PROYEK PEMBANGUNAN TERMINAL LPG
REFRIGERATED PERTAMINA
TANJUNG SEKONG MERAK
VISUAL EXAMINATION WELDING
REPAIR REPORT Report No. :
Form No. : -
Date :
ISO DWG : SHT 1 OF 1
DWG NO : REV: 0A LINE NO :
WELD MAP :
ACCEPTANCE STANDARD : ASME B31.3 PIPING CLASS : PAGE : 1 OF 1
DISCIPLINE : PIPING STEEL STRUCTURE STATIC EQUIPMENT OTHERS
Visual Inspection
Welding Filler Sch/ Welder ID
Weld No. WPS No. Size Date Result Remarks
Process Metal Thk(MM)
Root Capp Acc Rej
SKETCH OR COMMENTS/RESTRICTIONS
FINAL SURFACES REQUIRED BLIND GRINDING DURING EXAMINATION YES : NO :
COMPLETED BY SUBCONTRACTOR CONTRACTOR COMPANY
COMPANY PT.BBB CONCARTIUM WIKA - PEN PERTAMINA ( Persero )
SIGNATURE
NAME
DATE