100% found this document useful (1 vote)
1K views4 pages

Design of Pier Well Cap

This document summarizes the design of a well cap at a pier location. It includes: 1) Dimensions and parameters of the well cap, pier, and surrounding area. 2) Calculations of loads, moments, and shear on the well cap under two load cases. 3) Checks showing the well cap design meets code requirements for strength and serviceability. 4) Design of reinforcement at critical sections to resist bending and shear. The governing seismic load case is analyzed in detail to design the well cap reinforcement.

Uploaded by

kailashahar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views4 pages

Design of Pier Well Cap

This document summarizes the design of a well cap at a pier location. It includes: 1) Dimensions and parameters of the well cap, pier, and surrounding area. 2) Calculations of loads, moments, and shear on the well cap under two load cases. 3) Checks showing the well cap design meets code requirements for strength and serviceability. 4) Design of reinforcement at critical sections to resist bending and shear. The governing seismic load case is analyzed in detail to design the well cap reinforcement.

Uploaded by

kailashahar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Design of Well Cap at Pier Location
  • Load Considerations and Case Analysis
  • Shear and Moment Analysis
  • Support and Stability Check

Design of Well Cap at Pier location

3500

7.000

Well Cap

6.254
7.000

3.500

1.500
6.254

Pier - Well Cap -Steining Wall

Results: V= 11139 KN
ML= 2173 KN-m Case-I HFL Condition (non-siesmic)
MT= 2109 KN-m
MR= 3028 KN-m

Results: V= 11382 KN
ML= 504 KN-m Case-II HFL Condition (Siesmic)
MT= 22275 KN-m
MR= 22281 KN-m

Dia of Pier = 3.50 m


External radius of well = 3.50 m
Internal radius of well = 2.50 m
Thickness of steining wall = 1.00 m
Overall depth of well cap = 1.50 m

Span of well cap is minm of -


(i) c/c distance of well steining = 6.000 m
(i) clear span + deff = 6.377 m
Hence, effective span = 6.000 m

RL at top of well Cap = 90.490 m


HFL = 97.660 m
Assuming load dispersion at an angle of 45 degree upto effective depth of well cap, diameter of dispersion area
= 6.254 m
Area = 30.719 sqm

Weight of water above well cap = 71.70 KN/sqm


Weight of well Cap (considering 15% buoyancy) = 35.25 KN/sqm

Load intensity due to vertical load


Case-I
w = 469.56 KN/sqm

Case-II
w = 477.47 KN/sqm

Moment and shear in well Cap due to applied vertical load:


Bending moment is calculated assuming well cap is partially fixed between steining wall
2
Span moment per metre width = wl / 24 x 0.8
2
Support moment per metre width = wl / 60
Shear in well cap per metre width = w Di / 4
where, Di is inner dia of well.

Case-I
Mspan = 563.47 KN-m/m
Msupport = 281.74 KN-m/m
Shear Force = 586.95 KN/m

Case-II
Mspan = 572.96 KN-m/m
Msupport = 286.48 KN-m/m
Shear Force = 596.84 KN/m

Moment and shear in well Cap due to applied moment:

6.000

1.750 MR

Face of Pier
MR/2

MR/2

1.250

BM Diagram

Moment at face of Pier= MR / 2 x 1.25 / 3 = 0.208 MR


Moment per metre width= 0.208MR / 6 = 0.035 MR KN-m/m

Section modulus of well:


Zouter = = 24.908 m3
Zinner = = 34.872 m3
l0

1.000 1.000

Ro= 3.500 q Ri= 2.500

q = 0.400 radian
l0= R0 x q = 1.400 m
Shear force= 1/2 x (d0 x l0 + di x li) x 1.0

Case-I
MR = 3028.00 KN-m
Mspan = 105.98 KN-m/m
Msupport = 52.99 KN-m/m
d0= = 121.57 KN/sqm
di= = 86.83 KN/sqm
Hence, Shear force= = 128.51 KN/m

Case-II
MR = 22281.00 KN-m
Mspan = 779.84 KN-m/m
Msupport = 389.92 KN-m/m
d0= = 894.53 KN/sqm
di= = 638.94 KN/sqm
Hence, Shear force= = 945.64 KN/m

Summary of BM and SF:


Case-I
Mspan = 669.45 KN-m/m
Msupport = 334.73 KN-m/m
V = 715.46 KN/m

Case-II
Mspan = 1352.80 KN-m/m
Msupport = 676.40 KN-m/m
V = 1542.48 KN/m
Siesmic case i.e. case-II governs the design.

Check for siesmic case:


For M-25 Grade Concrete & Fe-415 steel :
m= 10
scbc= 12.50 N/sqmm
sst= 300 N/sqmm
k= 0.294
j= 0.90
Q= 1.65

At Span:
Effective depth required = 905.47 mm
Provide overall depth 1500.00 mm
Hence, effective depth provided =(1500-75-32-32/2) 1377.00 mm > 905.47 mm Hence O.K.
Area of steel required = 3639 sqmm
Diameter of bar provided @ 150 mm c/c= 32 mm
Area of steel provided = 5361.65 sqmm > 3639.00 sqmm Hence O.K.
At Support:
Effective depth provided =(1500-75-25-25/2) 1387.50 mm
Area of steel required = 1805.54 sqmm
Diameter of bar provided @ 150 mm c/c= 25 mm
Area of steel provided = 3272.49 sqmm > 1805.54 sqmm Hence O.K.

Check for shear:

0.750 3.500

1.000

7.000

Check the Shear at inner face of well


V = 1542.48 KN/m
tv = 1.11 N/sqmm
% of steel = 0.24
tc = 0.34 N/sqmm
As per Table 12B of IRC: 21-2000
ts=tv-tc = 0.77 N/sqmm
b=pi() x (5 + 3.5 )/2 = 13.352 m
No of legs with 250mm width = 53 nos
With 16 tor bars spacing required
s= n . Asw . sst / (b x ts) = 311 mm
Provide 53 legged 16 tor stirrups @ 250mm c/c