Task Inspection Form: Compliance Verification Heightened Awareness Checklist

This task inspection form contains fields to record information about a project task including the project ID and name, location, subcontractor details, crew names, relevant specifications and drawings, checklists to verify compliance and task completion, spaces to note any nonconformances, and signature lines for subcontractors and supervisors to sign off on task completion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
266 views1 page

Task Inspection Form: Compliance Verification Heightened Awareness Checklist

This task inspection form contains fields to record information about a project task including the project ID and name, location, subcontractor details, crew names, relevant specifications and drawings, checklists to verify compliance and task completion, spaces to note any nonconformances, and signature lines for subcontractors and supervisors to sign off on task completion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Your Name

Task Inspection Form


Version (version Date)

………………………………………………………………………..
Task(#Section)
Project ID# Project Name: Location/ Area: Sub-contractor Company ID#

Reference Specification Reference Drawing Crew ID / Name

Compliance Verification Heightened Awareness Checklist


 Compliance with initial job ready 
requirements 
 Compliance with Materials inspection & 
Tests 
 Compliance with work in process first article

inspection report requirements

 Compliance with work in process inspection
requirements 
 Compliance with Task Competition 
inspection requirements 
 Compliance with inspection & test plans

Production Notes:

Report Nonconformance’s :

Verification of task Completion (Sign & Date)

Subcontractor Sign & Date

Project Superintendent Quality :

On-time:

Safety:

Sign & Date

Quality Manager Quality:

Sign & Date