pabrikasi dan pemasangan baja WF : Kg 1.000 Kg
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Besi propil WF < 200 mm s/d 400 mm 1.100 Kg Rp 9,250.00 Rp 10,175.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 14,775.00
Nilai HSPK : Rp 20,670.00
Harga Satuan Jadi
Angker Ø25mm 1.000 Bh Rp 33,000.00 Rp 33,000.00
Nilai HSPK : Rp 33,000.00

Angker Ø22mm 1.000 Bh Rp 26,500.00 Rp 26,500.00


Nilai HSPK : Rp 26,500.00

Baut HTB Ø16mm 1.000 Bh Rp 8,800.00 Rp 8,800.00


Nilai HSPK : Rp 8,800.00
Baut gording HTB Ø12mm 1.000 Bh Rp 11,000.00 Rp 11,000.00
Nilai HSPK : Rp 11,000.00

Penggantung gording Ø12mm 1.000 Kg Rp 9,800.00 Rp 9,800.00


Nilai HSPK : Rp 9,800.00

Ikatan angin Ø16mm 1.000 Kg Rp 9,800.00 Rp 9,800.00


Nilai HSPK : Rp 9,800.00

Kontramoor Ø22mm 1.000 Bh Rp 38,500.00 Rp 38,500.00


Nilai HSPK : Rp 38,500.00

Kontramoor Ø16mm 1.000 Bh Rp 29,150.00 Rp 29,150.00


Nilai HSPK : Rp 29,150.00

Trek stang Ø22mm 1.000 Kg Rp 9,800.00 Rp 9,800.00


Nilai HSPK : Rp 9,800.00

Pemasangan gording C 125 x 50 x 20 x 3,2


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Besi profil C 145 x 58 x 10 x 3,2 1.100 Kg Rp 9,250.00 Rp 10,175.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 14,775.00
Nilai HSPK : Rp 20,670.00

Pabrikasi dan pemasangan baja L 70.70.7 1.000 Kg


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Besi propil L 70.70.9 1.100 Kg Rp 9,250.00 Rp 10,175.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 14,775.00
Nilai HSPK : Rp 20,670.00

Pabrikasi dan pemasangan baja L 70.70.7 1.000 Kg


Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Pipa Ø 2 " 1.100 Kg Rp 64,500.00 Rp 70,950.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 75,550.00
Nilai HSPK : Rp 81,445.00
Penyambungan plat baja 1.000 Kg
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Bahan :
Besi plat 1.100 Kg Rp 9,850.00 Rp 10,835.00
Elektroda baja ( 20 % ) 0.200 Kg Rp 23,000.00 Rp 4,600.00
Jumlah Rp 15,435.00
Nilai HSPK : Rp 21,330.00

Perbaikan Sambungan (Baut, Cincin, Pasak, dll) Kg

Upah:
Kepala Tukang Besi 0.030 O.H Rp 50,000.00 Rp 750.00
Tukang Besi 0.090 O.H Rp 45,000.00 Rp 2,025.00
Pembantu Tukang 0.090 O.H Rp 35,000.00 Rp 1,575.00
Jumlah: Rp 4,350.00
Nilai HSPK : Rp 4,350.00

Pekerjaan PLAT Beton Bertulang (120 kg besi + Bekisting) m3


Tenaga:
Mandor 0.320 O.H Rp 60,000.00 Rp 15,360.00
Kepala Tukang Besi 0.330 O.H Rp 50,000.00 Rp 13,200.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.280 O.H Rp 45,000.00 Rp 10,080.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,240.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 130.000 Kg Rp 9,800.00 Rp 1,274,000.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,585,165.00
Nilai HSPK : Rp 2,911,405.00
Pekerjaan Listplank Beton Bertulang (60 kg besi + Bekisting) m3
Tenaga:
Mandor 0.320 O.H Rp 60,000.00 Rp 15,360.00
Kepala Tukang Besi 0.330 O.H Rp 50,000.00 Rp 13,200.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.280 O.H Rp 45,000.00 Rp 10,080.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,240.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 70.000 Kg Rp 9,800.00 Rp 686,000.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 1,997,165.00
Nilai HSPK : Rp 2,323,405.00

Pemasangan Angker buah

Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Angker baut ø 16 1.000 bh Rp 2,750.00 Rp 2,750.00
Nilai HSPK Rp 8,645.00
Pemasangan Baut ø16 buah
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
mur/baut ø 16 1.000 bh Rp 2,750.00 Rp 2,750.00
Nilai HSPK Rp 8,645.00
Pekerjaan Pemasangan Besi Profil Kg
Tenaga:
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala Tukang 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Las 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pekerja / Buruh Tak Terampil 0.060 O.H Rp 35,000.00 Rp 1,050.00
Jumlah: Rp 3,080.00
Bahan:
Besi Profil (Baja Konstruksi) 1.120 Kg Rp 12,500.00 Rp 14,000.00
Jumlah: Rp 14,000.00
Nilai HSPK : Rp 17,080.00
Pemasangan Walter Mour buah
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
mur/baut ø 16 1.000 bh Rp 2,750.00 Rp 2,750.00
Nilai HSPK Rp 8,645.00
Pemancangan Tiang Pancang m1 (≥ 200m) m1
Upah:
Mandor 0.130 O.H Rp 60,000.00 Rp 7,800.00
Pekerja tak trampil 0.750 O.H Rp 35,000.00 Rp 26,250.00
Jumlah: Rp 34,050.00
Sewa Peralatan:
Sewa Crane 30 ton - min. 8 jam (termasuk mob/demob, operator, BBM) 0.220 Jam Rp 225,000.00 Rp 49,500.00
Sewa Hammer tiang pancang - min. 8 jam(termasuk mob/demob, operato 0.220 Jam Rp 185,000.00 Rp 40,700.00
Jumlah: Rp 89,380.00
Nilai HSPK : Rp 179,580.00
Pekerjaan pengadaan tiang pancang 1.000 M1
Tiang pancang type B Ø40 Cm 1.000 M1 Rp 367,000.00 Rp 367,000.00
Nilai HSPK : Rp 367,000.00
Sambungan tiang pancang Ø 40 cm 1.000 Titik Rp 44,000.00 Rp 44,000.00
Nilai HSPK : Rp 44,000.00

Pecah tiang pancang Ø40 cm - Ø30 cm 1.000 Titik Rp 19,250.00 Rp 19,250.00


Nilai HSPK : Rp 19,250.00

Cat railling selasar / pagar / talang 1.000 M2


Upah :
Mandor 0.008 O.H Rp 60,000.00 Rp 480.00
Kepala tukang batu 0.023 O.H Rp 50,000.00 Rp 1,150.00
Tukang cat 0.225 O.H Rp 45,000.00 Rp 10,125.00
Pekerja 0.150 O.H Rp 35,000.00 Rp 5,250.00
Jumlah Rp 17,005.00
Bahan
Meni besi 0.425 Kg Rp 16,500.00 Rp 7,012.50
Cat besi 0.425 Kg Rp 41,800.00 Rp 17,765.00
Dempol 0.080 Kg Rp 12,500.00 Rp 1,000.00
Minyak cat / afduner 0.057 Ltr Rp 9,500.00 Rp 541.50
Kertas gosok 1.000 Lbr Rp 3,500.00 Rp 3,500.00
Jumlah Rp 29,819.00
Nilai HSPK : Rp 46,824.00

Pemasangan Listplank Kalsiboard 12 MM X 200 CM (Rangka Kayu Kamper) m2


Upah:
Mandor 0.008 O.H Rp 60,000.00 Rp 468.00
Kepala Tukang Kayu 0.046 O.H Rp 50,000.00 Rp 2,310.00
Tukang Kayu 0.462 O.H Rp 45,000.00 Rp 20,790.00
Pembantu tukang 0.156 O.H Rp 35,000.00 Rp 5,460.00
Jumlah: Rp 29,028.00
Bahan:
Kayu Kamper (balok 5/7) 0.022 m3 Rp 4,642,000.00 Rp 102,124.00
Kalsiboard 12 MM X 200 MM 1.000 m2 Rp 165,000.00 Rp 165,000.00
Paku Reng 0.100 Kg Rp 14,500.00 Rp 1,450.00
Jumlah: Rp 268,574.00
Nilai HSPK : Rp 297,602.00

SNI 03-2838 -2002 Pekerjaan


Pemasangan Triplek Bawah Aluminium foil m2
Langit - langit (6.21)
Upah:
Mandor 0.014 O.H Rp 60,000.00 Rp 810.00
Kepala Tukang Kayu 0.040 O.H Rp 50,000.00 Rp 2,000.00
Tukang Kayu 0.400 O.H Rp 45,000.00 Rp 18,000.00
Pembantu tukang 0.270 O.H Rp 35,000.00 Rp 9,450.00
Jumlah: Rp 30,260.00
Bahan:
Triplek tebal 4 mm 1,20 x 2,40 m 0.390 Lembar Rp 48,500.00 Rp 18,915.00
Paku Triplek/sekrup triplek 0.060 Kg Rp 14,500.00 Rp 870.00
Jumlah: Rp 19,785.00
Nilai HSPK : Rp 50,045.00

SNI 03-2838 -2002 Pekerjaan


Pemasangan Alluminiumfoil Bawah reng galvalum m2
Langit - langit (6.21)
Upah:
Mandor 0.014 O.H Rp 60,000.00 Rp 810.00
Kepala Tukang Kayu 0.040 O.H Rp 50,000.00 Rp 2,000.00
Tukang Kayu 0.040 O.H Rp 45,000.00 Rp 1,800.00
Pembantu tukang 0.027 O.H Rp 35,000.00 Rp 945.00
Jumlah: Rp 5,555.00
Bahan:
Aluminiumfoil 1,2 mm double side 1.050 Lembar Rp 22,500.00 Rp 23,625.00
Paku Triplek/sekrup triplek 0.060 Kg Rp 14,500.00 Rp 870.00
Jumlah: Rp 24,495.00
Nilai HSPK : Rp 30,050.00

Pemasangan Genteng Glazurr m2 SNI 2002 Pekerjaan Penutup Atap (6.1)


Upah:
Mandor 0.008 O.H Rp 60,000.00 Rp 480.00
Kepala Tukang Kayu 0.008 O.H Rp 50,000.00 Rp 400.00
Tukang Kayu 0.075 O.H Rp 45,000.00 Rp 3,375.00
Pembantu tukang 0.150 O.H Rp 35,000.00 Rp 5,250.00
Jumlah: Rp 9,505.00
Bahan:
Genteng Glazurr 20.000 Buah Rp 5,937.50 Rp 118,750.00
Jumlah: Rp 118,750.00
Nilai HSPK : Rp 128,255.00

Pemasangan Wuwung Genteng Glazurr m1 SNI 2002 Pekerjaan Penutup Atap (6.5)
Upah:
Mandor 0.002 O.H Rp 60,000.00 Rp 120.00
Kepala Tukang Batu 0.020 O.H Rp 50,000.00 Rp 1,000.00
Tukang Batu 0.200 O.H Rp 45,000.00 Rp 9,000.00
Pembantu tukang 0.400 O.H Rp 35,000.00 Rp 14,000.00
Jumlah: Rp 24,120.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.160 Zak Rp 54,500.00 Rp 8,720.00
Pasir Pasang 0.032 m3 Rp 120,000.00 Rp 3,876.00
Genteng Wuwung Glazurr 4.000 Buah Rp 14,250.00 Rp 57,000.00
Jumlah: Rp 69,596.00
Nilai HSPK : Rp 93,716.00

Pemasangan Lantai keramik Granit m2 SNI DT 91-0012-2007 (6.43)


Upah:
Mandor 0.035 O.H Rp 60,000.00 Rp 1,680.00
Kepala Tukang Batu 0.035 O.H Rp 50,000.00 Rp 1,400.00
Tukang Batu 0.350 O.H Rp 45,000.00 Rp 12,600.00
Pekerja/Buruh Tak Terampil 0.700 O.H Rp 35,000.00 Rp 19,600.00
Jumlah: Rp 35,280.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.164 Zak Rp 54,000.00 Rp 8,845.20
Semen Berwarna Yiyitan 0.650 Kg Rp 7,500.00 Rp 4,875.00
Pasir Pasang 0.045 m3 Rp 120,000.00 Rp 5,400.00
Keramik Lantai Granit Alam 1.040 m2 Rp 233,000.00 Rp 242,320.00
Jumlah: Rp 261,440.20
Nilai HSPK : Rp 296,720.20

Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan 1.000 m


Bahan:
U Gutter U400/500-1200 (K 350 ; Besi 130 Kg) (Fabrikasi) 1.000 bh Rp 275,000.00 Rp 275,000.00
Jumlah: Rp 275,000.00
Sewa Peralatan :
Sewa Crane 0.174 jam Rp 225,000.00 Rp 39,060.00
Sewa Alat Bantu ( 1 Set @ 3 alat ) 0.100 jam Rp 1,100.00 Rp 110.00
Jumlah: Rp 39,170.00

Nilai HSPK : Rp 314,170.00

Penurunan dan Pemasangan 1.000 m ANALISIS BOW


Upah:
Mandor 0.004 O.H Rp 60,000.00 Rp 228.00
Pekerja Tak Terampil 0.038 O.H Rp 35,000.00 Rp 1,333.50
Operator Alat Konstruksi 0.174 O.H Rp 30,000.00 Rp 5,208.00
Jumlah: Rp 6,769.50

Cover Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan 1.000 m


Bahan:
Cover 620x1200x150 (K 350 ; Besi 160 Kg) (Fabrikasi) 1.000 m Rp 165,000.00 Rp 165,000.00
Jumlah: Rp 165,000.00
Sewa Peralatan :
Sewa Crane 0.174 jam Rp 225,000.00 Rp 39,060.00
Sewa Alat Bantu ( 1 Set @ 3 alat ) 0.100 jam Rp 1,100.00 Rp 110.00
Jumlah: Rp 39,170.00

Nilai HSPK : Rp 210,939.50

Penurunan dan Pemasangan 1.000 m


Upah:
Mandor 0.004 O.H Rp 60,000.00 Rp 228.00
Pekerja Tak Terampil 0.038 O.H Rp 35,000.00 Rp 1,333.50
Operator Alat Konstruksi 0.174 O.H Rp 30,000.00 Rp 5,208.00
Jumlah: Rp 6,769.50

Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan


Bahan:
U Gutter U600/1000-2400 (K 350 ; Besi 130 Kg) (Fabrikasi) 1.000 m Rp 275,000.00 Rp 275,000.00
Jumlah: Rp 275,000.00
Sewa Peralatan :
Sewa Crane 0.174 jam Rp 225,000.00 Rp 39,060.00
Sewa Alat Bantu ( 1 Set @ 3 alat ) 0.100 jam Rp 1,100.00 Rp 110.00
Jumlah: Rp 39,170.00
Nilai HSPK : Rp 320,939.50

Penurunan dan Pemasangan 1.000 m


Upah:
Mandor 0.004 O.H Rp 60,000.00 Rp 228.00
Pekerja Tak Terampil 0.038 O.H Rp 35,000.00 Rp 1,333.50
Operator Alat Konstruksi 0.174 O.H Rp 30,000.00 Rp 5,208.00
Jumlah: Rp 6,769.50

Cover Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan


Cover 800x2400x150 (K 350 ; Besi 160 Kg) (Fabrikasi) 1.000 m Rp 480,200.00 Rp 480,200.00
Jumlah: Rp 480,200.00
Sewa Peralatan :
Sewa Crane 0.174 jam Rp 225,000.00 Rp 39,060.00
Sewa Alat Bantu ( 1 Set @ 3 alat ) 0.100 jam Rp 1,100.00 Rp 110.00
Jumlah: Rp 39,170.00
Nilai HSPK : Rp 526,139.50
HARGA DASAR ARSITEKTUR DAN STRUKTUR
NO
A
1
2
3
4
5

B
1
2
3
4

C
1

No
1
2
3
4
5
6
7
8
No
A
1
2

B
1
2
3
4
5

C
1
2
3
4

D
1
2
3
4
5
6
7
8
9
10

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

E
1
2
3
4
5
6
7
8

F
1
2
G
1
2
3

H
1
2
3

I
1
2
3
4
5
6
7
8

J
1
2
3
4
5
6

K
1
2
3
4
5
6
7
8

L
1
2
3
4
5
6
7
8
9
10
11
12
13

M
1
2
3
4
5
6
7

N
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
SNI 2002 Pekerjaan Pengecatan (6.20)

SNI 2002 Pekerjaan Pengecatan (6.15)


SNI DT 91-0012-2007 (6.11) & (6.35)
HARGA DASAR ARSITEKTUR DAN STRUKTUR

NO
A
1
2
3
4
5
B
1
2
3
4

C
1

No
1
2
3
4
5
6
7
8

No
A
1
2

B
1
2
3
4
5

C
1
2
3
4

D
1
2
3
4
5
6
7
8
9
10

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

E
1
2
3
4
5
6
7
8

F
1
2

G
2
3

H
1
2
3

I
1
2
3
4
5
6
7
8

SNI 2002 Pekerjaan Penutup Atap (6.1) J


1
2
3
4
5
6

K
1
2
3
SNI 2002 Pekerjaan Penutup Atap (6.5) 4
5
6
7
8

L
1
2
3
4
5
6
7
8
9
10
11
12
13
M
1
2
3
4
5
6
7

N
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
RENCANA ANGGARAN BIAYA

Sub Jumlah
No. Uraian Pekerjaan Volume Sat. Harga Satuan Jumlah Harga
Harga

I LANTAI 1
A Pekerjaan Persiapan
1 Pengukuran 11.60 M' 5,069 58,796
2 Pembersihan 8.55 M² 3,250 27,788
86,583
B Pekerjaan Dinding
1 Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr. 48.00 M² 65,140 3,126,720
2 Pekerjaan plesteran batu merah 1 PC. : 4 Psr. 48.00 M² 24,935 1,196,899
3 Pasang kolom struktur 15X20 Cm. 0.36 M³ 1,830,000 658,800
4 Pasang ring balk 12X25 Cm. 0.35 M³ 1,830,000 636,840
5 Pekerjaan acian 48.00 M² 13,830 663,840
6,283,099
C Pekerjaan Pondasi
1 Galian tanah 3.28 M³ 34,200 112,219
2 Pasir urug bawah pondasi 0.31 M³ 149,100 46,594
3 Pekerjaan Sloof 15/25 0.44 M³ 1,830,000 796,050
4 Pekerjaan urugan tanah kembali 1.31 M³ 12,900 16,931
971,794
D Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Plafon 8.55 M² 24,615 210,458
2 Pekerjaan Pengecatan dinding bata 48.00 M² 24,615 1,181,520
1,391,978
E Pekerjaan Kusen dan Daun Pintu
1 Pekerjaan Kusen kayu 15x78 1.83 M¹ 102,788 188,101
2 Pekerjaan Slimar daun pintu Alluminium 3/8" 1.83 M¹ 64,288 117,646
3 Engsel Pintu 3.00 Bh. 76,220 228,660
4 Grendel tanam 1.00 Set. 54,100 54,100
5 Kunci pintu 1.00 Set. 36,250 36,250
6 Kaca pintu t. = 8 mm. 2.16 M² 116,720 252,115
7 Kaca mati atas pintu t. = 6 mm 0.36 M² 100,220 36,079
8 Pekerjaan Kusen kayu 15x78 8.40 M¹ 102,788 863,416
9 Pekerjaan Slimar daun pintu kayu 8.40 M¹ 64,288 540,016
10 Engsel Pintu 4.00 Bh. 76,220 304,880
11 Grendel tanam 2.00 Set. 54,100 108,200
2,729,464
F Pasang keramik Tile 40X40 ( Warna coklat )
1 Kamar tidur lantai 1 8.55 M² 296,720 2,536,958
2,536,958
Jumlah 13,999,876
Sub Jumlah
No. Uraian Pekerjaan Volume Sat. Harga Satuan Jumlah Harga
Harga
II LANTAI 2
A Pekerjaan Pembongkaran (Persiapan)
1 Pembersihan 8.55 M² 3,250 27,788
27,788
B Pekerjaan Dinding
1 Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr. 48.00 M² 65,140 3,126,720
2 Pekerjaan plesteran batu merah 1 PC. : 4 Psr. 48.00 M² 24,935 1,196,899
3 Pengecatan tembok 48.00 M² 24,615 1,181,520
4 Cat dinding plafon 48.00 M² 24,615 1,181,520
6,686,659
C Pekerjaan Lantai
1 Cor beton lantai 5.76 M² 2,649,880 15,263,309
2 Pasang lantai keramik 40X40 Cm. 8.55 M² 115,857 990,580
3 Pasang kolom struktur 12X50 Cm. 1.20 M³ 1,830,000 2,196,000
4 Pasang ring balk 12X25 Cm. 0.44 M³ 1,830,000 796,050
19,245,939
D Pekerjaan Pasang Plapon Gypsum Rangka Metalfuring
1 Kamar tidur lantai 2 8.55 M² 118,899 1,016,589
1,016,589
REKAPITULASI ANGGARAN BIAYA - GEDUNG RENOVASI

#REF! #REF!
0 0
0 0

No. Uraian Pekerjaan Jumlah Harga

I LANTAI 1
A Pekerjaan Persiapan Rp 86,583.26
B Pekerjaan Dinding Rp 6,283,099.20
C Pekerjaan Pondasi Rp 971,793.75
D Pekerjaan Pengecatan Rp 1,391,978.25
E Pekerjaan Kusen dan Daun Pintu #REF!
#REF! #REF! #REF!
F Pasang keramik Tile 40X40 ( Warna coklat ) Rp 2,536,957.71

II LANTAI 2
A Pekerjaan Pembongkaran (Persiapan) Rp 27,787.50
B Pekerjaan Dinding Rp 6,686,659.20
C Pekerjaan Lantai Rp 19,245,939.23
#REF! #REF! #REF!
D Pekerjaan Pasang Plapon Gypsum Rangka Metalfuring Rp 1,016,588.84
#REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

JUMLAH #REF!
LANTAI 1 : ( rehap )
Pekerjaan Pembongkaran Dinding
As C ( 2 – 4 ) 9.50 * 4.2 * 2 = 79.8 M²
As 2 , 3 ( C – D ) 5.50 * 4.2 * 1 - 3.2 M2 = 19.9 M²
As D¹ ( 2 – 4 ) 10.00 * 4.2 * 1 - 6 M2 = 36 M²
As 3 ( D – D¹ ) 1.30 * 4.2 * 1 = 5.46 M²
As 2¹ ( D¹ – E ) 4.60 * 4.2 * 1 - 3.75 M2 = 15.57 M²
As 2¹ ( E – E¹ ) 2.50 * 0.92 * 1 = 2.3 M²
As 4 ( D – F¹ ) 11.60 * 4.2 * 1 - 3.75 M2 = 44.97 M²
As D¹¹ ( 2¹ – 2¹¹ ) 2.60 * 4.2 * 1 = 10.92 M²
= 214.92 M²

As I ( 3¹ – 4 ) 3.20 * 4.2 * 1 - 3.75 M2 = 9.69 M²


As 2 4.50 * 2.5 * 1 = 11.25 M²
= 20.94 M²

Pekerjaan Pembongkaran Partisi/Kusen


As C¹ ( 2 – 3 ) 4.50 * 4.2 * 1 = 18.9 M²
As 2¹¹ ( D¹¹ – F¹ ) 6.00 * 4.2 * 1 = 25.2 M²
As H ( 2 – 3¹ ) 6.60 * 4.2 * 1 = 27.72 M²
As 3¹¹¹ ( F¹ – G ) 2.40 * 4.2 * 1 = 10.08 M²
As F¹ ( 3¹ – 4 ) 3.60 * 4.2 * 1 = 15.12 M²
As 3¹ ( H – I¹ ) 5.00 * 4.2 * 1 = 21 M²
As 3¹ ( D¹ – F¹ ) 8.80 * 4.2 * 1 = 36.96 M²
Bongkar pintu 2.50 * 0.92 * 1 = 2.3 M²
As C' ( 2 – 3 ) 4.50 * 4.2 * 1 = 18.9 M²
As 3¹ ( H – I¹ ) 5.00 * 4.2 * 1 = 21 M²
As 2 , 3 ( C – D ) 2.00 * 0.8 * 2 = 3.2 M²
As D¹ ( 2 – 4 ) 2.50 * 0.9 + 2.5 * 1.5 = 6 M²
As 2¹ ( D¹ – E ) 2.50 * 1.5 * 1 = 3.75 M²
As 4 ( D – F¹ ) 2.50 * 1.5 * 1 = 3.75 M²
As 3¹ ( D¹ – F¹ ) 2.50 * 1.5 * 1 = 3.75 M² 71.6
As 3 ( G – H ) 2.75 * 4.2 - 2.50 * 0.90 = 13.8 M²
As H ( 2 – 3¹ ) 8.00 * 4.2 * 1 = 33.6 M²
As I ( 3¹ – 4 ) 2.50 * 1.5 * 1 = 3.75 M²
= 268.78 M²

Lantai 1 :
Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr.
AS D ( 2 - 5 ) 13.50 * 4.70 - 2.00 * 0.80 * 6.00 = 53.85 M²
AS 3' ( I' - J' ) 5.50 * 4.70 - 2.50 * 0.92 = 23.55 M²
DIAGONAL 4.00 * 4.10 - 1.50 * 2.50 = 16.40 M²
AS 5 ( D - F ) 3.50 * 4.00 - 2.00 * 0.80 * 2.00 = 10.80 M²
1. 6.40 * 4.20 = 26.88 M²
2. 4.00 * 4.20 - 1.50 * 2.50 = 13.05 M²
= 144.53 M²

Pekerjaan plesteran batu merah 1 PC. : 4 Psr. 144.53 * 2.00 = 289.06 M²

Pekerjaan acian 144.53 * 2.00 = 289.06 M²

Pekerjaan Dinding Partisi Rangka Metal Stud 40X60


As E ( 2 - 3 ) 2.00 * 4.20 = 8.40 M²
3). 8.00 * 4.20 - 1.50 * 2.50 = 29.85 M²
As J ( 2 - 3' ) 6.60 * 4.20 = 27.72 M²
= 65.97 M²
Dinding untuk pengurang urugan 39.60 * 0.15 * 0.15 = 0.89 M²
Ukuran untukmkusen/jendela 6.60 * 4.20 = 27.72 M²

Pekerjaan pondasi :
Galian tanah 6.40 * 1.50 * 0.90 = 8.64 M³
2.40 * 1.50 * 0.90 = 3.24 M³
1.40 * 0.70 * 0.30 = 0.29 M³
3.60 * 1.50 * 0.90 = 4.86 M³
As D ( 2 - 5 ) 13.50 * 0.70 * 0.30 = 2.84 M³
As 5 ( D - F ) 3.50 * 0.70 * 0.30 = 0.74 M³
As 2 ( D' - E ) 4.20 * 0.70 * 0.30 = 0.88 M³
= 21.49 M³

Pasir urug bawah pondasi 6.40 * 0.90 * 0.10 = 0.58 M³


2.40 * 0.90 * 0.10 = 0.22 M³
3.60 * 0.90 * 0.10 = 0.32 M³
= 1.12 M³

Pekerjaan aanstamping batu kali 6.40 * 0.90 * 0.20 = 1.15 M³


2.40 * 0.90 * 0.20 = 0.43 M³
3.60 * 0.90 * 0.20 = 0.65 M³
= 2.23 M³

Pekerjaan pondasi batu kali 1 PC. : 5 Psr. 0.90 * 0.30 * 6.40 = 1.73 M³
0.90 * 0.30 * 2.40 = 0.65 M³
0.90 * 0.30 * 3.60 = 0.97 M³
= 3.35 M³

Pekerjaan Sloof 15/20 0.15 * 0.20 * 6.40 = 0.19 M³


0.15 * 0.20 * 2.40 = 0.07 M³
0.15 * 0.20 * 3.60 = 0.11 M³
= 0.37 M³

Pekerjaan urugan tanah kembali 21.49 - 1.12 - 2.23 - 3.35 - 0.37


- 0.83 = 13.59 M³
Pekerjaan Pengecatan dinding partisi 3.20 * 2 = 6.40 M²
3.20 * 8 - 1.50 * 2.50 = 21.85 M²
3.20 * 6.6 = 21.12 M²
= 49.37 M²
Pekerjaan Pengecatan dinding bata 3.20 * 13.5 - 2.00 * 0.80 * 6.00 = 33.60 M²
3.20 * 5.5 - 2.50 * 0.92 * 1.00 = 15.30 M²
3.20 * 4 - 1.50 * 2.50 * 2.00 = 18.10 M²
3.20 * 3.5 - 2.00 * 0.80 * 2.00 = 8.00 M²
3.20 * 6.4 = 20.48 M²
3.20 * 27.6 = 88.32 M²
3.20 * 12 = 38.40 M²
3.20 * 8 = 25.60 M²
3.20 * 3 = 9.60 M²
3.20 * 5 * 2.00 = 32.00 M²
= 289.40 M²

0.90 * 15.6 * 1 = 14.04 M²


0.90 * 9.4 * 1 = 8.46 M²
0.90 * 12.6 * 1 = 11.34 M²
0.90 * 27.6 * 1 = 24.84 M²
0.90 * 8 * 1 = 7.20 M²
0.90 * 7.6 * 1 = 6.84 M²
0.90 * 4 * 1 = 3.60 M²
0.90 * 4.4 * 1 = 3.96 M²
0.90 * 1 * 9 = 8.10 M²
0.90 * 3.2 * 2 = 5.76 M²
= 94.14 M²

= 383.54 M²
2X = 767.08 M²

Pekerjaan Kusen Alluminium 4"


P5 = 4 Bh. 2.50 * 2 * 4 = 20.00 M¹
1.50 * 2 * 4 = 12.00 M¹
0.40 * 1 * 4 = 1.60 M¹
= 33.60 M¹

Pekerjaan Slimar daun pintu Alluminium 3/8" 0.70 + 2.1 * 4 * 4 = 44.80 M¹

Engsel Pintu = 12 Bh.


Grendel tanam = 2 Set.
Kunci pintu Alluminium = 2 Set.
Kaca pintu t. = 8 mm. 0.45 * 0.72 * 4 = 1.30 M²
Kaca mati atas pintu t. = 6 mm 0.40 * 0.6 * 4 = 0.96 M²

Pekerjaan Kusen Alluminium 4"


P1 = 2 Bh. 2.50 * 2 * 1 = 5.00 M¹
0.90 * 2 * 1 = 1.80 M¹
= 6.80 M¹
2X = 13.60 M¹

Daun pintu double triplek 4 mm. 0.80 * 2.1 = 2.00 Bh.

Engsel Pintu 80X210 Cm. = 6 Bh.


Kunci pintu = 2 Set.
Kaca mati atas pintu t. = 6 mm 0.45 * 0.8 * 2 = 0.72 M²

Pekerjaan beton untuk portal pintu


Kolom beton pintu utama 20X20 Cm. 0.20 * 0.2 * 2.4 * 2 = 0.19 M³
0.20 * 0.2 * 1.5 = 0.06 M³
Kolom 15X15 Cm 0.15 * 0.15 * 4.1 * 13 = 1.20 M³
Balok latai 15X20 Cm. 0.15 * 0.2 * 5 * 3 = 0.45 M³
0.15 * 0.2 * 2.6 * 1 = 0.08 M³
0.15 * 0.2 * 3.7 * 1 = 0.11 M³
0.15 * 0.2 * 5.8 * 1 = 0.17 M³
0.15 * 0.2 * 3 * 1 = 0.09 M³
= 2.35 M³

Pembongkaran plapon 10.00 * 7.6 = 76.00 M²


10.00 * 16.5 = 165.00 M²
9.00 * 6.8 = 61.20 M²
3.00 * 1 = 3.00 M²
5.60 * 4.5 = 25.20 M²
= 330.40 M²

Pasang Plapon Gypsum Rangka Metalfuring 15.20 * 8 = 121.60 M²


8.40 * 1.2 = 10.08 M²
6.00 * 1.5 = 9.00 M²
2.40 + 6.5 * 2.1 = 18.69 M²
3.20 * 1.6 = 5.12 M²
3.00 * 0.8 = 2.40 M²
15.00 * 6 = 90.00 M²
10.00 + 8.4 * 0.9 = 16.56 M²
6.80 * 4 = 27.20 M²
7.60 * 3.2 = 24.32 M²
= 324.97 M²
Pasang keramik 40X40 Cm.
Ruang Perpustakaan 15.00 * 8 = 120.00 M²
8.40 * 1.2 = 10.08 M²
6.00 * 1.5 = 9.00 M²
= 139.08 M² 356.39
Ruang Tunggu/Lobby 2.40 + 6.5 * 2.1 = 18.69 M²
3.20 * 1.6 = 5.12 M²
3.00 * 0.8 = 2.40 M²
15.00 * 6 = 90.00 M²
10.00 + 8.4 * 0.9 = 16.56 M²
6.80 * 4 = 27.20 M²
= 159.97 M²

Ruang koperasi 7.60 * 3.2 = 24.32 M²

Teras 7.20 * 1.6 = 11.52 M²


8.00 * 1.6 = 12.80 M²
3.00 * 2.2 = 6.60 M²
3.00 * 0.7 = 2.10 M²
= 33.02 M²

Pengecatan dinding luar 15.50 * 4.1 = 63.55 M²


6.50 * 4.1 * 2 = 53.30 M²
3.00 * 4.1 = 12.30 M²
8.00 * 4.1 = 32.80 M²
2.80 * 4.1 * 2 = 22.96 M²
2.00 * 4.1 = 8.20 M²
7.20 * 4.1 - 0.90 * 2.50 = 27.27 M²
4.00 * 4.1 - 1.50 * 2.50 = 12.65 M²
9.40 * 4.1 = 38.54 M²
4.20 * 4.1 = 17.22 M²
7.00 * 4.1 - 1.50 * 2.50 = 24.95 M²
2.00 * 4.1 = 8.20 M²
1.40 * 4.1 * 4 = 22.96 M²
12.50 * 4.1 = 51.25 M²
5.50 * 4.1 - 0.90 * 2.50 = 20.30 M²
6.50 * 4.1 - 0.90 * 2.50 * 2 = 22.15 M²
= 438.60 M²
LANTAI 2 :
Pekerjaan Pembongkaran Dinding Tembok
As2¹ ( E – H ) 6.00 * 4.08 = 24.48 M²
As3 ( F – H ) 6.00 * 4.08 - 1.6 * 2.5 = 20.48 M²
As F ( 2¹ – 3 ) 1.00 * 3.50 = 3.50 M²
As H ( 2¹ – 3 ) 1.00 * 3.50 = 3.50 M²
As E(2–3) 5.00 * 3.50 = 17.50 M²
As L¹ ( 4 – 4¹ ) 1.00 * 2.50 = 2.50 M²
As I¹ ( 4 – 4¹¹ ) 2.00 * 3.50 = 7.00 M²
As 4¹ ( I – I¹ ) 1.00 * 3.50 = 3.50 M²
= 82.46 M² 82.46
Pekerjaan Pembongkaran Dinding Partisi
As 3¹ ( C¹ – D ) 5.00 * 3.25 = 16.25 M²
As 4¹ ( A¹ – D ) 9.20 * 3.25 = 29.90 M²
As C (4 – 4¹ ) 1.00 * 3.25 = 3.25 M²
As B¹ ( 5 – 6 ) 5.00 * 3.25 = 16.25 M²
As C¹ ( 4¹ – 5 ) ) 4.00 * 3.25 = 13.00 M²
As 5 ( B¹ – C¹ ) 2.00 * 3.25 = 6.50 M²
As 5¹¹¹ ( A¹ – B¹ ) 2.00 * 3.25 = 6.50 M²
As C (2 – 3) 5.00 * 3.25 - 2.92 * 2.5 = 8.95 M²
As 5¹¹ ( G – H¹ ) 3.20 * 3.25 = 10.40 M²
As C' (3 - 4) 4.00 * 3.25 = 13.00 M²
As E(4-5) 7.50 * 3.25 = 24.38 M²
As G ( 5" - 6 ) 2.00 * 3.25 = 6.50 M²
As H ( 5' - 5" ) 2.00 * 3.25 = 6.50 M²
As 5" ( H - I ) 3.00 * 3.25 = 9.75 M²
= 171.13 M² 171.13
Pekerjaan Pembongkaran Kusen
As 3 ( F - H ) 2.50 * 1.60 = 4.00 M²
As 6 ( L¹ - J ) 2.50 * 1.40 = 3.50 M²
As 4¹ ( C - D ) 2.50 * 1.40 = 3.50 M²
AS B¹ ( 5 - 6 ) 2.50 * 0.92 = 2.30 M²
As C ( 2 - 3 ) 2.50 * 0.92 = 2.30 M²
= 15.60 M² 15.60
Pekerjaan Bongkar Tangga Depan
8.40 * 3.00 * 0.12 = 3.02 M³
0.15 * 0.30 / 2 * 21 = 0.47 M³
= 3.50 M³ 3.50
Pasangan batu merah 1 PC. : 4 Psr.
As 3 ( E – E¹ ) 1.50 * 3.50 = 5.25 M²
As E¹ ( 3 - 2¹ ) 2.30 * 4.08 = 9.38 M²
As 3 ( G – H¹ ) 1.50 * 4.08 = 6.12 M²
As G¹ ( 2¹ - 3 ) ) 1.00 * 4.08 = 4.08 M²
As 4 ( H¹ - I ) 1.20 * 3.50 = 4.20 M²
As 4¹ ( I – I¹ ) 2.20 * 3.50 = 7.70 M²
= 36.73 M² 36.73
Plesteran tembok 1 PC. : 4 Psr.
As 3 ( E – E¹ ) 1.50 * 3.50 = 5.25 M²
As E¹ ( 3 - 2¹ ) 2.30 * 4.08 = 9.38 M²
As 3 ( G – H¹ ) 1.50 * 4.08 = 6.12 M²
As G¹ ( 2¹ - 3 ) ) 1.00 * 4.08 = 4.08 M²
As 4 ( H¹ - I ) 1.20 * 3.50 = 4.20 M²
As 4¹ ( I – I¹ ) 2.20 * 3.50 = 7.70 M²
= 36.73 M² 73.47
2X = 73.47 M²
Pengecatan tembok
As 3 ( E – E¹ ) 1.50 * 3.50 = 5.25 M²
As E¹ ( 3 - 2¹ ) 2.30 * 4.08 = 9.38 M²
As 3 ( G – H¹ ) 1.50 * 4.08 = 6.12 M²
As G¹ ( 2¹ - 3 ) ) 1.00 * 4.08 = 4.08 M²
As 4 ( H¹ - I ) 1.20 * 3.50 = 4.20 M²
As 4¹ ( I – I¹ ) 2.20 * 3.50 = 7.70 M²
= 36.73 M² 73.47
2X = 73.47 M²
Pekerjaan dinding partisi :
AS C' ( 3-4' ) 7.00 * 3.25 - 2.5 * 1.4 = 19.25 M²
AS C' ( 5"-4' ) 36.00 * 3.25 = 117.00 M²
AS C'" ( 2 - 3 ) 5.00 * 3.25 - 2.5 * 0.92 = 13.95 M²
AS D ( 2-3' ) 7.60 * 3.25 = 24.70 M²
AS D ( 5'-6 ) 3.60 * 3.25 = 11.70 M²
AS D' ( 4-5' ) 6.60 * 3.25 = 21.45 M²
AS D" ( 4-5' ) 6.60 * 3.25 - 2.5 * 0.92 = 19.15 M²
AS E ( 2-3 ) 5.00 * 3.25 - 2.5 * 0.92 = 13.95 M²
AS G ( 5-6 ) 5.00 * 3.25 = 16.25 M²
AS I( 5'- 6' ) 4.00 * 3.25 = 13.00 M²
AS I' ( 6-8 ) 10.00 * 3.25 - 2.5 * 1.4 = 29.00 M²
AS J' ( 7-7' ) 2.00 * 3.25 = 6.50 M²
AS 3 ( C'-D ) 5.00 * 3.25 - 2.5 * 1.4 = 12.75 M²
AS 4 ( C'-D ) 5.00 * 3.25 - 2.5 * 1.4 = 12.75 M²
AS 4 ( D-E ) 5.00 * 3.25 = 16.25 M²
AS 4' ( A'-C' ) 6.00 * 3.25 = 19.50 M²
AS 5' ( A'-C' ) 6.00 * 3.25 - 0.92 * 2.5 = 17.20 M²
AS 6 ( I'-I ) 4.00 * 3.25 - 0.92 * 2.5 = 10.70 M²
AS 7' ( J-J' ) 2.00 * 3.25 = 6.50 M²
= 401.55 M² 401.55
Pengecatan dinding partisi :
AS C' ( 3-4' ) 7.00 * 3.25 - 2.5 * 1.4 * 2 = 38.50 M²
AS C' ( 5"-4' ) 36.00 * 3.25 * 2 * 1 = 234.00 M²
AS C'" ( 2 - 3 ) 5.00 * 3.25 - 2.5 * 0.92 * 2 = 27.90 M²
AS D ( 2-3' ) 7.60 * 3.25 * 2 * 1 = 49.40 M²
AS D ( 5'-6 ) 3.60 * 3.25 * 2 * 1 = 23.40 M²
AS D' ( 4-5' ) 6.60 * 3.25 * 2 * 1 = 42.90 M²
AS D" ( 4-5' ) 6.60 * 3.25 - 2.5 * 0.92 * 2 = 38.30 M²
AS E ( 2-3 ) 5.00 * 3.25 - 2.5 * 0.92 * 2 = 27.90 M²
AS G ( 5-6 ) 5.00 * 3.25 * 2 * 1 = 32.50 M²
AS I( 5'- 6' ) 4.00 * 3.25 * 2 * 1 = 26.00 M²
AS I' ( 6-8 ) 10.00 * 3.25 - 2.5 * 1.4 * 2 = 58.00 M²
AS J' ( 7-7' ) 2.00 * 3.25 * 2 * 1 = 13.00 M²
AS 3 ( C'-D ) 5.00 * 3.25 - 2.5 * 1.4 * 2 = 25.50 M²
AS 4 ( C'-D ) 5.00 * 3.25 - 2.5 * 1.4 * 2 = 25.50 M²
AS 4 ( D-E ) 5.00 * 3.25 * 2 * 1 = 32.50 M²
AS 4' ( A'-C' ) 6.00 * 3.25 * 2 * 1 = 39.00 M²
AS 5' ( A'-C' ) 6.00 * 3.25 - 0.92 * 2.5 * 2 = 34.40 M²
AS 6 ( I'-I ) 4.00 * 3.25 - 0.92 * 2.5 * 2 = 21.40 M²
AS 7' ( J-J' ) 2.00 * 3.25 * 2 * 1 = 13.00 M²
= 803.10 M² 803.10
Pengecatan tembok lama ( dinding dalam )
AS A' ( 2-6 ) 20.00 * 3.25 - 1.58 * 8 = 52.36 M²
AS E ( 5"-6 ) 3.60 * 3.25 = 11.70 M²
AS E' ( 2-3 ) 5.00 * 3.25 = 16.25 M²
AS F' ( 2-2' ) 3.00 * 3.25 = 9.75 M²
AS G ( 4-5 ) 5.00 * 3.25 = 16.25 M²
AS G ( 6-8 ) 10.00 * 3.25 - 4.58 * 2 = 23.34 M²
AS G' ( 2-3 ) 4.00 * 3.25 = 13.00 M²
AS H ( 4-5' ) 6.00 * 3.25 = 19.50 M²
AS I ( 2-3' ) 7.60 * 3.25 - 2.3 * 1 * 2 = 44.80 M²
AS J ( 3-5"' ) 13.00 * 3.25 - 3.5 * 2.3 * 2 = 68.40 M²
AS J ( 6-8 ) 10.00 * 3.25 - 2.3 * 2 * 2 = 55.80 M²
AS J'( 2-3' ) 8.00 * 3.25 - 2.3 * 1 = 23.70 M²
AS K ( 3-5"' ) 13.00 * 3.25 - 9.18 = 7.07 M²
AS K ( 6-8 ) 10.00 * 3.25 - 4.58 * 2 = 23.34 M²
AS I'( 5'-6 ) 4.00 * 3.25 - 2.3 * 1 * 2 = 21.40 M²
AS I'( 4-5' ) 10.00 * 3.25 - 2.3 * 3 = 25.60 M²
AS I( 4-5' ) 6.00 * 1.25 * 2 = 15.00 M²
AS I'( 4-5' ) 6.00 * 1.25 = 7.50 M²
As 2 (A'-J') 38.20 * 3.25 = 124.15 M²
As 3 ( A' - C' ) 6.00 * 3.25 = 19.50 M²
As 3 ( E - E' ) 1.50 * 3.25 * 2 = 9.75 M²
As 3 ( H-I ) 3.00 * 3.25 = 9.75 M²
As 3 ( J - J' ) 3.00 * 3.25 = 9.75 M²
As 3 ( J' - K ) 3.00 * 1.25 = 3.75 M²
As 3' ( D - E ) 6.00 * 3.25 * 2 = 39.00 M²
As 3'(I-J ) 9.00 * 3.25 - 2.3 * 1 * 2 = 53.90 M²
As 3'(j'-K ) 3.00 * 3.25 - 2.3 * 1 = 7.45 M²
As 3'(j'-K ) 3.00 * 3.25 = 9.75 M²
As 4 (D-6) 12.00 * 3.25 - 3.5 * 2 * 2 = 25.00 M²
As 4 ( H' - I' ) 6.00 * 3.25 - 2.3 * 1 * 2 = 14.90 M²
As 4 ( H' - I' ) 6.00 * 1.25 = 7.50 M²
As 5 (G-H) 3.00 * 3.25 * 2 = 19.50 M²
As 5' (H-I') 6.00 * 3.25 = 19.50 M²
As 5' (H-I') 6.00 * 1.25 = 7.50 M²
As 5' ( D - E ) 6.00 * 3.25 - 2.3 * 1 * 2 = 34.40 M²
As 5"" (I - I' ) 3.60 * 3.25 * 2 = 23.40 M²
As 5"" (J -K' ) 6.00 * 3.25 * 2 = 39.00 M² 932.21
As 6(J-K) 6.00 * 3.25 - 2.3 * 4 - 4.58 * 2 = 1.14 M²
As 6(J-K) 6.00 * 3.25 * 2 = 39.00 M²
As 7(J-K) 6.00 * 3.25 - 2.3 * 3 = 12.60 M²
As 8 ( G - I' ) 9.60 * 3.25 - 2.3 * 2 = 26.60 M²
As 8 ( J - K ) 6.00 * 3.25 - 2.3 * 2 = 14.90 M² 93.10
= 1,026.45 M2
LANTAI 3 : (rehab)
Pembongkaran dinding tembok
AS 8 ( I¹ - J ) 2.50 * 3.25 =

Pembongkaran dinding partisi


AS G ( 5 - 6 ) 5.00 * 3.25 =
AS 6 ( J - K ) 6.00 * 3.25 =
AS 3¹ ( E - F ¹ ) 4.50 * 3.50 =
AS F ( 2¹ - 3¹ ) 3.50 * 3.25 =
AS 3¹ ( J - K ) 6.00 * 3.25 - 2.30 =
As 2¹ ( E - E¹ ) 1.80 * 3.25 - =
=

Pembongkaran penutup plapon :


Ruang Bidang Statistik Sosial 0.40 * 113.50 =
Ruang Kepala bidang distribusi 0.40 * 27.00 =
Rung Bidang Distribusi 0.40 * 79.20 =
Ruang Bidang Statistik Produksi 0.40 * 84.00 =
=
Pasang balok latai 12X 20
AS K ( 6¹ - 7 ) 0.12 * 0.20 * 2.50 =
Plesteran 0.55 * 2.50 =
Acian 0.55 * 2.50 =

Pekerjaan dinding partisi & kusen


AS G¹ ( 7 - 8 ) 5.00 * 3.25 =
AS 7 ( G' - I' ) 4.00 * 3.25 =
AS 2¹ ( E - E¹ ) 5.50 * 3.25 =
AS F¹ ( 2¹ - 3¹ ) 1.80 * 3.25 =
AS 3' ( 6.00 * 3.25 - 2.30 =
As I¹ ( 6 - 8 ) 10.00 * 3.25 - 3.50 =
P1 0.92 * 2.50 * 4.00 =
P2 1.40 * 2.50 * 3.00 =
=
Pekerjaan Kusen Alluminium 4"
P1 0.92 * 2.00 + 2.50 * 2 =
P2 1.40 * 2.00 + 2.50 * 3 =
=
Pekerjaan Slimar daun pintu Alluminium 4"
P1 0.92 * 2.00 + 2.00 * 2 =
P2 1.40 * 2.00 + 2.00 * 4* 2 =
=

Kaca terang t. = 6 mm 0.76 * 1.84 * 1.00 =


1.08 * 1.84 * 2.00 =
=
Pekerjaan cat plapon
Ruang Bidang Statistik Sosial 10.00 * 10.00 + 2.70 * 5 =
Ruang Kepala bidang distribusi 4.50 * 6.00 =
Rung Bidang Distribusi 6.00 * 23.20 =
Ruang Bidang Statistik Produksi 7.50 * 9.20 + 3.00 * 5 =
Ruang raoat umum 12.00 * 20.00 =
Ruang rapat kecil 9.00 * 5.00 =
Gudang 4.80 * 4.20 =
Dapur 4.20 * 2.00 =
KM/WC 6.30 * 6.20 =
Ruang Kepala Bidang Statistik Sosial 6.00 * 5.00 =
Penghubung 2.70 * 17.40 =
9.60 * 2.40 =
2.30 * 8.00 =
Ruang tunggu 6.00 * 7.50 =
Ruang Kepala Bidang Statistik Produksi 5.00 * 4.60 =
Gudang kecil 4.60 * 2.50 =
Ruang Tangga 3.20 * 5.00 =
Ruang Depan Lift 4.50 * 4.00 =
=
Pekerjaan cat dinding ( akibat bocoran )
Ruang Bidang Statistik Sosial 36.70 * 3.25 - 2.00 * 0.79 * 4+
2.00 * 2.29 * 2.00 =
Ruang Kepala bidang distribusi 21.00 * 3.25 - 2.50 * 0.92 =
Rung Bidang Distribusi 38.00 * 3.25 - 15.18 * 3.5 * 1.58 =
Ruang Bidang Statistik Produksi 39.00 * 3.25 + 12.44 =
Ruang rapat umum 76.00 - 48.22 * 3.25 =
Ruang rapat kecil 28.00 - 10.38 =
Gudang 12.80 * 3.25 =
Dapur 12.40 - 2.30 * 3.25 =
KM/WC 45.70 * 1.25 =
Ruang Kepala Bidang Statistik Sosial 22.00 - 2.30 * 3.25 =
Penghubung 40.20 * 3.25 =
24.00 * 3.25 =
20.60 * 3.25 =
Ruang tunggu 37.00 * 3.25 - 3.50 + 4 =
Ruang Kepala Bidang Statistik Produksi 19.20 - 10.20 * 3.25 =
Gudang 14.20 - 2.30 * 3.25 =
Ruang Tangga 16.40 * 3.25 =
=
Pengecatan dinding partisi
AS 6¹ ( J - K ) 6.00 * 3.25 * 1.00 =
AS F¹ ( J - K ) 5.50 * 3.25 * 1.00 =
AS 2¹ ( E - E¹ ) 1.80 * 3.25 * 2.00 =
As I¹ ( 6 - 7 ) 5.00 * 3.25 * 1.00 =
As 7 ( I¹ - J ) 2.70 * 3.25 * 1.00 =
=
Pekerjaan sealant
Type J1 5.58 * 2.00 * 21.00 =
Type J4 8.58 * 2.00 * 15.00 =
=
Pengecatan dinding luar
As C ( 2 - 6 ) 4.50 * 4.20 - 2.25 * 3.15 * 12 =
0.60 * 4.20 * 16.00 =
As G ( 6 - 8 ) 4.50 * 4.20 - 2.25 * 3.15 * 6 =
0.60 * 4.20 * 6.00 =
As 6 ( C - G ) 2.05 * 21.00 + 3.90 * 21 - 13.5 =
As 8 ( G - K ) 2.05 * 17.25 + 3.90 * 17.25 - 12.6 =
As K ( 2 - 8 ) 4.50 * 4.20 - 2.25 * 3.15 * 9 =
4.20 * 15.00 - 15.30 =
As 2 ( I - J' ) 2.05 * 9.00 + 3.90 * 9- 10.5 =
As 2 ( C - E ) 4.20 * 12.00 - 14.80 =
As 2 ( E - I ) 4.20 * 14.90 =
=

Perbaikqan Atap Lantai 3 :


Bongkar bubungan 10.20 * 4.00 =
7.50 * 2.00 =

Bongkar genteng 15.60 + 10.20 * 2.00 * 1 =


2

8.10 + 12.60 * 5.70 * 4 =


2

7.35 + 8.10 * 4.80 * 4 =


2

Bongkar reng galvalum 15.60 + 10.20 * 2.00 * 1 =


2

8.10 + 12.60 * 5.70 * 4 =


2

7.35 + 8.10 * 4.80 * 4 =


2

Bongkar lluminium foil lapis triplek 4 mm 15.60 + 10.20 * 2.00 * 1 =


2

8.10 + 12.60 * 5.70 * 4 =


2

7.35 + 8.10 * 4.80 * 4 =


2

Pekerjaan Kuda - Kuda WF 200X100X5.5X8 ( Type E = 2 bh. ) : 0.80 * 2 * 21.3 Kg/M1 =


3.00 * 2 * 21.3 Kg/M1 =
1.40 * 2 * 21.3 Kg/M1 =
0.58 * 2 * 21.3 Kg/M1 =
0.20 * 2 * 21.3 Kg/M1 =
0.45 * 2 * 21.3 Kg/M1 =
=
2X =

Stiefner t. = 10 mm. 0.18 * 0.06 * 0.008 * 7850 * 10 =

Flendes t. = 10 mm. 0.101 * 0.70 * 0.008 * 7850 * 10 =


0.101 * 0.64 * 0.008 * 7850 * 10 =
0.101 * 0.52 * 0.008 * 7850 * 10 =
Flendes t. = 12 mm. 0.101 * 0.30 * 0.012 * 7850 * 10 =

Batang tarik Ø 22 5.00 * 2.98 Kg/M1 =

Walter Moer Ø 22 =

Baut Ø 19 34.00 X 2.00 Bh. =

Angker Baut Ø 19 , panjang 60 Cm. 4.00 X 2.00 X 2.00 Bh. =

Plat penahan goding ( L 80X40X4 ) 0.120 * 0.10 * 0.004 * 7850 * 10 =


Pengecatan baja Zinc Chromate 0.79 * 0.80 * 2.00 =
0.79 * 3.00 * 2.00 =
0.79 * 1.40 * 2.00 =
0.79 * 0.58 * 2.00 =
0.79 * 0.20 * 2.00 =
0.79 * 0.45 * 2.00 =
=
2X =

Pekerjaan Kuda - Kuda WF 200X100X5.5X8 ( Type D = 5.60 * 21.3 * 1 Kg/M1 =


0.80 * 21.3 * 1 Kg/M1 =
1.40 * 21.3 * 1 Kg/M1 =
0.58 * 21.3 * 1 Kg/M1 =
0.20 * 21.3 * 1 Kg/M1 =
0.45 * 21.3 * 1 Kg/M1 =
=
8X =

Stiefner t. = 10 mm. 0.18 * 0.06 * 0.008 * 7850 * 6 =


8X =

Flendes t. = 10 mm. 0.101 * 0.64 * 0.008 * 7850 * 1 =


0.101 * 0.52 * 0.008 * 7850 * 1 =
0.101 * 0.40 * 0.008 * 7850 * 1 =
Flendes t. = 12 mm. 0.300 * 0.30 * 0.012 * 7850 * 1 =
=
8X =

Batang tarik Ø 22 5.00 * 2.98 Kg/M1 =

Walter Moer Ø 22 =

Baut Ø 19 28.00 X 8.00 Bh. =

Angker Baut Ø 19 , panjang 60 Cm. 4.00 X 8.00 X 1.00 Bh. =

Plat penahan goding ( L 80X40X4 ) 0.120 * 0.10 * 0.004 * 7850 * 6 =


8X =

Pengecatan baja Zinc Chromate 0.79 * 5.60 * 1.00 =


0.79 * 0.80 * 1.00 =
0.79 * 0.58 * 1.00 =
0.79 * 0.20 * 1.00 =
0.79 * 0.45 * 1.00 =
0.79 * 0.45 * 1.00 =
=
8X =

Pasang lisplang Kalsiboard 12 MM X 200 MM 43.50 X 2.00 =

Pengecatan lisplang Kalsoboard 87.00 X 0.24 =

Bongkar/pasang kembali penangkal petir =

Pasang triplek bawah alluminium foil 15.60 + 10.20 * 2.00 * 1 =


2

8.10 + 12.60 * 5.70 * 4 =


2

7.35 + 8.10 * 4.80 * 4 =


2
=

Pasang alluminium foil double side =

Pasang kembali usuk galvalum 0.85 * 410.10 =

Pasang baru usuk galvalum 0.15 * 410.10 =

Pasang kembali atap genteng 0.85 * 410.10 =


Pasang baru atap genteng Glassur 0.15 * 410.10 =

PasAng bubungan genteng glassur baru 10.20 * 4.00 =


7.50 * 2.00 =
=

Pasang talang jurai Seng BJLS 40 4.80 * 2.00 * 2.00 =

Water profing talang beton 67.50 * 1.20 =


Pekerjaan pengaman kerja ( atas plapon/pekerjaan atap ) 12.00 * 15.00 * 2.00 =
8.13 M²

16.25 M²
19.50 M²
15.75 M²
11.38 M²
17.20 M²
5.85 M²
85.93 M²

45.40 M²
10.80 M²
31.68 M²
33.60 M²
121.48 M²

0.06 M³
1.38 M²
1.38 M²

16.25 M²
13.00 M²
17.88 M²
5.85 M²
17.20 M²
29.00 M²
9.20 M²
10.50 M²
118.88 M²

6.84 M¹
10.30 M¹
17.14 M¹

5.84 M¹
18.80 M¹
24.64 M²

1.40 M²
3.97 M²
5.37 M²

113.50 M²
27.00 M²
139.20 M²
84.00 M²
240.00 M²
45.00 M²
20.16 M²
8.40 M²
39.06 M²
30.00 M²
46.98 M²
23.04 M²
18.40 M²
45.00 M²
23.00 M²
11.50 M²
16.00 M²
18.00 M²
948.24 M²

122.12 M²
70.55 M²
123.50 M²
126.75 M²
90.29 M²
17.62 M²
41.60 M²
32.83 M²
57.13 M²
64.03 M²
130.65 M²
78.00 M²
66.95 M²
112.75 M²
29.25 M²
38.68 M²
53.30 M²
1,255.97 M²
19.50 M²
17.88 M²
11.70 M²
16.25 M²
8.78 M²
74.10 M²

234.36 M¹
257.40 M¹
491.76 M¹

141.75 M²
40.32 M²
70.88 M²
15.12 M²
111.45 M²
90.04 M²
106.31 M²
47.70 M²
43.05 M²
35.60 M²
62.58 M²
764.80 M²

40.80 M²
15.00 M²

25.80 M²

235.98 M²

148.32 M²

25.80 M²

235.98 M²

148.32 M²

25.80 M²

235.98 M²

148.32 M²

59.64 Kg.
106.50 Kg.
72.42 Kg.
54.95 Kg.
46.86 Kg.
52.19 Kg.
392.56 Kg.
785.12 Kg.

153.23 Kg.

501.77 Kg.
463.46 Kg.
389.99 Kg.
377.74 Kg.

14.90 Kg.

2.00 Bh.

68.00 Bh.

16.00 Bh.

69.08 Kg.
1.26 M²
4.73 M²
2.21 M²
0.92 M²
0.32 M²
0.71 M²
10.15 M²
20.29 M²

26.90 Kg.
22.10 Kg.
22.70 Kg.
21.88 Kg.
21.50 Kg.
21.75 Kg.
136.83 Kg.
1,094.64 Kg.

91.94 Kg.
735.51 Kg.

46.35 Kg.
39.00 Kg.
31.46 Kg.
56.52 Kg.
173.33 Kg.
1,386.62 Kg.

14.90 Kg.

2.00 Bh.

224.00 Bh.

32.00 Bh.

41.45 Kg.
331.58 Kg.

4.42 M²
0.63 M²
0.46 M²
0.16 M²
0.36 M²
0.36 M²
6.38 M²
51.00 M²

87.00 M²

20.88 M²

2.00 Bh.

25.80 M²

235.98 M²

148.32 M²

410.10 M²

410.10 M²

348.59 M²

61.52 M²

348.59 M²
61.52 M²

40.80 M¹
15.00 M¹
55.80 M¹

19.20 M¹

81.00 M²
360.00 M²
LANTAI 4 ( atap ) : ( rehab )
Bongkar bubungan 5.8 * 4+ 5.5 = 28.7 M¹

Bongkar atap genteng glassur 21.3 + 5.5 X 8.4 * 2- = 225.12 M²


2 \
6.6 * 4.5 * 2 = 11.1 M²
2 = 214.02 M²

12.6 * 8.7 * 2 = 21.3 M²


2 = 235.32 M²

Bongkar usuk/reng galvalum 21.3 + 5.5 X 8.4 * 2- = 225.12 M²


2 \
6.6 * 4.5 * 2 = 11.1 M²
2 = 214.02 M²

12.6 * 8.7 * 2 = 21.3 M²


2 = 235.32 M²

Bongkar alluminium lapis triplek 4 mm 21.3 + 5.5 X 8.4 * 2- = 225.12 M²


2 \
6.6 * 4.5 * 2 = 11.1 M²
2 = 214.02 M²

12.6 * 8.7 * 2 = 21.3 M²


2 = 235.32 M²

Pekerjaan Kuda - Kuda WF 250X125X6X9 ( Type A = 1 bh. ) : 0.80 * 29.6 * 1 Kg/M1 = 30.40 Kg.
8.53 * 29.6 * 1 Kg/M1 = 38.13 Kg.
1.40 * 29.6 * 1 Kg/M1 = 31.00 Kg.
0.58 * 29.6 * 1 Kg/M1 = 30.18 Kg.
0.20 * 29.6 * 1 Kg/M1 = 29.80 Kg.
0.45 * 29.6 * 1 Kg/M1 = 30.05 Kg.
= 189.56 Kg.

Stiefner t. = 10 mm. ( 232X60X8 ) 0.23 * 0.06 * 0.008 * 7850 * 16 = 293.40 Kg.

Flendes t. = 10 mm. 0.126 * 0.70 * 0.008 * 7850 * 2 = 103.49 Kg.


0.126 * 0.64 * 0.008 * 7850 * 2 = 95.83 Kg.
0.126 * 0.52 * 0.008 * 7850 * 2 = 81.14 Kg.
Flendes t. = 12 mm. 0.300 * 0.30 * 0.012 * 7850 * 2 = 113.04 Kg.
= 393.50 Kg.

Batang tarik Ø 22 12.00 * 2.98 Kg/M1 = 35.76 Kg.

Walter Moer Ø 22 = 1.00 Bh.

Baut Ø 19 = 34.00 Bh.

Angker Baut Ø 19 , panjang 60 Cm. = 8.00 Bh.

Plat penahan goding ( L 80X40X4 ) 0.120 * 0.13 * 0.004 * 7850 * 18 = 138.47 Kg.

Pengecatan baja Zinc Chromate 0.77 * 8.53 * 2 = 13.10 M²


0.77 * 0.80 * 2 = 1.23 M²
0.77 * 1.40 * 2 = 2.15 M²
0.77 * 0.58 * 2 = 0.89 M²
0.77 * 0.20 * 2 = 0.31 M²
0.23 * 0.06 * 16.00 = 0.22 M²
= 17.90 M²

Pekerjaan Kuda - Kuda WF 200X100X5.5X8 ( Type B = 8 bh. ) : 5.00 * 21.3 * 1 Kg/M1 = 26.30 Kg.
0.80 * 21.3 * 1 Kg/M1 = 22.10 Kg.
1.40 * 21.3 * 1 Kg/M1 = 22.70 Kg.
0.58 * 21.3 * 1 Kg/M1 = 21.88 Kg.
0.20 * 21.3 * 1 Kg/M1 = 21.50 Kg.
0.45 * 21.3 * 1 Kg/M1 = 21.75 Kg.
= 136.23 Kg.
8X = 1,089.84 Kg.

Stiefner t. = 10 mm. 0.18 * 0.06 * 0.008 * 7850 * 5 = 76.62 Kg.


8X = 612.93 Kg.

Flendes t. = 10 mm. 0.101 * 0.64 * 0.010 * 7850 * 1 = 57.93 Kg.


0.101 * 0.52 * 0.010 * 7850 * 1 = 48.75 Kg.
0.101 * 0.40 * 0.010 * 7850 * 1 = 39.33 Kg.
Flendes t. = 12 mm. 0.300 * 0.30 * 0.012 * 7850 * 1 = 56.52 Kg.
= 202.53 Kg.
8X = 1,620.24 Kg.

Baut Ø 19 28.00 X 8.00 Bh. = 224.00 Bh.

Angker Baut Ø 19 , panjang 60 Cm. 4.00 X 8.00 X 1.00 Bh. = 32.00 Bh.

Plat penahan gording ( L 80X40X4 ) 0.120 * 0.10 * 0.004 * 7850 * 5 = 34.54 Kg.
8X = 276.32 Kg.
Pengecatan baja Zinc Chromate 0.79 * 5.00 * 1.00 = 3.95 M²
0.79 * 0.80 * 1.00 = 0.63 M²
0.79 * 1.00 * 1.00 = 0.79 M²
0.79 * 2.75 * 1.00 = 2.17 M²
0.79 * 0.60 * 1.00 = 0.47 M²
= 8.01 M²
8X = 64.07 M²

Pasang lisplang Kalsiboard 12 MM X 200 MM 55.20 X 1.00 = 55.20 M²

Pengecatan lisplang Kalsoboard 55.20 X 0.24 = 13.25 M²

Bongkar/pasang kembali penangkal petir = 2.00 Bh.

Pasang triplek bawah alluminium foil 21.30 + 5.50 * 8.40 * 2 = 225.12 M²


2

6.60 + 4.50 * 2.00 * 1 = 11.10 M²


2 = 236.22 M²

12.60 + 8.70 * 2.00 * 1 = 21.30 M²


2
= 214.92 M²

Pasang alluminium foil double side = 214.92 M²

Pasang kembali usuk galvalum 0.85 * 214.92 = 182.68 M²

Pasang baru usuk galvalum 0.15 * 214.92 = 32.24 M²

Pasang kembali atap genteng 0.85 * 214.92 = 182.68 M²


Pasang baru atap genteng Glassur 0.15 * 214.92 = 32.24 M²

PasAng bubungan genteng glassur baru 5.80 * 4.00 + 5.50 = 28.70 M¹


= 28.70 M¹

Water profing talang beton 79.20 * 1.20 = 95.04 M²

Pekerjaan pengaman kerja ( atas plapon/pekerjaan atap ) lt.4 12.00 * 21.40 * 1.00 = 256.80 M²