This document summarizes the design of the outer intake and orifice for the Arung Khola Hydropower Project. It includes calculations for the required intake discharge, orifice dimensions and area, total loss at the intake, water levels for different flood scenarios, and notes the intake will regulate flow using gates to maintain submergence. Key parameters designed include an orifice area of 6 square meters across 2 openings, a total intake width of 5.15 meters, and an intake headwall elevation of 273.622 masl.

Uploaded by

pushkar078
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
584 views1 page

Intake Design

This document summarizes the design of the outer intake and orifice for the Arung Khola Hydropower Project. It includes calculations for the required intake discharge, orifice dimensions and area, total loss at the intake, water levels for different flood scenarios, and notes the intake will regulate flow using gates to maintain submergence. Key parameters designed include an orifice area of 6 square meters across 2 openings, a total intake width of 5.15 meters, and an intake headwall elevation of 273.622 masl.

Uploaded by

pushkar078
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Project Detail Overview

Arung Khola Hydropower Project

Detail Design
Outer Intake and orifice design

Design discharge Qpower 5 m3/sec Sharp edge/roughly finished concrete/ masonry 0.6
Gravel flushing discharge Q grav. flush 1.00 m3/sec (Approximate 20% of design discharge) 0.7 aperture
In between Sharp edge/roughly finished concrete/ masonry & Carefully finished
Required intake discharge Qintake 6.00 m3/sec Carefully finished aperture 0.8
Minimum flow 1.29 m3/sec
Type of entrance Carefully finished aperture
Assume coefficient of discharge of orifice 0.8
Assume orifice entrance velocity 1.0 m/sec

Orifice
Orifice area 6.00 m2
Height of orifice 1.4 m
Width of orifice 4.29 m
Adopt no of opening 2.0
Width of each orifice intake 2.14 m
Adopt width of each orifice 2.20 m
Gross Area of orifice 6.16 m2 >= 6, OK
No of piers 1.0 no
Actual Velocity through orifice 0.97 m/sec
Width of each pier 0.75 m
Total Width of Intake excluding Side Wall 5.15 m

Total loss at intake 0.12 m


i) Velocity head loss, hr-hh, (min reqd head) 0.08 m
and hh = water level in the headrace canal 1.45 m
where, hr = water level in the river next to the orifice 1.53 m
ii) Entrance loss for round edge shape 0.010 m
iii) Trashrack loss 0.038 m

Bed level of the river 264.43 masl


Ht of orifice invert level from undersluice (avg) 1.90 m
Assume, min submergence depth inside intake canal 0.05 m
Invert Level of Front Intake 266.33 masl
Invert level of Undersluice 264.43 m
Flow level at Q100 273.12 masl
Flow level at Q20 272.11 masl
Crest Level of Weir 268.00 masl Free board @ weir 0.10 m
Full supply level 267.90 masl
Free board 1.00 m
Platform level of opening gate at front orifice 274.12 masl Iteration for Q inside the intake in Q100
Top level of orifice 267.73 masl Output = -0.944603435 Input, hc = 4.09
Invert level of orifice 266.33 masl 29.19394297 30.13854641
Water level inside the front orifice canal 267.78 masl Iteratiion for Q inside the intake in Q20
Design flood discharge 667.70 m3/sec Output = 3.49979E-07 Input, hc = 3.61
Bed level of canal inside front intake 266.33 masl 26.1443599 26.14435955

Check discharge through orifice:


Discharge coefficient C 0.65
Design Discharge Water Discharge through
Discharge through Water Level Inside
Return period or Discharge in Water level, mlevel in hr-hc, m submerged
spillway, m3/s the Intake, m
river, m3/sec the canal orifice, m3/s
Normal 6.000 267.900 behind
267.777 0.123 6.230 0.230 267.777 OK
1in 100 667.700 273.122 270.413 2.710 29.194 23.194 270.413
1in 20 455.900 272.110 269.937 2.173 26.144 20.144 269.937

Free board = 0.5 m


Adopt intake headwall elevation 273.622 (Maximum high flood level +50 cm freeboard, when discharge in river 667.7 m3/s , 100 years flood)
Note: To regulate the flow and maintain submergence of orifice, two of the orifices will be closed during dry season

Arung_Design_latest.xls Intake n orifice1of1