Job No. Sheet No. 1 Rev.
Calculation Sheet
PERUNDING AZMAN, OOI & RAO SDN. BHD. Member/Location:
Consulting Engineers Ref. MSMA
Job Title : APPENDIX 14.B EXAMPLE – COMPOSITE DRAIN Design by: WAN Date: 3/23/15
Item/ No Calculation Result Refences
1 Problem:
Determine the size of a composite drain to convey a 5-year ARI minor system design flow from a proposed 2
hectare bungalow development in Kuala Lumpur. The post-development time of concentration, tc at the
development outlet is estimated to be 25 minutes.
2 Determine design flows for the composite drain:
(A) Intensity Eqn 2.2
T = 5 yr ARI Table 1.1
d = 25 min
Location & ARI, T Storm Derived Parameters
Appendix
Station ID yr duration, d λ κ θ η
2.B (Table
Puchong Drop, KL 2.B2)
3015001 5 25 69.65 0.151 0.223 0.88
69.65 x 5.00
0.15
= 131.59 mm/hr 131.59
0.42 + 0.22 0.88
mm/hr
(B) peak flow
Eqn . 2.3
i = 131.59
mm/hr
A = 2 ha
c = 0.65 Table 2.5
= 0.65 x 131.59 x 2.00 = 0.48 m3/s 0.48
360 m3/s
(C) For dry-weather base flows and minor flows up to a 10 mm rainfall depth,
Assume storm duration = 25 min 14.2.4.1
Hence, the design flows are:
0.65 x 10.00 x 2.00 = 0.09 m3/s 0.09
25 60 m3/s
360.00
Page 1 of 3
Job No. Sheet No. 2 Rev.
Calculation Sheet
PERUNDING AZMAN, OOI & RAO SDN. BHD. Member/Location:
Consulting Engineers Ref. MSMA
Job Title : APPENDIX 14.B EXAMPLE – COMPOSITE DRAIN Design by: WAN Date: 3/23/15
Item/ No Calculation Result Refences
3 Calculate size of lined drain section (dry-weather base flows):
Manning’s n for concrete lining = 0.015
Assuming:
Drain longitudinal slope = 0.500 % (1 in 200) 0.50 %
Drain width, B = 0.600 m 0.60 m
Side slope, Z = 0 0.00
Q= v x A
Where :
Trial and
D A P R v Q error
m m2 m m/s m3/s
0.150 0.09 0.9 0.100 1.016 0.091
0.200 0.12 1.00 0.120 1.147 0.138 > 0.087
0.250 0.15 1.10 0.136 1.249 0.187
0.300 0.18 1.20 0.150 1.331 0.240
0.350 0.21 1.30 0.162 1.398 0.294
Provided dimension of lined drain:
Drain width, B = 0.600 m
Depth, D = 0.200 m
Velocity, v = 1.147 m/s
Discharge, Q = 0.138
m3/s
The drain dimensions are 0.60 m wide x 0.20 m deep, which is within the recommended limits.
Check flow velocity for lined drain. (0.6<v<2 m/s); OK
Page 2 of 3
Job No. Sheet No. 3 Rev.
Calculation Sheet
PERUNDING AZMAN, OOI & RAO SDN. BHD. Member/Location:
Consulting Engineers Ref. MSMA
Job Title : APPENDIX 14.B EXAMPLE – COMPOSITE DRAIN Design by: WAN Date: 3/23/15
Item/ No Calculation Result Refences
4 Calculate size of total drain section:
Manning’s n for concrete lining 0.015
Manning’s n for stone pitching 0.035
yt TW BW yd yt-yd A1&3 P1&3 R1&3 v1&3 Q1&3 Trial and
error
0.5 3.00 0.60 0.20 0.30 0.36 2.47 0.1455 0.559 0.2012
0.45 2.60 0.60 0.20 0.25 0.25 2.06 0.1213 0.495 0.1237
0.4 2.20 0.60 0.20 0.20 0.16 1.65 0.097 0.427 0.0682
yt TW BW A2 P2 R2 V2 Q2 Q total = Q
1 &3 + Q 2
0.5 3.00 0.60 0.30 1.00 0.3 2.113 0.6338 0.8349861
0.45 2.60 0.60 0.27 1.00 0.27 1.969 0.5317 0.655443 > Q5 OK
0.4 2.20 0.60 0.24 1.00 0.24 1.821 0.4369 0.5051793
Allowing a minimum freeboard 50 mm
Provide dimension of composite drain
Top width , TW 2.60 m
Bottom width , BW 0.60 m
Depth , D 0.45 m
3
Qischarge , Q 0.66 m /s
> Q5 OK