Saep 85
Saep 85
Contents
1 Scope ................................................................ 2
2 Conflicts and Deviations ................................... 2
3 Applicable Documents ...................................... 2
4 Definitions and Abbreviations............................ 3
5 General ............................................................. 4
6 Registration and Workflow Creation .................. 6
7 Screening .......................................................... 7
8 Manufacturing Plant Assessments .................... 9
9 Reporting Manufacturing Plant Assessments . 10
10 Support to Newly Established Local
Manufacturers ................................................. 12
11 Approval Process Finalization ......................... 13
12 Approved Suppliers Maintenance ................... 13
13 Roles and Responsibilities .............................. 15
14 Exhibits ........................................................... 20
Revision Summary.................................................. 20
1 Scope
This procedure defines the minimum requirements, roles, and responsibilities to assess
technical and quality capabilities of new and existing manufacturing plants to supply
Saudi Aramco facilities and projects with inspectable commodities (9COMs) as defined
in SAEP-44 and SAEP-133.
Any conflicts between this document and other applicable Mandatory Saudi Aramco
Engineering Requirements (MSAERs) shall be addressed to the EK&RD Coordinator.
Any deviation from the requirements herein shall follow internal company procedure
SAEP-302.
3 Applicable Documents
All referenced specifications, standards, codes, forms, drawings, and similar material
shall be of the latest issue (including all revisions, addenda, and supplements) unless
stated otherwise.
Page 2 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
AAJ: Aramco Asia Japan. The abbreviation in SAP for Aramco Asia Operations.
Supplier Relations Unit (SRU): The entity responsible for supplier relations
coordination. This is recognized as Supplier Relations & Qualification Unit in SAO, or
its equivalent in Saudi Aramco subsidiaries: Supplier Relations Groups in AOC & AAJ,
or Strategic Project Group in ASC.
Sourcing Management Unit: The entity responsible for developing the Materials’
Sourcing priority list, which is based on the corporate Materials Sourcing Strategy.
The entity is centrally located in SAO to support and concur all Out of Kingdom New
Manufacturing Registration and Additional Materials Requests.
Page 3 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Technical Assessment Unit (TAU): The entity responsible for technical Assessments,
such as: CSD, P&CSD, EPD, Drilling, or other technical department.
Usage Decision (UD): SAP terminology used at the stage of final decision on
manufacturer to assign approval status.
5 General
Page 4 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Page 5 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Refer to EXHIBIT I for more information about the request type, reasons, and
assessment type along with the issuing entities.
Proper review shall take place to ensure the following prior to workflow creation:
6.1 SRU to complete the review of all commercial and financial requirements.
6.2 SRU to complete the attachment of all technical requirements as per established
technical screening checklist. This includes but not limited to vendor
compliance letter to Saudi Aramco specifications/standards, past major supply,
major customers list, and technical and quality certifications.
Commentary Note:
6.3 SRU to complete the attachment of all quality requirements folder including
minimum of below documents as applicable:
Uncontrolled copy of the quality manual
Copies of the mandatory quality systems procedures as required by
ISO 9001
Complete organization chart including all QA/QC staff names
List of key manufacturing equipment at the manufacturing facility
Number and certifications of welding and NDT QC Inspectors
Qualification of QA and QC Managers
Manufacturing plant Capacity
Manufacturing Area (covered and uncovered)
Factory location map
Page 6 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
6.4 SRU to confirm in writing with the manufacturer their readiness for the
assessment on a specified week. This confirmation is required to allow for
proper planning for the company technical and quality assessments.
6.5 SRU must ensure that the production is running during the confirmed
survey/assessment date.
6.6 SRU shall create Assessment request not less than four (4) weeks before the
manufacturer confirmed assessment week for OOK and not less than one (1)
week for IK manufacturer. This Assessment request will be directed to
Technical and Quality organizations to review the submitted package,
acknowledge the SAP WF, and then allocate the required resources to conduct
the assessment as the specified assessment week.
6.8 RIO shall schedule periodic assessment WFs in SAP system. The WF for
periodic assessment will be triggered for quality and technical assessments.
However, the need to conduct the technical assessment will be determined by
the technical unit Supervisor according to pre-established criteria.
7 Screening
In Kingdom (IK) manufacturer workflow shall be triggered by SRU in the system to the
technical and quality supervisors to perform the screening review. This includes
assigning assessors/reviewers to review the technical and quality packages content and
attachments against established screening checklists to ensure manufacturer technical
readiness for assessment.
Commentary Note:
Pre-screening meeting should be conducted with new local manufacturers to verify and
support on meeting the quality and technical approval requirements stipulated in ERTQA
(Posted in IKTVA website).
Page 7 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
During the screening review, assessors/reviewers will either Acknowledge or Return the
workflow as follows:
7.1 Acknowledge
7.2 Return
This action confirms rejection of the quality and/or technical packages due to
issues with package completeness or manufacturer readiness. Rejection of the
request shall be processed in the system. Once selected, the packages will be
returned to the vendor through SRU for subsequent action.
Commentary Notes:
1- The option to “Wait for Assessment” is intended for assessors to check their workload
and schedule the assessment in their calendar according to the confirmed
assessment week. Alternatively, the assessor(s), through the “Process Immediately”
option, may schedule the assessment earlier in collaboration with the vendor.
Page 8 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
The purpose of this section is to highlight the two methods utilized in conducting the
manufacturing plant assessment. Based on the decision requirements of Section 5.4, a
physical or desk review assessment shall be conducted as specified below:
8.1.1 Upon work flow creation and after successful screening, the assessor will
coordinate the manufacturing plant assessment schedule with the
vendor’s representative. This physical assessment may be on the vendor
confirmed assessment week or an earlier agreed upon time with the
vendor:
8.1.2 The assessor(s) may share the assessment plan/agenda as part of the
coordination/planning activities. Communication should be initiated in
advance to allow vendor and team members to prepare for the
Assessment.
8.1.3 Upon arrival to the manufacturer’s facility, the assessor(s) shall conduct
an opening meeting introducing the team members, explaining the scope
of the manufacturing plant Assessment (i.e., list of 9COM materials) and
discuss the agenda.
8.1.6 The minimum passing score for manufacturer quality and technical
assessments is 70%.
Page 9 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Commentary Note:
8.1.9 The assessor(s) should ensure that the findings and recommendations are
documented in a clear, concise manner and supported by objective
evidence.
8.1.10 The assessor(s) shall conduct a closing meeting with the manufacturer’s
top management representatives to present the assessment findings.
Vendor Acknowledgement of assessment Findings (EXHIBIT IV) shall be
completed and signed by manufacturer’s top management representative
along with acceptable ETC (90 days maximum) to close the findings.
8.1.11 The assessor(s) is/are not allowed to inform the manufacturer with the
Assessment conclusion. The assessor(s) should explain to the
manufacturer that SRU is the official channel to communicate the
assessment results.
Desk Review is not allowed for new manufacturing plants and survey shall be
conducted through physical assessment.
9.1 The assessor(s) shall timely document and report the assessment results along
with the recommendation in the relevant SAP workflow. The assessor(s) shall
prepare and attach to SAP WF the following documents:
1. Compliance letter (EXHIBIT III)
Page 10 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Photos are required for requests for new, reinstatement, and additional material
assessment reasons. The assessor shall take photos of the facility size,
receiving inspection and quarantine areas, testing equipment, storage, and
ongoing manufacturing of the assessed commodity.
9.3 The quality assessor shall process the approval recommendation as per Table 1
for manufacturer’s quality management system.
Page 11 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
9.4 The technical assessor(s) shall process the approval recommendation as per
Table 2 for each 9COM in the relevant SAP WF.
10.1 The approval status of such facilities shall be assigned as temporary (QSAT).
10.2 First PO will be considered as trial and this condition shall be reflected in SAP
“Q-Info” record against each commodity along with applicable technical
limitations (e.g., quantity, size, rating, etc.).
10.3 Inspection Department and relevant Technical Department shall monitor the
performance of the manufacturer during the production of the trial PO and
conduct complete quality and technical assessments. Performance monitoring
can be done through increasing inspection levels, reviewing inspection reports,
attending final inspections/FAT by the technical SME, and/or conducting focus
assessments.
10.4 Quality and Technical assessors will reflect the result of the manufacturer actual
performance monitoring during the trial purchase ordered as well as the
assessment in a SAP MAP WF along with proper recommendation for required
approval.
Page 12 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
10.5 Technical and Quality Assessment teams may elect to conduct a Pre-assessment
to support local manufacturing plants, without WF in coordination with P&SCM
addressed to a Division Head level as minimum.
Upon completion of quality WF and a minimum of one technical WF, combined approval
decision will be automatically reflected in SAP for SRU further communication with the
manufacturer.
Page 13 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Technical limitation may include product related limitation (i.e., size, thickness,
material type, and system release), scope limitation, machine and product line
capacity.
Commentary Note:
12.4 Handling of Approval Status of Vendors with 9COMs with Changed Status
(Changed to Deleted/Non-Inspectable Commodities)
12.4.3 If there is no alternative for deleted 9COM, the manufacturer status shall
be changed through SAP workflow as QZNU (no longer used) as long as
the subject 9COM is the only 9COM linked to this manufacturer.
Page 14 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
All technical and quality on-hold related actions shall be processed through SAP
workflow.
12.6.1 Receiving a formal letter from the vendor senior management addressed
to the Procurement appropriate management authority notifying about
the manufacturing facility closure, ceasing production, or relocation.
12.6.2 In case of relocation, the vendor shall indicate as applicable the status of
the new facility readiness and the date it can be fully operational if not
already.
12.6.3 Once the vendor formal notification letter is received, the workflow can
be created by the Procurement team and attach to the workflow the
received vendor letter for further processing.
Page 15 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
13.1.6 Attach technical and quality documentations listed as per 6.2 and 6.3
and check that technical and quality requirements are fulfilled for each
WF.
13.1.8 Trigger technical and quality Assessment request workflows in line with
paragraphs 6.6 and 6.7 of this procedure.
Page 16 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
List and the Corporate Materials Sourcing Strategy. SMU Supervisor shall
review OOK WFs in order to:
Concur on each 9COM Material in the SAP WF.
Reject at least one 9COM or the entire WF as applicable via the system for
failing to comply with the Materials Sourcing List. Justification has to be
given per rejected 9COMs. Only 9COMs approved by SMU Supervisor
shall proceed to the quality and technical supervisors.
Return the entire WF back to SRU to request SRU to add missing materials
worth evaluating, contingent that the manufacturer is legally and physically able
to produce/manufacture the material(s) to be added.
Page 17 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
13.3.2.4 For all Assessments, other than new vendors, the QA should
review the vendor’s records in SAP including previous
Assessments, inspection lots for previous 60 months purchase
orders, Q-Info records for material limitations, and previous
24 months of quality notifications including the following:
F4: Assessment Findings
Q4: Equipment Deficiency Report (EDR)
Q5: Rejection Notice
Q8: Nonconformance Report (NCR)
Q9: Worksheet
Commentary Note:
Page 18 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Page 19 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
14 Exhibits
EXHIBIT I ASSESSMENT REQUEST MATRIX
EXHIBIT II PLANT ASSESSMENT PROCESS MAP IN SAP
EXHIBIT III VENDOR COMPLIANCE LETTER
EXHIBIT IV VENDOR ACKNOWLEDGEMENT OF ASSESSMENT FINDINGS
FORM
Revision Summary
14 November 2017 New Saudi Aramco Engineering Procedure that defines the minimum requirements and
roles and responsibilities to assess technical and quality capabilities of new and existing
manufacturing plants to supply Saudi Aramco facilities and projects with inspectable
commodities (9COMs).
Page 20 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Assessment Assessment
Initiator Assessment Type
Request Type Request Reason
New Manufacture Supplier Relations New Manufacturing Plant Survey
Plant Unit Reassessment Survey
Assessment, or
Revise Limitation
Update Existing Supplier Relations Desk Review*
Manufacturer Plant Unit Additional Material Assessment
Reinstatement Survey
Delete Material
Manufacturing Plant Closure
Supplier Relations Assessment, or
Delink Manufacturing Plant
Unit Desk Review*
Relocation
Place On Hold
Supplier Relations
One Time Approval New Manufacturing Plant Survey
Unit
Periodic Assessment
Notification
Technical and/or Assessment, or
Other Escalation
Quality Unit Desk Review*
Follow Up on Pending
Corrective Actions
*The decision to conduct physical visit or desk review is determined as per pre-established criteria by the organization
responsible to perform the Assessment
Page 21 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
*For Assessment requests with type “Other”, workflow will start in the “Screening and Assessor Assignment” stage.
**WFs with Periodic Assessments as Assessment reasons are excluded if the Assessment results do not require change in the
approval status on quality and/or 9COM(s) level.
Page 22 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
We (Company Name, Manufacturer Number: 3XXXXX) confirm that our manufacturing plant
has the full capability to manufacture below commodities and equipment and will strictly
comply with the flowing Saudi Aramco requirements:
Signature: ___________________
Page 23 of 24
Document Responsibility: Project Quality Standards Committee SAEP-85
Issue Date: 14 November 2017
Next Planned Update: 14 November 2020 Suppliers Assessment and Approval
Engineering Services
Vendor Acknowledgement of Assessment Findings
Findings
Acknowledgement
Corrective Action Implementation Date
Management Representative
Signature Date
(Please print the name)
Page 24 of 24