Harga Upah dan Material Konstruksi
Harga Upah dan Material Konstruksi
B TUKANG KONTRUKSI
A SEMEN
C PASIR
4 Sirtu 1 M3 Rp 60,000.00
D LOGAM BAJA
9 Paku 1 Kg Rp 17,000.00
E KAYU
F TIANG PANCANG
G KERAMIK
I BAHAN LAINYA
5 Dempul 1 Kg Rp 12,500.00
7 Lem 1 Kg Rp 13,200.00
J Material sanitasi
9 Watermoor 1 Bh Rp 15,000.00
11 Knee 1 Bh Rp 9,500.00
5 Kaca t= 5 mm 1 M2 Rp 60,000.00
6 Kaca t= 6 mm 1 M2 Rp 85,000.00
7 Kaca t= 8 mm 1 M2 Rp 100,000.00
NO URAIAN KEGIATAN SATUAN HARGA
11 Karet 1 M1 Rp 1,250.00
L AKSESORIS
M CAT
N PELAPIS
13 Waterprofing 1 Kg Rp 37,000.00
17 Roster 1 Bh Rp 16,500.00
19 Watermoor 1 Bh Rp 16,500.00
20 Knee 1 Bh Rp 10,780.00
21 Sifon 1 Bh Rp 93,500.00
26 U clam 1 Bh Rp 950.00
27 Chanel 1 Bh Rp 1,500.00
30 textletape 1 Bh Rp 13,750.00
35 Sunscreen 1 Bh Rp 374,000.00
38 Cerlak 1 Kg Rp 95,800.00
43 Politur 1 Kg Rp 45,000.00
44 Shanding 1 Kg Rp 160,000.00
GRANITO NIRO :
Grendel tanam :
Genteng Glazurr :
KIA 1 Bh Rp 5,500.00
KANMURI 1 Bh Rp 11,000.00
M CLASS 1 Bh Rp 10,000.00
Bubungan glazurr
KIA 1 Bh Rp 14,000.00
KANMURI 1 Bh Rp 14,250.00
M CLASS 1 Bh Rp 8,000.00
NO URAIAN KEGIATAN SATUAN HARGA
Kalsiplank :
Gypsum :
1 Kg Rp 67,595.00
1 Kg Rp 74,750.00
Rp 67,595.00
Pengukuran dan Pembuatan Bauwplank m1
Upah:
Mandor 0.005 O.H Rp 60,000.00 Rp 270.00
Kepala Tukang Kayu 0.010 O.H Rp 50,000.00 Rp 450.00
Tukang Kayu 0.100 O.H Rp 45,000.00 Rp 4,050.00
Pekerja / Buruh Tak Terampil 0.100 O.H Rp 35,000.00 Rp 3,150.00
Jumlah: Rp 7,920.00
Bahan:
Kayu Meranti (Papan 2/20) 0.007 m3 Rp 2,800,000.00 Rp 48,546.00
Kayu Meranti (Usuk 5/7) 0.012 m3 Rp 2,400,000.00 Rp 11,592.00
Paku biasa 2" - 5" 0.020 Kg Rp 23,000.00 Rp 84,000.00
Jumlah: Rp 144,138.00
Nilai HSPK : Rp 152,058.00
Pembersihan m2
Upah:
Mandor 0.025 O.H Rp 60,000.00 Rp 1,500.00
Pekerja / Buruh Tak Terampil 0.050 O.H Rp 35,000.00 Rp 1,750.00
Jumlah: Rp 3,250.00
Nilai HSPK : Rp 3,250.00
Upah:
Mandor 0.050 O.H Rp 60,000.00 Rp 3,000.00
Tenaga Kasar 1.000 O.H Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 38,000.00
Nilai HSPK : Rp 38,000.00
Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata m2 SNI 6897:2008 (6.9)
Upah:
Mandor 0.015 O.H Rp 60,000.00 Rp 765.00
Kepala Tukang Batu 0.010 O.H Rp 50,000.00 Rp 425.00
Tukang Batu 0.100 O.H Rp 45,000.00 Rp 3,825.00
Tenaga Kasar 0.300 O.H Rp 35,000.00 Rp 8,925.00
Jumlah: Rp 13,940.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.230 Zak Rp 48,000.00 Rp 11,040.00
Pasir Pasang 0.043 m3 Rp 120,000.00 Rp 5,160.00
Batu Bata Merah uk 22 x 11 x 4.5 cm 70.000 Buah Rp 500.00 Rp 35,000.00
Jumlah: Rp 51,200.00
Nilai HSPK : Rp 65,140.00
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud m2 SNI 2002 Pekerjaan Kayu (6.56)
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Kayu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pembantu Tukang 0.150 O.H Rp 35,000.00 Rp 4,200.00
Jumlah: Rp 25,800.00
Bahan:
Rangka Metal Stud 0.015 m3 Rp 4,262,050.00 Rp 65,635.57
Gypsum Tebal 12 mm 1.000 Lembar Rp 66,000.00 Rp 66,000.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 135,835.57
Nilai HSPK : Rp 161,635.57
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud m2 SNI 2002 Pekerjaan Kayu (6.56)
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Kayu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pekerja/Buruh Tak Terampil 0.150 O.H Rp 35,000.00 Rp 4,200.00
Jumlah: Rp 25,800.00
Bahan:
Rangka Metal Stud 0.015 m3 Rp 4,262,050.00 Rp 67,698.40
Gypsum Tebal 12 mm 1.000 Lembar Rp 66,000.00 Rp 66,000.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 137,898.40
Nilai HSPK : Rp 163,698.40
Pengangkutan Tanah keluar Proyek m3
Upah:
Pekerja / Buruh Tak Terampil 0.250 O.H Rp 35,000.00 Rp 8,750.00
Jumlah: Rp 8,750.00
Sewa Peralatan:
Sewa Dump Truck 5 T (min 5 jam) 0.250 Jam Rp 65,000.00 Rp 16,250.00
Jumlah: Rp 16,250.00
Nilai HSPK : Rp 25,000.00
Penggalian Tanah untuk Konstruksi m3 SNI DT 91-0006-2007 (6.2)
Upah:
Mandor 0.045 O.H Rp 60,000.00 Rp 2,700.00
Pekerja / Buruh Tak Terampil 0.900 O.H Rp 35,000.00 Rp 31,500.00
Jumlah: Rp 34,200.00
Nilai HSPK : Rp 34,200.00
Penggalian Tanah Keras m3 SNI DT 91-0006-2007 (6.4)
Upah:
Mandor 0.032 O.H Rp 60,000.00 Rp 1,920.00
Pekerja / Buruh Tak Terampil 1.000 O.H Rp 35,000.00 Rp 35,000.00
Jumlah: Rp 36,920.00
Nilai HSPK : Rp 36,920.00
Pekerjaan Pasangan Batu Kali Belah 15/20 cm (1 Pc : 5 Ps) m3 SNI DT 91-0007-2007 (6.6)
Tenaga:
Mandor 0.075 O.H Rp 60,000.00 Rp 3,600.00
Kepala Tukang Batu 0.060 O.H Rp 50,000.00 Rp 2,400.00
Tukang Batu 0.600 O.H Rp 45,000.00 Rp 21,600.00
Pekerja/Buruh Tak Terampil 1.500 O.H Rp 35,000.00 Rp 42,000.00
Jumlah: Rp 69,600.00
Bahan:
Semen portland (50kg) 2.720 Zak Rp 54,000.00 Rp 146,880.00
Pasir Pasang 0.544 m3 Rp 120,000.00 Rp 65,280.00
Batu Kali Belah 15/20 cm 1.100 m3 Rp 130,100.00 Rp 143,110.00
Jumlah: Rp 355,270.00
Nilai HSPK : Rp 424,870.00
Pengecatan Tembok Lama (1 lapis cat dasar,2 lapis cat penutup) m2 SNI 2002 Pekerjaan Pengecatan (6.15)
Upah:
Mandor 0.003 O.H Rp 60,000.00 Rp 150.00
Kepala Tukang Cat 0.004 O.H Rp 50,000.00 Rp 210.00
Tukang Cat 0.042 O.H Rp 45,000.00 Rp 1,890.00
Pekerja/Buruh Tak Terampil 0.028 O.H Rp 35,000.00 Rp 980.00
Jumlah: Rp 3,230.00
Bahan:
Dempul Tembok (cat Dasar) 0.120 Kg Rp 12,500.00 Rp 1,500.00
Cat Tembok Luar 0.180 Kg Rp 64,960.00 Rp 11,692.80
Jumlah: Rp 13,192.80
Nilai HSPK : Rp 16,422.80
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) m3 SNI DT 91-0008-2007 (6.33)
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,000.00 Rp 403,200.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 230,000.00 Rp 186,300.00
Besi Beton (polos/ulir) 150.000 Kg Rp 8,000.00 Rp 1,200,000.00
Kawat Beton 2.250 Kg Rp 14,000.00 Rp 31,500.00
Kayu meranti bekisting 0.240 m3 Rp 2,400,000.00 Rp 144,000.00
Kayu Kamper balok 3/5 0.160 m3 Rp 3,700,000.00 Rp 148,000.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 24.000 Batang Rp 12,000.00 Rp 72,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 17,000.00 Rp 54,400.00
Minyak Bekisting 1.600 ltr Rp 4,800.00 Rp 7,680.00
Jumlah: Rp 2,383,780.00
Nilai HSPK : Rp 2,649,880.00
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) m3 SNI DT 91-0008-2007 (6.34)
Tenaga:
Mandor 0.283 O.H Rp 60,000.00 Rp 13,584.00
Kepala Tukang Besi 0.323 O.H Rp 50,000.00 Rp 12,920.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.560 O.H Rp 45,000.00 Rp 56,160.00
Pekerja / Buruh Tak Terampil 5.650 O.H Rp 35,000.00 Rp 158,200.00
Jumlah: Rp 301,164.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,000.00 Rp 403,200.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 230,000.00 Rp 186,300.00
Besi Beton (polos/ulir) 210.000 Kg Rp 8,000.00 Rp 1,680,000.00
Kawat Beton 3.000 Kg Rp 14,000.00 Rp 42,000.00
Kayu meranti bekisting 0.250 m3 Rp 2,400,000.00 Rp 150,000.00
Kayu Kamper balok 3/5 0.105 m3 Rp 3,700,000.00 Rp 97,125.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 14.000 Batang Rp 12,000.00 Rp 42,000.00
Plywood tebal 9 mm 2.500 lembar Rp 95,000.00 Rp 59,375.00
Paku Usuk 3.000 Kg Rp 17,000.00 Rp 51,000.00
Minyak Bekisting 1.200 ltr Rp 4,800.00 Rp 5,760.00
Jumlah: Rp 2,786,960.00
Nilai HSPK : Rp 3,088,124.00
Pemasangan Tegel Keramik 40x40 cm (Motif/Warna Gelap) m2 SNI DT 91-0012-2007 (6.11) & (6.35)
Upah:
Mandor 0.035 O.H Rp 60,000.00 Rp 1,680.00
Kepala Tukang Batu 0.035 O.H Rp 50,000.00 Rp 1,400.00
Tukang Batu 0.350 O.H Rp 45,000.00 Rp 12,600.00
Pekerja/Buruh Tak Terampil 0.700 O.H Rp 35,000.00 Rp 19,600.00
Jumlah: Rp 35,280.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.196 Zak Rp 54,000.00 Rp 10,584.00
Semen Berwarna Yiyitan 1.300 Kg Rp 7,500.00 Rp 9,750.00
Pasir Pasang 0.045 m3 Rp 120,000.00 Rp 5,400.00
Tegel Keramik 40x40 (motif/warna gelap) 1.061 m2 Rp 51,700.00 Rp 54,843.36
Jumlah: Rp 80,577.36
Nilai HSPK : Rp 115,857.36
Pemasangan Tegel Keramik 20x25 cm (Dinding) m2 SNI DT 91-0012-2007 (6.54)
Upah:
Mandor 0.045 O.H Rp 60,000.00 Rp 2,160.00
Kepala Tukang Batu 0.045 O.H Rp 50,000.00 Rp 1,800.00
Tukang Batu 0.450 O.H Rp 45,000.00 Rp 16,200.00
Pekerja/Buruh Tak Terampil 0.900 O.H Rp 35,000.00 Rp 25,200.00
Jumlah: Rp 45,360.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.186 Zak Rp 54,000.00 Rp 10,044.00
Semen Berwarna Yiyitan 1.940 Kg Rp 7,500.00 Rp 14,550.00
Pasir Pasang 0.018 m3 Rp 120,000.00 Rp 2,160.00
Tegel Keramik 20 x 25 Cm (dinding) 1.050 m2 Rp 37,500.00 Rp 39,375.00
Jumlah: Rp 66,129.00
Nilai HSPK : Rp 111,489.00
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud m2 SNI 2002 Pekerjaan Kayu (6.56)
Upah:
Mandor 0.075 O.H Rp 60,000.00 Rp 4,050.00
Kepala Tukang Kayu 0.045 O.H Rp 50,000.00 Rp 2,025.00
Tukang Kayu 0.450 O.H Rp 35,000.00 Rp 14,175.00
Pekerja/Buruh Tak Terampil 0.150 O.H Rp 45,000.00 Rp 6,075.00
Jumlah: Rp 26,325.00
Bahan:
Rangka Metal Stud 0.015 m3 Rp 4,262,050.00 Rp 67,698.40
Gypsum Tebal 12 mm 1.000 Lembar Rp 66,000.00 Rp 66,000.00
Paku Sekrup 28.000 Buah Rp 150.00 Rp 4,200.00
Jumlah: Rp 137,898.40
Nilai HSPK : Rp 164,223.40
Pelapisan Waterproofing m2
Upah:
Mandor 0.003 O.H Rp 60,000.00 Rp 150.00
Kepala Tukang Cat 0.008 O.H Rp 50,000.00 Rp 375.00
Tukang Cat 0.075 O.H Rp 45,000.00 Rp 3,375.00
Tenaga Kasar 0.050 O.H Rp 35,000.00 Rp 1,750.00
Jumlah: Rp 5,650.00
Bahan:
Waterproofing 0.350 Kg Rp 44,000.00 Rp 15,400.00
Serat Fiber 1.000 m2 Rp 2,750.00 Rp 2,750.00
Jumlah: Rp 18,150.00
Nilai HSPK : Rp 23,800.00
Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 24.00
Kepala Tukang Besi 0.001 O.H Rp 50,000.00 Rp 35.00
Tukang Besi 0.007 O.H Rp 45,000.00 Rp 315.00
Pekerja / Buruh Tak Terampil 0.007 O.H Rp 35,000.00 Rp 245.00
Jumlah: Rp 619.00
Bahan:
Besi Beton (polos/ulir) 1.050 Kg Rp 9,800.00 Rp 10,290.00
Kawat Beton 0.015 Kg Rp 17,500.00 Rp 262.50
Jumlah: Rp 10,552.50
Nilai HSPK : Rp 11,171.50
Pekerjaan Pondasi Beton Bertulang (168 kg besi + Bekisting) ( Poer m3 SNI DT 91-0008-2007 (6.28)
2 )
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 168.000 Kg Rp 9,800.00 Rp 1,646,400.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.200 m3 Rp 3,080,000.00 Rp 154,000.00
Paku Usuk 1.500 Kg Rp 14,500.00 Rp 21,750.00
Minyak Bekisting 0.400 ltr Rp 2,750.00 Rp 1,100.00
Jumlah: Rp 2,545,965.00
Nilai HSPK : Rp 2,812,065.00
m3 SNI DT 91-0008-2007 (6.29)
Pekerjaan Sloof 30X40 Beton Bertulang (216 kg besi + Bekisting)
Tenaga:
Mandor 0.283 O.H Rp 60,000.00 Rp 13,584.00
Kepala Tukang Besi 0.323 O.H Rp 50,000.00 Rp 12,920.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.560 O.H Rp 45,000.00 Rp 56,160.00
Pekerja / Buruh Tak Terampil 5.650 O.H Rp 35,000.00 Rp 158,200.00
Jumlah: Rp 301,164.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 216.000 Kg Rp 9,800.00 Rp 2,116,800.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.270 m3 Rp 3,080,000.00 Rp 207,900.00
Paku Usuk 2.000 Kg Rp 14,500.00 Rp 29,000.00
Minyak Bekisting 0.600 ltr Rp 2,750.00 Rp 1,650.00
Jumlah: Rp 3,091,190.00
Nilai HSPK : Rp 3,392,354.00
m3 SNI DT 91-0008-2007 (6.31)
Pekerjaan Balok 20X40 Beton Bertulang (164 kg besi + Bekisting)
Tenaga:
Mandor 0.318 O.H Rp 60,000.00 Rp 15,264.00
Kepala Tukang Besi 0.333 O.H Rp 50,000.00 Rp 13,320.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,084.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 164.000 Kg Rp 9,800.00 Rp 1,607,200.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,918,365.00
Nilai HSPK : Rp 3,244,449.00
m3 SNI DT 91-0008-2007 (6.31)
Pekerjaan Balok 30X50 Beton Bertulang (186 kg besi + Bekisting)
Tenaga:
Mandor 0.318 O.H Rp 60,000.00 Rp 15,264.00
Kepala Tukang Besi 0.333 O.H Rp 50,000.00 Rp 13,320.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,084.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 164.000 Kg Rp 9,800.00 Rp 1,607,200.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,918,365.00
Nilai HSPK : Rp 3,244,449.00
Tenaga:
Mandor 0.318 O.H Rp 60,000.00 Rp 15,264.00
Kepala Tukang Besi 0.333 O.H Rp 50,000.00 Rp 13,320.00
Tukang Besi 1.400 O.H Rp 45,000.00 Rp 50,400.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.650 O.H Rp 45,000.00 Rp 59,400.00
Pekerja / Buruh Tak Terampil 6.350 O.H Rp 35,000.00 Rp 177,800.00
Jumlah: Rp 326,084.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 164.000 Kg Rp 9,800.00 Rp 1,607,200.00
Kawat Beton 3.000 Kg Rp 17,500.00 Rp 52,500.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.140 m3 Rp 4,675,000.00 Rp 163,625.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 16.000 Batang Rp 12,000.00 Rp 48,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,918,365.00
Nilai HSPK : Rp 3,244,449.00
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.265 O.H Rp 50,000.00 Rp 10,600.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.400 O.H Rp 35,000.00 Rp 151,200.00
Jumlah: Rp 269,020.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 133.000 Kg Rp 9,800.00 Rp 1,303,400.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.320 m3 Rp 3,080,000.00 Rp 246,400.00
Kayu Kamper balok 3/5 0.120 m3 Rp 4,675,000.00 Rp 140,250.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 32.000 Batang Rp 12,000.00 Rp 96,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 2,626,065.00
Nilai HSPK : Rp 2,895,085.00
Tenaga:
Mandor 0.265 O.H Rp 60,000.00 Rp 12,720.00
Kepala Tukang Besi 0.262 O.H Rp 50,000.00 Rp 10,480.00
Tukang Besi 1.050 O.H Rp 45,000.00 Rp 37,800.00
Tukang Batu 0.275 O.H Rp 45,000.00 Rp 9,900.00
Tukang Kayu 1.300 O.H Rp 45,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 5.300 O.H Rp 35,000.00 Rp 148,400.00
Jumlah: Rp 266,100.00
Bahan:
Semen portland (40kg) 8.400 Zak Rp 48,500.00 Rp 407,400.00
Pasir Beton 0.540 m3 Rp 130,000.00 Rp 70,200.00
Batu Pecah Mesin 1/2 cm 0.810 m3 Rp 254,000.00 Rp 205,740.00
Besi Beton (polos/ulir) 69.000 Kg Rp 9,800.00 Rp 676,200.00
Kawat Beton 2.250 Kg Rp 17,500.00 Rp 39,375.00
Kayu meranti bekisting 0.240 m3 Rp 3,080,000.00 Rp 184,800.00
Kayu Kamper balok 3/5 0.160 m3 Rp 4,675,000.00 Rp 187,000.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 24.000 Batang Rp 12,000.00 Rp 72,000.00
Plywood tebal 9 mm 2.800 lembar Rp 95,000.00 Rp 66,500.00
Paku Usuk 3.200 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekisting 1.600 ltr Rp 2,750.00 Rp 4,400.00
Jumlah: Rp 1,960,015.00
Nilai HSPK : Rp 2,226,115.00
Tenaga:
Mandor 0.009 O.H Rp 60,000.00 Rp 540.00
Kepala Tukang Besi 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Besi 0.020 O.H Rp 45,000.00 Rp 900.00
Tukang Batu 0.020 O.H Rp 45,000.00 Rp 900.00
Tukang Kayu 0.020 O.H Rp 45,000.00 Rp 900.00
Pekerja / Buruh Tak Terampil 0.180 O.H Rp 35,000.00 Rp 6,300.00
Jumlah: Rp 9,840.00
Bahan:
Semen portland (40kg) 0.100 Zak Rp 48,500.00 Rp 4,850.00
Pasir Beton 0.006 m3 Rp 130,000.00 Rp 780.00
Batu Pecah Mesin 1/2 cm 0.009 m3 Rp 254,000.00 Rp 2,286.00
Besi Beton (polos/ulir) 3.000 Kg Rp 9,800.00 Rp 29,400.00
Kawat Beton 0.450 Kg Rp 17,500.00 Rp 7,875.00
Kayu meranti bekisting 0.002 m3 Rp 3,080,000.00 Rp 1,540.00
Paku Usuk 0.010 Kg Rp 14,500.00 Rp 145.00
Jumlah: Rp 46,876.00
Nilai HSPK /1M¹ Rp 56,716.00
Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 12.00
Kepala Tukang 0.000 O.H Rp 50,000.00 Rp 10.00
Tukang Besi 0.002 O.H Rp 45,000.00 Rp 90.00
Pekerja / Buruh Tak Terampil 0.004 O.H Rp 35,000.00 Rp 140.00
Jumlah: Rp 252.00
Bahan:
Electrode Las 0.040 kg Rp 23,000.00 Rp 920.00
Solar 0.030 liter Rp 4,500.00 Rp 135.00
Minyak Pelumas 0.004 liter Rp 2,750.00 Rp 11.00
Jumlah: Rp 1,066.00
Nilai HSPK : Rp 1,318.00
Pekerjaan Perakitan Besi kg SNI DT 91-0014-2007 (6.3)
Tenaga:
Mandor 0.000 O.H Rp 60,000.00 Rp 3.00
Kepala Tukang 0.000 O.H Rp 50,000.00 Rp 0.50
Tukang Besi 0.001 O.H Rp 45,000.00 Rp 45.00
Pekerja / Buruh Tak Terampil 0.001 O.H Rp 35,000.00 Rp 35.00
Jumlah: Rp 83.50
Bahan:
Solar 0.010 liter Rp 4,500.00 Rp 45.00
Minyak Pelumas 0.001 liter Rp 2,750.00 Rp 2.75
Jumlah: Rp 47.75
Sewa Peralatan:
Sewa Alat Bantu (1 Set @ 3 Alat) 0.008 jam Rp 1,100.00 Rp 8.80
Jumlah: Rp 8.80
Nilai HSPK : Rp 140.05
Total HSPK : Rp 18,713.05
Tenaga:
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala Tukang 0.006 O.H Rp 50,000.00 Rp 300.00
Tukang Las 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pekerja / Buruh Tak Terampil 0.060 O.H Rp 35,000.00 Rp 1,050.00
Jumlah: Rp 2,880.00
Bahan:
Besi Profil (Baja Konstruksi) 1.150 Kg Rp 12,500.00 Rp 14,375.00
Jumlah: Rp 14,375.00
Nilai HSPK : Rp 17,255.00
Upah:
Kepala Tukang Besi 0.030 O.H Rp 50,000.00 Rp 750.00
Tukang Besi 0.090 O.H Rp 45,000.00 Rp 2,025.00
Pembantu Tukang 0.090 O.H Rp 35,000.00 Rp 1,575.00
Jumlah: Rp 4,350.00
Nilai HSPK : Rp 4,350.00
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
Angker baut ø 16 1.000 bh Rp 2,750.00 Rp 2,750.00
Nilai HSPK Rp 8,645.00
Pemasangan Baut ø16 buah
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
mur/baut ø 16 1.000 bh Rp 2,750.00 Rp 2,750.00
Nilai HSPK Rp 8,645.00
Pekerjaan Pemasangan Besi Profil Kg
Tenaga:
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala Tukang 0.010 O.H Rp 50,000.00 Rp 500.00
Tukang Las 0.060 O.H Rp 45,000.00 Rp 1,350.00
Pekerja / Buruh Tak Terampil 0.060 O.H Rp 35,000.00 Rp 1,050.00
Jumlah: Rp 3,080.00
Bahan:
Besi Profil (Baja Konstruksi) 1.120 Kg Rp 12,500.00 Rp 14,000.00
Jumlah: Rp 14,000.00
Nilai HSPK : Rp 17,080.00
Pemasangan Walter Mour buah
Upah :
Mandor 0.003 O.H Rp 60,000.00 Rp 180.00
Kepala tukang besi 0.060 O.H Rp 50,000.00 Rp 1,350.00
Tukang besi 0.060 O.H Rp 45,000.00 Rp 1,215.00
Pekerja 0.080 O.H Rp 35,000.00 Rp 1,260.00
Sewa welding set ( min 5 jam ) 0.070 Hari Rp 27,000.00 Rp 1,890.00
Jumlah Rp 5,895.00
mur/baut ø 16 1.000 bh Rp 2,750.00 Rp 2,750.00
Nilai HSPK Rp 8,645.00
Pemancangan Tiang Pancang m1 (≥ 200m) m1
Upah:
Mandor 0.130 O.H Rp 60,000.00 Rp 7,800.00
Pekerja tak trampil 0.750 O.H Rp 35,000.00 Rp 26,250.00
Jumlah: Rp 34,050.00
Sewa Peralatan:
Sewa Crane 30 ton - min. 8 jam (termasuk mob/demob, operator, BBM) 0.220 Jam Rp 225,000.00 Rp 49,500.00
Sewa Hammer tiang pancang - min. 8 jam(termasuk mob/demob, operato 0.220 Jam Rp 185,000.00 Rp 40,700.00
Jumlah: Rp 89,380.00
Nilai HSPK : Rp 179,580.00
Pekerjaan pengadaan tiang pancang 1.000 M1
Tiang pancang type B Ø40 Cm 1.000 M1 Rp 367,000.00 Rp 367,000.00
Nilai HSPK : Rp 367,000.00
Sambungan tiang pancang Ø 40 cm 1.000 Titik Rp 44,000.00 Rp 44,000.00
Nilai HSPK : Rp 44,000.00
Pemasangan Wuwung Genteng Glazurr m1 SNI 2002 Pekerjaan Penutup Atap (6.5)
Upah:
Mandor 0.002 O.H Rp 60,000.00 Rp 120.00
Kepala Tukang Batu 0.020 O.H Rp 50,000.00 Rp 1,000.00
Tukang Batu 0.200 O.H Rp 45,000.00 Rp 9,000.00
Pembantu tukang 0.400 O.H Rp 35,000.00 Rp 14,000.00
Jumlah: Rp 24,120.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.160 Zak Rp 54,500.00 Rp 8,720.00
Pasir Pasang 0.032 m3 Rp 120,000.00 Rp 3,876.00
Genteng Wuwung Glazurr 4.000 Buah Rp 14,250.00 Rp 57,000.00
Jumlah: Rp 69,596.00
Nilai HSPK : Rp 93,716.00
B
1
2
3
4
C
1
No
1
2
3
4
5
6
7
8
No
A
1
2
B
1
2
3
4
5
C
1
2
3
4
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
E
1
2
3
4
5
6
7
8
F
1
2
G
1
2
3
H
1
2
3
I
1
2
3
4
5
6
7
8
J
1
2
3
4
5
6
K
1
2
3
4
5
6
7
8
L
1
2
3
4
5
6
7
8
9
10
11
12
13
M
1
2
3
4
5
6
7
N
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
SNI 2002 Pekerjaan Pengecatan (6.20)
NO
A
1
2
3
4
5
B
1
2
3
4
C
1
No
1
2
3
4
5
6
7
8
No
A
1
2
B
1
2
3
4
5
C
1
2
3
4
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
E
1
2
3
4
5
6
7
8
F
1
2
G
2
3
H
1
2
3
I
1
2
3
4
5
6
7
8
K
1
2
3
SNI 2002 Pekerjaan Penutup Atap (6.5) 4
5
6
7
8
L
1
2
3
4
5
6
7
8
9
10
11
12
13
M
1
2
3
4
5
6
7
N
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
RENCANA ANGGARAN BIAYA
Sub Jumlah
No. Uraian Pekerjaan Volume Sat. Harga Satuan Jumlah Harga
Harga
I LANTAI 1
A Pekerjaan Persiapan
1 Pengukuran 11.60 M' 5,069 58,796
2 Pembersihan 8.55 M² 3,250 27,788
86,583
B Pekerjaan Dinding
1 Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr. 48.00 M² 65,140 3,126,720
2 Pekerjaan plesteran batu merah 1 PC. : 4 Psr. 48.00 M² 24,935 1,196,899
3 Pasang kolom struktur 15X20 Cm. 0.36 M³ 1,830,000 658,800
4 Pasang ring balk 12X25 Cm. 0.35 M³ 1,830,000 636,840
5 Pekerjaan acian 48.00 M² 13,830 663,840
6,283,099
C Pekerjaan Pondasi
1 Galian tanah 3.28 M³ 34,200 112,219
2 Pasir urug bawah pondasi 0.31 M³ 149,100 46,594
3 Pekerjaan Sloof 15/25 0.44 M³ 1,830,000 796,050
4 Pekerjaan urugan tanah kembali 1.31 M³ 12,900 16,931
971,794
D Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Plafon 8.55 M² 24,615 210,458
2 Pekerjaan Pengecatan dinding bata 48.00 M² 24,615 1,181,520
1,391,978
E Pekerjaan Kusen dan Daun Pintu
1 Pekerjaan Kusen kayu 15x78 1.83 M¹ 102,788 188,101
2 Pekerjaan Slimar daun pintu Alluminium 3/8" 1.83 M¹ 64,288 117,646
3 Engsel Pintu 3.00 Bh. 76,220 228,660
4 Grendel tanam 1.00 Set. 54,100 54,100
5 Kunci pintu 1.00 Set. 36,250 36,250
6 Kaca pintu t. = 8 mm. 2.16 M² 116,720 252,115
7 Kaca mati atas pintu t. = 6 mm 0.36 M² 100,220 36,079
8 Pekerjaan Kusen kayu 15x78 8.40 M¹ 102,788 863,416
9 Pekerjaan Slimar daun pintu kayu 8.40 M¹ 64,288 540,016
10 Engsel Pintu 4.00 Bh. 76,220 304,880
11 Grendel tanam 2.00 Set. 54,100 108,200
2,729,464
F Pasang keramik Tile 40X40 ( Warna coklat )
1 Kamar tidur lantai 1 8.55 M² 296,720 2,536,958
2,536,958
Jumlah 13,999,876
Sub Jumlah
No. Uraian Pekerjaan Volume Sat. Harga Satuan Jumlah Harga
Harga
II LANTAI 2
A Pekerjaan Pembongkaran (Persiapan)
1 Pembersihan 8.55 M² 3,250 27,788
27,788
B Pekerjaan Dinding
1 Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr. 48.00 M² 65,140 3,126,720
2 Pekerjaan plesteran batu merah 1 PC. : 4 Psr. 48.00 M² 24,935 1,196,899
3 Pengecatan tembok 48.00 M² 24,615 1,181,520
4 Cat dinding plafon 48.00 M² 24,615 1,181,520
6,686,659
C Pekerjaan Lantai
1 Cor beton lantai 5.76 M² 2,649,880 15,263,309
2 Pasang lantai keramik 40X40 Cm. 8.55 M² 115,857 990,580
3 Pasang kolom struktur 12X50 Cm. 1.20 M³ 1,830,000 2,196,000
4 Pasang ring balk 12X25 Cm. 0.44 M³ 1,830,000 796,050
19,245,939
D Pekerjaan Pasang Plapon Gypsum Rangka Metalfuring
1 Kamar tidur lantai 2 8.55 M² 118,899 1,016,589
1,016,589
REKAPITULASI ANGGARAN BIAYA - GEDUNG RENOVASI
#REF! #REF!
0 0
0 0
I LANTAI 1
A Pekerjaan Persiapan Rp 86,583.26
B Pekerjaan Dinding Rp 6,283,099.20
C Pekerjaan Pondasi Rp 971,793.75
D Pekerjaan Pengecatan Rp 1,391,978.25
E Pekerjaan Kusen dan Daun Pintu #REF!
#REF! #REF! #REF!
F Pasang keramik Tile 40X40 ( Warna coklat ) Rp 2,536,957.71
II LANTAI 2
A Pekerjaan Pembongkaran (Persiapan) Rp 27,787.50
B Pekerjaan Dinding Rp 6,686,659.20
C Pekerjaan Lantai Rp 19,245,939.23
#REF! #REF! #REF!
D Pekerjaan Pasang Plapon Gypsum Rangka Metalfuring Rp 1,016,588.84
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
JUMLAH #REF!
LANTAI 1 : ( rehap )
Pekerjaan Pembongkaran Dinding
As C ( 2 – 4 ) 9.50 * 4.2 * 2 = 79.8 M²
As 2 , 3 ( C – D ) 5.50 * 4.2 * 1 - 3.2 M2 = 19.9 M²
As D¹ ( 2 – 4 ) 10.00 * 4.2 * 1 - 6 M2 = 36 M²
As 3 ( D – D¹ ) 1.30 * 4.2 * 1 = 5.46 M²
As 2¹ ( D¹ – E ) 4.60 * 4.2 * 1 - 3.75 M2 = 15.57 M²
As 2¹ ( E – E¹ ) 2.50 * 0.92 * 1 = 2.3 M²
As 4 ( D – F¹ ) 11.60 * 4.2 * 1 - 3.75 M2 = 44.97 M²
As D¹¹ ( 2¹ – 2¹¹ ) 2.60 * 4.2 * 1 = 10.92 M²
= 214.92 M²
Lantai 1 :
Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr.
AS D ( 2 - 5 ) 13.50 * 4.70 - 2.00 * 0.80 * 6.00 = 53.85 M²
AS 3' ( I' - J' ) 5.50 * 4.70 - 2.50 * 0.92 = 23.55 M²
DIAGONAL 4.00 * 4.10 - 1.50 * 2.50 = 16.40 M²
AS 5 ( D - F ) 3.50 * 4.00 - 2.00 * 0.80 * 2.00 = 10.80 M²
1. 6.40 * 4.20 = 26.88 M²
2. 4.00 * 4.20 - 1.50 * 2.50 = 13.05 M²
= 144.53 M²
Pekerjaan pondasi :
Galian tanah 6.40 * 1.50 * 0.90 = 8.64 M³
2.40 * 1.50 * 0.90 = 3.24 M³
1.40 * 0.70 * 0.30 = 0.29 M³
3.60 * 1.50 * 0.90 = 4.86 M³
As D ( 2 - 5 ) 13.50 * 0.70 * 0.30 = 2.84 M³
As 5 ( D - F ) 3.50 * 0.70 * 0.30 = 0.74 M³
As 2 ( D' - E ) 4.20 * 0.70 * 0.30 = 0.88 M³
= 21.49 M³
Pekerjaan pondasi batu kali 1 PC. : 5 Psr. 0.90 * 0.30 * 6.40 = 1.73 M³
0.90 * 0.30 * 2.40 = 0.65 M³
0.90 * 0.30 * 3.60 = 0.97 M³
= 3.35 M³
= 383.54 M²
2X = 767.08 M²
Walter Moer Ø 22 =
Walter Moer Ø 22 =
16.25 M²
19.50 M²
15.75 M²
11.38 M²
17.20 M²
5.85 M²
85.93 M²
45.40 M²
10.80 M²
31.68 M²
33.60 M²
121.48 M²
0.06 M³
1.38 M²
1.38 M²
16.25 M²
13.00 M²
17.88 M²
5.85 M²
17.20 M²
29.00 M²
9.20 M²
10.50 M²
118.88 M²
6.84 M¹
10.30 M¹
17.14 M¹
5.84 M¹
18.80 M¹
24.64 M²
1.40 M²
3.97 M²
5.37 M²
113.50 M²
27.00 M²
139.20 M²
84.00 M²
240.00 M²
45.00 M²
20.16 M²
8.40 M²
39.06 M²
30.00 M²
46.98 M²
23.04 M²
18.40 M²
45.00 M²
23.00 M²
11.50 M²
16.00 M²
18.00 M²
948.24 M²
122.12 M²
70.55 M²
123.50 M²
126.75 M²
90.29 M²
17.62 M²
41.60 M²
32.83 M²
57.13 M²
64.03 M²
130.65 M²
78.00 M²
66.95 M²
112.75 M²
29.25 M²
38.68 M²
53.30 M²
1,255.97 M²
19.50 M²
17.88 M²
11.70 M²
16.25 M²
8.78 M²
74.10 M²
234.36 M¹
257.40 M¹
491.76 M¹
141.75 M²
40.32 M²
70.88 M²
15.12 M²
111.45 M²
90.04 M²
106.31 M²
47.70 M²
43.05 M²
35.60 M²
62.58 M²
764.80 M²
40.80 M²
15.00 M²
25.80 M²
235.98 M²
148.32 M²
25.80 M²
235.98 M²
148.32 M²
25.80 M²
235.98 M²
148.32 M²
59.64 Kg.
106.50 Kg.
72.42 Kg.
54.95 Kg.
46.86 Kg.
52.19 Kg.
392.56 Kg.
785.12 Kg.
153.23 Kg.
501.77 Kg.
463.46 Kg.
389.99 Kg.
377.74 Kg.
14.90 Kg.
2.00 Bh.
68.00 Bh.
16.00 Bh.
69.08 Kg.
1.26 M²
4.73 M²
2.21 M²
0.92 M²
0.32 M²
0.71 M²
10.15 M²
20.29 M²
26.90 Kg.
22.10 Kg.
22.70 Kg.
21.88 Kg.
21.50 Kg.
21.75 Kg.
136.83 Kg.
1,094.64 Kg.
91.94 Kg.
735.51 Kg.
46.35 Kg.
39.00 Kg.
31.46 Kg.
56.52 Kg.
173.33 Kg.
1,386.62 Kg.
14.90 Kg.
2.00 Bh.
224.00 Bh.
32.00 Bh.
41.45 Kg.
331.58 Kg.
4.42 M²
0.63 M²
0.46 M²
0.16 M²
0.36 M²
0.36 M²
6.38 M²
51.00 M²
87.00 M²
20.88 M²
2.00 Bh.
25.80 M²
235.98 M²
148.32 M²
410.10 M²
410.10 M²
348.59 M²
61.52 M²
348.59 M²
61.52 M²
40.80 M¹
15.00 M¹
55.80 M¹
19.20 M¹
81.00 M²
360.00 M²
LANTAI 4 ( atap ) : ( rehab )
Bongkar bubungan 5.8 * 4+ 5.5 = 28.7 M¹
Pekerjaan Kuda - Kuda WF 250X125X6X9 ( Type A = 1 bh. ) : 0.80 * 29.6 * 1 Kg/M1 = 30.40 Kg.
8.53 * 29.6 * 1 Kg/M1 = 38.13 Kg.
1.40 * 29.6 * 1 Kg/M1 = 31.00 Kg.
0.58 * 29.6 * 1 Kg/M1 = 30.18 Kg.
0.20 * 29.6 * 1 Kg/M1 = 29.80 Kg.
0.45 * 29.6 * 1 Kg/M1 = 30.05 Kg.
= 189.56 Kg.
Plat penahan goding ( L 80X40X4 ) 0.120 * 0.13 * 0.004 * 7850 * 18 = 138.47 Kg.
Pekerjaan Kuda - Kuda WF 200X100X5.5X8 ( Type B = 8 bh. ) : 5.00 * 21.3 * 1 Kg/M1 = 26.30 Kg.
0.80 * 21.3 * 1 Kg/M1 = 22.10 Kg.
1.40 * 21.3 * 1 Kg/M1 = 22.70 Kg.
0.58 * 21.3 * 1 Kg/M1 = 21.88 Kg.
0.20 * 21.3 * 1 Kg/M1 = 21.50 Kg.
0.45 * 21.3 * 1 Kg/M1 = 21.75 Kg.
= 136.23 Kg.
8X = 1,089.84 Kg.
Angker Baut Ø 19 , panjang 60 Cm. 4.00 X 8.00 X 1.00 Bh. = 32.00 Bh.
Plat penahan gording ( L 80X40X4 ) 0.120 * 0.10 * 0.004 * 7850 * 5 = 34.54 Kg.
8X = 276.32 Kg.
Pengecatan baja Zinc Chromate 0.79 * 5.00 * 1.00 = 3.95 M²
0.79 * 0.80 * 1.00 = 0.63 M²
0.79 * 1.00 * 1.00 = 0.79 M²
0.79 * 2.75 * 1.00 = 2.17 M²
0.79 * 0.60 * 1.00 = 0.47 M²
= 8.01 M²
8X = 64.07 M²
Pekerjaan pengaman kerja ( atas plapon/pekerjaan atap ) lt.4 12.00 * 21.40 * 1.00 = 256.80 M²