The document provides guidelines for implementing GST for ongoing construction works as of July 1, 2017 in Telangana. It recommends keeping the same hire charges for machinery as in the pre-GST regime. It also exempts bricks and coarse aggregate from embedded taxes and retains pre-GST rates for ongoing works.

Uploaded by

Jaikanth Ragi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views63 pages

GST Final Orders R&B

The document provides guidelines for implementing GST for ongoing construction works as of July 1, 2017 in Telangana. It recommends keeping the same hire charges for machinery as in the pre-GST regime. It also exempts bricks and coarse aggregate from embedded taxes and retains pre-GST rates for ongoing works.

Uploaded by

Jaikanth Ragi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GOVERNMENT OF TELANGANA

ROADS & BUILDINGS DEPARTMENT

Office of Engineer-in-Chief (R&B), State Roads& CRN


Errummanzil, Hyderabad-500022.

Proc.No. ENC (R&B)/DCE(R)/EE(R)/DEE1/AEE1/2019,Dt.06.07.2019

Sub:-I & CAD Dept, Finalization of issues related to GST and Works Contract
-Implementation of Goods and Services Tax (GST) for ongoing and
future Works Contractsw.e.f 01-07-2017- Guidelines on implementation of
Goods and Services Tax (GST) for regulating work bills for all Engineering
Departments - GO Ms No 67 I&CAD (Reforms) dept dated 04.07.2018
Quantification of Embedded Tax rates for the previous SoRs prior to 2017-18
Directed by the Government - Board of Chief Engineers meeting held on
23.03.2019- Minutes of BOCEs meeting held on 23.03.2019 -Embedded tax
rates of previous SoRsi.e,2008-09, 2014-15 to 2016-17on
implementation of GST for ongoing works as on 01.07.2017- Approval -
Communicated -Regarding.

Ref:-1. G.O.M.SNo. 67 I & CAD (Reforms) Dept dated 04.07.2018


2. Chairman, BOCES proceeding dated 27.08.2018 on communication of
Embedded taxes for SoRs 2009-10 to 2016-17
3. Chairman, BOCEs letter N0 ENC/IW/P&M/EE/DEE.2/AEE.5/ BOCE/61108
/2018, dated 01.04.2019 communicating BOCES minutes

&&&

As per the directions of Government under G.O 1stcited and subsequent


recommendations of Board of Chief Engineers meeting held on 20.08.2018, the
embedded tax rates of previous SoRs (pertaining to Irrigation) from 2009-10 to
2016-17 was approved by the Chairman, BOCEs vide proceeding 2ndcited and the
same are published in I&CAD Dept web site for its implementation accordingly.

Further, as per the plea of BAI, Telangana before the Board of Chief
Engineers meeting on 23.03.2019, the embedded tax rates of common materials like
Bricks, Fine & Coarse aggregate was also examined and discussed by the BOCEs.

After detailed deliberations in the matter, the BOCEs have recommended as


below.
”The Board of Chief Engineers has deliberated the issue in detail and after
comprehensive discussions in the matter, the BOCEs has recommended to keep the
same hire charges of machinery as adopted in pre-GST regime in the post-GST
regime also for all the ongoing works as on 01.07.2017. In this regard, BOCEs
observed that by keeping the same machinery hire charges in post-GST regime, the
machinery lead/conveyance charges will not be affected and hence recommended to
keep the same machinery lead/conveyance charges in post-GST regime for all the
ongoing works as on 01.07.2017.

Further, BOCEs also examined the embedded tax rates of common materials
like Fine & Coarse aggregate and Bricks etc., in pre-GST regime and after detailed
deliberations of BOCEs. It was recommended for exemption of bricks (except factory
made aerated bricks like Aerocon etc.,) and Coarse aggregate (crusher by product)
from the purview of embedded taxes and to retain the same rates in post-GST
regime as that of pre-GST regime for all the ongoing works as on 01.07.2017. This is
because most of the dealers/suppliers come under exempted category.”

In view of the above BOCEs recommendations, the embedded tax rates of


previous SoRs (pertaining to Irrigation) from 2009-10 to 2016-17 is revised and
approved accordingly duly superseding all the earlier approvals of BOCEs on
Quantification of Embedded Tax rates vide proceeding 3rd cited. The revised
embedded tax rates of previous SoRs (pertaining to Irrigation) from 2009-10 to
2016-17 are uploaded in I&CAD Dept web site for its implementation by all
Engineering Departments accordingly.

In this regard, the following revised guidelines on implementation of GST for


the ongoing works as on 01.07.20l7 in working out the embedded tax component of
the same is here with communicated to the HODs of all Engineering Depts&
members of Board of Chief Engineers for information and directed to take necessary
action accordingly.

1. Same hire charges of machinery are to be kept as adopted in pre-


GST regime in the post-GST regime for all the ongoing works as on
01.07.2017.
SSR - 2008-09
Statement showing the Schedule of Rates with Revised embedded tax rates for the material rates items of
SoR 2008-09

Sl. S.S. Description Unit Total


No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING,
BREAKING,BURNING, SPLITING AND STACKING
1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap 1 cum 133
4
2 b.I For SS Revetment work 225 mm 1 cum 71 4
3 b.ii For SS Revetment work 300 mm 1 cum 95 4
4 b.iii For SS Revetment work450 mm 1 cum 114 4
5 c Jeddy Stone above 450 mm to 600 mm 1 cum 156 4
6 d I. Laterite for revetment 225 mm 1 cum 98 4
7 d II. Laterite for revetment 300 mm 1 cum 114 4
8 d.iii Granite for SS revetment 225 mm 1 cum 117 4
9 d.iv Granite for SS revetment 300 mm 1 cum 136 4
Note:- Only when other than granite is not available
10 e Laterite for masonry 1 cum 114 4
11 f Cyclopean stones above 0.2 cum 1 cum 210 4
12 g For R.R.Masonry works ( granite, dolamite and trap variety 1 cum 155 4
NOTE:- For items 22(a) to 22© ,22d.iii,22d.iv 22(f) and 22(g) add 1 cum 67
extra Rs /cum, wherever quarrying is done by blasting
COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING,
BURNING AND SPLITTING INCLUDING STACKING FOR SS
FIRST SORT WORKS

13 23.a Granite, dolamite and trap 1 cum 218 4


14 b For other varieties 1 cum 152 4
15 27 Granite stone slabs for culverts, lintels and copings (3 faces dressed 1 cum 1409
4
coarsed rubble masonry)
NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum, 1 cum 69
4
wherever quarrying is done by blasting
16 28 Bond stones ( 600 x 200 x 200 mm ) each 25 4
17 b Chainage stones and Centre line stones (750x150x150xmm) each 30 4
18 31 Demarcation Stones ( 900 x 150 x 150 mm) each 57.5 4
19 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 86 4
20 b Guide Stones ( 800 x 150 x150 mm ) each 57.5 4
21 c Carving letters and figures in stone up to 100 mm size each 5.3 4
22 d Carving letters and figures in stone above 100 mm size each 7 4
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE
FREE FROM DUST OBTAINED BY QUARRYING, WEDGING,
BREAKING, BURNING AND SPLITTING INCLUDING
STACKING.
23 33.a - do - 6mm size (IS383,1970) 1 cum 430 0
24 b - do - 10mm size (IS383,1970) 1 cum 560 0
25 c - do - 12mm size (IS383,1970) 1 cum 690 0
26 d - do - 20mm size (IS383,1970) 1 cum 845 0
27 e - do - 25mm size (IS383,1970) 1 cum 830 0
28 f - do - 40mm size (IS383,1970) 1 cum 500 0
29 g - do - 50mm size (IS383,19705) 1 cum 390 4
30 h - do - 60mm size (IS383,1970) 1 cum 360 4
31 I - do - 65mm size (IS383,1970) 1 cum 325 4
32 j - do - 75mm size (IS383,1970) 1 cum 260 4
33 k - do - 75 to 100mm size (IS383,1970) 1 cum 210 4
NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the 70
metal is obtained by blasting
(2) Add 25% extra per cum if the metal is obtained by machine 25%
crushing excluding cost of blasting.
(3) Deduct Rs. /- per cum if the metal or rubble is obtained from 9
surface stone and boulders.
(4) Add Rs. /- per cum for selection of stones and boulders from 15.00
excavated spoil dumps for items 33 a to 33 k, when this addition of Rs. 9.00
/- per Cum is allowed deduction of Rs. /- per Cum mentioned under
Note (3) above should invariably be made.

SOFT BROKEN STONE SCREENED AND FREE FROM DUST


INCLUDING STACKING
34 33.l - do - 40 mm size ( IS383,1970 ) 1 Cum 105 4
35 33.m - do - 50 mm size ( IS383,1970 ) 1 Cum 95 4
36 33.n - do - 60 mm size ( IS383,1970 ) 1 Cum 75 4
37 33.o - do - 65 mm size ( IS383,1970 ) 1 Cum 67 4
38 33.p - do - 75 mm size ( IS383,1970 ) 1 Cum 63 4
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND
DOLAMITE FREE FROM DUST OBTAINED BY QUARRYING
WEDGING, BREAKING, BURNING AND SPLITTING INCLUDING
STACKING (QUARTZITE AND BASALT WITH AGGREGATE
IMPACT OF LESS THAN 20)

39 33a -do- 2.36 mm to 5 mm size ( IRC, MORTH &MORD) 1 cum 234 4


40 b -do- 5 mm to 7 mm size ( IRC, MORTH & MORD) 1 cum 430 4
41 c -do- 9.5 mm to 11.2 mm size ( IRC, MORTH & MORD) 1 cum 560 0
42 d -do- 12mm to 14 mm size ( IRC, MORTH & MORD) 1 cum 690 0
43 e -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 cum 845 0
44 f -do- 25 mm to 27 mm size ( IRC,MORTH &MORD ) 1 cum 830 0
45 g -do- 40 mm to 45 mm size ( IRC , MORTH &MORD) 1 cum 500 0
46 h -do- 50 mm to 55 mm size ( IRC,MORTH & MORD ) 1 cum 390 4
47 i -do- 60 mm to 63 mm size ( IRC, MORTH &MORD) 1 cum 360 4
48 j -do- 65 mm size ( IRC ,MORTH &MORD ) 1 cum 325 4
49 k -do- 75 mm size ( IRC,MORTH &MORD) 1 cum 260 4
1 NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the 1 cum 70
metal is obtained by blasting
2 Add 25% extra per cum if the metal is obtained by machine crushing 1 cum 25%
excluding cost of blasting.
3 Deduct Rs. /- per cum if the metal or rubble is obtained from surface 1 cum 9
stones and boulders
4 Add Rs. /- per cum for selection of stones and boulders from 1 cum 15.00
excavated soil dumps for items 33 (a) to 33 (k), when this addition of 9.00
Rs. /- per cum allowed deduction of Rs. /- per cum mentioned under
note (3) above should invariably be made

HARD BROKEN STONE OTHER THAN GRANITE SUCH AS


QUARTZ, QUARTZ-NAPA AND BASALT SCREENED AND FREE
FROM DUST INCLUDING STACKING

50 33.q- do - 10 mm size (IS383,1970) 1 Cum 331 0


51 -do- 9.5 mm to 11.2 mm size ( IRC,MORTH & MORD ) 1 Cum 331 0
52 r - do - 12 mm size (IS383,1970) 1 Cum 310 0
53 -do- 12mm to 14 mm size ( IRC , MORTH & MORD ) 1 Cum 310 0
54 s - do - 20 mm size (IS383,1970) 1 Cum 251 0
55 -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 Cum 251 0
56 t - do - 25 mm size (IS383,1970) 1 Cum 247 0
57 u - do - 40 mm size (IS383,1970) 1 Cum 146 0
58 -do- 40 mm to 45 mm size ( IRC , MORTH & MORD) 1 Cum 146 0
59 v - do - 50 mm size (IS383,1970) 1 Cum 129 4
60 -do- 50 mm to 55 mm size ( IRC,MORTH &MORD) 1 Cum 129 4
61 33.w - do - 65 mm size (IS383,1970) 1 Cum 122 4
62 -do- 60 mm to 65 mm size ( IRC, MORTH &MORD) 1 Cum 122 4
63 x - do - 75 mm size (IS383,1970) 1 Cum 101 4
64 - do - 75 mm size ( IRC ,MORTH & MORD) 1 Cum 101 4
65 y - do - 75 to 100 mm size (IS383,1970) 1 Cum 80 4
66 - do - 75 to 100 mm ( IRC, MORTH & MORD) 1 Cum 80 4
OTHER ITEMS INCLUDING STACKING
67 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 87.5 4
68 z2 kankar, hard broken kankar 40 to 75 mm ( ring ) 1 Cum 65.5 4
69 z3 Soling stone of 150 mm size of granite, trap and Dolamite varieties. 1 Cum 82 4
NOTE:- (1) Add extra for items to 33(z3) Rs /- Per cum, wherever 1 Cum 70
quarrying is done by blasting. (2) Wherever controlled blasting is
resorted to the Chief Engineer concerned shall approve the observed
data in support of SS item No. 22 a to 22 c , 22g, 23

70 z4 Soling stone of 150 mm size other than granite variety 1 Cum 57.5 4
71 z5 Soling Stone laterite, Kankar 150mm, surface stone 1 Cum 35 4
72 z6 Field picked metal unbroken 20 mm size 1 Cum 47.5 4
73 z7 - do - 25 mm size 1 Cum 37.5 0
74 z8 - do - 40 mm size 1 Cum 42 0
75 z9 - do - 50 mm size 1 Cum 37.5 4
76 z10 - do - 60 mm size 1 Cum 31 4
77 z11 - do - 80 mm size 1 Cum 22.5 4
NOTE:- Add Rs. /- Per Cum for selection of stone and boulders from 15.00
excavated spoil dumps for items 33 (Q) TO 33 Z , when this addition of Rs. 9.00
78 34 Gravel including stacking 1 Cum 56 -
79 35 a Quarry rubbish 1 Cum 25 4
b HBG Stone Chips 2.36mm and below 1 Cum 225 4
80 36.a Sand for mortar, ceiling coat including washing screening etc., 1 Cum 175 4
81 Sand for concrete
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
82 b Sand for filling and blindage 1 Cum 60 4
83 37 Clay for puddle and masonry Items 38 (a) to 39 (h) As per local prevailing
1 rates
Cum based 28 on competitive quotations.
(C) LIME AND CEMENT
40 to As per local
41(c ) prevailing
84 42 Cement excluding cost of empty cement bags Metric The price of cement
will be reviewed
Tonne and fixed on
monthly basis as
per G.O.Ms.No.94
T,R&B Dept Dt16-4-
2008 and rates will
be communicated
separately.

NOTE:
(1) The rate is material at site ( No conveyance charges to be allowed) 2)As per
85 42.a
Labour for mixing cement mortar 1 Cum 28 0
86 b Mixing of cement mortar by machine 1 Cum 45 0
87 c Grinding lime mortar or Surkhi mortar 1 Cum 78 4
88 d Shell lime slaked and screened 1 Cum 780 4
(D) MORTARS
89 43 to Items 43 to 45 Rates have
45 to be worked
(E) METAL AND IRON WORKS out based on
(A) CLEARING SITE
90 1.a Clearing heavy Jungle 1 Sqm 2.2 0
91 b Clearing light Jungle 1 Sqm 2 0
92 c Clearing Scrub Jungle 1 Sqm 2 0
93 d Clearing Juliflora (Prosafis) jungle including up-rooting and removing of 1 Sqm 3.3
0
Juliflora stumps.
94 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 to Each 27
0
100 cm.
95 ii - do - 100 to 200 cm. Each 42.5 0
96 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth Each 30
0
30 to 100 cm.
97 ii - do - 100 to 200 cm. Each 46 0
98 2.c.I Cutting and removing date trees including stacking of girth 30 to 100 Each 18
0
cm
99 ii - do - 100 to 200 cm Each 28 0
100 d.I Uprooting and removing stumps of date trees including stacking of Each 18
0
girth 30 to 100 cm.
101 ii - do - 100 to 200 cm Each 24 0
102 eI Cutting and removing other kind of trees including stacking of girth 30 Each 24
0
to 100 cm
103 ii - do - 100 to 200 cm Each 38 0
104 iii - do - above 200 cm Each 62 0
105 f.I Uprooting and removing stumps of other kind of trees including Each 18
0
stacking of girth 30 to 100 cm.
106 ii - do - 100 to 200 cm Each 26 0
107 iii - do - above 200 cm Each 35.5 0
108 3.a Uprooting and clearing prickly pear jungle 1 Sq.m 1.9
0
109 b - do - under 2.5 meters height including burning and burying as 1 Sq.m 2.4
0
directed.
110 c - do - over 2.5 meters height including burning and burying with an 1 Sq.m 2.9
0
initial lead of conveyance
111 4.a Removing of natchu, goobi, thooti etc., from drains, channels including 1 Sq.m 1.5
clearance if not more than 1 metre depth of water with an initial lead
0
of 10 metres and lift of 2 metres.

112 b.I Clearing alchi, tilla 1 Sq.m 2.9 0


113 b.ii Removal of Jammu 1 Sq.m 2.5 0
114 c.I Removal of imponea, cornea 1 Sq.m 2.9 0
115 c.ii Removal of water hyacinth up to 30 cm thick. 1 Sq.m 3 0
116 c.iii - do - more than 30 cm thick 1 Sq.m 4.1 0
117 d Removal of natchu, goobi, thooti etc., for every extra lead or lift over 1 Sq.m 1
0
the initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND CAREFULLY STACKING
-
MATERIALS USEFUL FOR REUSE.
118 n.(i) Dry rough stone revetment for aprons and stacking within 40 metres 1 cum 50
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
(C) QUARRYING AND BLASTING
119 6 Blasting and removing hard granite measured in solid 1 cum covered
under earth
7 Drilling holes in hard granite or sheet rock
a) Manually ( Hand)
120 I) 20 mm dia meter 1 RM 88 0
121 ii) 25 mm dia meter 1 RM 95.5 0
122 iii) 36 mm dia meter 1 RM 109 0
b) Pneumatic Compressor
123 I) 20 mm dia meter 1 RM 100 0
124 ii) 25 mm dia meter 1 RM 110 0
125 iii) 36 mm dia meter 1 RM 121 0
8 Grouting the holes with neat cement slurry excluding cost of
steel
126 I) 20 mm dia meter 1 RM 64.5 0
127 ii) 25 mm dia meter 1 RM 81 0
128 iii) 36 mm dia meter 1 RM 99.5 0
EARTH WORK EXCAVATION AND DEPOSITING ON BANK WITH
AN INITIAL LEAD OF 10 METRES AND AN INITIAL LIFT OF 2
METRES IN CASE OF HEAD LEAD ONLY.
Sand or loose soils wet sand not under water, silt in canals, channels
129 8.a 1 cum 27 0
and drains SS 20-A.
130 b - do - 20-B 1 cum 25 0
Loamy and Clayey soils like black cotton soils, red earth and ordinary
131 9.a 1 cum 41 0
gravel SS 20-A.
132 b - do - 20-B 1 cum 37.5 0

133 10.b Slushy soil and silt clearance up to 0.60 metres depth SS 20-B 1 cum 41 0

134 11.b Clayey Soil in wet and slushy condition SS 20-B 1 cum 43 0

135 12.a Hard Gravelly Soils SS 20-A 1 cum 43 0

136 b - do - SS 20-B 1 cum 40.5 0


Mixture of gravel and soft disintegrated rock like shales ordinary
137 13.a gravel, stoney earth and earth mixed with fair sized boulders 1 cum 45.5 0
SS 20-A
138 b - do - 20-B 1 cum 41.5 0

139 14 Soft disintegrated rock ( removable by pick axes and crow bars) 1 cum 49 0

140 15 Stone matrix 1 cum 50.5 0


Hard disintegrated rock or soft rock or conglomerate rock etc.,
141 16 1 cum 66 0
removable by pick axes and crow bars
Hard disintegrated rock or soft rock or conglomerate rock and Hard
142 17 1 cum 87 0
lime kankar requiring partial blasting.
Fissured and fractured rock and boulders up to 3 cum in size requiring
143 18.a.I 1 cum 147 0
blasting including stacking
144 a.ii - do - Stacking is not done 1 cum 141.5 0
Excavation of Nandyal Slabs more than 3 cum in size requiring blasting
145 18.b.I 1 cum 180 0
including stacking
146 b.ii - do - Stacking is not done 1 cum 175 0
Hard rock and boulders more than 3 cum in size requiring blasting
147 19.a.I 1 cum 320 0
including stacking
148 a.ii - do - Stacking is not done 1 cum 310 0
Hard rock and boulders more than 3 cum in size wherever quarrying is
149 a.iii 1 cum 400 0
done by controlled blasting.
150 a.iv - do - Stacking is not done 1 cum 390 0
Benching, chiseling, wedging and boring in rock in foundation grade
151 19.b 1 cum 440 0
levelling.
FOR ALL SOILS, SOFT DISINTEGRATED ROCK AND STONE
MATRIX (ITEM N0s 8-b to 15 ABOVE )
Extra for every additional 10 metres lead or part there of over the
152 20.a.I 1 cum 1.7 0
initial lead for the first 3 extra leads
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
153 ii -do- from 4 th extra lead to 6 th extra lead 1 cum 2.7 0

154 iii -do- from 7 th extra lead to 9 th extra lead 1 cum 4 0

FOR HARD DISINTEGRATED ROCK (ITEM 16 TO 17 ABOVE )


(Extra for every additional 10 metres lead or part there of) over the
155 20bi 1 cum 2.9 0
initial lead for the first 3 extra leads
Extra for every additional 10 mtrs. Lead or part there of from 4 th
156 ii 1 cum 4.5 0
extra lead to 6 th extra lead
157 iii -do- from 7 th extra lead to 9 th extra lead 1 cum 6 0
FOR FISSURED AND FRACTURED HARD ROCK AND BOULDERS
ETC., (ITEM 18 & 19 a ABOVE)
(Extra for every additional 10 metres lead or part there of) over the
158 20.c.I 1 cum 4.5 0
initial lead for the first 3 extra leads
Extra for every additional 10 mtrs. Lead or part there of from 4 th
159 ii 1 cum 7 0
extra lead to 6 th extra lead
160 iii -do- from 7 th extra lead to 9 th extra lead 1 cum 8.5 0
FOR ALL SOILS, SOFT DISINTEGRATED ROCK AND STONE
MATRIX (ITEM N0s 8-b to 15 ABOVE )
Extra for every additional 1 metre lift or part there of over the initial lift
161 21.a.I 1 cum 1.7 0
for the first 3 extra lifts
Extra for every additional 1 mtrs. lift or part there of from 4 th extra
162 ii 1 cum 2.7 0
lift to 6 th extra lift
163 iii -do- from 7 th extra lift and above 1 cum 4 0

FOR HARD DISINTEGRATED ROCK (ITEM 16 & 17 ABOVE )


Extra for every additional 1 metres Lift or part there of over the initial
164 21.b. I 1 cum 2.9 0
lift for first 3 extra lifts
Extra for every additional 1 mtrs. lift or part there of from 4 th extra
165 ii 1 cum 4.5 0
lift to 6 th extra lift
166 21.b.iii -do- from 7 th extra lift and above 1 cum 6 0
FOR FISSURED AND FRACTURED, HARD ROCK AND BOULDERS
ETC.,(ITEM 18 TO 19 a ABOVE ).
Extra for every additional lift of 1 metre or part there of over the initial
167 21.c.I 1 cum 4.5 0
lift for the first 3 extra lifts
Extra for every additional lift of 1metre or part there of over from 4th
168 ii 1 cum 7 0
extra lift to 6 th extra lift
169 iii -do- from 7 th extra lift and above 1 cum 8.5 0
Note: The lift charges mentioned in SS item Nos 21a,21 b, and 21c
under (D) Earth work are applicable to delifts also.
Add to relevant SS 20-A rates for new tank bunds, closing breaches,
22.a road formation and embankments for extra watering and consolidation 1 cum 3 0
by stone roller up to 1 tonne.
170 b - do - with stone roller 2 tonnes or cattle treading 1 cum 4.8 0

Add to relevant SS 20-A rates for new tank bunds, closing breaches,
b(I) road formation and embankments for extra watering and consolidation 1 cum 5 0
by pneumatic tampers at 90% proctor's density.

Add to relevant SS 20-A rates for new tank bunds, closing breaches,
road formation and embankments for extra watering and consolidation
171 c 1 cum 28 0
of proctor's density with 8 to 10 tonne power roller including watering
and conveyance of water for initial lead of 1/2 Kilometer.

Note: The element of Hire charges is Rs 51.76 per 10 cum


corresponding to the hire charges of 8 to 10 Tonne power roller fixed
at Rs. 2200 /- per day of 8 hours. The rate shall be increased when
the element of hire charges increases for item No. 22 c above, if the
roller is lent to the contractor at a rate of Rs 275/- per hour (i.e.,) Rs
2200 /- per day of 8 hours may be effected.)
Extra for every additional 1/2 km lead for water over the initial lead of
172 22.d 1 cum 3 0
1/2 Km for consolidation of banks .
173 23.a Benching old embankment slopes 0.45 x 0.45 metres. 1 RM 2 0
174 23.b Puddle wall work 1 cum 43 0
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
Turfing slopes including watering for 3 months with initial lead for
175 24 1 Sq.m 19 0
conveyance of water and grass for 1 hectometer.
Refilling with the excavated sand complying with the standard
176 25 1 cum 14 0
specifications for filling foundations
Refilling with the excavated soils ( other than sand) complying with
177 26.a 1 cum 14 0
the standard specifications for filling foundations.

50% of
earth work
Trimming of slopes of embankments and depositing the soils on the
178 b 1 cum excavation
top of the bank.
of similar
classification

179 c Ploughing 1 Sq.m 0.8 0


(E) CONCRETE AND (G) STONE MASONRY
Rates have
to be worked
180 SSI NOS 31a to 39 and SSI Nos. 60 to 87 based on
standard
data
Note:
1. Add for vibrating concrete 1 cum 43 0

2. Add for machine mixing of concrete. 1 cum 45 0

3.Add where the power is available for operating the mixer, the rate is, 1 cum 27.5 0
White washing and colour banding for guard and guide stones
181 aI each 5.8 0
including cost of materials
182 bI Screening sand and gravel 1 cum 5.7 0
183 b2 Screening chips and metal 1 cum 11.8 0
184 c1 Removing and refixing Hectometer or Demarcation stones each 8.6 0
CENTERING CHARGES
Centering charges for culvert slabs and other structures of 3 mts.
185 L1 1 cum 950 0
span and above
Centering charges for bed blocks and culvert slabs and other
186 L2 1 cum 760 0
structures of less than 3 mts. span.
CENTERING CHARGES FOR MINOR AND MAJOR BRIDGE
WORKS
For mass concrete piers, abutments and steining well curbs, well caps
187 L3 1 cum 700 0
etc.,
For RCC piers, abutments, wing wall, steining, well curbs, well caps
188 L4 1 cum 850 0
etc.,
NOTE:- The rates under L3 and L 4 are applicable to Roads and
189
Buildings and Irrigation structures up to 2 metres width
190 L5 For RCC deck slabs 1 cum 1550 0
191 L6 For RCC beams 1 cum 2000 0
192 L7 For RCC hand rails 1 cum 2200 0
For CC pavements, wearing coats, approach, slabs, guide stone, J. M.
193 L8 1 cum 160 0
stone etc.,
Laying and fixing RCC Hume pipes in position including lifting,
aligning etc., complete with (fixing ) collars for the following
n
diametres of pipes but excluding cost of materials ( NP2 Class
)
194 n 1 250 mm diameter 1 Rm 17 0
195 n 2 300 mm diameter 1 Rm 23.5 0
196 n 3 450 mm diameter 1 Rm 30 0
197 n 4 600 mm diameter 1 Rm 49 0
198 n 5 750 mm diameter 1 Rm 60 0
199 n 6 800 mm diameter 1 Rm 73 0
200 n 7 1000 mm diameter 1 Rm 82 0
201 n 8 1220 mm diameter 1 Rm 100 0
Note:- For NP3 class 50% extra over the rates of NP2. Class may be
allowed.
(S ) ROAD WORK ITEMS
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100
mm SPREADING OLD METAL AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND SUBGRADE ROLLING,
SPREADING METAL INCLUDING BLINDAGE OFGRAVEL
WATERING WITH AN INITIAL LEAD OF 2 HECTOMETERS AND
HAND ROLLER ( 1.5 TO 2 TONNES) ROLLING ETC., INCLUDING
BARRICADING,DIVERSION OF TRAFFIC AND WETTING THE
NEW CONSOLIDATION FOR A FORTNIGHT COMPLETE.

( For a compact thickness )


1 (I ) HARD METAL
202 a 40 mm thickness 10 sqm 52
0
203 b 50 mm thickness 10 sqm 55
0
204 c 75 mm thickness 10 sqm 60
0
205 d 100 mm thickness 10 sqm 65
0
1 (ii ) For compact thickness of soft metal
206 a 50 mm thickness 10 sqm 40 0
207 b 75 mm thickness 10 sqm 48 0
208 c 100 mm thickness 10 sqm 52 0
209 2 Picking 5 to 100 mm old metalled surface and sectioning 10 sqm 20 0

210 3 Picking gravelled surface 25 mm deep and levelling and sectioning 10 sqm 6 0

211 4 Picking the existing B.T. surface and removal of chips 10 sqm 22 0
5 Picking old metalled surface to a depth of 40 to 100 mm and
spreading metal including watering with an initial lead of 2
Hectometers and rolling with power rollers watering and
spreading gravel for blindage and power roller rolling
including hire charges of power roller rolling including hire
charges of power roller ( 8 to 10 T) barricading and diversion
of traffic and wetting the new consolidation for a fortnight (
for compacted thickness of )
HARD METAL
212 5 (a) 40 mm thickness 10 sqm 137
0
213 (b) 50 mm thickness 10 sqm 155
0
214 (c ) 75 mm thickness 10 sqm 170
0
215 (d ) 100 mm thickness 10 sqm 185
0
216 (e) 150 mm thick excluding hire charges 10 sqm 330
0
Spreading gravel watering with an initial lead of 2
hectometers and power roller ( 8 to 10 T ) rolling excluding
hire charges of power roller and barricading etc., ( for a
compact thickness of )
217 6a 50 mm thickness 10 sqm 25 0

218 b 75 mm thickness 10 sqm 34 0

219 c 100 mm thickness 10 sqm 53 0

220 d 150 mm thickness 10 sqm 60 0


Blinding the road surface 6 mm thick with gravel or sand
221 7a 10 sqm 1.8 0
available at site after remaining loose stones including
222 b -do- without watering 10 sqm 1.5 0
Blinding the road surface 6 mm thick with gravel or sand dug
223 8a 10 sqm 2.9 0
from road site including watering.
224 b -do- without watering 10 sqm 2.1 0
Spreading gravel sand including watering and roller rolling (
225
for compacted thickness of )
Sl. S.S. Description Unit Total
No Item SS Rate for embedded
No. 2008-09 Tax Rate (%)

1 2 3 4 5 6
226 9a -do- 6mm to 20 mm thick 1 cum 38 0

227 b -do- from 20 to 25 mm thick 1 cum 34 0

228 c -do- from 25 to 40 mm thick 1 cum 32 0

229 d -do- from 40 to 50 mm thick 1 cum 30 0


Picking 50 to 100 mm Old metalled surface, spreading metal and
230 10 10 sqm 28 0
blindage watering tamping for patch repairs ( labour only )
Picking old metalled surface 50 to 100 mm deep spreading gravel
231 11 10 sqm 15 0
watering and tamping ( labour only )
232 12 Levelling ruts and tamping gravelled roads 10 sqm 3 0

233 13 Levelling ruts and tamping metalled roads 10 sqm 6 0


Spreading gravel or sand including watering and rolling with hand
234 14 10 cum 230 0
roller irrespective of thickness in layer
Carrying for water for WBM consolidation metal and blindage of 40 to
235 15(I) 10 sqm 3 0
150 mm thickness for every one hectometer beyond initial lead of 2
Rate towards the cost of water to be consumed for Cement Concrete
236 (ii) 1 sqm 10 0
Roads(including curing) under Greater Hyderabad Municipal
Structural steel/ Reinforcement steel (HYSD/TMT) Note:- As per
237 16 1 tonne 20.64
monthly rate fixed by the sub committee
Cement 43Gr/ 53 Gr Note:- As per monthly rate fixed by the sub
238 17 1 tonne 30.5
committee
Excise duty and
vat as provided
239 18 Bitumen 1 tonne in the sanctioned
estimate
SSR - 2014-15
Statement showing the Schedule of Rates with Revised embedded tax
rates for the material rates items of SoR 2014-15
Sl. S.S. Description Unit TS SSR Total
No Item 2014-15 embedde
No. d Tax
Rate(%)
1 2 3 4
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING,
BREAKING,BURNING, SPLITING AND STACKING
1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap 1 cum
160 5
2 b.I For SS Revetment work 225 mm 1 cum 144 5
3 b.ii For SS Revetment work 300 mm 1 cum 164 5
4 b.iii For SS Revetment work450 mm 1 cum 136 5
5 c Jeddy Stone above 450 mm to 600 mm 1 cum 188 5
6 d I. Laterite for revetment 225 mm 1 cum 118 5
7 d II. Laterite for revetment 300 mm 1 cum 138 5
8 d.iii Granite for SS revetment 225 mm 1 cum 154 5
9 d.iv Granite for SS revetment 300 mm 1 cum 156 5
10 Note:- Only when other than granite is not available
11 e Laterite for masonry 1 cum 136 5
12 f Cyclopean stones above 0.2 cum 1 cum 254 5
13 g For R.R.Masonry works ( granite, dolamite and trap variety 1 cum 252
14 NOTE:- For items 22(a) to 22© ,22d.iii,22d.iv 22(f) and 22(g) add 1 cum
extra Rs /cum, wherever quarrying is done by blasting 70

COURSED RUBBLE STONE QUARRYING WEDGING,


BREAKING, BURNING AND SPLITTING INCLUDING
STACKING FOR SS FIRST SORT WORKS

15 23.a Granite, dolamite and trap 1 cum 262 5


16 b For other varieties 1 cum 188 5
17 27 Granite stone slabs for culverts, lintels and copings (3 faces dressed 1 cum
1728 5
coarsed rubble masonry)
18 NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum, 1 cum
74
wherever quarrying is done by blasting
19 28 Bond stones ( 600 x 200 x 200 mm ) each 30 5
20 b Chainage stones and Centre line stones (750x150x150xmm) each 37 5
24 31 Demarcation Stones ( 900 x 150 x 150 mm) each 70 5
25 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 102 5
26 b Guide Stones ( 800 x 150 x150 mm ) each 70 5
27 c Carving letters and figures in stone up to 100 mm size each 8 5
28 d Carving letters and figures in stone above 100 mm size each 9 5
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE
FREE FROM DUST OBTAINED BY QUARRYING, WEDGING,
BREAKING, BURNING AND SPLITTING INCLUDING
STACKING.
29 33.a - do - 6mm size (IS383,1970) 1 cum 532 0
30 b - do - 10mm size (IS383,1970) 1 cum 692 0
31 c - do - 12mm size (IS383,1970) 1 cum 822 0
32 d - do - 20mm size (IS383,1970) 1 cum 1036 0
33 e - do - 25mm size (IS383,1970) 1 cum 994 0
34 f - do - 40mm size (IS383,1970) 1 cum 620 0
35 g - do - 50mm size (IS383,19705) 1 cum 456 5
36 h - do - 60mm size (IS383,1970) 1 cum 419 5
37 I - do - 65mm size (IS383,1970) 1 cum 379 5
38 j - do - 75mm size (IS383,1970) 1 cum 304 5
39 k - do - 75 to 100mm size (IS383,1970) 1 cum 248 5
40 NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if
70
the metal is obtained by blasting
41 (2) Add 25% extra per cum if the metal is obtained by machine
25%
crushing excluding cost of blasting.
42 (3) Deduct Rs. /- per cum if the metal or rubble is obtained from
9.9
surface stone and boulders.
43 (4) Add Rs. /- per cum for selection of stones and boulders from
excavated spoil dumps for items 33 a to 33 k, when this addition of
Rs. /- per Cum is allowed deduction of Rs. /- per Cum 17
mentioned under Note (3) above should invariably be made.

SOFT BROKEN STONE SCREENED AND FREE FROM DUST


INCLUDING STACKING
44 33.l - do - 40 mm size ( IS383,1970 ) 1 Cum 123 0
45 33.m - do - 50 mm size ( IS383,1970 ) 1 Cum 111 5
46 33.n - do - 60 mm size ( IS383,1970 ) 1 Cum 87 5
47 33.o - do - 65 mm size ( IS383,1970 ) 1 Cum 78 5
48 33.p - do - 75 mm size ( IS383,1970 ) 1 Cum 73 5
HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND
DOLAMITE FREE FROM DUST OBTAINED BY QUARRYING
WEDGING, BREAKING, BURNING AND SPLITTING
INCLUDING STACKING (QUARTZITE AND BASALT WITH
AGGREGATE IMPACT OF LESS THAN 20)

49 33a -do- 2.36 mm to 5 mm size ( IRC, MORTH &MORD) 1 cum 308 5


50 b -do- 5 mm to 7 mm size ( IRC, MORTH & MORD) 1 cum 504 0
51 c -do- 9.5 mm to 11.2 mm size ( IRC, MORTH & MORD) 1 cum 656 0
52 d -do- 12mm to 14 mm size ( IRC, MORTH & MORD) 1 cum 780 0
53 e -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 cum 984 0
54 f -do- 25 mm to 27 mm size ( IRC,MORTH &MORD ) 1 cum 944 0
55 g -do- 40 mm to 45 mm size ( IRC , MORTH &MORD) 1 cum 588 0
56 h -do- 50 mm to 55 mm size ( IRC,MORTH & MORD ) 1 cum 456 5
57 i -do- 60 mm to 63 mm size ( IRC, MORTH &MORD) 1 cum 419 5
58 j -do- 65 mm size ( IRC ,MORTH &MORD ) 1 cum 379 5
59 k -do- 75 mm size ( IRC,MORTH &MORD) 1 cum 304 5
60 1 NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the 1 cum
70
metal is obtained by blasting
61 2 Add 25% extra per cum if the metal is obtained by machine 1 cum
25%
crushing excluding cost of blasting.
62 3 Deduct Rs. /- per cum if the metal or rubble is obtained from 1 cum
9.9
surface stones and boulders
63 4 Add Rs. /- per cum for selection of stones and boulders from 1 cum
excavated soil dumps for items 33 (a) to 33 (k), when this addition
of Rs. /- per cum allowed deduction of Rs. /- per cum mentioned 17
under note (3) above should invariably be made

HARD BROKEN STONE OTHER THAN GRANITE SUCH AS


QUARTZ, QUARTZ-NAPA AND BASALT SCREENED AND FREE
FROM DUST INCLUDING STACKING
64 33.q - do - 10 mm size (IS383,1970) 1 Cum 386 0
65 -do- 9.5 mm to 11.2 mm size ( IRC,MORTH & MORD ) 1 Cum 386 0
66 r - do - 12 mm size (IS383,1970) 1 Cum 362 0
67 -do- 12mm to 14 mm size ( IRC , MORTH & MORD ) 1 Cum 362 0
68 s - do - 20 mm size (IS383,1970) 1 Cum 293 0
69 -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 Cum 293 0
70 t - do - 25 mm size (IS383,1970) 1 Cum 287 0
71 u - do - 40 mm size (IS383,1970) 1 Cum 170 0
72 -do- 40 mm to 45 mm size ( IRC , MORTH & MORD) 1 Cum 170 0
73 v - do - 50 mm size (IS383,1970) 1 Cum 150 5
74 -do- 50 mm to 55 mm size ( IRC,MORTH &MORD) 1 Cum 150 5
75 33.w - do - 65 mm size (IS383,1970) 1 Cum 142 5
76 -do- 60 mm to 65 mm size ( IRC, MORTH &MORD) 1 Cum 142 5
77 x - do - 75 mm size (IS383,1970) 1 Cum 117 5
78 - do - 75 mm size ( IRC ,MORTH & MORD) 1 Cum 117 5
79 y - do - 75 to 100 mm size (IS383,1970) 1 Cum 92 5
80 - do - 75 to 100 mm ( IRC, MORTH & MORD) 1 Cum 92 5
81 OTHER ITEMS INCLUDING STACKING
82 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 101 5
83 z2 kankar, hard broken kankar 40 to 75 mm ( ring ) 1 Cum 75 5
84 z3 Soling stone of 150 mm size of granite, trap and Dolamite varieties. 1 Cum 95 5
85 NOTE:- (1) Add extra for items to 33(z3) Rs /- Per cum, wherever 1 Cum
quarrying is done by blasting. (2) Wherever controlled blasting is
resorted to the Chief Engineer concerned shall approve the 70
observed data in support of SS item No. 22 a to 22 c , 22g, 23

86 z4 Soling stone of 150 mm size other than granite variety 1 Cum 66 5


87 z5 Soling Stone laterite, Kankar 150mm, surface stone 1 Cum 41 5
88 z6 Field picked metal unbroken 20 mm size 1 Cum 55 5
89 z7 - do - 25 mm size 1 Cum 42 0
90 z8 - do - 40 mm size 1 Cum 48 0
91 z9 - do - 50 mm size 1 Cum 42 5
92 z10 - do - 60 mm size 1 Cum 36 5
93 z11 - do - 80 mm size 1 Cum 32 5
94 NOTE:- Add Rs. /- Per Cum for selection of stone and boulders from 17
95 34 Gravel including stacking 1 Cum 103 0
96 35 a Quarry rubbish 1 Cum 81 5
97 b HBG Stone Chips 2.36mm and below 1 Cum 340 5
98 36.a Sand for mortar, ceiling coat including washing screening etc., 1 Cum 606 5
99 Sand for concrete 462 5
100 b Sand for filling and blindage 1 Cum 342 5
101 37 Clay for puddle and masonry Items 38 (a) to 39 (h) As per local prevailing
1 Cumrates 35 on competitive
based 5 quotation
102 (C) LIME AND CEMENT
103 40 to
41(c )
104 42 Cement excluding cost of empty cement bags Metric
Tonne
NOTE: (1) The rate is material at site ( No conveyance charges to be allowed) 2)As
105 42.a Labour for mixing cement mortar 1 Cum
106 b Mixing of cement mortar by machine 1 Cum
107 c Grinding lime mortar or Surkhi mortar 1 Cum 94 5
108 d Shell lime slaked and screened 1 Cum 940 5
(D) MORTARS
110 43 to Items 43 to 45
45
(E) METAL AND IRON WORKS
(A) CLEARING SITE
111 1.a Clearing heavy Jungle 1 Sqm 2.9 0
112 b Clearing light Jungle 1 Sqm 2.6 0
113 c Clearing Scrub Jungle 1 Sqm 2.6 0
114 d Clearing Juliflora (Prosafis) jungle including up-rooting and 1 Sqm
3.7 0
removing of Juliflora stumps.
115 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 Each
19 0
to 100 cm.
116 ii - do - 100 to 200 cm. Each 44 0
117 2.b.I Uprooting and removing Palmyrah stumps including stacking of Each
46 0
girth 30 to 100 cm.
118 ii - do - 100 to 200 cm. Each 48 0
119 2.c.I Cutting and removing date trees including stacking of girth 30 to Each
24 0
100 cm
120 ii - do - 100 to 200 cm Each 35 0
121 d.I Uprooting and removing stumps of date trees including stacking of Each
24 0
girth 30 to 100 cm.
122 ii - do - 100 to 200 cm Each 30 0
123 e I Cutting and removing other kind of trees including stacking of girth Each
30 0
30 to 100 cm
124 ii - do - 100 to 200 cm Each 46 0
125 iii - do - above 200 cm Each 75 0
126 f.I Uprooting and removing stumps of other kind of trees including Each
24 0
stacking of girth 30 to 100 cm.
127 ii - do - 100 to 200 cm Each 33 0
128 iii - do - above 200 cm Each 41 0
129 3.a Uprooting and clearing prickly pear jungle 1 Sq.m
2.3 0
130 b - do - under 2.5 meters height including burning and burying as 1 Sq.m
3 0
directed.
131 c - do - over 2.5 meters height including burning and burying with an 1 Sq.m
3.5 0
initial lead of conveyance
132 4.a Removing of natchu, goobi, thooti etc., from drains, channels 1 Sq.m
including clearance if not more than 1 metre depth of water with an 1.9 0
initial lead of 10 metres and lift of 2 metres.
133 b.I Clearing alchi, tilla 1 Sq.m
3.8 0
134 b.ii Removal of Jammu 1 Sq.m
3.3 0
135 c.I Removal of imponea, cornea 1 Sq.m
3.6 0
136 c.ii Removal of water hyacinth up to 30 cm thick. 1 Sq.m
3.7 0
137 c.iii - do - more than 30 cm thick 1 Sq.m
5 0
138 d Removal of natchu, goobi, thooti etc., for every extra lead or lift 1 Sq.m
1.4 0
over the initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND CAREFULLY
STACKING MATERIALS USEFUL FOR REUSE.
139 n.(i) Dry rough stone revetment for aprons and stacking within 40 1 cum
62.5 0
metres
(C) QUARRYING AND BLASTING
140 6 Blasting and removing hard granite measured in solid 1 cum - -
7 Drilling holes in hard granite or sheet rock
a) Manually ( Hand)
141 I) 20 mm dia meter 1 RM 124 0
142 ii) 25 mm dia meter 1 RM 131 0
143 iii) 36 mm dia meter 1 RM 151 0
b) Pneumatic Compressor
144 I) 20 mm dia meter 1 RM 140 0
145 ii) 25 mm dia meter 1 RM 152 0
146 iii) 36 mm dia meter 1 RM 165 0
8 Grouting the holes with neat cement slurry excluding cost
of steel
147 I) 20 mm dia meter 1 RM 88 0
148 ii) 25 mm dia meter 1 RM 111 0
149 iii) 36 mm dia meter 1 RM 138 0
150 aI White washing and colour banding for guard and guide stones each
8.6 0
including cost of materials
151 bI Screening sand and gravel 1 cum 9.3 0
152 b2 Screening chips and metal 1 cum 16 0
153 c1 Removing and refixing Hectometer or Demarcation stones each 11.5 0
(S ) ROAD WORK ITEMS
PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100
mm SPREADING OLD METAL AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND SUBGRADE ROLLING,
SPREADING METAL INCLUDING BLINDAGE OFGRAVEL
WATERING WITH AN INITIAL LEAD OF 2 HECTOMETERS
AND HAND ROLLER ( 1.5 TO 2 TONNES) ROLLING ETC.,
INCLUDING BARRICADING,DIVERSION OF TRAFFIC AND
WETTING THE NEW CONSOLIDATION FOR A FORTNIGHT
COMPLETE.
( For a compact thickness )
1 (I ) HARD METAL
154 a 40 mm thickness 10 sqm
70 0
155 b 50 mm thickness 10 sqm
74 0
156 c 75 mm thickness 10 sqm
80.3 0
157 d 100 mm thickness 10 sqm
87 0
1 (ii ) For compact thickness of soft metal
158 a 50 mm thickness 10 sqm 53.8 0
159 b 75 mm thickness 10 sqm 63.9 0
160 c 100 mm thickness 10 sqm 70.1 0
161 5 Picking old metalled surface to a depth of 40 to 100 mm
and spreading metal including watering with an initial lead
of 2 Hectometers and rolling with power rollers watering
and spreading gravel for blindage and power roller rolling
including hire charges of power roller rolling including hire
charges of power roller ( 8 to 10 T) barricading and
diversion of traffic and wetting the new consolidation for a
fortnight ( for compacted thickness of )
HARD METAL
162 5 (a) 40 mm thickness 10 sqm
185 0
163 (b) 50 mm thickness 10 sqm
210 0
164 (c ) 75 mm thickness 10 sqm
231 0
165 (d ) 100 mm thickness 10 sqm
248.8 0
166 (e) 150 mm thick excluding hire charges 10 sqm
445.4 0
Structural steel/ Reinforcement steel (HYSD/TMT) Note:- As per
167 16 1 tonne 18.12
monthly rate fixed by the sub committee
Cement 43Gr/ 53 Gr Note:- As per monthly rate fixed by the sub
168 17 1 tonne 28.81
committee
Excise duty
and vat as
provided in
169 18 Bitumen 1 tonne
the
sanctioned
estimate
SSR - 2015-16
Statement showing the Rates with Revided Embedded tax rates for the material
rates of SoR 2015-16

Sl. S.S. Description Unit TS SSR 2015- Total


No Item 16 embedded
No. Tax Rate (%)

1 2 3 4
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING,
BREAKING,BURNING, SPLITING AND STACKING

1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap 1 cum 160 5
2 b.I For SS Revetment work 225 mm 1 cum 160 5
3 b.ii For SS Revetment work 300 mm 1 cum 164 5
4 b.iii For SS Revetment work450 mm 1 cum 136 5
5 c Jeddy Stone above 450 mm to 600 mm 1 cum 188 5
6 d I. Laterite for revetment 225 mm 1 cum 118 5
7 d II. Laterite for revetment 300 mm 1 cum 138 5
8 d.iii Granite for SS revetment 225 mm 1 cum 154 5
9 d.iv Granite for SS revetment 300 mm 1 cum 156 5
Note:- Only when other than granite is not available
10 e Laterite for masonry 1 cum 136 5
11 f Cyclopean stones above 0.2 cum 1 cum 254 5
12 g For R.R.Masonry works ( granite, dolamite and trap variety 1 cum 252 5
13 NOTE:- For items 22(a) to 22© ,22d.iii,22d.iv 22(f) and 22(g) add extra Rs 1 cum
/cum, wherever quarrying is done by blasting 70

COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING,


BURNING AND SPLITTING INCLUDING STACKING FOR SS FIRST
SORT WORKS

14 23.a Granite, dolamite and trap 1 cum 262 5


15 b For other varieties 1 cum 188 5
16 27 Granite stone slabs for culverts, lintels and copings (3 faces dressed coarsed 1 cum
1728 5
rubble masonry)
17 NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum, wherever 1 cum
74
quarrying is done by blasting
18 28 Bond stones ( 600 x 200 x 200 mm ) each 30 5
19 b Chainage stones and Centre line stones (750x150x150xmm) each 37 5
20 31 Demarcation Stones ( 900 x 150 x 150 mm) each 70 5
21 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 102 5
22 b Guide Stones ( 800 x 150 x150 mm ) each 70 5
23 c Carving letters and figures in stone up to 100 mm size each 8 5
24 d Carving letters and figures in stone above 100 mm size each 9 5
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE
FROM DUST OBTAINED BY QUARRYING, WEDGING, BREAKING,
BURNING AND SPLITTING INCLUDING STACKING.

25 33.a - do - 6mm size (IS383,1970) 1 cum 532 0


26 b - do - 10mm size (IS383,1970) 1 cum 692 0
27 c - do - 12mm size (IS383,1970) 1 cum 822 0
28 d - do - 20mm size (IS383,1970) 1 cum 1036 0
29 e - do - 25mm size (IS383,1970) 1 cum 994 0
30 f - do - 40mm size (IS383,1970) 1 cum 620 0
31 g - do - 50mm size (IS383,19705) 1 cum 456 5
32 h - do - 60mm size (IS383,1970) 1 cum 419 5
33 I - do - 65mm size (IS383,1970) 1 cum 379 5
34 j - do - 75mm size (IS383,1970) 1 cum 304 5
35 k - do - 75 to 100mm size (IS383,1970) 1 cum 248 5
36 NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the
70
metal is obtained by blasting
37 (2) Add 25% extra per cum if the metal is obtained by machine crushing
excluding cost of blasting. 25%

38 (3) Deduct Rs. /- per cum if the metal or rubble is obtained from surface
9.9
stone and boulders.
39 (4) Add Rs. /- per cum for selection of stones and boulders from excavated
spoil dumps for items 33 a to 33 k, when this addition of Rs. /- per Cum is
allowed deduction of Rs. /- per Cum mentioned under Note (3) above 17
should invariably be made.

SOFT BROKEN STONE SCREENED AND FREE FROM DUST


INCLUDING STACKING
40 33.l - do - 40 mm size ( IS383,1970 ) 1 Cum 123 0
41 33.m - do - 50 mm size ( IS383,1970 ) 1 Cum 111 5
42 33.n - do - 60 mm size ( IS383,1970 ) 1 Cum 87 5
43 33.o - do - 65 mm size ( IS383,1970 ) 1 Cum 78 5
44 33.p - do - 75 mm size ( IS383,1970 ) 1 Cum 73 5
HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND
DOLAMITE FREE FROM DUST OBTAINED BY QUARRYING
WEDGING, BREAKING, BURNING AND SPLITTING INCLUDING
STACKING (QUARTZITE AND BASALT WITH AGGREGATE IMPACT
OF LESS THAN 20)
45 33a -do- 2.36 mm to 5 mm size ( IRC, MORTH &MORD) 1 cum 308 5
46 b -do- 5 mm to 7 mm size ( IRC, MORTH & MORD) 1 cum 504 0
47 c -do- 9.5 mm to 11.2 mm size ( IRC, MORTH & MORD) 1 cum 656 0
48 d -do- 12mm to 14 mm size ( IRC, MORTH & MORD) 1 cum 780 0
49 e -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 cum 984 0
50 f -do- 25 mm to 27 mm size ( IRC,MORTH &MORD ) 1 cum 944 0
51 g -do- 40 mm to 45 mm size ( IRC , MORTH &MORD) 1 cum 588 0
52 h -do- 50 mm to 55 mm size ( IRC,MORTH & MORD ) 1 cum 456 5
53 i -do- 60 mm to 63 mm size ( IRC, MORTH &MORD) 1 cum 419 5
54 j -do- 65 mm size ( IRC ,MORTH &MORD ) 1 cum 379 5
55 k -do- 75 mm size ( IRC,MORTH &MORD) 1 cum 304 5
56 1 NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the metal is 1 cum
70
obtained by blasting
57 2 Add 25% extra per cum if the metal is obtained by machine crushing 1 cum
25%
excluding cost of blasting.
58 3 Deduct Rs. /- per cum if the metal or rubble is obtained from surface 1 cum
9.9
stones and boulders
59 4 Add Rs. /- per cum for selection of stones and boulders from excavated 1 cum
soil dumps for items 33 (a) to 33 (k), when this addition of Rs. /- per cum
allowed deduction of Rs. /- per cum mentioned under note (3) above 17
should invariably be made

HARD BROKEN STONE OTHER THAN GRANITE SUCH AS QUARTZ,


QUARTZ-NAPA AND BASALT SCREENED AND FREE FROM DUST
INCLUDING STACKING
60 33.q - do - 10 mm size (IS383,1970) 1 Cum 386 0
61 -do- 9.5 mm to 11.2 mm size ( IRC,MORTH & MORD ) 1 Cum 386 0
62 r - do - 12 mm size (IS383,1970) 1 Cum 362 0
63 -do- 12mm to 14 mm size ( IRC , MORTH & MORD ) 1 Cum 362 0
64 s - do - 20 mm size (IS383,1970) 1 Cum 293 0
65 -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 Cum 293 0
66 t - do - 25 mm size (IS383,1970) 1 Cum 287 0
67 u - do - 40 mm size (IS383,1970) 1 Cum 170 0
68 -do- 40 mm to 45 mm size ( IRC , MORTH & MORD) 1 Cum 170 0
69 v - do - 50 mm size (IS383,1970) 1 Cum 150 5
70 -do- 50 mm to 55 mm size ( IRC,MORTH &MORD) 1 Cum 150 5
71 33.w - do - 65 mm size (IS383,1970) 1 Cum 142 5
72 -do- 60 mm to 65 mm size ( IRC, MORTH &MORD) 1 Cum 142 5
73 x - do - 75 mm size (IS383,1970) 1 Cum 117 5
74 - do - 75 mm size ( IRC ,MORTH & MORD) 1 Cum 117 5
75 y - do - 75 to 100 mm size (IS383,1970) 1 Cum 92 5
76 - do - 75 to 100 mm ( IRC, MORTH & MORD) 1 Cum 92 5
OTHER ITEMS INCLUDING STACKING
77 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 101 5
78 z2 kankar, hard broken kankar 40 to 75 mm ( ring ) 1 Cum 75 5
79 z3 Soling stone of 150 mm size of granite, trap and Dolamite varieties. 1 Cum 95 5
NOTE:- (1) Add extra for items to 33(z3) Rs /- Per cum, wherever 1 Cum
quarrying is done by blasting. (2) Wherever controlled blasting is resorted
to the Chief Engineer concerned shall approve the observed data in support 70
of SS item No. 22 a to 22 c , 22g, 23

80 z4 Soling stone of 150 mm size other than granite variety 1 Cum 66 5


81 z5 Soling Stone laterite, Kankar 150mm, surface stone 1 Cum 41 5
82 z6 Field picked metal unbroken 20 mm size 1 Cum 55 5
83 z7 - do - 25 mm size 1 Cum 42 0
84 z8 - do - 40 mm size 1 Cum 48 0
85 z9 - do - 50 mm size 1 Cum 42 5
86 z10 - do - 60 mm size 1 Cum 36 5
87 z11 - do - 80 mm size 1 Cum 32 5
NOTE:- Add Rs. /- Per Cum for selection of stone and boulders from excavated 17
88 34 Gravel including stacking 1 Cum 103 0
89 35 a Quarry rubbish 1 Cum 81 5
90 b HBG Stone Chips 2.36mm and below 1 Cum 340 5
91 36.a Sand for mortar, ceiling coat including washing screening etc., 1 Cum 606 5
92 Sand for concrete 462 5
93 b Sand for filling and blindage 1 Cum 342 5
94 37 Clay for puddle and masonry Items 38 (a) to 39 (h) As per local prevailing rates
1 Cum
based on 35
competitive 5
quotations.
(C) LIME AND CEMENT
95 40 to
41(c )
96 42 Cement excluding cost of empty cement bags Metric
Tonne
NOTE: (1) The rate is material at site ( No conveyance charges to be allowed) 2)As per the
97 42.aLabour for mixing cement mortar 1 Cum
98 b Mixing of cement mortar by machine 1 Cum
99 c Grinding lime mortar or Surkhi mortar 1 Cum 94 5
100 d Shell lime slaked and screened 1 Cum 940 5
(D) MORTARS
101 43 to Items 43 to 45
45
(E) METAL AND IRON WORKS
(A) CLEARING SITE
102 1.a Clearing heavy Jungle 1 Sqm Based on
103 b Clearing light Jungle 1 Sqm detailed
104 c Clearing Scrub Jungle 1 Sqm analysis as
105 d Clearing Juliflora (Prosafis) jungle including up-rooting and removing of 1 Sqm
3.7 0
Juliflora stumps.
106 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 to 100 Each
19 0
cm.
107 ii - do - 100 to 200 cm. Each 44 0
108 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth 30 to Each
46 0
100 cm.
109 ii - do - 100 to 200 cm. Each 48 0
110 2.c.I Cutting and removing date trees including stacking of girth 30 to 100 cm Each
24 0
111 ii - do - 100 to 200 cm Each 35 0
112 d.I Uprooting and removing stumps of date trees including stacking of girth 30 Each
24 0
to 100 cm.
113 ii - do - 100 to 200 cm Each 30 0
114 eI Cutting and removing other kind of trees including stacking of girth 30 to Each
30 0
100 cm
115 ii - do - 100 to 200 cm Each 46 0
116 iii - do - above 200 cm Each 75 0
117 f.I Uprooting and removing stumps of other kind of trees including stacking of Each
24 0
girth 30 to 100 cm.
118 ii - do - 100 to 200 cm Each 33 0
119 iii - do - above 200 cm Each 41 0
120 3.a Uprooting and clearing prickly pear jungle 1 Sq.m
2.3 0
121 b - do - under 2.5 meters height including burning and burying as directed. 1 Sq.m
3 0
122 c - do - over 2.5 meters height including burning and burying with an initial 1 Sq.m
3.5 0
lead of conveyance
123 4.a Removing of natchu, goobi, thooti etc., from drains, channels including 1 Sq.m
clearance if not more than 1 metre depth of water with an initial lead of 10 1.9 0
metres and lift of 2 metres.
124 b.I Clearing alchi, tilla 1 Sq.m 3.8 0
125 b.ii Removal of Jammu 1 Sq.m 3.3 0
126 c.I Removal of imponea, cornea 1 Sq.m 3.6 0
127 c.ii Removal of water hyacinth up to 30 cm thick. 1 Sq.m 3.7 0
128 c.iii - do - more than 30 cm thick 1 Sq.m 5 0
129 d Removal of natchu, goobi, thooti etc., for every extra lead or lift over the 1 Sq.m
1.4 0
initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND CAREFULLY STACKING
62.5 0
MATERIALS USEFUL FOR REUSE.
130 n.(i) Dry rough stone revetment for aprons and stacking within 40 metres 1 cum

(C) QUARRYING AND BLASTING


131 6 Blasting and removing hard granite measured in solid 1 cum

7 Drilling holes in hard granite or sheet rock


a) Manually ( Hand)
132 I) 20 mm dia meter 1 RM 124 0
133 ii) 25 mm dia meter 1 RM 131 0
134 iii) 36 mm dia meter 1 RM 151 0
b) Pneumatic Compressor
135 I) 20 mm dia meter 1 RM 140 0
136 ii) 25 mm dia meter 1 RM 152 0
137 iii) 36 mm dia meter 1 RM 165 0
8 Grouting the holes with neat cement slurry excluding cost of steel

138 I) 20 mm dia meter 1 RM 88 0


139 ii) 25 mm dia meter 1 RM 111 0
140 iii) 36 mm dia meter 1 RM 138 0
141 aI White washing and colour banding for guard and guide stones including each
8.6 0
cost of materials
142 bI Screening sand and gravel 1 cum 9.3 0
143 b2 Screening chips and metal 1 cum 16 0
144 c1 Removing and refixing Hectometer or Demarcation stones each 11.5 0
(S ) ROAD WORK ITEMS
PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100 mm
SPREADING OLD METAL AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND SUBGRADE ROLLING, SPREADING
METAL INCLUDING BLINDAGE OFGRAVEL WATERING WITH AN
INITIAL LEAD OF 2 HECTOMETERS AND HAND ROLLER ( 1.5 TO 2
TONNES) ROLLING ETC., INCLUDING BARRICADING,DIVERSION
OF TRAFFIC AND WETTING THE NEW CONSOLIDATION FOR A
FORTNIGHT COMPLETE.

( For a compact thickness )


1 (I ) HARD METAL
145 a 40 mm thickness 10 sqm
70 0
146 b 50 mm thickness 10 sqm
74 0
147 c 75 mm thickness 10 sqm
80.3 0
148 d 100 mm thickness 10 sqm
87 0
1 (ii ) For compact thickness of soft metal
149 a 50 mm thickness 10 sqm 53.8 0
150 b 75 mm thickness 10 sqm 63.9 0
151 c 100 mm thickness 10 sqm 70.1 0
5 Picking old metalled surface to a depth of 40 to 100 mm and
spreading metal including watering with an initial lead of 2
Hectometers and rolling with power rollers watering and
spreading gravel for blindage and power roller rolling including
hire charges of power roller rolling including hire charges of
power roller ( 8 to 10 T) barricading and diversion of traffic and
wetting the new consolidation for a fortnight ( for compacted
thickness of )

HARD METAL
152 5 (a) 40 mm thickness 10 sqm
185 0
153 (b) 50 mm thickness 10 sqm
210 0
154 (c ) 75 mm thickness 10 sqm
231 0
155 (d ) 100 mm thickness 10 sqm
248.8 0
156 (e) 150 mm thick excluding hire charges 10 sqm
445.4 0
Structural steel/ Reinforcement steel (HYSD/TMT) Note:- As per monthly
157 16 1 tonne 18.12
rate fixed by the sub committee
Cement 43Gr/ 53 Gr Note:- As per monthly rate fixed by the sub
158 17 1 tonne 28.81
committee
Excise duty and
vat as provided
159 18 Bitumen 1 tonne in the sanctioned
estimate
SSR - 2016-17
Statement showing the Schedule of Rates with Revised embedded tax rates
for the material rates items of SoR 2016-17
Sl. S.S. Description Unit TS SSR Total
No Item 2016-17 embedded
No. Tax Rate (%)

1 2 3 4
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING,
BREAKING,BURNING, SPLITING AND STACKING

1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap 1 cum 160 5
2 b.I For SS Revetment work 225 mm 1 cum 160 5
3 b.ii For SS Revetment work 300 mm 1 cum 164 5
4 b.iii For SS Revetment work450 mm 1 cum 136 5
5 c Jeddy Stone above 450 mm to 600 mm 1 cum 188 5
6 d I. Laterite for revetment 225 mm 1 cum 118 5
7 d II. Laterite for revetment 300 mm 1 cum 138 5
8 d.iii Granite for SS revetment 225 mm 1 cum 154 5
9 d.iv Granite for SS revetment 300 mm 1 cum 156 5
Note:- Only when other than granite is not available
10 e Laterite for masonry 1 cum 136 5
11 f Cyclopean stones above 0.2 cum 1 cum 254 5
12 g For R.R.Masonry works ( granite, dolamite and trap variety 1 cum 252 5
13 NOTE:- For items 22(a) to 22© ,22d.iii,22d.iv 22(f) and 22(g) add extra Rs 1 cum
/cum, wherever quarrying is done by blasting 70

COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING,


BURNING AND SPLITTING INCLUDING STACKING FOR SS FIRST SORT
WORKS

14 23.a Granite, dolamite and trap 1 cum 262 5


15 b For other varieties 1 cum 188 5
16 27 Granite stone slabs for culverts, lintels and copings (3 faces dressed coarsed 1 cum
1728 5
rubble masonry)
NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum, wherever 1 cum
74
quarrying is done by blasting
17 28 Bond stones ( 600 x 200 x 200 mm ) each 30 5
18 b Chainage stones and Centre line stones (750x150x150xmm) each 37 5
22 31 Demarcation Stones ( 900 x 150 x 150 mm) each 70 5
23 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 102 5
24 b Guide Stones ( 800 x 150 x150 mm ) each 70 5
25 c Carving letters and figures in stone up to 100 mm size each 8 5
26 d Carving letters and figures in stone above 100 mm size each 9 5
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE FROM
DUST OBTAINED BY QUARRYING, WEDGING, BREAKING, BURNING
AND SPLITTING INCLUDING STACKING.

27 33.a - do - 6mm size (IS383,1970) 1 cum 532 0


28 b - do - 10mm size (IS383,1970) 1 cum 692 0
29 c - do - 12mm size (IS383,1970) 1 cum 822 0
30 d - do - 20mm size (IS383,1970) 1 cum 916 0
31 e - do - 25mm size (IS383,1970) 1 cum 874 0
32 f - do - 40mm size (IS383,1970) 1 cum 532 0
33 g - do - 50mm size (IS383,19705) 1 cum 456 5
34 h - do - 60mm size (IS383,1970) 1 cum 419 5
35 I - do - 65mm size (IS383,1970) 1 cum 379 5
36 j - do - 75mm size (IS383,1970) 1 cum 304 5
37 k - do - 75 to 100mm size (IS383,1970) 1 cum 248 5
NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the metal is
70
obtained by blasting
(2) Add 25% extra per cum if the metal is obtained by machine crushing
excluding cost of blasting. 25%

(3) Deduct Rs. /- per cum if the metal or rubble is obtained from surface stone
9.9
and boulders.
(4) Add Rs. /- per cum for selection of stones and boulders from excavated spoil
dumps for items 33 a to 33 k, when this addition of Rs. /- per Cum is allowed
17
deduction of Rs. /- per Cum mentioned under Note (3) above should
invariably be made.
SOFT BROKEN STONE SCREENED AND FREE FROM DUST INCLUDING
STACKING
38 33.l - do - 40 mm size ( IS383,1970 ) 1 Cum 123 0
39 33.m - do - 50 mm size ( IS383,1970 ) 1 Cum 111 5
40 33.n - do - 60 mm size ( IS383,1970 ) 1 Cum 87 5
41 33.o - do - 65 mm size ( IS383,1970 ) 1 Cum 78 5
42 33.p - do - 75 mm size ( IS383,1970 ) 1 Cum 73 5
HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND DOLAMITE
FREE FROM DUST OBTAINED BY QUARRYING WEDGING, BREAKING,
BURNING AND SPLITTING INCLUDING STACKING (QUARTZITE AND
BASALT WITH AGGREGATE IMPACT OF LESS THAN 20)

43 33a -do- 2.36 mm to 5 mm size ( IRC, MORTH &MORD) 1 cum 320 5


44 b -do- 5 mm to 7 mm size ( IRC, MORTH & MORD) 1 cum 504 5
45 c -do- 9.5 mm to 11.2 mm size ( IRC, MORTH & MORD) 1 cum 656 0
46 d -do- 12mm to 14 mm size ( IRC, MORTH & MORD) 1 cum 717 0
47 e -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 cum 864 0
48 f -do- 25 mm to 27 mm size ( IRC,MORTH &MORD ) 1 cum 824 0
49 g -do- 40 mm to 45 mm size ( IRC , MORTH &MORD) 1 cum 500 5
50 h -do- 50 mm to 55 mm size ( IRC,MORTH & MORD ) 1 cum 456 5
51 i -do- 60 mm to 63 mm size ( IRC, MORTH &MORD) 1 cum 419 5
52 j -do- 65 mm size ( IRC ,MORTH &MORD ) 1 cum 379 5
53 k -do- 75 mm size ( IRC,MORTH &MORD) 1 cum 304 5
1 NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the metal is 1 cum
70
obtained by blasting
2 Add 25% extra per cum if the metal is obtained by machine crushing excluding 1 cum
25%
cost of blasting.
3 Deduct Rs. /- per cum if the metal or rubble is obtained from surface stones 1 cum
9.9
and boulders
4 Add Rs. /- per cum for selection of stones and boulders from excavated soil 1 cum
dumps for items 33 (a) to 33 (k), when this addition of Rs. /- per cum allowed
17
deduction of Rs. /- per cum mentioned under note (3) above should invariably
be made
HARD BROKEN STONE OTHER THAN GRANITE SUCH AS QUARTZ,
QUARTZ-NAPA AND BASALT SCREENED AND FREE FROM DUST
INCLUDING STACKING
54 33.q - do - 10 mm size (IS383,1970) 1 Cum 386 0
55 -do- 9.5 mm to 11.2 mm size ( IRC,MORTH & MORD ) 1 Cum 386 0
56 r - do - 12 mm size (IS383,1970) 1 Cum 362 0
57 -do- 12mm to 14 mm size ( IRC , MORTH & MORD ) 1 Cum 362 0
58 s - do - 20 mm size (IS383,1970) 1 Cum 293 0
59 -do- 19 mm to 22 mm size ( IRC,MORTH & MORD ) 1 Cum 293 0
60 t - do - 25 mm size (IS383,1970) 1 Cum 287 0
61 u - do - 40 mm size (IS383,1970) 1 Cum 170 0
62 -do- 40 mm to 45 mm size ( IRC , MORTH & MORD) 1 Cum 170 5
63 v - do - 50 mm size (IS383,1970) 1 Cum 150 5
64 -do- 50 mm to 55 mm size ( IRC,MORTH &MORD) 1 Cum 150 5
65 33.w - do - 65 mm size (IS383,1970) 1 Cum 142 5
66 -do- 60 mm to 65 mm size ( IRC, MORTH &MORD) 1 Cum 142 5
67 x - do - 75 mm size (IS383,1970) 1 Cum 117 5
68 - do - 75 mm size ( IRC ,MORTH & MORD) 1 Cum 117 5
69 y - do - 75 to 100 mm size (IS383,1970) 1 Cum 92 5
70 - do - 75 to 100 mm ( IRC, MORTH & MORD) 1 Cum 92 5
OTHER ITEMS INCLUDING STACKING
71 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 101 5
72 z2 kankar, hard broken kankar 40 to 75 mm ( ring ) 1 Cum 75 5
73 z3 Soling stone of 150 mm size of granite, trap and Dolamite varieties. 1 Cum 95 5
NOTE:- (1) Add extra for items to 33(z3) Rs /- Per cum, wherever quarrying is 1 Cum
done by blasting. (2) Wherever controlled blasting is resorted to the Chief
70
Engineer concerned shall approve the observed data in support of SS item No. 22
a to 22 c , 22g, 23
74 z4 Soling stone of 150 mm size other than granite variety 1 Cum 66 5
75 z5 Soling Stone laterite, Kankar 150mm, surface stone 1 Cum 41 5
76 z6 Field picked metal unbroken 20 mm size 1 Cum 55 5
77 z7 - do - 25 mm size 1 Cum 42 0
78 z8 - do - 40 mm size 1 Cum 48 0
79 z9 - do - 50 mm size 1 Cum 42 5
80 z10 - do - 60 mm size 1 Cum 36 5
81 z11 - do - 80 mm size 1 Cum 32 5
NOTE:- Add Rs. /- Per Cum for selection of stone and boulders from excavated spoil 17
82 34 Gravel including stacking 1 Cum 103 0
83 35 a Quarry rubbish 1 Cum 81 5
84 b HBG Stone Chips 2.36mm and below 1 Cum 360 5
85 36.a Sand for mortar, ceiling coat including washing screening etc., 1 Cum 760 5
86 Sand for concrete 560 5
87 b Sand for filling and blindage 1 Cum 560 5
88 37 Clay for puddle and masonry Items 38 (a) to 39 (h) As per local prevailing rates based
1 Cum 35 quotations.
on competitive 5
(C) LIME AND CEMENT
40 to
41(c )
89 42 Cement excluding cost of empty cement bags Metric
Tonne
NOTE: (1) The rate is material at site ( No conveyance charges to be allowed) 2)As per the rates
90 42.a Labour for mixing cement mortar 1 Cum
91 b Mixing of cement mortar by machine 1 Cum
92 c Grinding lime mortar or Surkhi mortar 1 Cum 94 5
93 d Shell lime slaked and screened 1 Cum 940 5
(D) MORTARS
94 43 to Items 43 to 45
45
(E) METAL AND IRON WORKS
(A) CLEARING SITE
95 1.a Clearing heavy Jungle 1 Sqm
96 b Clearing light Jungle 1 Sqm
97 c Clearing Scrub Jungle 1 Sqm
98 d Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora 1 Sqm
3.7 0
stumps.
99 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 to 100 cm. Each
19 0
100 ii - do - 100 to 200 cm. Each 44 0
101 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth 30 to 100 Each
46 0
cm.
102 ii - do - 100 to 200 cm. Each 48 0
103 2.c.I Cutting and removing date trees including stacking of girth 30 to 100 cm Each
24 0
104 ii - do - 100 to 200 cm Each 35 0
105 d.I Uprooting and removing stumps of date trees including stacking of girth 30 to Each
24 0
100 cm.
106 ii - do - 100 to 200 cm Each 30 0
107 eI Cutting and removing other kind of trees including stacking of girth 30 to 100 cm Each
30 0
108 ii - do - 100 to 200 cm Each 46 0
109 iii - do - above 200 cm Each 75 0
110 f.I Uprooting and removing stumps of other kind of trees including stacking of girth Each
24 0
30 to 100 cm.
111 ii - do - 100 to 200 cm Each 33 0
112 iii - do - above 200 cm Each 41 0
113 3.a Uprooting and clearing prickly pear jungle 1 Sq.m 2.3 0
114 b - do - under 2.5 meters height including burning and burying as directed. 1 Sq.m
3 0
115 c - do - over 2.5 meters height including burning and burying with an initial lead of 1 Sq.m
3.5 0
conveyance
116 4.a Removing of natchu, goobi, thooti etc., from drains, channels including clearance 1 Sq.m
if not more than 1 metre depth of water with an initial lead of 10 metres and lift 1.9 0
of 2 metres.
117 b.I Clearing alchi, tilla 1 Sq.m 3.8 0
118 b.ii Removal of Jammu 1 Sq.m 3.3 0
119 c.I Removal of imponea, cornea 1 Sq.m 3.6 0
120 c.ii Removal of water hyacinth up to 30 cm thick. 1 Sq.m 3.7 0
121 c.iii - do - more than 30 cm thick 1 Sq.m 5 0
122 d Removal of natchu, goobi, thooti etc., for every extra lead or lift over the initial 1 Sq.m
1.4 0
lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND CAREFULLY STACKING
62.5 0
MATERIALS USEFUL FOR REUSE.
123 n.(i) Dry rough stone revetment for aprons and stacking within 40 metres 1 cum

(C) QUARRYING AND BLASTING


124 6 Blasting and removing hard granite measured in solid 1 cum

7 Drilling holes in hard granite or sheet rock


a) Manually ( Hand)
125 I) 20 mm dia meter 1 RM 124 0
126 ii) 25 mm dia meter 1 RM 131 0
127 iii) 36 mm dia meter 1 RM 151 0
b) Pneumatic Compressor
128 I) 20 mm dia meter 1 RM 140 -
129 ii) 25 mm dia meter 1 RM 152 -
130 iii) 36 mm dia meter 1 RM 165 -
8 Grouting the holes with neat cement slurry excluding cost of steel

131 I) 20 mm dia meter 1 RM 88 0


132 ii) 25 mm dia meter 1 RM 111 0
133 iii) 36 mm dia meter 1 RM 138 0
134 aI White washing and colour banding for guard and guide stones including cost of each
8.6 0
materials
135 bI Screening sand and gravel 1 cum 9.3 0
136 b2 Screening chips and metal 1 cum 16 0
137 c1 Removing and refixing Hectometer or Demarcation stones each 11.5 0
(S ) ROAD WORK ITEMS
PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100 mm
SPREADING OLD METAL AND NEW METAL SECTIONING INCLUDING
EDGEBUNDS AND SUBGRADE ROLLING, SPREADING METAL
INCLUDING BLINDAGE OFGRAVEL WATERING WITH AN INITIAL LEAD
OF 2 HECTOMETERS AND HAND ROLLER ( 1.5 TO 2 TONNES) ROLLING
ETC., INCLUDING BARRICADING,DIVERSION OF TRAFFIC AND
WETTING THE NEW CONSOLIDATION FOR A FORTNIGHT COMPLETE.

( For a compact thickness )


1 (I ) HARD METAL
138 a 40 mm thickness 10 sqm 70 0
139 b 50 mm thickness 10 sqm 74 0
140 c 75 mm thickness 10 sqm 80.3 0
141 d 100 mm thickness 10 sqm 87 0
1 (ii ) For compact thickness of soft metal
142 a 50 mm thickness 10 sqm 53.8 0
143 b 75 mm thickness 10 sqm 63.9 0
144 c 100 mm thickness 10 sqm 70.1 0
5 Picking old metalled surface to a depth of 40 to 100 mm and spreading
metal including watering with an initial lead of 2 Hectometers and
rolling with power rollers watering and spreading gravel for blindage
and power roller rolling including hire charges of power roller rolling
including hire charges of power roller ( 8 to 10 T) barricading and
diversion of traffic and wetting the new consolidation for a fortnight (
for compacted thickness of )

HARD METAL
145 5 (a) 40 mm thickness 10 sqm 185 0
146 (b) 50 mm thickness 10 sqm 210 0
147 (c ) 75 mm thickness 10 sqm 231 0
148 (d ) 100 mm thickness 10 sqm 248.8 0
149 (e) 150 mm thick excluding hire charges 10 sqm 445.4 0
Structural steel/ Reinforcement steel (HYSD/TMT) Note:- As per monthly rate
150 16 1 tonne 18.12
fixed by the sub committee
151 17 Cement 43Gr/ 53 Gr Note:- As per monthly rate fixed by the sub committee 1 tonne 28.81

Excise duty and


vat as provided
152 18 Bitumen 1 tonne in the sanctioned
estimate
Model Calculation
ROAD METAL RATES

NAME OF WORK ::-

Initial cost less Embedded (1+(Tax Basic Rate Embedded tax (col
Sl.No Description of Metal Lead in Kms
stacking Tax Rate% Rate/100)) (Col 4/Col6) 4- Col 7)
1 2 3 4 5 6 7 9
A) FOR ROAD WORKS
60 to 63 mm IRC and MoRTH
1 HBG metal
10 419.00 5.00 1.05 399.05 19.95
50 to 55 mm IRC and MoRTH
2 HBG metal
10 456.00 5.00 1.05 434.29 21.71

40 to 45 mm IRC and MoRTH


3 HBG metal
10 500.00 5.00 1.05 476.19 23.81

4 SS Revetment work 300mm 10 164.00 5.00 1.05 156.19 7.81


Quarry spall(Field picked metal)
5 Av. Of rate 25mm & 40mm
10 45.00 0.00 1.00 45.00 0.00
150 mm soling stone
6 10 95.00 5.00 1.05 90.48 4.52
HBG metal
40 to 45 mm IRC and MoRTH
1 HBG M/C metal
10 500.00 0.00 1.00 500.00 0.00
25 to 27 mm IRC and MoRTH
2 HBG M/C metal
10 824.00 0.00 1.00 824.00 0.00
19 to 22 mm IRC and MoRTH
3 HBG M/C metal
10 864.00 0.00 1.00 864.00 0.00
12 to 14 mm IRC and MoRTH
4 HBG M/C metal
10 717.00 0.00 1.00 717.00 0.00
9.5 to 11.20 mm IRC and MoRTH
5 HBG M/C metal
10 656.00 0.00 1.00 656.00 0.00
5 to 7 mm IRC and MoRTH
6 HBG M/C metal
10 504.00 0.00 1.00 504.00 0.00
2.36 to 5 mm IRC and MoRTH
7 HBG M/C metal
10 320.00 5.00 1.05 304.76 15.24

HBG Stone chips 2.36mm


8 and below
10 360.00 5.00 1.05 342.86 17.14
Rubble stone/ Stone masonry 1st sort
8(a) deressing 5 faces 10 2705.00 5.00 1.05 2576.19 128.81
8(b) Bond stone each 10 30.00 5.00 1.05 28.57 1.43
8(c) CRS Stone 10 262.00 5.00 1.05 249.52 12.48
9 Gravel 5 103.00 103.00
B) FOR C.D. WORKS 0.00
10 40 mm SS-5 HBG M/C metal 10 532.00 0.00 1.00 532.00 0.00
11 25 mm SS-5 HBG M/C metal 10 874.00 0.00 1.00 874.00 0.00
12 20 mm SS-5 HBG M/C metal 10 916.00 0.00 1.00 916.00 0.00
13 12 mm SS-5 HBG M/C metal 10 822.00 0.00 1.00 822.00 0.00
14 10 mm SS-5 HBG M/C metal 10 692.00 0.00 1.00 692.00 0.00
15 6 mm SS-5 HBG M/C metal 10 532.00 0.00 1.00 532.00 0.00
16 Sand for Mortar 87 760.00 5.00 1.05 723.81 36.19
17 Sand for concrete 87 560.00 5.00 1.05 533.33 26.67
18 Sand for Filling 87 560.00 5.00 1.05 533.33 26.67
19 HYSD Steel 38000.00 18.12 1.1812 32170.67 5829.33
20 6mm Mild Steel 37000.00 18.12 1.1812 31324.08 5675.92
21 Mild Steel 38000.00 18.12 1.1812 32170.67 5829.33
22 Cement 5200.00 28.81 1.2881 4036.95 1163.05
COST OF BITUMEN / MT (ZERO LEADS)

Name of Work:-

Ref ::- For Emulsion (Bulk) :- HINCOL Price List With Effect From Dated:- 16.05.2017
For Bulk Bitumen VG-10, VG-30 :- HPCL Price List With Effect From

Bulk 80/100 Bulk 60/70


Emulsion Emulsion Emulsion
Grade Grade
(Bulk) (RS1) (MS) (SS1)
VG -10 VG-30

Vizag HPCL / IOCL Emulsion

Basic Price including 24876 24826 21156 21066 33546


excise duty @ 14% (a) 3483 3476 2962 2949 4696
28359 28302 24118 24015 38242
CST @ 2% (b) 567 566 482 480 765

Lead from
0.00
610 0 0 0 0 0
Lead charges for Bulk
0.00 per KM
@

Rates of Bitumen / Emulsion including taxes 28926 28868 24600 24496 39007

Basic Rate of Bitumen / Emulsion 24876 24826 21156 21066 33546

Embedded tax amount - (a) + (b) = 4049.81 4041.67 3444.20 3429.54 5461.29
DATAS

Quantity Description of Item Rate per Amount


1 Construction of Granular sub-base by providing HBG/HBG material confirming to Grading - VI of
MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by approved means, on
prepared surface mixing by mix in place method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density etc., complete for finished item of work
as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (
Payment will be made based on levels for finished item of work ).
Unit = cum
Taking output = 300 cum Page 95 of MoRT&H SDB
(A) Labour
0.48 day Mate day 0.00
2.00 day Mazdoor skilled day 0.00
10.00 day Mazdoor unskilled day 0.00
Total 0.00
(B) Machinery
6.00 hr Motor grader 3.35M Blade @50 cum/Hr hr 0.00
12.00 hr Tractor with Rotavator hr 0.00
6.00 hr Vibratory roller 8T hr 0.00
3.00 hr Water tanker 6 KL hr 0.00
Total 0.00
(C) Material
Coarse graded Granular sub-base material
as per Table 400-1 of MORT&H
45mm-9.50 IRC & MORT&H HBG/HBG Chips @
134.4 cum 0 Cum 0.00
35%
9.5mm to 4.75mm @ 47.5%
182.40 cum (Av. rate of 9.5-11.2mm , 5-7mm & 2.36 - 5mm 5.08 Cum 926.48
HBG M/C metal)
2.36mm and below @17.5%
67.20 cum 17.14 Cum 1152.00
(Rate of 2.36mm & below HBG metal)
Total 2078.48
(D) Over head charges @ 5% (10%-VAT)
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 2078.48
(F) Add Contractors Profit at 10% on (E) 0% 0.00
Cost per 300 cum (E) + (F) 2078.48
Rate per 1 cum 6.93
1 Cum
2 Providing, Laying, Spreading and compacting graded HBG/HBG crushed stone aggregate to Wet Mix
macadem specification including cost of all materials and including premixing the material with water at
OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with
paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the
desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th
revision) for finished item of work. (Payment based on levels for finished item of work)

Unit = cum Page 110,111 of MoRT&H SDB


Taking output = 225 cum
(A) Labour
0.48 nos. Mate day 0.00
2.00 nos. Mazdoor skilled day 0.00
10.00 nos. Mazdoor day 0.00
Page 1
Quantity Description of Item Rate per Amount
Total 0.00
(B) Machinery
6.60 hr Wet mix plant of 60 tonne hr. capacity hr 0.00
6.00 hr Electric generating set 125 KVA hr 0.00
6.00 hr front end loader 1 cum capacity hr 0.00
6.00 hr Hydero static sensor Paver finisher hr 0.00
3.90 hr Vibratory roller 8-10 T hr 0.00
3.00 hr Water tanker hr 0.00
Total 0.00
(C) Material
89.10 cum 45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 0.00 cum
30% 0.00
(Av. Of 40-45, 25-27, 19-22mm )
118.80 cum 22.4 to 2.36mm IRC&MoRT&H HBG M/C 3.05 cum
metal@40% 362.06
(Av. Of 19-22mm, 12-14mm, 9.5-11.2mm, 5-7mm,
2.36 - 5mm )

89.10 cum 2.36mm to 75 micron @ 30% (2.36mm & below) 17.14 cum
1527.43
Total 1889.49
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 1889.49
(F) Add Contractors Profit at 10% on (E) 0% 0.00
Cost per 225 cum (E) + (F) 1889.49
Rate per 1 cum 8.40
Cum
3 Providing and applying tack coat with bitumenemulsion (Rapid settting) (Bulk) using Emulsion pressure
distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with
mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as
directed by the Engineer-in-Charge.
unit = sqm Page 124 of MoRT&H SDB
Taking output = 3500 sqm
(A) Labour
0.08 nos Mate day 0.00
2.00 nos Mazdoor day 0.00
Total 0.00
(B) Machinery
2.80 hr Mechanical broom Hydraulic @ 1250 sqm/hr. hr 0.00
2.80 hr Air compressor 250 cfm hr 0.00
2.00 hr Emulsion pressure distributor @1750 sqm/hr hr 0.00
Total 0.00
(C) Material
0.70 MT Bitumen emulsion @ 0.20 Kgs/sqm 3,444.20 MT 2410.94
Total 2410.94
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 2410.94
(F) Add Contractors Profit at 10% on (E) 0% 0.00
Cost per 3500 sqm (E) + (F) 2410.94
Rate per 1 sqm 0.69
1 Sqm

Page 2
Quantity Description of Item Rate per Amount
4 Providing and applying primer coat with Bitumen Emulsion (Slow Setting-1) on the prepared surface of
granular base including clearing of road surface and sparaying primer at the rate of 0.70kg/sqm using
mechanical means for finished item of work as per MoRT&H Specification 502 (5th revision) and as
directed by the Engineer-in-Charge.
unit = sqm Page 123 of MoRT&H SDB
Taking output = 3500 sqm
(A) Labour
0.08 nos Mate day 0.00
2.00 nos Mazdoor day 0.00
Total 0.00
(B) Machinery
2.80 hr Mechanical broom Hydraulic @ 1250 sqm/hr. hr 0.00
2.80 hr Air compressor 250 cfm hr 0.00
2.00 hr Bitumen pressure distributor @1750 sqm/hr hr 0.00
1.00 hr Water tanker 6 KL capacity @ 1 trip per hour hr 0.00
Total 0.00
(C) Material
2.45 MT Bitumen Emulsion @ 0.70 Kgs/sqm 5461.29 MT 13380.16
6.00 KL Cost of water 0 0.00
Total 13380.16
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 13380.16
(F) Add Contractors Profit at 10% on (E) 0% 0.00
Cost per 3500 sqm (E) + (F) 13380.16
Rate per 1 sqm 3.82
1 Sqm
5 Providing and Laying 40/30mm thick Bituminous concrete with 100 to 120 TPH batch type hot mix
plant using HBG crushed aggregates of Grading-2 as per table 500-17 of Specification 507 of
MoRT&H (5th revesion), premixed with Bituminious binder VG-30 Grade @ 5.4% of mix and filler,
transporting the hot mix to work site, laying with Hydro static sensor paver finisher to the required
grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the
desired compaction as per MoRT&H Specification 507 (5th Revision) complete for finished item of
work in all respects excluding seiniorage charges and as directed by Engineer-in-charge.(Excluding
taxes Charges)
Unit = cum Page 138 of MoRT&H SDB
Taking output = 191 cum (450 tonnes.)
(A) Labour
0.84 nos. Mate day 0.00
14.00 nos. Mazdoor working with HMP, Mechanical broom, day 0.00
5.00 nos. paver,roller,asphalt
Skilled Mazdoor for cutter andline
checking assistance for setting
and levels. day 0.00
Total 0.00
(B) Machinary
6.00 hr Batch Mix HMP @ 100 to 120TPH hr 0.00
6.00 hr Hydero static sensor Paver finisher hr 0.00
6.00 hr Generator 250 KVA hr 0.00
6.00 hr Front end loader 1 cum capacity hr 0.00
3.90 hr Power road roller 8 tonne for initial break down rolling hr 0.00
3.90 hr Pneumatic road Roller hr 0.00
3.90 hr smooth wheeled roller 8 Ton hr 0.00
Total 0.00
(C) Material
24.30 M.T (I) Bitumen VG-30 @ 5.40% by weight of mix 4041.67 MT 98212.65
=191*2.356=450 ton
(ii) Aggregate
Quantity Description of Item Rate per Amount
total wt of mix 450T-24.30=425.70T
For Grading I
56.760 cum IRC &MORT&H HBG M/C chip Avg. of (14-12),(9.5-11.2) @ 20% 0 cum 0.00
70.950 cum IRC &MORT&H HBG M/C chipsAvg. of (9.5-11.2),( 5-7) 25% 0 cum 0.00

150.410 cum IRC &MORT&H HBG M/C chips2.36 to 5mm, 2.36 & 16.190 cum 2435.21
above 53%
2.838 cum Filler @ 1% of weight of aggregates. 17.14 cum 48.65
4.257 MT Filler (Cement) @ 1% of weight of aggregates. 1163.05 MT 4951.09
285.22 Total 105647.60
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00

(E) Total of (A) + (B)+( C)+(D) 105647.60


(F) Add Contractors Profit at 10% on (E) 0% 0.00
Cost per 191 cum (E) + (F) 105647.60
Rate per 1 cum 553.13
1 Cum

6 Providing and laying Dense graded bituminous macadam with 100-120 TPH batch type HMP using
HBG crushed aggregates of Grading-II as per table 500-10 of MoRT&H Specification 505 (5th
revision) premixed with bituminous binder of VG-30 grade @ 4.5% of weight of total mixture,
transporting the hot mix to work site, laid over a previously prepared surface with sensor paver finisher
to the required grade, level and alignment, rolled as per Clauses 501.6 and 501.7 to achive the
desired compaction for finished item of work as directed by the Engineer-In-Charge including hire and
operational charges all T&P and all other contingent charges necessary excluding cost of seiniorage
charges of all materials etc., completes and as per MoRT&H specification No.505 (5th revision)
(Excluding VAT charges)

Quantity Description of Item Rate per Amount


Unit = cum
Taking out put = 195 cum (450 tonne) Page 132,133 of MoRT&H SDB
(A) Labour
0.84 nos. Mate nos. 0.00
14.00 nos. Mazdoor working with HMP, mechanical broom, nos. 0.00
5.00 nos. paver,
Mazdoorroller, asphalt cutter and assistance for setting
skilled nos. 0.00
0.00
0.00 % Municipal area allowance 0.00
Total 0.00
(B) Machinery
6.00 hr Batch Mix HMP @ 100 to 120TPH hr 0.00
6.00 hr Hydero static sensor Paver finisher hr 0.00
6.00 hr Generator 250 KVA hr 0.00
6.00 hr Front end loader 1 cum bucket capacity hr 0.00
3.90 hr Smooth wheeled roller 8-10 tonnes for initial break hr 0.00
3.90 hr down rollingroad Roller
Pneumatic hr 0.00
3.90 hr smooth wheeled roller 8 Ton hr 0.00
Total 0.00
(C) Material
20.25 MT Bitumen VG-30 @ 4.5 % of weight of 4041.67 MT 81843.87
mix=195x2.31=450 tonne
ii) Aggregate
Total weight of mix = 450 tonnes
weight of bitumen - 20.25 tonnes
Weight of aggregate = 450-20.25 = 429.75 tonnes
Taking density of aggregate = 1.5 tonne/cum
Quantity Description of Item Rate per Amount
Volume of aggregate = 286.50 cum
Grading - II (19mm nominal size)
25-10mm @ 30%
cum IRC &MORT&H HBG M/C chips 37.50 to 25 mm 0.00 cum 0.00

85.95 cum IRC &MORT&H HBG M/C chips 25 to 10mm 0.00 cum 0.00
@ 30%
Average rate of IRC&MoRT&H HBG M/C
metal of sizes 25-27mm, 19-22mm, 12-
14mm, 9.5-11.2mm
80.22 cum IRC &MORT&H HBG M/C chips 10 to 5mm 0.00 cum 0.00
@ 40%
Average rate of IRC&MoRT&H HBG M/C
metal of sizes 9.5-11.2mm, 5 to 7mm
114.60 cum IRC &MORT&H HBG M/C chips 5mm and 16.19 cum 1855.43
below @ 20%
Average rate of IRC&MoRT&H HBG M/C
metal of sizes 2.36 to 5mm and 2.36mm&
below
5.73 cum Filler @ 2% of weight of aggregates 17.14 cum 98.23
Total 83797.53
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 83797.53
(F) Add Contractors Profit at 10% on (E) 0% 0.00
Cost per 195 cum (E) + (F) 83797.53
Rate per 1 cum 429.73
1 Cum
Data's with 100% Rock Sand
Quantity Description of Item Rate per Amount
7 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below CC Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate day 0.00
1.00 nos Mason day 0.00
15.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Stone dust 17.14 cum 57.86
3.375 cum Stone dust 17.14 cum 57.86
2.43 MT Cement at site 1163.05 MT 2826.20
Total 2941.92
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
2.00 hr Water tanker 6 KL hr 0.00
Total 0.00
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 2941.92
(F) Add Contractors Profit at 10% on (E) 0% 0.00
13.50 40mm SS-5 HBG M/C metal 0.00
3.38 Sand 0.00
Cost per 15 cum 2941.92
Rate for 1 cum 196.13
1 Cum
8 Vibrated cement concrete M 40 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished
item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th revision) and as directed
by the Engineer-in-Charge for C.C Pavement.
Unit = cum Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0
5.40 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0
3.375 cum Stone dust 17.14 cum 57.86
3.375 cum Stone dust 17.14 cum 57.86
6.45 MT Cement at site 1163.05 MT 7501.65
Total 7617.37
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
Quantity Description of Item Rate per Amount
0.00
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 7617.37
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 7617.37
Rate for 1 cum 507.82
1 Cum
9 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished
item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th revision) and as directed
by the Engineer-in-Charge for C.C Pavement.
Unit = cum Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0
5.40 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0
3.375 cum Stone dust 17.14 cum 57.86
3.375 cum Stone dust 17.14 cum 57.86
6.33 MT Cement at site 1163.05 MT 7362.08
Total 7477.8
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 7477.80
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 7477.80
Rate for 1 cum 498.52
1 Cum
10 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost and conveyance of all materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th revision) for footings and Raft foundation .
Unit = cum Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
Quantity Description of Item Rate per Amount
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
4.05 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
1.35 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.38 cum Manufactured rock sand 17.14 cum 57.86
3.38 cum Manufactured rock sand 17.14 cum 57.86
4.13 MT Cement at site 1163.05 MT 4803.38
Total 4919.10
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 4919.10
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G)+(H) 4919.10
Rate for 1 cum 327.94
1 Cum
11 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, and conveyance of all materials to site and all labour charges for machine
mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200
(5th revision) for Sub structure .
Unit = cum Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
4.05 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
1.35 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.38 cum Manufactured rock sand 17.14 cum 57.86
3.38 cum Manufactured rock sand 17.14 cum 57.86
4.13 MT Cement at site 1163.05 MT 4803.38
Total 4919.10
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 4919.10
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 4919.10
Rate for 1 cum 327.94
1 Cum
Quantity Description of Item Rate per Amount
23 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness
of not less than 600mm with smaller size towards the soil and bigger size towards the wall and
provided over the entire surface behind the abutment, wing wall and return wall to the full height
compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all
labour charges as directed by the departmental officers as per drawing and Technical specifications
as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th revision) for finished item of work.

Unit = cum Page 463 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.32 nos Mate day 0.00
7.00 nos Mazdoor for filling watering, ramming etc day 0.00
1.00 nos Mazdoor skilled day 0.00
Total 0.00

(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum Cost of 150mm size IRC soling stone (HBG) 4.52 cum 27.14
6.00 cum Cost of 40mm size IRC HBG metal 23.81 cum 142.86
Total 170.00
© Machinery
0.06 hr Water tanker 6 KL capacity hr 0.00
Total 0.00
(D) Over head charges @
Cost per 10 cum (E)+(F) 170.00
Rate for 1 cum 17.00
1 Cum
12 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure .
Unit = cum Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
5.40 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
2.70 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.38 cum Manufactured rock sand 17.14 cum 57.86
3.38 cum Manufactured rock sand 17.14 cum 57.86
5.16 MT Cement at site 1163.05 MT 6001.32
Total 6117.04
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
4.00 % Form work @ 10% on (A)+(B)+( C) Cum 0.00
Quantity Description of Item Rate per Amount
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 6117.04
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 6117.04
Rate for 1 cum 407.80
1 Cum
Data's with 50% sand & 50% Rock Sand
Quantity Description of Item Rate per Amount
7 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below CC Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate day 0.00
1.00 nos Mason day 0.00
15.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Manufactured rock sand 17.14 cum 57.86
3.375 cum Sand for concrete 26.67 cum 90.00
2.43 MT Cement at site 1163.05 MT 2826.20
Total 2974.06
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
2.00 hr Water tanker 6 KL hr 0.00
Total 0.00
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 2974.06
(F) Add Contractors Profit at 10% on (E) 0% 0.00
13.50 40mm SS-5 HBG M/C metal 0.00
3.38 Sand 0.00
Cost per 15 cum 2974.06
Rate for 1 cum 198.27
1 Cum
8 Vibrated cement concrete M 40 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished
item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th revision) and as directed
by the Engineer-in-Charge for C.C Pavement.
Unit = cum Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0
5.40 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0
3.375 cum Manufactured rock sand 17.14 cum 57.86
3.375 cum Sand for concrete 26.67 cum 90
6.45 MT Cement at site 1163.05 MT 7501.65
Total 7649.51
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
Quantity Description of Item Rate per Amount
0.00
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 7649.51
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 7649.51
Rate for 1 cum 509.97
1 Cum
9 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished
item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th revision) and as directed
by the Engineer-in-Charge for C.C Pavement.
Unit = cum Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0
5.40 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0
3.375 cum Manufactured rock sand 17.14 cum 57.86
3.375 cum Sand for concrete 26.67 cum 90
6.33 MT Cement at site 1163.05 MT 7362.08
Total 7509.94
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 7509.94
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 7509.94
Rate for 1 cum 500.66
1 Cum
10 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost and conveyance of all materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th revision) for footings and Raft foundation .
Unit = cum Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
Quantity Description of Item Rate per Amount
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
4.05 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
1.35 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Manufactured rock sand 17.14 cum 57.86
3.375 cum Sand for concrete 26.67 cum 90.00
4.13 MT Cement at site 1163.05 MT 4803.38
Total 4951.24
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 4951.24
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G)+(H) 4951.24
Rate for 1 cum 330.08
1 Cum
11 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, and conveyance of all materials to site and all labour charges for machine
mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200
(5th revision) for Sub structure .
Unit = cum Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
4.05 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
1.35 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Manufactured rock sand 17.14 cum 57.86
3.375 cum Sand for concrete 26.67 cum 90.00
4.13 MT Cement at site 1163.05 MT 4803.38
Total 4951.24
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 4951.24
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 4951.24
Rate for 1 cum 330.08
1 Cum
Quantity Description of Item Rate per Amount
23 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness
of not less than 600mm with smaller size towards the soil and bigger size towards the wall and
provided over the entire surface behind the abutment, wing wall and return wall to the full height
compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all
labour charges as directed by the departmental officers as per drawing and Technical specifications
as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th revision) for finished item of work.

Unit = cum Page 463 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.32 nos Mate day 0.00
7.00 nos Mazdoor for filling watering, ramming etc day 0.00
1.00 nos Mazdoor skilled day 0.00
Total 0.00

(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum Cost of 150mm size IRC soling stone (HBG) 4.52 cum 27.14
6.00 cum Cost of 40mm size IRC HBG metal 23.81 cum 142.86
Total 170.00
© Machinery
0.06 hr Water tanker 6 KL capacity hr 0.00
Total 0.00
(D) Over head charges @
Cost per 10 cum (E)+(F) 170.00
Rate for 1 cum 17.00
1 Cum
12 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure .
Unit = cum Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
5.40 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
2.70 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Manufactured rock sand 17.14 cum 57.86
3.375 cum Sand for concrete 26.67 cum 90.00
5.16 MT Cement at site 1163.05 MT 6001.32
Total 6149.18
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
4.00 % Form work @ 10% on (A)+(B)+( C) Cum 0.00
Quantity Description of Item Rate per Amount
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 6149.18
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 6149.18
Rate for 1 cum 409.95
1 Cum
Data's with 100% Sand
Quantity Description of Item Rate per Amount
7 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below CC Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate day 0.00
1.00 nos Mason day 0.00
15.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Sand for concrete 26.67 cum 90.00
3.375 cum Sand for concrete 26.67 cum 90.00
2.43 MT Cement at site 1163.05 MT 2826.20
Total 3006.20
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
2.00 hr Water tanker 6 KL hr 0.00
Total 0.00
(D) Over head charges @
0% Add for Over head charges on (A)+(B)+( C) 0.00
(E) Total of (A) + (B)+( C)+(D) 3006.20
(F) Add Contractors Profit at 10% on (E) 0% 0.00
13.50 40mm SS-5 HBG M/C metal 0.00
3.38 Sand 0.00
Cost per 15 cum 3006.20
Rate for 1 cum 200.41
1 Cum
8 Vibrated cement concrete M 40 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished
item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th revision) and as directed
by the Engineer-in-Charge for C.C Pavement.
Unit = cum Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0
5.40 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0
3.375 cum Sand for concrete 26.67 cum 90
3.375 cum Sand for concrete 26.67 cum 90
6.45 MT Cement at site 1163.05 MT 7501.65
Total 7681.65
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
Quantity Description of Item Rate per Amount
0.00
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 7681.65
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 7681.65
Rate for 1 cum 512.11
1 Cum
9 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished
item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th revision) and as directed
by the Engineer-in-Charge for C.C Pavement.
Unit = cum Page 345,346 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0
5.40 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0
3.375 cum Sand for concrete 26.67 cum 90
3.375 cum Sand for concrete 26.67 cum 90
6.33 MT Cement at site 1163.05 MT 7362.08
Total 7542.08
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 7542.08
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 7542.08
Rate for 1 cum 502.81
1 Cum
10 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost and conveyance of all materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th revision) for footings and Raft foundation .
Unit = cum Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
Quantity Description of Item Rate per Amount
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
4.05 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
1.35 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Sand for concrete 26.67 cum 90.00
3.375 cum Sand for concrete 26.67 cum 90.00
4.13 MT Cement at site 1163.05 MT 4803.38
Total 4983.38
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 4983.38
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G)+(H) 4983.38
Rate for 1 cum 332.23
1 Cum
11 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, and conveyance of all materials to site and all labour charges for machine
mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200
(5th revision) for Sub structure .
Unit = cum Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
4.05 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
1.35 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Sand for concrete 26.67 cum 90.00
3.375 cum Sand for concrete 26.67 cum 90.00
4.13 MT Cement at site 1163.05 MT 4803.38
Total 4983.38
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) Cum 0.00
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 4983.38
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 4983.38
Rate for 1 cum 332.23
1 Cum
Quantity Description of Item Rate per Amount
23 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness
of not less than 600mm with smaller size towards the soil and bigger size towards the wall and
provided over the entire surface behind the abutment, wing wall and return wall to the full height
compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all
labour charges as directed by the departmental officers as per drawing and Technical specifications
as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th revision) for finished item of work.

Unit = cum Page 463 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.32 nos Mate day 0.00
7.00 nos Mazdoor for filling watering, ramming etc day 0.00
1.00 nos Mazdoor skilled day 0.00
Total 0.00

(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum Cost of 150mm size IRC soling stone (HBG) 4.52 cum 27.14
6.00 cum Cost of 40mm size IRC HBG metal 23.81 cum 142.86
Total 170.00
© Machinery
0.06 hr Water tanker 6 KL capacity hr 0.00
Total 0.00
(D) Over head charges @
Cost per 10 cum (E)+(F) 170.00
Rate for 1 cum 17.00
1 Cum
12 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure .
Unit = cum Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate day 0.00
1.50 nos Mason day 0.00
20.00 nos Mazdoor day 0.00
Total 0.00
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum 0.00
5.40 cum Cost of 20mm SS-5 HBG M/C metal 0.00 cum 0.00
2.70 cum Cost of 10mm SS-5 HBG M/C metal 0.00 cum 0.00
3.375 cum Sand for concrete 26.67 cum 90.00
3.375 cum Sand for concrete 26.67 cum 90.00
5.16 MT Cement at site 1163.05 MT 6001.32
Total 6181.32
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum hr 0.00
6.00 hr Generator set 35 KVA hr 0.00
0.00
(D) Form work
4.00 % Form work @ 10% on (A)+(B)+( C) Cum 0.00
Quantity Description of Item Rate per Amount
(E) Over head charges @
0% Add for Over head charges on (A)+(B)+( C)+(D) 0.00
(F) Total of (A) + (B)+( C)+(D)+(E) 6181.32
(G) Add Contractors Profit at 10% on (F) 0% 0.00
Cost per 15 cum (F)+(G) 6181.32
Rate for 1 cum 412.09
1 Cum
MINUTES OF 1st BOARD OF CHIEF ENGINEERS MEETING FOR THE
YEAR 2019 HELD ON 23.03.2019 @ 4.00PM IN THE BOCE CONFERENCE
HALL OF ENGINEER-IN-CHIEF (AW), I & CAD DEPARTMENT, ERRUM
MANZIL, HYDERABAD.

At the outset the Engineer-in-Chief (AW), Chairman, Board of Chief Engineers


has welcomed all the participants and placed the following agenda for discussions by
the members of the Board of Chief Engineers. The names of the officers attended the
meeting is appended vide Annexure-I. The Engineer-in-Chief (AW) has initiated the
discussions.

Based on the request of Builders Association of India (BAI), the


representatives of BAI were allowed to submit their plea before the Board of Chief
Engineers on issues related to implementation of GST for the ongoing works i.e.,
exemption of embedded taxes in hire charges of machinery and common materials
like Bricks, Fine & Coarse aggregate

Agenda item No – 1:
I & CAD Department – Exemption of on hand works pending for want of
statutory clearances such as Forest clearance, Wild life clearance, Environmental
clearance and also Road permissions, Railway permissions, N.H Clearances while
calculating ‘B’ value in arriving Bid capacity of Bidders in Tenders Evaluation –
Placed before the Board of Chief Engineers - For discussion and necessary
recommendations - Regarding
Proposed by Engineer-in-Chief (AW), I&CAD Dept
and Commissioner, COT, Hyd

Certain instances have come up, wherein the bidders have represented that
some of their works are getting delayed because of delay in clearance of forest land
and LA of private land and other statutory Government clearances due to which such
works are delayed abnormally. This is affecting their Bid capacity criteria which is
one of the main eligibility criteria for tender qualification & requested to exempt all
pending projects (where the delay is not on account of contractor) in calculating

1
eligibility criteria like Bid capacity (B Value) to enable all the contractors to get the
required Bid Capacity.

Further, Government vide Memo .No.28647/Reforms-A1/2011, dt:21.12.2011,


have requested to examine the proposal by placing in the BOCE and furnish the
minutes with specific remarks to Government for taking further necessary action.
In this regard, the Senior Technical officer,(Andhra Region),A.P Secretariat,
Hyderabad vide Lr dt 04-07-2012 has requested the Commissioner, COT to examine
the representation of M/s SEW Infrastructure Ltd., Hyderabad pertaining to the
exemption of some of the on hand works for the reasons quoted by the agency.
The Commissionerate of Tenders (COT) in its meeting held on 11-07-2012 has
opined that it is not advisable to exempt some of the on hand works for the reasons
furnished by M/s SEW Infrastructure Ltd., Hyderabad as this will become precedence
for other agencies to approach the Government or to the Court for such exemptions.
Further, as long as the agreements are in force, all those works shall be
considered as on hand works while calculating Bid Capacity of the bidder till the
agreement (i.e. balance works concerned) are closed by the Competent Authority.

In this connection, the agenda of Exemption in Bid capacity of EPC, Major


Irrigation works to participate in tenders was discussed by the Board of Chief
Engineers during its 3rd meeting for the year 2012 held on dt 23.08.2012.

“ The Board of Chief Engineers has discussed the issue and opined to recommend
the Government that it is not advisable to exempt some of the on hand works as this
will become precedence for other agencies to approach the Government. or to the
Court for such exemptions. As long as the agreement is in force, all those works shall
be considered as on hand works while calculating Bid Capacity of the bidder till the
agreement (i.e. balance works concerned) are closed by the Competent Authority.
However a procedure has to be evolved for solving the issue in case of the agencies
who are having a large number of non-started or standstill works which are not due to
the account of the agencies.”
The subject issue was once again placed for discussion before COT Committee
meeting held on 01.12.2018 and the members have opine to refer the matter to BOCEs
for its detailed discussion and necessary recommendations in the matter.

2
The Board of Chief Engineers has deliberated the issue in detail and
opined that on hand works pending due to delay in Forest clearance,
Environmental clearance and Interstate issues may be considered for exemption
in calculating ‘B’ Value for arriving Bid Capacity of Bidders based on the
specific reports by the concerned ENC/CE with detailed reasons thereof. In this
regard, the Government is to be addressed for issue of necessary GO in the
matter.
Action: Engineer-in-Chief (AW), I&CAD Dept
and Commissioner, COT, Hyd

Agenda Item No 2 :

GHMC – Implementation of GST for ongoing Building Works Contract –


Implementation of GST for payment of bills in respect of 2BHK Housing Projects
executed on or after 01.07.2017 – Payment issues – Committee constituted by the
Govt to examine the issues- Report submitted - Request of BAI to allow 5% as
Embedded Tax component as final settlement for the ongoing Works Contracts
of Building works - Placed before the Board of Chief Engineers - For discussion and
necessary recommendations– Regarding
Proposed by Chief Engineer(H&A) GHMC, Hyd

The Government in Memo No: 33/WP/A2/2017, dt: 08-08-2017 of Finance


(WP) Dept have issued certain instructions for implementation of GST for payment of
bills in respect of ongoing works executed on or after 01-07-2017 duly allowing 5%
GST of the value of the work as interim arrangement subject to GSTDS as and when
applicable and subject to final adjustment as per actual GST liability and ITC.

The Government vide Memo No: 33/WP/A2/2017, dt: 10-08-2017 of Finance


(WP) Dept has constituted a committee for specific recommendations regarding
implementation of GST provisions with respect to work contracts which are (a)
Executed before 30-06-2017, (b) Ongoing after 01-07-2017 & (c) New works which
would be let out. The Government further directed that the committee shall make their
recommendations based on the Board of Chief Engineers report and also feedback
obtained from other states.
3
As the matter stood thus, subsequently the Government vide G.O. Ms. No. 67
of I & CAD (Reforms) Department, Dt: 04-07-2018 have issued certain guidelines on
implementation of Goods & Service Tax for regulating work bills for all Engineering
departments in the state. As per the guidelines issued for the ongoing contracts for
which the estimates were prepared with SoR prior to 2017-18 (in which Taxes are
included) the net GST payable to the contractors shall be @ 5% or 12% or 18%
whichever is applicable on amount of work bill after deducting embedded taxes.

The Government further directed that, the Board of Chief Engineers (BoCEs)
shall quantify the embedded taxes in various types/component of works, within a
fortnight of issue of the above order, so as to have uniformity across the state. The
Government in the above G.O. further stated that, the 5% additional amount paid
towards GST for the intervening period based on the instructions issued by the
Government vide Memo No. 33/WP/A2/2017, Dt: 08-08-2017 has to be taken in to
account while adjusting GST payable.

Accordingly, the BoCE has worked out the embedded taxes and published on
the irrigation department website. Aggrieved by the procedure adopted for calculating
embedded taxes, the BAI has approached the Chief Secretary to government with a
request to intervene in the matter and to instruct the concerned to consider the
exemptions, which were allowed under VAT regime, while calculating the embedded
taxes for all the ongoing works.

A meeting was conducted by the Chief Secretary to Government with Builders


Association of India (BAI) Telangana State and other concerned Government officials
on 06-10-2018 and as per the decision taken during the meeting the Government vide
G.O. Rt. No. 620 of T, R&B (R-I) Department, dt: 08-11-2018 has issued orders
constituting a committee to examine the issues regarding GST with the following
terms of reference.

4
a. The Committee shall discuss with the concerned departments and various
agencies executing the works and list out the issues post implementation of
GST from 1st July-2017 with reference to the works commenced under
VAT and spill over under GST.

b. These issues are to be examined in detail with reference to the provisions of


the relevant Acts like Value Added Tax -2005 Act, Central Sales Tax -
1956, Goods and Services Tax -2017, Central Excise Act -1994, Finance
Act -1994 on Service Tax and suggest ways to address the same.

c. Any other issues and legal aspects related to the above.

In compliance to the above orders issued by the Government several meetings


were held by the GST committee on 15-11-2018, 19-11-2018, 24-11-2018, 29-11-
2018, 01-12-2018, 29-01-2019, 31-01-2019 at Commissioner of States Taxes office,
Nampally, Hyderabad. In the meetings the BAI has represented to consider the
exemptions allowed under VAT regime.

The Builders Association of India, Telangana State vide their representation


dated 09.02.2019 has informed that as per the existing rule positions under VAT era
(under composition Scheme) the contractors are eligible to purchase materials under
CST (Interstate purchases) and from TOT/unregistered dealers.And also they have
stated that since no input tax credit is allowable on machinery in composition scheme
under VAT era, there should not be any deduction towards the same while calculating
embedded taxes in the present GST era.

The BAI have further informed that their association members together with
engineering department officials have made calculations duly considering the above
provisions under VAT act to ascertain embedded taxes in the 2BHK housing project
work construction of 4428 2BHK houses at Ahmedguda of Medchal Constituency
taken up by GHMC, and the embedded taxes have been arrived at 3.95 % of value of
work. Therefore the BAI has requested that they are ready to accept reimbursement of

5
GST @ 5% to avoid further exact amount of Hypothetical values and to save valuable
Government time and Engineering hours.

In this regard the CE(H&A)/GHMC has submitted that the 2BHK housing
projects were sanctioned/tendered based on SSR 2016-17 (rates including taxes) with
5% provision towards VAT on value of work with the all applicable provisions and
exemptions available under VAT regime. Therefore accordingly the agencies have
quoted their tenders duly taking into considerations all provisions and existing rules
under VAT regime.

The embedded taxes are worked out for the above project of 2BHK scheme in
considering the allowable provisions of composition scheme under VAT act like Inter
State purchase of materials (CST), purchase of materials from unregistered/TOT
dealers and no input tax credit allowable on machinery in composition scheme under
VAT era etc., is found to be 3.95 % on value of work subject to legally eligible of
claims made by BAI. On the other hand the embedded tax component adopting BOCE
communicated rates is working out to be 8.61 %.

Therefore changes in the tax structure subsequently should neither provide any
undue advantage to the contractors nor punish them. Calculation of embedded taxes
without considering the provisions available at the time of sanction/tenders which are
working to 8.61% will result in recovery of 1.61% from contractors work bills and
therefore will affect the financial position and may lead to contractual litigations, legal
complications and stoppage of works.

On the other hand, considering the existing provisions under VAT regime, the
embedded taxes are working out to be 3.95% and therefore result in additional
financial burden of 3.05% on the Government due to release of GST @ 8.05% to the
agencies.

However considering VAT provision of only 5% available as per


Administrative sanction/ Sanctioned estimates, the request of the BAI to allow 5%

6
GST as final settlement for the works contracts of Building works, may be considered
for ongoing housing works of GHMC taken up with SSR prior to 2017-18 (i.e., rates
including taxes). The above proposals have been also submitted to Commissioner of
State Taxes for finalization of GST for the works contracts of Building works.

In this regard, the CE(H&A)/GHMC has requested the Chairman, BOCEs to


include the above item in the agenda to be placed before the members of BoCE for
discussion and taking a decision on the above for finalization of GST for works
contracts of Building works.
The above issue is placed before the Board of Chief Engineers meeting for its
discussion and necessary recommendation in the matter.

The Board of Chief Engineers has discussed the issue in detail and opined
that allowing of 5% or any other fixed percentage as Embedded Tax component
as final settlement for the ongoing Works Contracts of Building works is adhoc
and not justifiable as the same will vary from work to work depending on nature
& item of works in the Contract and advised to work out the same as per
embedded tax rates finalized by the concerned Depts., accordingly. This will be
one time exercise for each Agreement by the sanctioning authority and works can
be carried out and finalized accordingly. Otherwise there would be possibility of
Audit objections for the same as causing financial loss to Government and undue
benefit to the agencies.
Action: Chief Engineer (H&A) GHMC, Hyd

Agenda Item No 3 :

R&B Dept., – Implementation of GST–Request for not to deduct embedded taxes


from the Hire charges /Depreciation of machinery - Representation of BAI
Telangana dated 28.02.2019 – Forwarded by the Engineer-in-Chief (SR & CRN),
R&B Dept., for placing before the Board of Chief Engineers - For its discussion and
necessary recommendations - Regarding
Proposed by Engineer-in-Chief (SR & CRN), R & B Dept.

7
The Engineer-in-Chief (SR & CRN), R&B Dept., vide letter dated 18.03.2019 has
furnished the following as submitted by the BAI, Telangana vide their letter dated
28.02.2019 in the subject matter.
1) No input is allowed for the machinery in the VAT era in Composition Scheme.
The element of "Hire Charges of the machinery" was arrived at by dividing the
Capital Cost of the Machinery by the life-time working period of the machinery
and adding the salaries/wages of the crew and cost of Diesel. Hence, it is clear
that though the words "hire charges of the machinery" are used in the SoRs, in
fact, "depreciation of the machinery" is' taken into account for the calculation,
and the "hire charges" are nowhere taken into consideration. The correct
position is that there would be no embedded taxes in the value or depreciation
of the machinery OWNED by the contractor, and hence there should not be any
deduction on account of embedded taxes.

2) No changes have been made either in the ruling position pertaining to taxes like
VAT or in the procedure of preparation of SoRs existing in the combined state
of AP after bifurcation of the State. After introduction of GST w.e.f.
01-7-2017, the issue of deduction towards embedded taxes in the machinery is
being examined alike in both the States. The Government of AP have issued
orders vide GO Ms No.118, Dt:09.11.2018 to keep the same hire charges of
machinery adopted in the pre-GST regime even in the GST regime from
01-7-2017, for all the ongoing works as on 01-7-2017 (for which agreements
have been concluded before 01-7-2017) Suitable instructions have also been
issued by the Government of A.P. vide letter No Rev SoRs/
ENC(R&B)/DCE®/ EE(TEC) / DEE7 /AEE2 /2019, Dt:21.02.2019 to adopt
the SoRs and revised estimates as per the GO Ms No.118 Dt:09.11.2018 and
the datas with zero lead has been communicated.

3) Further, the BAI has requested to take similar action and issue necessary orders
as those of Government of AP so that no deduction towards embedded taxes is
made from the hire charges of the machinery, as the element of hire charges is
actually depreciation in the value of the machinery and as the machinery items
are owned by the contractors.

8
4) In this regard, the Engineer-in-Chief (SR & CRN), R&B Dept has requested to
put forth the above subject matter before Committee of Board of Chief
Engineers for its discussion and necessary recommendations.

In view of the above, the subject issue along with copies of


Engineer-in-Chief (SR & CRN) letter dated 20.03.2019 and BAI Telangana
letter dated 28.02.2019 is placed before Board of Chief Engineers (BOCEs)
for its discussion and necessary recommendations in the matter.

While submitting their plea on this issue before BOCEs, the BAI has also
requested Board of Chief Engineers to examine the embedded taxes of common
materials like Fine & Coarse aggregate and Bricks.

The Board of Chief Engineers has deliberated the issue in detail and after
comprehensive discussions in the matter, the BOCEs has recommended to keep
the same hire charges of machinery as adopted in pre-GST regime in the
post-GST regime also for all the ongoing works as on 01.07.2017. In this regard,
BOCEs observed that by keeping the same machinery hire charges in post-GST
regime, the machinery lead/conveyance charges will not be affected and hence
recommended to keep the same machinery lead/conveyance charges in post-GST
regime for all the ongoing works as on 01.07.2017.
Further, BOCEs also examined the embedded tax rates of common
materials like Fine & Coarse aggregate and Bricks etc., in pre-GST regime and
after detailed deliberations BOCEs has recommended for exemption of bricks
(except factory made aerated bricks like Aerocon etc.,) and Coarse aggregate
(crusher by product) from the purview of embedded taxes and to retain the same
rates in post-GST regime as that of pre-GST regime for all the ongoing works as
on 01.07.2017. This is because most of the dealers/suppliers come under
exempted category.
Action: Engineer-in-Chief (SR & CRN), R & B Dept

Agenda item No. 4

I& CAD Dept - SC/ST Contractors Development Policy- Public


works- Concessions to SC / ST Con tractors - Implementation of the GO
9
Ms.No.59 - Concessions/Relaxations in respect of reservation of works
to SC / ST contractors in public works - Detail Methodology for
implementation - Requested by CE/Civil, TSTRANSCO - Placed before the
Board of Chief Engineers - For discussion and necessary recommendations–
Regarding
Proposed by Chief Engineer/Civil, TS TRANSCO

The Chief Engineer/Civil, TS TRANSCO vide their letter dated 15.12.2018


has requested for Methodology on Implementation GO Ms No 59,
I&CAD(Reforms) Dept., dated 21.05.2018 i.e., entrustment of works to
SC/ST/Waddera(Sagara) communities as per the earmarked reservation in the said
GO.
In GO Ms No 59, I&CAD(Reforms) Dept., dated 21.05.2018, the following
is stipulated regarding reservation of works costing (ECV) up to Rs 1.00 crore as
below.
i) 15% to SCs
ii) 6% to STs
iii) 3% to Waddera/Sagara Communities.
The presenting officer on this agenda i.e., Chief Engineer/Civil,
TS TRANSCO was absent in the meeting. However, members have discussed
the issue and opined that the matter may be examined after obtaining
feedback from Division/Circle level on current implementation of GO Ms 59.
In this regard, the HODs of all Engineering Depts are requested to obtain
feedback from the concerned and furnish the same to BOCEs for its
examination and discussion in subsequent BOCEs meeting. Mean while all
efforts should be made by all tender inviting authorities to implement the
orders of GO Ms No 59 in a fair and transparent manner.

Agenda item No. 5

I&CAD Department –Settlement of Disputes by way of Arbitration in


Government Contracts with Claim amount up to Rs.40,00,000/- by the
International Centre for Alternative Disputes Resolution(ICADR), Hyderabad in

10
Telangana State- Certain Instruction issued by Govt to place the matter before the
Board of Chief Engineers Meeting - Regarding
Proposed by Engineer-in-Chief (AW), I&CAD Dept

The International Centre for Alternative Dispute Resolution (ICADR) stated


that their organization is autonomous working under the aegis of the Supreme Court
of India with its Regional Centre at Hyderabad and fully funded and supported by the
Government of Telangana.

As per the request of the ICADR, the Government of Telangana have issued
the G.O.Rt.No. 597 Law (B) Department dated 31-10-2018 (copy enclosed) by raising
the ceiling of claim amount to Rs.10,00,000 to Rs.40,00,000/- for the purpose of the
arbitration disputes arising in the Government contracts and with a direction to get the
disputes arbitrated through the ICADR, Regional Centre, Hyderabad.

According to ICADR, the above direction by the Government will help to settle
disputes of all kinds arising out of Government contracts expeditiously, economically
and without the hassles involved in traditional court litigation within one-year period
as per the Arbitration and Conciliation (Amendment) Act, 2015.

In this regard, this office has requested the Government to issue necessary
orders for implementation of G.O.Rt.No. 597 Law (B) Department dated 31-10-2018
of Govt. of Telangana by all unit officers of I & CAD Department at their level to
settle disputes arbitrated through the ICADR, Regional Centre, Hyderabad.

In view of above, the Government has informed that at present in almost all
agreements in I&CAD Department, there is no provision for arbitration beyond
Rs.50,000/-. As per the existing instructions, the concerned CE or SE they can
arbitrate up to Rs.50,000/- claims only.

Further, the Government has informed that the Law Department has suggested
to incorporate alternative dispute resolutions and they have issued G.O.Rt.No. 597
Law (B) Department dated 31-10-2018 duly enhancing the limitation to