3 - Design of Intake Well
3 - Design of Intake Well
Reservoir Particulars
TBL 481.50 m
FRL 477.50 m
MDDL 455.10 m
LSL/NZE 453.00 m
Canal Particulars
Design Data :-
2.5 2.5
Upward reaction
3 3
Where,
Grade of Concrete is M 25
3 scbc = 8.5 mm2
modular ratio m = 280
= 10.98
3 scbc
k= m scbc = 0.337
m scbc + sst
j= 1- K/3 = 0.888
Q = 1/2 scbc kj = 1.272
Stresses:
Steel, HYSD BAR = 184.00 N/mm ²
Concrete = 2.00 N/mm ² (tensoin)
π a b q1 W
3.14 3 2.5 345833 5298750
Mr = W 2 Log a/b+1-(b/a)^
-3q(a²
2
-b²)
8π 16
Mr = 580050 NM
Effective depth Required
d = M
Rb
= 675.288 mm
{Provide eff. D = 850 mm
Overall thickness = 1000 mm
Area of steel required
Ast = M
σst xj xd
= 4176.53 mm ²
Area of steel requiredMinimum) = 0.3x cs area 3000 mm ²
But Max. is 4176.53 mm ² on both ways
Steel on each face 2088.27 mm ²
Provide 25 mm dia bar at 230 mm c/c
Aφ = Area of bar = 490.625 mm ²
Spacing = Aφx1000 /Ast 234.94 mm c/c
Actual steel provided 2133.15 mm ² OK
HYDRAULIC PARTICULARS
Reservoir Particulars
TBL 481.50 m
FRL 477.50 m
MDDL 455.10 m
LSL/NZE 453.00 m
Canal Particulars
Design Data :-
(iii) Net Pressure with combination of above (1) & (2) " =100200 N
1-The worst stress condition is; well full of water & no earth at outside
Maximum Hoop tension at 30 m below from top = P x D /2= 600000 N
Using Cement concrete
Concrete M- 20 wt. of concrete 25000 kg/m3
scbc 7 m 13
Steel Inside Out side
sst 150 sst 190
sct 1.2 N/mm2
Steel required Ast = Hoop Tention
sst
= 600000
190
= 3157.89474 mm2
In each face provide Ast = 1578.94737 mm2
Provide 18 mm dia bar =Aφx1000/Ast
3.14xdia2
using 18 mm bars =A=
4 x 100
3.14 x 18 x 18
=
4
254.3 mm 2
Spacing = 161.1
Provide hoop steel 18 mm ø 160 mm c/c up to30m height
2-Thickness of Well- Though the reinforcement has been provided to take the entire hoop
tension,the concrete has not been prevented to take a part of this tension.The thickness of the
wall showithin safe limitIf uld therefore, be such that the tensile stress developed in the
complete section is with in safe limit.If αct is the permissible tensile stress in equilent
concrete section and T is the thickness of wall then
αct = wHD/2
1000T+(M-1)Ash
600000
1000T + 12 x 3157.895
600000.00
1.2 =
1000T + 37895
1000T + 37894.74 = 500000
T= 462.105 mm
But provided 500 mm hence safe
3.14xdia2
using 18 mm bars =A=
4 x 100
3.14 x 18 x 18
=
4
254.3 mm 2
Spacing = 241.6
Provide hoop steel 18 mm ø240 mm c/c up to30m height
2-Thickness of Well- Though the reinforcement has been provided to take the entire hoop
tension,the concrete has not been prevented to take a part of this tension.The thickness of the
wall showithin safe limitIf uld therefore, be such that the tensile stress developed in the
complete section is with in safe limit.If αct is the permissible tensile stress in equilent
concrete section and T is the thickness of wall then
αct = wHD/2
1000T+(M-1)Ash
400000
1000T + 12 x 2105.263
400000.00
1.2 =
1000T + 25263
1000T + 25263.16 = 333333
T= 308.07 mm
But provide 350 mm
Maximum Hoop tension at 10 m below from top = P x D /2= 200000 N
3.14xdia2
using 18 mm bars =A=
4 x 100
3.14 x 18 x 18
=
4
254.3 mm 2
Spacing = 483.2
Provide hoop steel 18 mm ø 300 mm mm c/c up to10 m height
2-Thickness of Well- Though the reinforcement has been provided to take the entire hoop
tension,the concrete has not been prevented to take a part of this tension.The thickness of the
wall showithin safe limitIf uld therefore, αctbe= such that the tensile
wHD/2stress developed in the
complete section is with in safe limit.If αct is the permissible
1000T+(M-1)Ash
tensile stress in equilent
concrete section and T is the thickness of wall then
200000
1000T + 12 x 1052.632
200000.00
1.2 =
1000T + 12632
1000T + 12631.58 = 166667
T= 154.035 mm
But provided 250 mm hence safe
Vertical Steel- = 0.3 x C.S. Area =
From 30 M to 20 in hight from top = 0.3 x 1000 x 500
100
1500 mm ²
= 750 mm2 each face)
3.14xdia2
using 16 mm bars =A=
4 x 100
3.14 x 16 x 16
=
4
201.0 mm 2
Spacing = 267.9
Provide hoop steel 16 mm ø 250 mm c/c up to20 m height from Top
From 20 M to 10 in hight from top = 0.3 x 1000 x 350
100
1050 mm ²
= 525 mm2 each face)
3.14xdia2
using 16 mm bars =A=
4 x 100
3.14 x 16 x 16
=
4
201.0 mm 2
Spacing = 382.8
Provide hoop steel 16 mm ø 300 mm c/c up to20 m to 10 m height from top
From 10 M to 0 in hight from top = 0.3 x 1000 x 250
100
750 mm ²
= 375 mm2 each face)
3.14xdia2
using 16 mm bars =A=
4 x 100
3.14 x 16 x 16
=
4
201.0 mm 2
Spacing = 535.9
Provide hoop steel 16 mm ø 300 mm c/c up to 10 m to 0 m height from top
HIRAN MEDIUM IRRIGATION PROJECT
DESIGN OF INTAKE WELL AT OFFTAKE HEAD SLUICE
* HYDRAULIC PARTICULARS
Reservoir Particulars
TBL 481.50 m
FRL 477.50 m
MDDL 455.10 m
LSL/NZE 453.00 m
Canal Particulars
Design Data :-
(iii) Net Pressure with combination of above (1) & (2) " =199800 N
1-The worst stress condition is; well is empty & earth at outside
Maximum Hoop tension at 30 m below from top = P x D /2= 399600 N
Using Cement concrete
Concrete M- 20 wt. of concrete 25000 kg/m3
scbc 7 m 13
Steel Inside Out side
sst 150 sst 190
sct 1.2 N/mm2
Steel required Ast = Hoop Tention
sst
= 399600
190
= 2103.15789 mm2
In each face provide Ast = 1051.57895 mm2
Provide 18 mm dia bar =Aφx1000/Ast
3.14xdia2
using 18 mm bars =A=
4 x 100
3.14 x 18 x 18
=
4
254.3 mm 2
Spacing = 241.9
Provide hoop steel 18 mm ø 240 mm c/c up to30m height
2-Thickness of Well- Though the reinforcement has been provided to take the entire hoop
tension,the concrete has not been prevented to take a part of this tension.The thickness of the
wall showithin safe limitIf uld therefore, be such that the tensile stress developed in the
complete section is with in safe limit.If αct is the permissible tensile stress in equilent
concrete section and T is the thickness of wall then
αct = wHD/2
1000T+(M-1)Ash
399600
1000T + 12 x 2103.158
399600.00
1.2 =
1000T + 25238
1000T + 25237.89 =
T= 307.762 mm
But provided 350 mm hence safe
3.14xdia2
using 18 mm bars =A=
4 x 100
3.14 x 18 x 18
=
4
254.3 mm 2
Spacing = 362.8
Provide hoop steel 18 mm ø360 mm c/c up to30m height
2-Thickness of Well- Though the reinforcement has been provided to take the entire hoop
tension,the concrete has not been prevented to take a part of this tension.The thickness of the
wall showithin safe limitIf uld therefore, be such that the tensile stress developed in the
complete section is with in safe limit.If αct is the permissible tensile stress in equilent
concrete section and T is the thickness of wall then
αct = wHD/2
1000T+(M-1)Ash
266400
1000T + 12 x 1402.105
266400.00
1.2 =
1000T + 16825
1000T + 16825.26 =
T= 205.175 mm
But provide 250 mm
Maximum Hoop tension at 10 m below from top = P x D /2= 133200 N
3.14xdia2
using 18 mm bars =A=
4 x 100
3.14 x 18 x 18
=
4
254.3 mm 2
Spacing = 725.6
Provide hoop steel 18 mm ø 300 mm mm c/c up to10 m height
2-Thickness of Well- Though the reinforcement has been provided to take the entire hoop
tension,the concrete has not been prevented to take a part of this tension.The thickness of the
wall showithin safe limitIf uld therefore, αct
be= such that the tensile
wHD/2stress developed in the
complete section is with in safe limit.If αct is the permissible
1000T+(M-1)Ash
tensile stress in equilent
concrete section and T is the thickness of wall then
133200
1000T + 12 x 701.0526
133200.00
1.2 =
1000T + 8412.63
1000T + 8412.632 =
T= 102.587 mm
But provided 250 mm hence safe
Vertical Steel- = 0.3 x C.S. Area =
From 30 M to 20 in hight from top = 0.3 x 1000
100
1050 mm ²
= 525 mm2 each face)
3.14xdia2
using 16 mm bars =A=
4 x 100
3.14 x 16 x 16
=
4
201.0 mm 2
Spacing = 382.8
Provide hoop steel 16 mm ø 380 mm c/c up to20 m height from Top
From 20 M to 10 in hight from top = 0.3 x 1000
100
750 mm ²
= 375 mm2 each face)
3.14xdia2
using 16 mm bars =A=
4 x 100
3.14 x 16 x 16
=
4
201.0 mm 2
Spacing = 535.9
Provide hoop steel 16 mm ø 500 mm c/c up to20 m to 10 m height from top
From 10 M to 0 in hight from top = 0.3 x 1000
100
750 mm ²
= 375 mm2 each face)
3.14xdia2
using 16 mm bars =A=
4 x 100
3.14 x 16 x 16
=
4
201.0 mm 2
Spacing = 535.9
Provide hoop steel 16 mm ø 300 mm c/c up to 10 m to 0 m height from top
ake the entire hoop
The thickness of the
ss developed in the
e stress in equilent
2103.158
333000
1402.105
222000
701.0526
111000
x 350
00
x 250
00
x 250
00
Design of Base slabe
Base Slab is subjected to upward pressure due to submerged soil
1-Total vertical load on base footing:
1.1 Weight of circular wall = [(ᴫD2/4)- (ᴫd2/4)] x H x 2.5 T/m
Weight of vertical wall = (π/4)x(D^2-d^2)xhxWc
Inner dia of wall = 0 4.00 m
Outer dia of wall at height from top= 10 4.5 m
20 4.7 m
30 5 m
Weight of vertical wall from top = 10 834062.5 N
20 1195162.5 N
30 1766250 N
Total Weight of vertical wall = 3795475 N
1.2 Weight of water = ᴫD /4 x H x W
2
= 0.785 x 4 x 4x 30 x 10000
3768000 N
Assume thickness of raft = 1.00 m
Dia of raft with projction = 6.00 m
Area of raft = 28.26 m ²
Weight of base footing = ᴫD /4 x thickness x 2.5 x 10000
2
2.25 2.25
Upward reaction
3 3
= 0.785 x 4 x 4x 30 x
3768000 N
Assume thickness of raft = 1.00 m
Dia of raft with projction = 6.00 m
Area of raft = 28.26 m ²
Weight of base footing = ᴫD /4 x thickness x 2.5 x 10000
2
0.785 x 6 x 6x 1.00 x
= 706500
`.3 Weight of earth on projection =
height of eart over base slab he= (π/4)x(D1^2-d1^2)xhex We
Outer dia of base slab including projections D1= 6.00 m
Outer dia of base slab without projections d1= 5 m
Weight of earth on projection from top = 0 N
Total weight = 3795475.5 + 3768000 +
8269975.5 N
Therefore stress = Total wt./area of footing
8269975.5
=
28.26
= 292638.91 N/sqm
= 0.293 N/mm^2
Safe Bearing Capacity = 29.26 T/m^2
required
Safe Bearing Capacity foundation (sof < 80 Safe
Well Wall load Well Wall load
2.25 2.25
Upward reaction
3 3
25000
706500 + 0
N/mm^2
650