Completions and Workovers 1.9
Completions and Workovers 1.9
Workovers
Module 1.9
CAPPA Level 1
CAPPA
The drilling of a well takes many months of planning, preparation and a sizable
quantity of cash. The purpose of drilling the well is to access oil or gas reserves,
which hopefully will be present. If an optimistic indication of reserve potential
can be achieved from the drilling and testing operations, casing will be set and
cemented in the wellbore by the drilling rig.
The setting of the casing is really the first step in the completion of the well. The
completion of the well will enable access to the oil or gas reserves, so that they
may be produced to surface.
This module will provide information on how the completion progresses from a
cased well to the point of having a well capable of production. The well will
require perforating, equipment will be installed inside the casing, the productive
formation may require treatment to enable production and the fluids may need
assistance in getting up to the surface. After producing for a period of time, a
workover may be necessary if the downhole equipment needs repair or servicing
or the formation requires additional treatment in order to continue efficient
production.
1
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Topic 1: Casing and Tubular Completion Configurations
In this unit students will be introduced to the equipment installed in a well, the
purpose of that equipment and how the well equipment might be set up differently
for discrete needs of the well.
Objective 5: Wellhead
The student will identify and name the basic components of a wellhead and
explain the purpose of the wellhead.
2
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 7: Perforating
The student will name and explain the two methods of providing a flow path for
the formation fluids from the reservoir into the wellbore.
In this unit the students are presented with artificial lift and a brief explanation of
the three key methods of providing this lift in a well.
In this unit the student will be presented with information on the types of jobs
which would be considered a workover, the different service rigs which might be
used to perform the work and how these jobs are classified by oil companies on
the "books."
4
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Topic 1: Casing and Tubular Completion Configurations
Objective 1: The student will identify and name the basic components of a well.
TYPICAL CONFIGURATION
The casing, tubing and other downhole equipment will vary from well to well.
They will vary depending on the depth of the well, the type of fluids being
produced, the number of productive formations being produced and numerous
other choices available in designing the well completion.
Figure 1
5
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 2: The student will identify and name the different basic casing strings
of a well.
CASING REVIEW
The first step in the sequence of completing a well is the setting of the casing. As
covered in the Module on Drilling, the setting of the casing is normally an
operation handled by the drilling rig. The casing is set in position and cement is
pumped down the well, out and around the casing, into the annular region
between the casing and the wellbore. The procedure for cementing the casing in
place is known as primary cementing. The cement serves two key purposes: it
holds the casing in place and it prevents contamination resulting from formation
fluids flowing from one formation to another.
If a well is assessed as a dry hole the well will be abandoned. However, on a well
with some potential of hydrocarbons (oil or gas) the drilling rig is used to case the
well down to the deepest potential zone. The casing strings are set as the drilling
progresses. The shallowest casing string is the surface casing and all subsequent
casing strings are smaller in diameter and are placed into the well inside the last
casing string. The casing strings in a well, in the order of installation, could
include : surface casing, intermediate casing, production casing and a liner casing
string. At a minimum a cased well will include surface casing and production
casing.
Once the final casing string is set the drilling rig is normally released and moved
off the well site. A service rig is then moved onto the well site for the final
completion of the well. The service rig's primary role at this stage of the
completion is to install tubing and other downhole equipment. The drilling rig is
capable of handling the operations performed by the service rig; however the
hourly costs for a service rig can be significantly less than for a drilling rig (more
discussion on different types of service rigs will be found in Objective 18,
Workover/Service Rigs). The conventional service rig bears a resemblance to the
drilling rig; however it is more portable, and typically mounted on the back of a
truck. The service rig is primarily designed for the job of running tubing and other
tubing related equipment; although some light drilling can be accomplished with
proper equipment on a service rig.
6
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 3:The student will name and identify some basic downhole well
equipment and explain the purpose of that downhole well equipment.
Tubing comes in sections known as joints, around 10m (30 feet) in length with
threaded ends. The tubing joints are joined together by screwing the tubing into
threaded collars. The most common tubing sizes have an outside diameter of
60.3mm (2 3/8") or 73.0 mm (2 7/8"), however more prolific producing wells may
require significantly larger diameter tubing. The tubing is installed inside the
production casing with the end of the string of tubing near the depth of the
productive horizon.
Tubing has a smaller cross-sectional area than the casing. The fluids will be
easier to produce up the tubing, since the velocity will be increased in the
smaller sized pipe.
Chemicals can be pumped down the annulus between the outside of the tubing
and inside of the casing. These chemicals may be needed to treat the
producing fluids to reduce corrosion or prevent freezing or scaling in the
tubing or casing.
In order to "kill a well" fluids must be pumped down the well. The kill fluid is
pumped down the annulus between the casing and the tubing. A well that has
been killed is said to be "dead". A dead well can be brought back to life by
removing the kill fluid.
The tubing can aid in protecting the casing from abrasion, corrosion and
excessive pressures.
Some of the other equipment, which might be installed inside the casing, could
include:
Packers - A packer is used to isolate the annulus between the casing and the
tubing. Production entering the wellbore can enter the bottom of the tubing, but
the annulus is isolated from this production. This will protect the annulus if the
production is corrosive or if the pressures are too high for the casing. Also dual
7
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
or multiple packers can be used so that more than one tubing string can be
installed in the well and isolated from one another (see multiple zone completion
in the next section).
Blast Joint - This is a joint of tubing composed of specially alloyed steel. The
blast joint is used where tubing is beside a productive zone with high velocity
fluid being produced, which could erode normal tubing.
Sliding Sleeve - This is a piece of equipment installed with the tubing which can
be opened and closed to provide communication between the tubing and the
annulus. This would be of use where a packer is isolating the annulus but there is
a short term need to circulate chemicals down the annulus and up the tubing. The
sleeve has slots on it, which are aligned with slots on the tubing string when the
tool is in the open position. The tool is opened and/or closed by lowering a tool
on the end of a wire.
Nipples - These are short pieces of pipe with an inside profile in which a
removable plug could be set. These nipples can be used to plug off the tubing for
some completion process or tools such as pressure recording tools might be hung
and left at the bottom of the well during a flow test.
8
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 4: The student will recognize and identify some of the differences and
the reasons for those differences in the set-up of downhole well equipment.
COMPLETION CONFIGURATIONS
2. Tubing and packer completion: The tubing has been run down to the
productive zone and a packer has been included to isolate the annulus
from the pressures and fluids in the tubing. The sliding sleeve has been
installed so that fluids can be flowed between the tubing and annulus, if
the need arises. The sliding sleeve is mechanically opened and closed by a
tool lowered into the well on the end of a wireline.
5.Pumping well (with sucker rods and a bottomhole pump): In this well
the oil zone is being pumped. The tubing has been run down to the zone
and a bottomhole pump has been installed at the bottom of the tubing. The
pump is stroked by solid sucker rods run on the inside of the tubing and
attached to the pump. The sucker rods at the surface are connected to a
pumpjack unit.
9
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Figure 2
10
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 5:The student will identify and name the basic components of a
wellhead and explain the purpose of the wellhead.
WELLHEAD
After the tubing has been placed inside the casing it is hung at the surface in a
tubing hanger. The tubing hanger is a component of the wellhead.
The purpose of the wellhead is to contain the pressures and segregate the
annuluses of the various casing and tubing strings at the surface of the well. The
top portion of the wellhead is known as the Christmas Tree. The Christmas Tree
is made up of several valves, on which several other fittings, gauges and other
controls may be attached. With all of the valves and other attachments, the
wellhead set up may look quite elaborate, like a Christmas tree.
Casing Head: is attached to the surface casing, either threaded or welded. This
forms the foundation for the rest of the well and the wellhead.
Casing Hanger: is threaded to the top end of the casing. With the casing hanger
attached, the casing can be positioned in the well and hung in the casing head (and
normally then cemented during the drilling operation). The hanger has seals
which will isolate the casing annulus.
Casing Spool: If an intermediate casing string is set in the casing head a casing
spool will be bolted onto the top of the casing head. The production casing would
then have a casing hanger attached and be hung in the casing spool.
Tubing Head: is bolted onto the top of casing head or casing spool.
Master Valve: is bolted to the tubing head and is the first valve which can control
the production and pressures at the top of the tubing.
Flow Tee: directs flow and attaches to master, stabbing and wing valves.
Wing Valves: are valves off to the side of the wellhead and the production will
normally end up flowing through these valves.
Swabbing or Crown Valve: is a valve at the top of well through which tools or
instruments may be run.
11
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Figure 3
12
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Topic 2: Completion Techniques
Objective 6: The student will name some of the sources of information which help
to identify where in the well hydrocarbon production may be found and explain
how that information helps in the assessment of the hydrocarbon location.
1. Well logs are run by a logging unit during the drilling operation. The
logging instruments are lowered into the well on the end of an electric
cable. As the cable and the instruments are pulled out of the well, the
measurements from the instruments are recorded and correlated to the
depth. There are three basic categories of well logs: electric, acoustic and
radioactive. Well logs can be analyzed to assess some of the formation
characteristics (porosity, presence of hydrocarbons, permeability, water
saturation, shale content, rock type).
2. Drill Stem Tests (DST) are run prior to setting the production casing. A
DST uses packers on the end of the drill pipe to isolate a potential zone of
interest. The hydrostatic pressure is released and an attempt is made to
flow the zone. During the test, pressure recorders with the packer
assembly record the pressure responses of the interest zone. Flow is
monitored at the surface and after the test the types and volumes of fluids
trapped in the drill pipe are recorded.
3. Drill cuttings are sampled during the drilling operation. Records are kept
of drilling speed, drilling mud circulation and "shows" in the drilling mud
returns. These records will help in understanding the hardness of the
formation, changes in the rock type, potential for permeability and the
possibility of productive intervals.
4.Core may be cut from the well during the drilling operations. The core
provides a sample of the formation rock which can be analyzed and
inspected for such things as porosity, permeability, rock type and hydro-
carbon shows with in the samples.
13
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 7: The student will name and explain the two methods of providing a
flow path for the formation fluids from the reservoir into the wellbore.
PERFORATING
Perforating is the method used to make holes in the casing, through the cement
and into the formation. There are three principal types of perforating tools :
through-tubing gun, casing gun and end-of-tubing gun. The through-tubing
gun can be run with the tubing in the well, while the tubing must be removed to
run the larger diameter casing gun. The end-of-tubing gun is run in on the end of
the tubing and the charges can be detonated mechanically by dropping a metal bar
down the tubing.
Along the length of the perforating gun explosive charges are mounted. The
charges contain either a shaped charge, which forms a jet when ignited, or a
bullet. Today the jet is used almost exclusively. The gun carries several of these
charges, so that the well is perforated over the productive interval with as many as
12 to 15 shots per metre. The resulting perforation is approximately 1 to 2 cm in
diameter (1/2 to 3/4 inch) and passes through the casing and cement and into the
formation up to a depth of 30cm (1 foot). Refer to Figure 4.
Figure 4
14
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
The perforating procedure begins by running logging tools into the well to
correlate to the logs obtained during the drilling operations. A magnetic collar
locator log is also typically run which picks up the location of the casing collars.
The through-tubing gun or the casing gun is run into the well on an electric cable
by the wireline perforating unit. With all of the logging information the
perforating tool is placed at the proper depth by the wireline unit. The explosive
charges in the tool are discharged by an electric current passing down the electric
wireline.
Figure 5
15
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Unlike the open hole completion, most wells are completed with casing and
cement over the potential formations, thus communication needs to be
established.
There are some advantages and disadvantages for the use of open-hole completion
versus perforating a cased hole, which could include the following:
Eliminates the expense involved with casing and perforating the production
interval.
Formation is fully exposed for a less restrictive flow.
Drilling fluids can be changed after the casing is set and prior to penetrating
the zone, in order to reduce formation damage from the drilling mud.
If the need for a cased hole arises, it may still be possible to install a liner.
The open hole section is limited to intervals at the bottom of the hole.
Although "open hole" is often the best option for completing a well for the
reasons listed in the "Advantages" section above, only the bottom portion of
the hole can be used for this purpose. In a well completed "open hole", all
uphole prospective zones (those with both porosity and permeability) in the
well must be completed "normally" and therefore the above advantages only
apply to the deepest prospective zone penetrated by the well bore.
If the well is unsuccessful, the abandoned well would have been unnecessarily
cased and cemented at a significant cost.
Sloughing of the sides of the hole may force the interval to be cased or lined.
16
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
The student will explain the purpose and types of well stimulation
Objective 8:
and how both acidizing and hydraulic fracturing improve well productivity.
WELL STIMULATION
Well stimulation treatment may be required if the well will not produce after
perforating or if the flow performance requires improvement. During drilling and
possibly the completion process, the formation may be subjected to damage by
the drilling and completion fluids or the permeability of the formation rock may
be poor. The stimulation attempts to remove, break past or create improved flow
paths in the formation. The two primary stimulation techniques are acidizing and
fracturing (frac).
In acidizing, acid is pumped into the formation to dissolve the rock or any
damaging material, which might be restricting the permeability. The two principal
types of acid, used in well treatments, are hydrochloric (HCl) which is used to
dissolve calcium carbonates (CaCO3 : limestone & dolomites) and hydrofluoric
(HF) acid which dissolves silica (sand stone), clays and muds. A blend of HCl and
HF is known as mud acid, since it is well suited for cleaning out mud damage
which might have resulted from the drilling mud.
In the hydraulic fracture treatment, fluids are pumped into the well at rates and
pressures that create fractures in the formation (one or more cracks are formed in
the formation rock). The frac fluids are pumped into the well and into the
formation at rates faster than the fluid can leak off into the formation. This is
continued until the pressures build up such that the formation rock fractures. After
the pressure is released, the fracture will close back providing little or no benefit.
In order to keep the fractures open a proppant, such as specially selected sand, is
pumped into the fracture with the frac fluids. When the pressure is released in the
fractures, the propping agent is trapped when the fracture tries to close resulting in
permeable flow paths from the wellbore deep into the formation. The desired
characteristics of a proppant would be:
small and light enough so that the frac fluid can carry it into the structure.
hard enough so that it is not crushed by the closing pressure of the fracture.
Sand is usually the material of choice because of its cost and ability to meet the
desired needs of a good proppant. It comes from special quarries, which have
sand with the roundness and strength essential for proppants. The sand is carried
into the frac in a viscous fluid called a gel. Shortly after the gel/sand mixture is
injected, a chemical reaction occurs and the gel reverts to water. The water is
produced from the well and the sand is left behind in the frac. Some other
17
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
materials used as proppants include ceramics and in the early days of the oil
industry, even crushed walnut shells.
18
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 9: The student will explain what hydrostatic pressure is and how it
influences the production from a well and explain the term swabbing and when
this procedure used.
HYDROSTATIC PRESSURE
Figure 6
19
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
A well is said to be "killed" or "dead", if a fluid column can be established in the
wellbore which exerts a hydrostatic pressure greater than the formation pressure
and thus prevents the well from flowing.
After a well is completed the hydrostatic pressure may have to be relieved before
the well will flow. This is accomplished through an operation known as swabbing.
Swabbing is usually performed with a wireline unit and a tool with swabbing
cups. As the tool is lowered in the well, down into the fluid column, the swabbing
cups fold up. When the tool is pulled out of the well, the swabbing cups fold
down, so that the fluid is trapped above the tool and the fluid can be pulled to the
surface and removed. After a few trips in the well with the swabbing tool, the
fluid column is reduced and the well may start to produce.
The fluids used during a completion or workover (for killing the well, as a frac
fluid etc.) are known as load fluids. Load fluids are recovered from the well
before production is reported for the well. This is particularly important if oil was
used as a load fluid. The load oil is recovered before production is reported and
royalties are only paid on new production.
20
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 10:The student will explain what is meant by the terms segregated and
commingled production, will explain a multi-zone completion and will list
advantages and disadvantages of such completions.
1. Equipment
For most multi-zone completions the production from each zone must be
segregated (isolated) until it has been measured at surface. Segregation will
prevent contamination of one zone by another, pressurization of a low pressure
zone by a higher pressure zone and it will allow the measurement of the
production from each zone.
In order to achieve segregation each zone must have a separate and isolated flow
path to the surface (Figure 7), which could involve more than one tubing string,
one or more packers and a special wellhead to accommodate the tubing strings. In
some cases it may be possible to flow production from one zone up the tubing-
casing annulus or to run two or more tubing strings by installing them co-
centrically (one inside the other) and flowing production up a tubing-tubing
annulus.
21
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Figure 7
2. Planning
A multiple zone completion may need to be planned from the drilling stage. The
wellbore would be drilled with a larger bit and larger diameter casing would be
installed, to allow for the installation of more than one tubing string. This adds to
the drilling costs of the well, as it takes more time to drill a larger hole. The larger
casing and other drilling materials (drilling mud, cement) are also more costly.
In planning the completion, after the well has been cased it is preferred to
complete the lower zone first. By working on the lower zone first, each zone can
be isolated from the next higher zone with a packer or retrievable bridge plug.
This method allows tubing to be removed for perforating, isolation of the zone for
stimulation and creates no concerns with production moving into the wellbore or
completion fluids moving into a previously completed zone. This practice of
moving up the hole to the next zone is also typically used where a zone is
completed and the production drained, before completing the next zone.
22
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
There are several pros and cons regarding multi-zone completions and some of
those are:
CONS
PROS
With the added cost, consideration and the potential for problems, the lower zone
is often produced until the reserves are depleted and abandoned before the next
zone is completed or a second well is drilled for the uphole zone.
pressures in the zones must be comparable (such that one zone will not flow
into the other);
fluids in the zones must be compatible (if one zone did flow into the other
damage or contamination could occur if the fluids were not compatible - for
example a sour gas flowing into a gas zone containing sweet gas) and
the rights of all parties must be conserved (if the separate zones had different
working interest owners, royalty owners or lessors with commingled
production you would not be able to measure the production and allocate the
revenues).
23
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 11: The student will list the reasons why a well might be tested and
some of the different types of tests.
WELL EVALUATION
In order to evaluate the well after it has been completed, a flow test is performed.
If the necessary equipment and flowlines are available the well may be tied-into
existing production facilities. If the necessary facilities are not available,
temporary testing equipment will be set up on the well site. During the production
test, measurements may be taken of the volumes and pressures (surface and
bottom hole) all recorded against time. From the tests some of the things which
might be assessed are:
IP test: initial production test, the well is flowed at the anticipated production
conditions.
Single rate test: the well is produced and a set production rate is maintained
for an extended period of time.
AOFP: absolute open flow potential (gas well test) - the well is flowed at
various rates for set periods of time. The results from the analysis of the
AOFP test indicates the maximum rate the well could flow at if it were not
restricted by any hydrostatic pressure. This information also provides the
productivity of the well for various surface pressures.
Injection test: fluids are pumped into the well. This type of test is usually
used on wells to be used as injection wells for some form of enhanced
recovery scheme (EOR, waterflood etc).
24
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 12:The student will describe the purpose and basic content of a
completion program.
3. Run in tubing into the well and tag and establish the plugged back total
depth (PBTD - maximum depth the well can be penetrated).
4. Circulate out hole and circulate fluids out with completion fluid. (The
completion fluid will be selected by the completion specialist and could be
fresh water, a salt-water solution or possibly oil or some other type of
fluid. The fluid will be selected according to the needs for hydrostatic
pressures and/or the compatibility with the formation so as not to damage
the formation.)
5. Land bottom of tubing at 1208 mKB and set tubing in tubing hanger.
(During the drilling the kelly bushing is used as reference point from
which depths are measured, ie metres KB. Before the drilling rig is moved
the distance from the wellhead casing flange to the kelly bushing is
measured so that after the rig is moved KB measurements can now be
adjusted from the depth below the casing flange. If measurements are
referred to as mCF, they are the depth below the casing flange.)
25
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
8. Run in hole with logging tools CCL-GR (casing collar locator and gamma
ray tool) and log from total depth to tubing bottom, correlate to open hole
logs, pull out of hole.
10. Pull out of hole and rig out electric wireline unit.
12. Move on braided wireline unit and swab well to flare pit until flow is
established.
13. Run in bottomhole pressure records and set in tubing at 1200 mKB.
26
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Topic 3: Artificial Lift
Objective 13: The student will explain the term artificial lift, why it may be needed
in a well and describe the three main forms.
ARTIFICIAL LIFT
With sufficient reservoir pressure, oil wells will flow oil to the surface unassisted.
In time, however, the driving energy in the reservoir will drop, such that in time
the column of oil in the wellbore will "kill" the well so that it will no longer flow.
As the reservoir pressure drops and production declines, artificial lift may be
installed to assist in maintaining an optimum production level.
In some instances, gas wells may also require some form of lift. If a gas well is
producing fluids that are not produced to the surface with the gas, these fluids will
build-up and accumulate in the wellbore until they overcome the reservoir
pressure.
27
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 14:The student will explain the basic operation of a pumpjack and a
bottomhole pump.
PUMPJACK UNIT
The pumpjack unit bobbing up and down on the horizon is a familiar site to many
in oil producing areas (Figure 8). The pumpjack unit is attached to rods, known as
sucker rods, which are run on the inside of the tubing and are connected to a
pump at the bottom of the tubing. The up and down motion of the pumpjack
provides the stroking action necessary to operate the bottomhole pump.
Figure 8
The conventional pumpjack is composed of an electric or gas driven motor
connected to a gear box. The gear box rotates a crank which is attached to one end
of the pitman rod and counter-balance weights. The counter-balance weights
offset the weight of the fluid and sucker rods on the upstroke, since on the
upstroke the weight of all of the sucker rods and the fluids above the bottom-hole
pump are being lifted by the pumpjack. The other end of the pitman rod is linked
to the walking beam. The walking beam pivots up and down and has the horse's
head attached at the opposite end as the pitman rod. From the horse's head a cable
connects down to the polish rod. The polish rod passes down into the wellhead
through a stuffing box. The polish rod is allowed to stroke up and down through
the stuffing box, where a packing material fits around the polish rod and holds
back the pressure from any fluids in the wellhead. The polish rod is threaded into
the top sucker rod and the sucker rods are threaded together to provide a string of
rods, through the tubing down to the bottomhole pump. The bottomhole pump has
chambers with a valving assembly, which passes the oil from below the pump up
into the tubing and to the surface (Figure 9).
28
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Figure 9
29
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 15:The student will explain the basic operation of the electric
submersible pump and the progressive cavity pump.
PUMPS
The progressive cavity pump is used in applications where the oil is viscous. This
pump works on much the same principle as an auger bit, a grain auger or a meat
grinder. It is basically a screw conveyor where the viscous oil is pushed through
the pump and to the surface.
30
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 16: The student will explain the basic operation of a gas lift system.
Artificial lift can also be accomplished through a system known as a gas lift
system. If a field has a large supply of gas and the number of wells and the
amount of fluids to be lifted can justify the costs involved a gas lift system might
be installed. For an oil well with a packer installed, gas lift involves pressurizing
the annulus with gas. At selected intervals gas lift valves are installed on the
tubing string. The gas lift valves allow the gas to flow into the tubing with the oil.
Between the gas attempting to rise to the surface and the lighter oil column caused
by the gas mixed in the oil, the oil is produced to the surface. At the surface the
oil and gas are collected into a gathering pipeline system. The gas is then
separated from the oil, collected, compressed and transported back to the wells.
The gas is then injected into the annulus of the oil wells. In some cases, where a
large gas cap exists in the reservoir, the gas pressure in the annulus is supplied by
perforating the casing in the gas cap zone. In this scenario the returned gas would
be injected into the gas cap rather than being delivered back to each individual
well.
Gas lift systems are expensive to set up initially, due to the equipment and
pipeline systems involved. Once set up, gas lift systems are effective and
competitive with other artificial lift systems if the operating conditions and
volumes warrant the system.
31
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Topic 4: Workovers and Service Rigs
Objective 17: The student will define a workover and identify what type of work
on a well would be constituted as a workover and define remedial cementing and
list the reasons it may be required.
WELL WORKOVERS
After a well has been completed and has been on production for a period of time,
problems may occur which require some form of work in the wellbore. Any work
on the wellbore which changes the flowing characteristics of the well or repairs a
problem within the wellbore can be classified as a workover. Some of the work
and treatments which may be performed on a well are:
re-perforation job,
remedial cementing,
To assess the existing cement behind the casing a logging tool known as the
Cement Bond Log (CBL) may be run in the well. This tool uses sound waves to
detect the cement and the degree that the cement is bonded to the borehole and the
casing.
For the remedial cement job, where the cement is to be placed behind the casing
or in perforations, the cement will be pumped down the tubing and squeezed into
the repair point. If the remedial cement is to be placed in a longer interval behind
the casing, the well may be perforated above and below the area to be cemented
and the cement will be circulated from the lower perforations and out through the
upper perforations. After the cement has set the service rig may run in the hole
with a casing scraper and small drill bit to clean out any residual cement in the
casing.
For the abandonment of a zone or interval of the wellbore the wellbore may be
filled with cement from the bottom of the well up to the necessary plug-back
point. An alternative may involve setting a mechanical plug in the casing with
cement pumped down the tubing on to the top of the plug. A dump bailer used by
a wireline unit may also be used to place the cement. The dump bailer is a tubular
container which is filled with the cement slurry, run into the well by the wireline
unit and it is opened to dump the cement.
33
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 18: The student will describe a service rig and list the main types and
their particular functions.
There are different types of workover / service rigs available depending on the
type of work required. The most common is the conventional service rig. The
following is brief description of the rigs and the basic duties they can perform:
Conventional Service Rig: looks very much like a small drilling rig. Unlike the
drilling rig, the conventional service rig is usually a truck mounted mobile unit
with a derrick, which can be folded down for transporting. The rigs will include
drawworks for hoisting, a power swivel or possibly a rotary table and kelly for
rotating pipe, blowout preventors and pipe handling equipment such as pipe racks,
slips and tongs. Pumps and tanks may also be included in order to provide a
system for circulating fluids in the well. The conventional service rig performs
basic workover jobs usually involved with the tubing such as :
small acid or cementing jobs, spotted through tubing, and well clean outs
involving cutting or scraping tools mounted on tubing.
For well work to be conducted with a conventional service rig, the well must
be "dead."
Coiled Tubing Units (CTU) : are usually trucks or trailers mounted with a large
reel containing a continuous coil of thin-walled, small diameter tubing (OD 20 to
38 mm, 3/4 to 1.5 ") which will fit inside the existing tubing of most wells. The
units come with a blow-out preventor and injector head. The coiled tubing is fed
to the injector head, which will push the continuous tubing string down into the
well. The work which can be performed by the CTU can be done without
removing the tubing and includes:
light jobs such as spotting chemicals or cement downhole, light drilling (with
downhole motor tool) and setting downhole equipment (such as tubing plugs
or sliding sleeves).
Some units have electric wireline inserted through the tubing coil, which makes
them attractive for logging deviated or horizontal wells. Coiled tubing units can
work on "live" wells (pressure at surface).
34
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Snubbing Units : also known as hydraulic workover rigs, are special rigs
designed primarily to handle tubing in "live" wells. Snubbing units are self-
contained and portable. They are set-up on top of the wellhead and can push, pull
or rotate the tubing. A hydraulic cylinder allows the rig to handle one joint of
tubing from the well at a time. Once the joint of tubing has been raised into the
cylinder it can be isolated from the well and removed. The work duties include:
pushing tubing in the hole (conventional service rigs can only pull).
Wireline Units : are typically mounted on the back of a truck with a wire on a
reel. The reel is connected to a measuring device (depth measurements) and a
weight indicator. The wire is run into the well through a lubricator mounted on
the top of the wellhead, which allows the wire to be run in or out of the well with
pressure at surface ("live" well). There are three types of wireline units: slickline,
braided wireline or electric wireline. The duties of these units are as follows:
Braided wireline : has a strong line of braided wire and is used mainly for
swabbing operations or fishing jobs for tools or equipment stuck in tubing.
Electric wireline : has a braided wire with an electric cable inside and
it can run electric logging tools and perforating tools discharged by an electric
impulse.
35
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 19: The student will explain what is meant by the terms abandonment
and active and suspended wells.
WELL ABANDONMENT
block off and isolate all productive intervals with bridge plug and cement;
The AER requires the operator of a well to apply and obtain permission before a
zone or well is abandoned. For a well abandonment the AER will also issue a
Reclamation Certificate, once they have inspected the location and if the surface
conditions have been returned to their natural state, including the growth of
seeded grass.
A suspended well is any well which has had production suspended. The AER
classifies a well as inactive if it has never been completed, produced or if
production has been suspend for a year or longer. For an inactive well the AER
requires that the well be conditioned to preserve the wellbore and the wellbore
36
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
equipment. This can be accomplished by removing the tubing and setting a
removable bridge plug in the well or setting a plug in the tubing, if a packer is
installed. With the plug(s) in place, the wellbore is filled with a non-corrosive
inhibit fluid to provide further security to the well.
37
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Objective 20: The student will determine if a workover cost is classified as a
capital cost or an operating expense.
The costs of performing workovers must be classified between a capital cost and
an expense, for both taxation as well as corporate asset bookings purposes.
For corporate asset records, each company will have guidelines as to how they
will classify work between capital and expense. In general, work acceptable for
capital under the taxation rules, will be capitalized. Beyond this, if the work is
conducted to access reserves considered undeveloped or will increase booked
reserves the costs may be capitalized. This leaves work on zones to improve
existing production, for repairs or for maintenance as an operating expense.
38
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
Completions and Workovers - Recap of Important Points
The surface casing is the first string of pipe run into the well. It is the shallowest
string of pipe and has the largest diameter. Each subsequent string of pipe is
inserted inside the previous string. Each string of pipe run into the well is given a
name for easy reference.
The production casing is usually run from surface to below the deepest potential
zone. A liner may be used in place of production casing in certain applications.
The main advantage of a liner is lower cost. The setting of production casing or
liner is normally an operation performed by the drilling rig. The tubing is the
smallest string of pipe in most producing wells. It is inserted into the well by a
service rig and is used to provide better well control. Tubing can be easily
replaced when it becomes worn out.
The procedure for cementing the production casing in place is known as primary
cementing. The cement serves to hold the casing in place and to prevent fluids
from one zone flowing into a different zone and thereby contaminating the fluids
in the second zone.
A typical tubing or casing joint is 10 meters in length. The term “annulus” refers
to the region between two concentric strings of pipe, for example, the region
between the tubing and the production casing.
A packer can be used to isolate the annulus between the casing and tubing. A
sliding sleeve allows access to the region between the tubing and casing above the
packer.
The wellhead is the permanent hook up at ground level that is used to control a
producing well.
We use the time between when the drilling rig leaves and the service rig arrives to
plan the completion. We start this process by reviewing the information gleaned
during the drilling process. This information comes primarily from the drill
cuttings, any core data, the open hole well logs and any drill stem test we may
have run while the drilling rig was on location.
A well is perforated to allow the hydrocarbons to enter the wellbore from the
formation. Any one of three types of perforating guns may be: through tubing
gun, casing gun and end of tubing gun. Prior to perforating, the quality of the
39
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
primary cement job is checked and the fluid in the well is converted to completion
fluid (clean and non-damaging to the formation).
Load oil (oil borrowed from another well) is often used as a completion fluid for a
potential oil well. The first oil produced from the new well is deemed to be the
load oil which is then returned to the well from which it was borrowed.
Near wellbore damage may have been caused during either the drilling or the
completion operation. The degree of damage can be determined by performing a
flow test on the well. The damaged region can be repaired or bypassed by
stimulating the well (acidizing or hydraulic fracturing).
Hydrochloric acid (HCl) and / or hydrofluoric acid (HF) are often used in
acidizing operations.
When fracturing, it is common practice to insert a proppant into the open frac to
keep it from healing. The ideal proppant has uniform particle size, is difficult to
crush and is small and light. Sand is a commonly used proppant.
Acid is sometimes pumped into the open frac in a process known as acid
fracturing. The acid etches the rock to open new flow paths in the reservoir.
From the data obtained during a well test, we will be able to determine the size of
the reservoir if it is very small. The converse, however, is not true. We will not
have enough data from a short term well test to determine just how big a large
reservoir might be.
40
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
A multizone completion is often used when there is more than one potential zone
in order to reduce capital costs. For most multizone completions, the production
from each zone must be segregated until it has been measured at surface.
Segregation is often accomplished by using multiple tubing strings in the well.
A flow test is performed after the well has been completed. This allows us to
determine the well’s deliverability and the degree of formation damage, if any. If
the reservoir pressure declines noticeably during the test, we will have learned the
reservoir is very small, probably not worth tieing in to production facilities.
With sufficient reservoir pressure, oil wells will flow oil to the surface unassisted.
When the reservoir pressure declines to the point where the oil will no longer flow
to surface, we may have to install artificial lift.
The most common type of artificial lift in Alberta is the bottom hole pump. The
pump is powered through the up and down motion of the pumpjack (located at
surface) and the rod string, which connects the two.
The polish rod is the uppermost rod in the rod string. It is attached to the horse’s
head (part of the pumpjack) and passes into the wellhead through a stuffing box.
When the oil being pumped is very viscous, a progressive cavity pump is used.
If there is a large supply of gas, a gas lift system might be used to lift oil to
surface. Gas lift works by gasifying the oil in the wellbore and thereby reducing
its density.
Any work on the wellbore which changes the flowing characteristics of the well
or repairs a problem within the wellbore can be classified as a workover.
A service rig can be used for most workovers on existing wells but cannot be used
to drill a deep well from surface to TD. For well work to be conducted with a
conventional service rig, the well must be dead. Thus, a flowing well may have to
be killed before we can perform a workover. A snubbing unit may be used to
perform a workover on a live well.
41
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
A remedial cement job is a workover to place additional cement in the wellbore
and / or behind the production casing. This may be required when the cement top
is not high enough, when there is poor bond between the production casing and
the wall of the hole we have drilled or when we want to plug the bottom of the
hole (ie. a partial or complete abandonment of the well).
After a well has been abandoned, the AER will inspect the site and once they are
satisfied the site has been properly reclaimed, the AER will issue a Reclamation
Certificate.
A suspended well is any well which has had production suspended but which
remains capable of production.
42
Copyright 2013, 14 Canadian Association of Petroleum Production Accounting
ALL RIGHTS RESERVED: