This application is for prior environmental clearance for a stone quarry project located in Madhya Pradesh. Key details include: 1) The project is operated by MS SHRI KRISHAN CONSTRUCTINO GOWAR CONSTRUCTION LTD and involves mining of minerals from a 4.5 hectare site. 2) No public hearing is required as the project area is below 5 hectares. 3) The total project cost is 0.05 crores with 0.0120 crores allocated for environmental management plans. 4) No raw materials are required as this involves mining of existing stone resources.

Uploaded by

Santosh Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
908 views9 pages

Form-2 Application For Prior Environmental Clearance

This application is for prior environmental clearance for a stone quarry project located in Madhya Pradesh. Key details include: 1) The project is operated by MS SHRI KRISHAN CONSTRUCTINO GOWAR CONSTRUCTION LTD and involves mining of minerals from a 4.5 hectare site. 2) No public hearing is required as the project area is below 5 hectares. 3) The total project cost is 0.05 crores with 0.0120 crores allocated for environmental management plans. 4) No raw materials are required as this involves mining of existing stone resources.

Uploaded by

Santosh Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Form-2

APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE


S.
Item Details
No.

Details of Project:
(a)Name of the project(s) Stone Quarry
1. (b)Name of the Company / Organisation MS SHRI KRISHAN CONSTRUCTINO GOWAR CONSTRUCTION LTD
(c)Registered Address Roorki Road Meerut (UP),Meerut,Uttar Pradesh-250001
(d)Legal Status of the Company Others

Address for the correspondence:


(a)Name of the Applicant Harish Mangal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Roorki Road Meerut (UP),Meerut,Uttar Pradesh-250001
(d)Pin code 250001
2. (e)E-mail [email protected]
(f)Telephone No. 2520134
(g)Fax No.
(h)Copy of documents in support of the
competence/authority of the person making this
Annexure-Uploaded Copy of documents in support of the competence/authority
application to make application on behalf of the User
Agency .

Category of the Project/Activity as per Schedule of EIA Notification,2006:


(a)Major Project/Activity 1(a) Mining of minerals
(b)Minor Project/Activity 1(a) Mining of minerals
(c)Category B2
3.
(d)Proposal Number SIA/MP/MIN/38615/2019
(e)Master Proposal Number(Single Window) SW/109959/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC

Location of the Project:


(a)Plot/Survey/Khasra No. 89
(b)Pincode 470001
(c)Bounded Latitudes (North) FROM 23.17.30.80 To 23.17.39.20
(d)Bounded Longitudes (East) FROM 78.56.33.70 To 78.56.41.80
(e)Survey of India Topo Sheet No. 55I/15
4.
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 428
(h)Uploaded (kml) File Copy of Kml File
(i)Distance of Nearest HFL from the project boundary
2
within the study area
(j)Seismic Zone 1

(a)Number of States in which Project will be Executed 1


5.
(b)Main State of the project Madhya Pradesh

Details of State(s) of the project

S.
State Name District Name Tehsil Name Village Name
No.

(1.) Madhya Pradesh Sagar Deori Chhapakuru

Details of Terms of Reference (ToR):


(a)MoEF&CC / SEIAA File Number aaaaa
6. (b)Date of Apply of TOR 01 Jul 2019
(c)Date of Issue of TOR / Standard ToR 01 Jul 2019
(d)Previous TOR Letter Copy of Previous TOR letter

7. Details of Public Consultation:


(a)Whether the Project Exempted from Public Hearing? No
(b)Whether details of Public Hearing available? No
(c)Reason Case is below 5 ha. EIA not applicable
(d)Supporting Document Copy of Supporting Document

8. Details of Project Configuration/Product:

8.1. Project Configuration

S.
Plant/Equipment/Facility Configuration Remarks
No.

(1.) NA NA NA

8.2. Product

Other Mode of
S. Product/Activity Mode of Transport / Transport /
Quantity Unit Other Unit
No. (Capacity/Area) Transmission of Product Transmission of
Product

(1.) 4.50 273983 Others Cum/year Road

In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii)
/ Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
9.
Details Not Applicable

Details of Consent to Operate


(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since
NA
inception
9.1. (iii)Date of Issue 01 Jul 2019
(iv)Valid Upto 01 Jul 2019
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date NA

Project Cost:
(a)Total Cost of the Project at current price level (in
0.05
crores)
(b) Funds Allocated for Environment Management
0.0120
(Capital) (in crores)
10. (c) Funds Allocated Towards ESC (Entrepreneur Social
0.0120
Responsibility) (in crores)
(d) Funds Allocated for Environment Management Plan
0.120
(EMP) (Recurring per Annum) (in crores)
(e) Funds Allocated for Environment Management
NaN
Capital(%)

Whether project attracts the General Condition


11. No
specified in the Schedule of EIA Notification ?

Whether project attract the Specific Condition


12. No
specified in the Schedule of EIA Notification ?

Raw Material / Fuel Requirement:


(a)Proposed quantity of raw material/fuel 0
13.
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0

13.1. Raw Material / Fuel Profile

S. Raw Quantity Unit Other Source Mode of Other Distance of Type of Other Uploaded
No. Material Unit (incase Transport Mode of Source Linkage Type of Copy of
/ Fuel of Transport from Linkage Linkage
Import. Project Site
please (in
specify Kilometres)
country (In case of
and import,
Name of distance
the port from the
from port from
which which the
Raw raw
Material material /
/ Fuel is fuel is
received)
received
)

Basalt Open Copy of


(1.) 273983 Others Cum/year truck Road 1
Stone Market Linkage

Baseline Data :
14. (a)Period of Base Line Data Collection FROM 01 Jul 2019 To 01 Jul 2019
(b)Season Pre-Monsoon

14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 0

98
S. Maximum Minimum Prescribed
Criteria Pollutants Other Criteria Pollutants Unit Percentile
No. Value Value Standard
Value

(1.) PM10 NA 0 0 0 0

(2.) PM2.5 NA 0 0 0 0

(3.) SO2 NA 0 0 0 0

(4.) NOx NA 0 0 0 0

14.2. No. of Ground Water Monitoring Locations : 0

Other Maximum
S. Criteria Heavy Maximum Minimum Desirable
Criteria Unit Other Unit Permissible
No. Pollutants Metal Value Value Limit
Pollutants Limit

(1.) Chlorides NA 0 0 0 0

(2.) Fluoride NA 0 0 0 0

Total
(3.) NA 0 0 0 0
Hardness

(4.) TDS NA 0 0 0 0

(5.) TSS NA 0 0 0 0

(6.) pH NA 0 0 0 0

14.3. No. of Surface Water Monitoring Locations : 0

Classification
S. Maximum Minimum
Criteria Pollutants Other Criteria Pollutants Unit Other Unit of inland
No. Value Value
water body

(1.) pH NA 0 0 E

(2.) DO NA 0 0 E

(3.) BOD NA 0 0 E

(4.) COD NA 0 0 E

14.4. No. of Ambient Noise Monitoring Locations : 0

S. Prescribed
Parameter Unit Maximum Value Minimum Value
No. Standard

(1.) Leq(Night) A-weighted decibels(dB(A)) 0 0 0

(2.) Leq(Day) A-weighted decibels(dB(A)) 0 0 0

14.5. No. of Soil Sample Monitored Locations : 0

S.
Parameter Unit Other Unit Maximum Value Minimum Value
No.

(1.) K(Potassium) 0 0

(2.) Electric Conductivity 0 0

(3.) pH 0 0

(4.) P(Phosphorus) 0 0

(5.) N(Nitrogen) 0 0

14.6. Details of Ground Water Table:


(a)Range of Water Table Pre-Monsoon Season (Meters
From 30 To 35
Below Ground Level (m bgl))
(b)Range of Water Table Post-Monsoon Season (Meters From 30 To 35
Below Ground Level (m bgl))
(c)Whether Ground Water Intersection will be there ? No

15. Details of Water Requirement (During Operation)

Copy of
Other
Distance Permission Other Method of Date
S. Source Required Mode of Method of Letter Permitted
Source from from Mode of Water of
No. Other Quantity Transport Water No. Quantity
Source Competent Transport Withdrawal Issue
Withdrawal
Authority

Not 01 Jul
(1.) Surface 5 1 modeOthers Tanker Open Well 0 5
Appliacble 2019

15.1. (a)Whether Desalination is proposed No

16. Waste Water Management(During Operation)

Quantity of
Quantity of
Waste Treatment Quantity of
Treated Water
S. Water Capacity Treatment Mode of Other Mode of Discharged
Type/Source Used in
No. Generated (Kilolitre Method Disposal Disposal Water (Kilolitre
Recycling/Reuse
(Kilolitre per Day) per Day)
(Kilolitre per Day)
per Day)

Green Belt
(1.) No 0 0 0 0
Renewal Plant

(a)Total Waste Water Generation 0


16.1. (b)Total Discharged Water 0
(c)Total Reused Water 0

17. Solid Waste Generation/Management

Quantity Distance Other Mode


S. Name of Other Mode of Mode of Other Mode of
Item per Unit from of
No. Waste Item Transport Disposal Disposal
Annum Site(KM) Transport

(1.) No waste Others No waste 0 Tons 0 Road Others no waste

18.

18.1. Air Quality Impact Prediction

Other
S. Criteria Baseline Distance Incremental Prescribed
Criteria Unit Total GLC
No. Pollutants Concentration GLC Concentration Standard
Pollutants

(1.) PM2.5 NA 0 0 0 0 0

(2.) NOx NA 0 0 0 0 0

(3.) PM10 NA 0 0 0 0 0

(4.) SO2 NA 0 0 0 0 0

18.2. Stack Details

S. Stack
Source Fuel Stack Height(m) Pollutants Other Pollutants Emission (GLS)
No. Diameter(m)

(1.) 0 0 0 0 PM10 0

Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
19.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0

Land Ownership Pattern:


(a)Forest Land 0
(b)Private Land 0
20. (c)Government Land 4.50
(d)Revenue Land 0
(e)Other Land 0
Total Land 4.50
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 4.50
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
21.
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
Total 4.5

22. Land Requirement for Various Activities

S. Description of Activity /
Others Land Requirement Remarks
No. Facility / Plant / Others

(1.) Quarry Area 0 0

Total 0

Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco
23.
Sensitive Areas; ESZs-Eco Sensitive Zones :

23.1. Details of Ecological Sensitivity :

S. Details of Ecological
Name Distance from the Project (Km) Remarks
No. Sensitivity

(1.) Critically Polluted Area None 0 0

(2.) ESZs None 0 0

(3.) Corridors None 0 0

(4.) Wildlife Corridors None 0 0

(5.) ESAs None 0 0

(6.) WLS None 0 0

(7.) NPA None 0 0

23.2. Details of Environmental Sensitivity :

Other Details of
S. Details of Environmental
Environmental Name Distance from the Project (Km) Remarks
No. Sensitivity
Sensitivity

(1.) Archaeological Sites None 0 0

(2.) Forest None 0 0

(3.) Defence Installations None 0 0

(a)Whether Noc / Permission from the competent


No
23.3. authority is required?
(b)Whether NBWL recommendation is required? No

Forest Land:
24.
Whether any Forest Land involved? No

Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not
25. 0
Involved)
(b)Details of Tree Cutting and Planting of Trees Not Applicable

Land Acquisition Status:


(a)Acquired Land(Ha) 0
26.
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0

27. Rehabilitation and Resettlement (R&R):


(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R In-Progress

Details of Presence of Schedule-I Species:


(a)Whether there is Presence of Schedule-I Species ? No
28. (b)Whether conservation plan for Schedule-I Species has
No
been prepared ?
(c)Whether conservation plan for Schedule-I Species has
No
been approved by competent authority ?

Details of Presence of Water Bodies in Core Area:


(a)Whether there is Presence of Water Bodies in Core
No
Area ?
29.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from
No
competent authority ?

Details of Presence of Water Bodies in Buffer Area:


30. (a)Whether there is Presence of Water Bodies in Buffer
No
Area ?

Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 5
31. (c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 30
(e)No. of working days 300
(f)Total Manpower 35

Green Belt in Ha:


(a)Total Area of Green Belt (in hectare) 4.5
(b)Percentage of Total Project Area 100.00
32.
(c)No. of Plants to be Planted 4500
(d)Funds Allocated for Plantation 8.20
(e)Uploaded Green Belt plan Copy of Green Belt Plan

33. Project Benefits

S.
Type of Project Benefits Details of Project Benefits
No.

(1.) Environmental Green belt development

34. CRZ Specific Details : Not Applicable

35. Sector Specific Details For Non-Coal Mining

S.
Item Details
No.

1. No. of Mineral(s) to be Mined : 1

S.
Mineral(s) to be Mined Major or Minor Mineral
No.

(1.) Stone Quarry Minor

2. Mine Capacity in ROM (Run of Mine) 273983

Uploaded 500 meters Cluster Certificate from State Mines


3. Copy of 500 meters Cluster Certificate from State Mines and Geology
and Geology in case of minor minerals

4. Mining Plan:
(a)Approval Letter No. 970
(b)Date of Approval 05 Jun 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Collectorate Sagar
(e)Approved Mining Lease Area 4.50
(f)Approved Capacity 273983

Technical Details:
(a)Total Geological Reserves (Million Ton) 2137500
(b)Mineable Reserves (Million Ton) 1478000
(c)Extractable Reserves(Million Ton) 1369915
(d)Percent(%) of Extraction 95
(e)Grade of Coal /Ore /Mineral 0
5.
(f)Stripping Ratio 0:0
(g)Category of Gaseousness (Only for Coal Mining, Others
0
may Write NA)
(h)Average Gradient(Degree) 20
(i)Mining Method Opencast
(j)Life of Mine (Years) 2

Details of Beneficiations:
(a)Whether it is proposed to install beneficiation
No
6. plant/Coal washery within the mining lease area
(b)Whether it is proposed to install crusher within the
No
mining lease area

Details of Seams:
7.
(a)Whether details of seam applicable No

Details of Mining Lease:


(a)Mining Lease Area (in Hectare) 4.50
(b)Whether obtained Letter of Intent (LOI) from the state
Yes
government ?
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 05 Jun 2018
8.
(iii)Validity of LOI 2
(iv)Reference No. of LOI 970
(c)Whether Lease Deed Executed ? No
(i)Reason thereof No
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof No

OB (Over Burden) Management:


(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
9.
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0

Details of Topsoil Management:


(a)Quantity of Topsoil excavated during the entire life of
0
the mine (in Million Cubic metre)
(b)Quantity of Topsoil proposed for utilization for
10. reclamation during the entire life of the mine (in Million 0
Cubic metre)
(c)Quantity of Topsoil proposed for utilization for other
activities during the entire life of the mine (in Million 0
Cubic metre)

Details of Final Mine Void:


(a)Area (in Hectare) 4.50
11.
(b)Depth (in meter) 20
(c)Volume (in Million Cubic meter) 273983

12. Details of Quarry:


(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
Details of Transportation:
(a)In Pit/Underground to Surface 0
13.
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0

14. Details of Land Usage (Pre-Mining)

S. WITHIN ML AREA OUTSIDE ML AREA


LAND USE Other LAND USE TOTAL (Hectare)
No. (Hectare) (Hectare)

(1.) AGRICULTURE LAND 0 0 0

(2.) FOREST LAND 0 0 0

(3.) SURFACE WATER BODIES 0 0 0

(4.) SETTLEMENTS 0 0 0

(5.) WASTE LAND 4.5 0 4.5

(6.) GRAZING LAND 0 0 0

TOTAL 4.5 0 4.5

15. Details of Land Usage (Post-Mining)

S. Other Plantation Water


LAND USE Public Use (ha) Undisturbed (ha) Total
No. LAND USE (ha) Body (ha)

(1.) EXTERNAL OB DUMPS 0 0 0 0

(2.) TOP SOIL STORAGE 0 0 0 0

(3.) ROADS 0 0 0 0

BUILT UP AREA
(4.) 0 0 0 0
(COLONY/OFFICE)

(5.) GREEN BELT 0 0 0 0

(6.) INTERNAL OB DUMPS 0 0 0 0

(7.) EXCAVATION/QUARRY 0 0 0 0

(8.) VIRGIN AREA 0 0 0 0

TOTAL 0 0 0 0 0

Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 4.50

16. (d)Safety Zone(in hectare) 0


(e)Final Void of 4.5 (hectare) at a Depth of 20 meter
which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML
Boundary, along Roads and Infrastructure, Embankment 0
Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare) 4500

Status of progressive Mining Closure Plan:


17.
Details Not Applicable

18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:

Sanctioned Excess Production


Sanctioned Sanctioned
S. Financial Capacity as per Beyond the EC / CTO/
Capacity as per Capacity as per Actual Production
No. Year approved mining Mining Plan Sanctioned
EC (MTPA) CTO
plan Capacity (MTPA)

(1.) 2019 0 0 273983 0 0

S.
Item Details
No.

36. Details of Court Cases:


(a)Whether there is any Court Cases pending against the No
project and/or land in which the project is proposed to be
set up ?

Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water
(Prevention & Control of Pollution) Act:
37.
(a)Whether any Direction issued under EPA Act/Air
No
Act/Water Act ?

Details of EIA Consultant:


38. (a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant EIA Not applicable

Documents to be Attached:
(a)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(b)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(c)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project
Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering
Report(DPR) /Detailed Engineering Report /Detailed
Report /Detailed Conceptual Plan /Approved Mining Plan
Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
39. (e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the
competence/authority of the person making this Copy of documents in support of the competence/authority of the person
application to make application on behalf of the User making this application to make application on behalf of the User Agency
Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report &
NA
Baseline Survey Data
(i)Uploaded Additional File NA
(f)Uploaded Updated Form1 Copy of Updated Form1

Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my
knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any
stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to
above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.

Name of Applicant Harish Mangal


Designation Director
Name of Company (Applicant Name should not be
MS SHRI KRISHAN CONSTRUCTINO GOWAR CONSTRUCTION LTD
given here)
Address Roorki Road Meerut (UP)

You might also like