TEST REPORT OF GENERATOR PROTECTION
RELAY (87G_G60) D18T PANEL
FIELD TEST REPORT FOR GENERATOR PROTECTION RELAY
Relay Details
Make GE Feeder CONTROL RELAY FEEDER
Model No G60 Function GENERATOR PROTECTION
Generator Details
Rating 126.77 MW CT Ratio Phase 8000/1 A
HV Volts 14.51 kV CT Ratio Neutral 8000/1 A
LV Volts 221 kV Date of testing 26/05/2019
Testing Equipment Details
Equipment Name Make & Model Serial Number Date
Relay Test kit OMICRON/CMC 256 PLUS LD095F 16/08/2018
PHASE DISTANCE:
PT INJ: X VT 9,10,11,12 NCT used: X CT 9,10,11,12 Tripping Feedback (186,187 refer pg 52 scheme)
(Keeping I CONST (1A) - V CALC by Z=V/I)
ZONE-1 SETTINGS:
DIR: FWD Z = 11.48 Ω RCA = 90° TIME DELAY= 0.5 Sec
Ref Applied Voltage(V) Injected Current (A) Set time (sec) Operated time(m sec)
R 11.40 1 90
Y 11.4-120 1 330 0.3 363.2
B 11.4120 1 210
Tested by Witnessed by Witnessed/Reviewed by
VEPL RIL-Maintenance RIL- Operations
Sign & Date: Sign & Date: Sign & Date:
Name: ASHWATH K Name: Name:
Designation: Protection Engr. Designation: Designation:
Page: 1 of 5
TEST REPORT OF GENERATOR PROTECTION
RELAY (87G_G60) D18T PANEL
ZONE-2 SETTINGS:
DIR: FWD Z = 29.84 Ω RCA = 90° TIME DELAY= 1 Sec
Ref Applied Voltage(V) Injected Current (A) Set time (sec) Operated time( sec)
R 28.90 1 90
Y 28.9-120 1 330 1 1.041
B 28.9120 1 210
ZONE-3 SETTINGS:
DIR: REV Z = 13.65 Ω RCA = 90° TIME DELAY= 0.3 Sec
Tested by Witnessed by Witnessed/Reviewed by
VEPL RIL-Maintenance RIL- Operations
Sign & Date: Sign & Date: Sign & Date:
Name: ASHWATH K Name: Name:
Designation: Protection Engr. Designation: Designation:
Page: 2 of 5
TEST REPORT OF GENERATOR PROTECTION
RELAY (87G_G60) D18T PANEL
Ref Applied Voltage(V) Injected Current (A) Set time (sec) Operated time( sec)
R 13.60 1 90
Y 13.6 -120 1 330 0.3 335.3
B 13.6 120 1 210
Corresponding LED and 86N-1 Tripping Checked OK & Snapshot of RELAY Events attached
OVER VOLTAGE TEST: Tripping Feedback (196,197refer pg 52 scheme)
1st STAGE: Alarm only Set – 1.1 pu Time – 10 sec
Phase Set Voltage(PU) Applied Voltage (V) Set Time Operating Time
(sec) (sec)
R-Y 1.1 70 AFTER 10 Sec
AFTER 10 Sec ALARM
Y-B 1.1 70 ALARM CHECKED
ONLY
B-R 1.1 70 OK
Tested by Witnessed by Witnessed/Reviewed by
VEPL RIL-Maintenance RIL- Operations
Sign & Date: Sign & Date: Sign & Date:
Name: ASHWATH K Name: Name:
Designation: Protection Engr. Designation: Designation:
Page: 3 of 5
TEST REPORT OF GENERATOR PROTECTION
RELAY (87G_G60) D18T PANEL
2nd STAGE: Trip Stage set – 1.2 pu Time- 3 sec
Phase Set Voltage(PU) Applied Voltage(V) Set Time(sec) Operating Time (sec)
R-Y 1.2 76.3
Y-B 1.2 76.3 3.0 3.067
B-R 1.2 76.3
Tested by Witnessed by Witnessed/Reviewed by
VEPL RIL-Maintenance RIL- Operations
Sign & Date: Sign & Date: Sign & Date:
Name: ASHWATH K Name: Name:
Designation: Protection Engr. Designation: Designation:
Page: 4 of 5
TEST REPORT OF GENERATOR PROTECTION
RELAY (87G_G60) D18T PANEL
Corresponding LED and 86L-1 Tripping Checked OK & Snapshot of RELAY Events attached
RELAY FOUND HEALTHY.
Tested by Witnessed by Witnessed/Reviewed by
VEPL RIL-Maintenance RIL- Operations
Sign & Date: Sign & Date: Sign & Date:
Name: ASHWATH K Name: Name:
Designation: Protection Engr. Designation: Designation:
Page: 5 of 5