0% found this document useful (0 votes)
403 views7 pages

Civil Engineer CV Sample - Mohd Jafri

The document provides a curriculum vitae for Mohd As Shahiddin Jafri that outlines his education, qualifications, languages, and extensive work experience in quality control and inspection roles over 15+ years, primarily in the oil and gas industry in Malaysia.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
403 views7 pages

Civil Engineer CV Sample - Mohd Jafri

The document provides a curriculum vitae for Mohd As Shahiddin Jafri that outlines his education, qualifications, languages, and extensive work experience in quality control and inspection roles over 15+ years, primarily in the oil and gas industry in Malaysia.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • Curriculum Vitae Overview
  • Summary of Experiences
  • Detailed Working Experience

CURRICULUM VITAE

Name MOHD AS SHAHIDDIN JAFRI Nationality MALAYSIAN

Category INSPECTOR Race MALAY / ISLAM

04 MAY 1983 830504-01-5357


Date Of Birth IC / Passport No.

EDUCATION / TECHNICAL QUALIFICATIONS

Year Qualifications
1990 ~ 1995 Sek. Keb. Taman Johor Jaya 2, Johor Bahru, Johor
1996 ~ 2000 Sek. Men. Taman Johor Jaya 2, Johor Bahru, Johor

2001 ~ 2002 Welding Fabrication Technology at Institute Mara Johor Bahru

2002 ~ 2003 Mara PETRONAS Institute, Jasin, Melaka

07th Aug 2019 AESP (E4A6ACF5)

4th May 2018 CIDB (J21041220010076)

20th Oct 2014 CSWIP 3.1 Welding Inspector Course at Cyberjaya, Kuala Lumpur
16th July 2008 PCN Radiographic Interpretation Level 2 at PUPASTRI

15th Mac 2003 LNG Ship repair Program 2004-Quality Control (Marine Terminology

19th Sept 2003 Piping System / Basic Fire Fighting (CPR) at IKM Jasin, Melaka

10th Jan 2003 Trainee Tradesman at Malaysia Shipyard & Engineering (MSE)
01st Oct 2001 Building Wirering Installation at CIDB, Johor Bahru.

MOHD AS SHAHIDDIN JAFRI

Page 1 of 7
SUMMARY OF EXPERIENCES

1.Welder – 4year

2.Welder Foreman – 1year

3.Welding Technician – 1year

4.Quality Control – 10year

5.Third Party Inspector – 8year

LANGUAGES

Written Spoken
English Good Good

Bahasa Malaysia Good Good

Tagalog N/A N/A

WORKING EXPERIENCE

Period/ Duration Job Descriptions


October 2018 to May 2019 (8 month) QA/QC STRUCTURE
Position: QAQC Piping To conduct quality control inspection as per ITP, Prepare WQT for new welders
Company : Gee Project Prepare MDR & others QC Documents
Consulting Liaise with third party inspection.
Project: Petronas Rapid Project Package Read an inspection Test Plan (ITP), Procedures & Specification of client/project
4 before start any inspection or fabrication.
Client: Petronas & Petrofac
Check/inspect material verification inspection or invite client to be inspecting
Location: Pengerang Gate 2, Johor
MOHD AS SHAHIDDIN JAFRI

Page 2 of 7
WORKING EXPERIENCE

Period/ Duration Job Descriptions


dimensional, size, type and condition must be free from defect and segregation
August 2018 To September 2018 (1 band and witnessed UT inspection for lamination check & Mill certificate with
month) refer IFC drawing before cut to fabrication.
Position: QA/QC-Vessel Check/inspect Fit Up Inspection or invite client to be inspect joint reparation,
Company : First Oil Engineering bevel, gap, alignment, welding process is are following welding procedures
Sdn Bhd specification
Project: FLOUR RAPID Project
(WPS) welding sequence sketch, welder pass must be qualified, consumable,
Client: Petronas Carigali
tack weld and cleanliness of work area is maintained.
Location: ATB MMHE Pasir Gudang,
Monitoring pre-heating and interpass temperature and welding current is
Johor
correct.
July 2016 to June 2017 (1 yrs.) Check/inspect visual inspection or invite client to be inspect/marking this joint
Position: QA/QC-Structure must be free from surface defect porosity, undercut, spatter, hydrogen crack
Company : First Oil Engineering and distortion. Monitoring grinding or cleaning before proceed to
Sdn Bhd Project: Sepat A Substructure non-destructive inspection MPI, UT or RT depends on client specification and
Project procedures.
Client: Petronas Carigali Documentation / Final Document.
Location: MMHE Pasir Gudang, Johor
QA/QC PIPING
March 2016 to July 2016 (5 month) To perform / monitoring pipe erection / support / branch connection and
Position: Crane Inspector installation activities as per latest drawing& procedures / ITP
(On behalf TKK) To perform welding activities at site, check consumable and take a welding
Company : Bureau Veritas (M) parameter randomly
Sdn Bhd
To perform / inspection incoming material, welding equations, check
Project: LNGT7 Bintulu (Overhead
manufacturing certificate, baking / holding
Crane)
Electrode in according with manufacture recommendation.
Client: Petronas Carigali
Location: Simpang Renggam, Johor To perform / prepare fit up / visual / NDT report / piping test package / leak
test procedures
Jan2016 to March 2016 To perform pre-test line check with ISO / temporary blind / calibration of
Position: Assembly Inspector equipment and pressure gauge
(On behalf ITT) To perform / witness and inspection hydrostatic test / flushing / air blowing
Company : SteelCon Engineering (after hydro test)
Sdn Bhd To Prepare WPS / Welder list & procedures at site & request report for RT, UT,
Project: Toji Osiyo LCC-Reformer MPI, DPI, Hardness, PWHT,
Package Tajikistan Ferrite & PMI inspection
Client: ITT CH SA LUGANO Danghara To perform painting inspection surface preparation and apply paint & DFT
Refinery checklist
Location: Nilai 2, Negeri Sembilan Verification of Reinstatement of Piping systems after completion of all hydro
testing activities
October 2015 to December 2015
Issue of Non- conformance reports & verification of Corrective/Preventive
Position: Vessel Inspector
action
MOHD AS SHAHIDDIN JAFRI

Page 3 of 7
WORKING EXPERIENCE

Period/ Duration Job Descriptions


(On Behalf Of HHI) Liaison with client inspectors for inspections of Hold and Witness Point.
Company : Bureau Veritas Sdn Painting inspection Final Documentation
Bhd WELDING TECHNICIAN
Project: Baronia CPP-B Project (Vessel) Check/inspect/conduct welding procedures qualification test (WPQT) to take
Client: Petronas Carigali welding parameter check/calculation, welding current, voltage current, travel
Location: Pasir Gudang, Johor speed and heat input. Conduct Welding Qualification Test (WQT)
Check/inspect/surveillance/monitoring/record randomly for all welding
August 2015 to October 2015
activities fabrication at site for control repair rate
Position: Mechanical Inspector
To be inspect and calibrate welding machine, quiver, holding and baking oven
(On Behalf of HESS) electrode
Randomly check welding joint process for welding parameter record.
Company : Bureau Veritas Sdn
Witnessed/inspection NDT inspection MT or PT and RT or UT and mechanical
Bhd
testing (bend test, charpy test, tensile test, CTOD, impact or corrosion test.
Project: Bergading Project (Mechanical) Full monitoring/Witnessed/inspection hydrostatic test for riser, pipe and vessel
for high pressure, holding time and pressure release and reviewed the decoder
Client: Carigali HESS
chart.
Location: Pasir Gudang, JohoR Full monitoring/Witness of Hydrostatic Test and Gas Test of composite block
valve, spool body, tubing hanger, gate valve, wellhead etc. as per applicable
QCP / ITP
March 2015 to July 2015 (5mth)
Position: QA/QC-Piping/Line checker THIRD PARTY INSPECTOR
Witnessed / inspection Conduct Pre inspection meeting, Pre Production, Pré
Company : Tuah Effect
shipment, Assembly.
Engineering / Rotary
Witnessed /inspection / monitoring activities fabrication at site / workshop
Project: XSBR Witnessed / Inspection Final Visual checking on welding quality / Final
Dimensional
Client: Synthomer
Witnessed / inspection overhead crane, padestal crane, monorail hoist and
Location: Kluang,Johor lifting inspection
Witnessed / Inspection Internal inspection prior final closure
Witnessed / Inspection External & Internal Cleaning inspection
Feb 2014 to Oct 2014 (8mth) Witnessed / inspection Tube Assembly & Light Expansion / Hydro Static Test /
Position: QA/QC-structure (RFSB 1809) Leak Test.Witness / Inspection packing & preservation Witness / Inspection Pre
shipment inspection
Company : Tabung Haji Heavy
Engineering Final Documentation & report Compilation
Witnessed Load Test inspection, Hydrostatic Test, Welding Procedures
Project: Bertam Topside Qualification Test (WPQT), Welder Qualification Test (WQT),Christmas Tree
Client: Lundin Petroleum Inspection, Machining Inspection Test, LAB Test Inspection, Dimensional
Check,Boroscope Inspection, Visual Inspection, Material Verification ,NDT
Location: Pulau Indah, Selangor Darul inspection & Lifting inspection
Ehsan To perform inspection, Review of inspection report, supplier Quality
MOHD AS SHAHIDDIN JAFRI

Page 4 of 7
WORKING EXPERIENCE

Period/ Duration Job Descriptions


document, Material test certificate and test report based on statutory and Non
statutory requirement (third party inspection).
Jan 2010 to October 2011 (1 yrs 10mth)
Witnessed testing and inspection of steel fabrication, Offshore and Onshore
Position: QA/QC-Structure
project at various stage such as pressure vessel tanks, Heat
Company : First Oil Engineering
Sdn Bhd Exchanger,Boiler,Oil and Gas pipeline system in accordance to
ASME,PED,API,EN standard.
Project: Kinabalu Topside (structure) Witnessed / inspection / monitoring Nondestructive testing
Client: PETRONAS CariGali (NDT)(PT,MPI,UT,RI) Inspection of welding joint for the fabricated component
in accordance AWS,ASME,API and standard.
Location: MMHE, Pasir Gudang Procedures, WPS, WPQR, WPTR and welder certificate technical report writing
familiar with local & international regulation and requirement for pressurized
equipment min 5years with certification & Inspection companies.
May2010 to December2010 (7mth) Reviewed/Approving supplier: Quality Control and inspection test plan welder
Position: QA/QC-Structure procedures/qualification based on EN and ASME STDs, AWS D1.1, AWS D1.2
Company : Trylon Engineering and AWS standards..Full monitoring/Witnessed/inspection hydrostatic test for
Sdn Bhd riser, pipe and vessel for high pressure, holding time and pressure release and
reviewed the decoder chart.
Project: Gumusut Kakap FPS Project Full monitoring/Witness of Hydrostatic Test and Gas Test of composite block
Client: Sabah Shell Petroleum valve, spool body, tubing hanger, gate valve, wellhead etc. as per applicable
Corporation (SSPC) QCP / ITP.
Witnessing drift test, visual inspection, dimensional check, load test, final
inspection and pre-shipment inspection as per QCP /ITP and Client
July2008 to May2010 (2yrs) Specifications..Witnessing of Flange Testing (Sealing Test and Bolt Torque Test
Position: Welding Supervisor as per ASTM D4024) Witness of Bonder Qualification Test as per Client
Specification.
Company : Sime Darby Final and pre-shipment inspection (witness hydro test, visual, dimensional
Engineering Sdn Bhd
check, Barcol Hardness check, Conductivity check and packing
Project: Kinabalu (KNAG-B) Jacket inspection).Witnessed/inspection safe weight load and overload test for
pedestal crane, monorail trolley & hoist block with approximately
Client:Petronas CariGali
25%,50%,75%,100% & 125% around 5minutes/10minutes (Dynamic / Static)
Location: Pasir Gudang, Johor Proof test & Functional ,static overload test main hoist f & fly hoist ,check
visual all structure and mechanical component for satisfactory condition ,SLI
Verification ,Load verification ,Angle verification ,check manual Gross overload
July2008 to July2009 (1yrs) protection (MGOP) test consists of simulation checking and verification as
Position: Welding Technician follow the procedures for pedestal crane test depend the client specification
and check the rate load and for manual hoist make that the hand operated
Company : Sime Darby
chain is clean, hoist is free to traverse full length of overhead beam, load hook
Engineering Sdn Bhd
locking device is in working order and reviewed all mill certificate,
Project: Kumang & Tangga Barat documentation and NDT report intact and cannot cause injury to operator
during inspection .
MOHD AS SHAHIDDIN JAFRI

Page 5 of 7
WORKING EXPERIENCE

Period/ Duration Job Descriptions


Client: Petronas CariGali Sdn Bhd

Location: Sime Darby Engineering


Sdn.Bhd,Pasir Gudang

May 2008 to July2008 (3mth)


Position: QA/QC-Hull

Company: Marine Conversion (MMHE)

Project: FPSO RUBY

Client: MISC

Location: MMHE, Pasir gudang

Jan 2008 to May 2008 (5mth)


Position: QA/QC-Piping

Company: Carimin Engineering Sdn Bhd


Project: B11K-A Topside & Jacket

Client: Sarawak Shell Berhad (SSB)

Location: MMHE, Pasir Gudang

Mac 2007 to Jan 2008 (9mth)


Position: QA/QC-Piping

Company : Multitask Engineering


Sdn Bhd

Project Mopu Storage Tank Project

Client: Single Buoy Mooring (SBM)

Location: MMHE, Pasir Gudang

May 2006 to Jan 2007 (7mth)


Position: QC Inspector Piping

Company: Sri Paka Engineering Sdn Bhd

Project: Fabrication T10 Drilling and T11


MOHD AS SHAHIDDIN JAFRI

Page 6 of 7
WORKING EXPERIENCE

Period/ Duration Job Descriptions


Drilling

Client : Tioman Smigdiv

Location : MMHE, Pasir Gudang

Jan 2003 to April 2006 (3yrs 4mth)


Position: Trainee Marine QAQC
inspector
Company: Malaysia Shipyard &
Engineering Sdn Bhd(MSE)

Hull Construction Department

MOHD AS SHAHIDDIN JAFRI

Page 7 of 7

You might also like