Arung Khola Hydropower Project
Detail Design
Outer Intake and orifice design
Design discharge Qpower 5 m3/sec Sharp edge/roughly finished concrete/ masonry 0.6
Gravel flushing discharge Q grav. flush 1.00 m3/sec (Approximate 20% of design discharge) 0.7 aperture
In between Sharp edge/roughly finished concrete/ masonry & Carefully finished
Required intake discharge Qintake 6.00 m3/sec Carefully finished aperture 0.8
Minimum flow 1.29 m3/sec
Type of entrance Carefully finished aperture
Assume coefficient of discharge of orifice 0.8
Assume orifice entrance velocity 1.0 m/sec
Orifice
Orifice area 6.00 m2
Height of orifice 1.4 m
Width of orifice 4.29 m
Adopt no of opening 2.0
Width of each orifice intake 2.14 m
Adopt width of each orifice 2.20 m
Gross Area of orifice 6.16 m2 >= 6, OK
No of piers 1.0 no
Actual Velocity through orifice 0.97 m/sec
Width of each pier 0.75 m
Total Width of Intake excluding Side Wall 5.15 m
Total loss at intake 0.12 m
i) Velocity head loss, hr-hh, (min reqd head) 0.08 m
and hh = water level in the headrace canal 1.45 m
where, hr = water level in the river next to the orifice 1.53 m
ii) Entrance loss for round edge shape 0.010 m
iii) Trashrack loss 0.038 m
Bed level of the river 264.43 masl
Ht of orifice invert level from undersluice (avg) 1.90 m
Assume, min submergence depth inside intake canal 0.05 m
Invert Level of Front Intake 266.33 masl
Invert level of Undersluice 264.43 m
Flow level at Q100 273.12 masl
Flow level at Q20 272.11 masl
Crest Level of Weir 268.00 masl Free board @ weir 0.10 m
Full supply level 267.90 masl
Free board 1.00 m
Platform level of opening gate at front orifice 274.12 masl Iteration for Q inside the intake in Q100
Top level of orifice 267.73 masl Output = -0.944603435 Input, hc = 4.09
Invert level of orifice 266.33 masl 29.19394297 30.13854641
Water level inside the front orifice canal 267.78 masl Iteratiion for Q inside the intake in Q20
Design flood discharge 667.70 m3/sec Output = 3.49979E-07 Input, hc = 3.61
Bed level of canal inside front intake 266.33 masl 26.1443599 26.14435955
Check discharge through orifice:
Discharge coefficient C 0.65
Design Discharge Water Discharge through
Discharge through Water Level Inside
Return period or Discharge in Water level, mlevel in hr-hc, m submerged
spillway, m3/s the Intake, m
river, m3/sec the canal orifice, m3/s
Normal 6.000 267.900 behind
267.777 0.123 6.230 0.230 267.777 OK
1in 100 667.700 273.122 270.413 2.710 29.194 23.194 270.413
1in 20 455.900 272.110 269.937 2.173 26.144 20.144 269.937
Free board = 0.5 m
Adopt intake headwall elevation 273.622 (Maximum high flood level +50 cm freeboard, when discharge in river 667.7 m3/s , 100 years flood)
Note: To regulate the flow and maintain submergence of orifice, two of the orifices will be closed during dry season
Arung_Design_latest.xls Intake n orifice1of1