Form-2 Application For Prior Environmental Clearance
Form-2 Application For Prior Environmental Clearance
Details of Project:
(a)Name of the project(s) Stone Quarry
1. (b)Name of the Company / Organisation MS SHRI KRISHAN CONSTRUCTINO GOWAR CONSTRUCTION LTD
(c)Registered Address Roorki Road Meerut (UP),Meerut,Uttar Pradesh-250001
(d)Legal Status of the Company Others
S.
State Name District Name Tehsil Name Village Name
No.
S.
Plant/Equipment/Facility Configuration Remarks
No.
(1.) NA NA NA
8.2. Product
Other Mode of
S. Product/Activity Mode of Transport / Transport /
Quantity Unit Other Unit
No. (Capacity/Area) Transmission of Product Transmission of
Product
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii)
/ Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
9.
Details Not Applicable
Project Cost:
(a)Total Cost of the Project at current price level (in
0.05
crores)
(b) Funds Allocated for Environment Management
0.0120
(Capital) (in crores)
10. (c) Funds Allocated Towards ESC (Entrepreneur Social
0.0120
Responsibility) (in crores)
(d) Funds Allocated for Environment Management Plan
0.120
(EMP) (Recurring per Annum) (in crores)
(e) Funds Allocated for Environment Management
NaN
Capital(%)
S. Raw Quantity Unit Other Source Mode of Other Distance of Type of Other Uploaded
No. Material Unit (incase Transport Mode of Source Linkage Type of Copy of
/ Fuel of Transport from Linkage Linkage
Import. Project Site
please (in
specify Kilometres)
country (In case of
and import,
Name of distance
the port from the
from port from
which which the
Raw raw
Material material /
/ Fuel is fuel is
received)
received
)
Baseline Data :
14. (a)Period of Base Line Data Collection FROM 01 Jul 2019 To 01 Jul 2019
(b)Season Pre-Monsoon
98
S. Maximum Minimum Prescribed
Criteria Pollutants Other Criteria Pollutants Unit Percentile
No. Value Value Standard
Value
(1.) PM10 NA 0 0 0 0
(2.) PM2.5 NA 0 0 0 0
(3.) SO2 NA 0 0 0 0
(4.) NOx NA 0 0 0 0
Other Maximum
S. Criteria Heavy Maximum Minimum Desirable
Criteria Unit Other Unit Permissible
No. Pollutants Metal Value Value Limit
Pollutants Limit
(1.) Chlorides NA 0 0 0 0
(2.) Fluoride NA 0 0 0 0
Total
(3.) NA 0 0 0 0
Hardness
(4.) TDS NA 0 0 0 0
(5.) TSS NA 0 0 0 0
(6.) pH NA 0 0 0 0
Classification
S. Maximum Minimum
Criteria Pollutants Other Criteria Pollutants Unit Other Unit of inland
No. Value Value
water body
(1.) pH NA 0 0 E
(2.) DO NA 0 0 E
(3.) BOD NA 0 0 E
(4.) COD NA 0 0 E
S. Prescribed
Parameter Unit Maximum Value Minimum Value
No. Standard
S.
Parameter Unit Other Unit Maximum Value Minimum Value
No.
(1.) K(Potassium) 0 0
(3.) pH 0 0
(4.) P(Phosphorus) 0 0
(5.) N(Nitrogen) 0 0
Copy of
Other
Distance Permission Other Method of Date
S. Source Required Mode of Method of Letter Permitted
Source from from Mode of Water of
No. Other Quantity Transport Water No. Quantity
Source Competent Transport Withdrawal Issue
Withdrawal
Authority
Not 01 Jul
(1.) Surface 5 1 modeOthers Tanker Open Well 0 5
Appliacble 2019
Quantity of
Quantity of
Waste Treatment Quantity of
Treated Water
S. Water Capacity Treatment Mode of Other Mode of Discharged
Type/Source Used in
No. Generated (Kilolitre Method Disposal Disposal Water (Kilolitre
Recycling/Reuse
(Kilolitre per Day) per Day)
(Kilolitre per Day)
per Day)
Green Belt
(1.) No 0 0 0 0
Renewal Plant
18.
Other
S. Criteria Baseline Distance Incremental Prescribed
Criteria Unit Total GLC
No. Pollutants Concentration GLC Concentration Standard
Pollutants
(1.) PM2.5 NA 0 0 0 0 0
(2.) NOx NA 0 0 0 0 0
(3.) PM10 NA 0 0 0 0 0
(4.) SO2 NA 0 0 0 0 0
S. Stack
Source Fuel Stack Height(m) Pollutants Other Pollutants Emission (GLS)
No. Diameter(m)
(1.) 0 0 0 0 PM10 0
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
19.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
S. Description of Activity /
Others Land Requirement Remarks
No. Facility / Plant / Others
Total 0
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco
23.
Sensitive Areas; ESZs-Eco Sensitive Zones :
S. Details of Ecological
Name Distance from the Project (Km) Remarks
No. Sensitivity
Other Details of
S. Details of Environmental
Environmental Name Distance from the Project (Km) Remarks
No. Sensitivity
Sensitivity
Forest Land:
24.
Whether any Forest Land involved? No
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not
25. 0
Involved)
(b)Details of Tree Cutting and Planting of Trees Not Applicable
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 5
31. (c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 30
(e)No. of working days 300
(f)Total Manpower 35
S.
Type of Project Benefits Details of Project Benefits
No.
S.
Item Details
No.
S.
Mineral(s) to be Mined Major or Minor Mineral
No.
4. Mining Plan:
(a)Approval Letter No. 970
(b)Date of Approval 05 Jun 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Collectorate Sagar
(e)Approved Mining Lease Area 4.50
(f)Approved Capacity 273983
Technical Details:
(a)Total Geological Reserves (Million Ton) 2137500
(b)Mineable Reserves (Million Ton) 1478000
(c)Extractable Reserves(Million Ton) 1369915
(d)Percent(%) of Extraction 95
(e)Grade of Coal /Ore /Mineral 0
5.
(f)Stripping Ratio 0:0
(g)Category of Gaseousness (Only for Coal Mining, Others
0
may Write NA)
(h)Average Gradient(Degree) 20
(i)Mining Method Opencast
(j)Life of Mine (Years) 2
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation
No
6. plant/Coal washery within the mining lease area
(b)Whether it is proposed to install crusher within the
No
mining lease area
Details of Seams:
7.
(a)Whether details of seam applicable No
(4.) SETTLEMENTS 0 0 0
(3.) ROADS 0 0 0 0
BUILT UP AREA
(4.) 0 0 0 0
(COLONY/OFFICE)
(7.) EXCAVATION/QUARRY 0 0 0 0
TOTAL 0 0 0 0 0
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 4.50
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S.
Item Details
No.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water
(Prevention & Control of Pollution) Act:
37.
(a)Whether any Direction issued under EPA Act/Air
No
Act/Water Act ?
Documents to be Attached:
(a)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(b)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(c)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project
Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering
Report(DPR) /Detailed Engineering Report /Detailed
Report /Detailed Conceptual Plan /Approved Mining Plan
Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
39. (e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the
competence/authority of the person making this Copy of documents in support of the competence/authority of the person
application to make application on behalf of the User making this application to make application on behalf of the User Agency
Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report &
NA
Baseline Survey Data
(i)Uploaded Additional File NA
(f)Uploaded Updated Form1 Copy of Updated Form1
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my
knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any
stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to
above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.