This document communicates approved plinth area rates for building construction projects in Tamil Nadu between 2017-2018. It provides rates for various building types (residential, non-residential, hospital) in different regions, along with notes on calculating costs for foundations, superstructures, basements, earthquake zones, coastal areas and more. Chief engineers are requested to adopt these rates for rough cost estimates of building schemes from July 1, 2017 onwards.

Uploaded by

Maha Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
6K views15 pages

Plinth Area Rates For Rce 2017-18 PDF

This document communicates approved plinth area rates for building construction projects in Tamil Nadu between 2017-2018. It provides rates for various building types (residential, non-residential, hospital) in different regions, along with notes on calculating costs for foundations, superstructures, basements, earthquake zones, coastal areas and more. Chief engineers are requested to adopt these rates for rough cost estimates of building schemes from July 1, 2017 onwards.

Uploaded by

Maha Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

FOR DEPARTMENTAL USE ONLY

PUBLIC WORKS DEPARTMENT


BUILDING ORGANISATION
OFFICE OF THE [Link]-CHIEF (BUILDINGS),
CHIEF ENGINEER (BUILDINGS), CHENNAI REGION &
CHIEF ENGINEER (GENERAL), PWD, CHEPAUK, CHENNAI-s

Sub: Buildings Plinth Area Rates for the preparation of


-
Rough tost Estimates for building schemes during the
yeal zotz-2o18 - Approved - communication of -
Regarding.
iL,5 i!.
for
The Plinth Area Rates for the purpose of preparation of Rough cost Estimates

Building Schemes during the year 2O,7 -2018, worked out in line with the
impact of

adoption of Standard Schedule of Rates for the year 2OL7 -2018 are approved
and

furnished in Annexure I, II, III, IV & V' The Chief Engineers, the Superintending
Engineers and the Executive Engineers of Building organisation are requested
to adopt

the above rates in the preparation of the rough cost estimates for building schemes'
with effect from 01.O7.2O17, until further orders from thls office'

The receiPt of this circular memo along with its enclosures may b-"

acknowledged. \7
0
Enc!.: Annexures-I, II, III, IV &V.
for I ief (
Chief Engi ), Chennai
), PWD, Chennai-s

The chief rnlineer iguilaing"), PWD, Madurai Region, Madurai'


Copy to the Eng ineer- in-Chief, Water Resources Department, Chennai-5'
Department
copy to the All chief Engineers, Public works Department and water Resources
Copy to the Superlntending Engineers of Buildings Organisation'
Copy to the Executive Engineers of Buildings Organisation'
(with 10 copies)'
Copy to the Superintending Engineer, PWD, P&D Circle, Chennai-5
Copy to the EIC & CE (B), CR's Table'
Copy to the Joint Chief Engineer (Buildings), PWD, Chennai-5'
Copy to the Deputy Chief Engineer (Buildings). PWD, Chennai-5'
Executive Engineers of all Technical sections in o/o the Engineer-in-
-ni"f to HDO & Assistant
copy
& Chief Engineer (Buildings), Chennai Region, PWD' Chennai-5'
leritaingt)
Copy to Stock File / File / Spare copies (50 Nos')
ANNEXURE-I

PLINTH AREA RATES FOR THE YEAR 2O17-2O18


FOR THE PREPARATION OF ROUGH COST ESTIMATE

For works in Moffusil


(other than For works in Corporation Limits
Corporation Limits)
In Trichy, Salem,
Tirunelveli,
In Chennai,
€,)
C,l Coimbatore and
c f .5 Thoothukudi, Vellore,
o Madurai
sl. E fl- -E Tiruoour and Erode
Type of Building (I, ,9
No. E c c
C a i! r-!
€J cI)
C
o (r)
f, l- t: q- .E E r-L u- .E
o
tro o- o
o ooc 8.E o-c
o(,/)
o
ro 8.€ o(..)
f
{, d
f (,i d.'; C
l (,E rc
TL
a LL o
tL
(, ii
([Link] tn [Link] p(er 1 sqrn.)
1. Residentia I
Load Bearinq
3t70 7090 1185 3330 7445 1250 3415 76t0 1285

Framed 3760 9BBO t215 3950 10375 1285 4055 10605 1305
2. Non-Residentia I
2445 6010 1185 2565 6305 1250 2630 6460 1285
Load Bearinq
Framed 3760 7425 7215 3950 7795 1285 4055 7965 1305
3. Hospital
2445 6730 1185 2565 7505 1250 2630 7235 1285
Load Bearinq
Framed 3760 10350 t2t5 3950 10875 1285 4055 tLt40 1305

Note: -
(1) For the calculation of Foundation Cost, Plinth area at Ground level of the
building is to be taken.
(2) For the calculation of Super Structure cost, plinth area of respective floor
of the building is to be taken.
(3) For the calculation of Roof finishing cost, Plinth area at Ground level of
the building is to be taken.
(4) For School Buildings - the Super Structure cost will be 80o/o of Super
Structure cost of Non-Residential Buildings.
(5) For stilt floor towards Car parking, Garages, Cycle shed, Staircase Head
Rooms etc., - the plinth area rate will be 650lo of Super Structure cost of
Non-residential building.
(6) For basement floor, an extra 25olo over the super structure cost of
respective type of building is to be added.

(7) In framed structure, where dummy columns are to be provided, u rut" of


Rs.374/m2 of plinth area for Residential Building and a rate of Rs.295/m2
for Hospital Buildings and Non-residentlal Buildings is to be allowed.
(8) For upper floors, an extra @ Rs.2glm2 may be added towards lift charges
for each floor.
(9) The additional rates allowed in the schedule of rates for works in Jairs,
Reserve forests, Hirls and other speciar tracts etc., shall be added to the
above plinth area rates for works in respective areas.
(10) For works in the belt area of chennai city, the plinth area rate applicable
for Chennai City shall be adopted.
(11) For super structure for Earth-quake prone areas, the rates in Annexure-v
shall be adopted.
(L2) All the above provisions shal be added onry on the basic rates as
approved in the table above.

(13) For works in coastar area, the folowing rates over the basic rate as
approved in the table above, (for the total plinth area) shall be added for
providing concrete of higher grade
a. Upto 10 km distance from Sea Water Front _ Rs. 200/m2
b. Beyond 10 km and upto 24 km distance from Sea Water Front _
Rs. 100/m2

(14) PROVISIONS INCLUDED IN FOUNDATION RATE:


(a) The rate given for foundation is applicable for Ground Floor + 2
Floors in the case of Load bearing structure.
(b) The rate given for foundation is applicable for Ground Floor + 3
Floors in the case of Framed structure.
(c) The rate given for foundation is to be carcurated based on printh
area at Ground Floor of the building only.

(d) The depth of foundation assumed is [Link] below GL with


conventional stepped footing in the case of Load bearing structure.

(e) The depth of foundation assumed is 2.0m berow GL with isorated


footing in the case of Framed Structure.
(f) The foundation rate is inclusive of Earth Work, Sand filling, pCC
1 :5 : 10 for Mat Concrete, Brick Work
/ Random Rubble Mas6nry in
Cement Mortar, Re-filling the sides of foundation, plinth beam
including cost of centering, Cement Concrete, Steel, Damp proof
Course, Sand filling in basement and flooring concrete in bround
Floor in the case of Load bearing structure.
(S) The foundation rate is inclusive of Earth Work, Sand filling, pCC
[Link] for Mat Concrete, Cement Concrete, Centering, Steel for
column footing, pedestal, Column, Re-filling the sides of
foundation, Plinth beam, Brick work in Cement Mortar upto
basement level, Damp Proof Course, Sand filling in basement and
flooring concrete in Ground Floor in the case of framed structure.
(h) The foundation rates are applicable for building with basement at
0.9m height from ground level.
(15) PROVISIONS INCLUDED rN SUpER STRUCTURE RATE:
(a) This rate is inclusive of Brick work, RCC, Steel, Centering,
Plastering, joinery items with steel frames and M.D.F. shutter for
doors, steel glazed windows and steel glazed ventilators, Grano
flooring 25mm thick in the case of residential & non residential
buildings, mosaic tile flooring in the case of Hospital building and
Rain water down fall pipe of adequate dia.

(b) The height of each floor has been taken as 3.30m average.

(c) This rate is inclusive of provision for Anti skid ceramic tile flooring
and glazed tile dadooing in Toilets.

(d) This rate is inclusive of plasterlng with Cement Mortar 1:5, 12mm
thick, white washing two coats over one coat of white washing for
interior walls and colour washing two coats over one coat of white
washing for exterio r faces.

(16) PROVISIONS INCLUDED IN ROOF FINISHING RATE:


(a) This rate is inclusive of weathering course, finishing with pressed
tiles, providing parapet wall with Brick work in Cement Mortar,
plastering, white washing for interior faces and colour washing for
exterior walls.

(17) EXTRA PROVISIONS TO BE ALLOWED OVER THE ABOVE RATE:

(a) IN FOUNDATION:-
Rate in
sl. Type of foundation Rupees per Area to which applicable
No.
one sq.m,
For stub column arrangements
(i) 960 Plinth area at ground level
for Load bearing structu re
( ii) For combined footing 625 Plinth area at ground level
( iii) For strip raft 2505 Plinth area at ground level
(iv) For raft ( Floating Raft) 3760 Plinth area at ground level

(v) For every additional 0.3m


370 Plinth area at ground level
basement height

(vi) For every additional 0.3m


235 Plinth area at ground level
depth in foundation

4
st. Rate in
No. Type of foundation Rupees per Area to which applicable
one sq.m.
For every additional floor over
(vii) initial Ground +3 Floors in 515 Respective floor area
case of Framed Structure
(viii) For Anti-Termite Treatment 95 Plinth area at ground level
(ix) Pile Foundation
(a) Upto 4 storeys for a depth of
15m
7375 Plinth area at ground level

(b)
More than 4 storeys but less
than 8 floors 9475 Plinth area at ground level

(c) More than 8 Floors 12900 Plinth area at ground level


Add extra for every one metre
(d) depth, if the depth of pile 415 Plinth area at ground level
exceeds 15m
Deduct extra for every one
(e) metre depth, if the depth of 200 Plinth area at ground level
pile is less than 15m

(b) IN SUPER STRUCTURE:-

sl. Description of work


No. Rate

(i) For every additional 1m height over


the initial height of 3.30 m Rs.465/m'z

Flooring: - In Residential &


( ii) (Actual area of flooring has to be Non-Residential
In Hospita I

considered) Buildings
Build ings

(a) Grey Colour Mosaic Tiles Rs.590/m2 NIL


(b) Other Colour Mosaic Tiles Rs.795lm2 Rs.205/m'7
Ceramic Tiles
(c) Rs.845lm2 Rs.27O/m2
(not less than 305 x 305 x 6 mm size)
Marble (Macrona)
(d) Rs.1650/m2 Rs.1070/m'z
(not less than 600 x 600 x lBmm size)
Marble (Whlte)
(e) Rs.1840/m2 Rs.1265/m'z
(not less than 600 x 600 x 18mm size)

5
(f) Marble (Adanga)
(not less than 600 x 600 x 18mm size) Rs.1375lm2 Rs.800/m'z

(s) Vitrified Tiles


(not less than 600 x 600 x Bmm size) Rs.895/m2 Rs.305/m'?

(h) Rajasthan Kota Stone ( Plain) Rs.980/m2 Rs.405/m'z

(i) Rajasthan Kota stone (Laid in


Rs.1125/m2
combination with marble strips) Rs.550/m2

(i) Cuddapah Slab Rs.735lm'z Not


recommended

(k) Stain Free Nano Polish Vitrified Tiles


600x600xBmm Rs.1045/m2 Rs.455/m'2

(t)
Double Charged Vitrified Tiles
600x600xBmm Rs.1310/m2 Rs.720/m2

(m) Double Charged Vitrified Tiles


B00x800x1Omm Rs.1510/m2 Rs.920/m2

(n) Joint Free Rectified Glazed Ceramic


Tiles 305 x 305 x Bmm Rs.1000/m2 Rs.410/m'z

Joinery: (for any joinery like


( iii) Aluminium (or) any other equivalent
types of joineries if proposed) - Add Rs.518/m2 of carpet area
extra

( iv) Cement Painting if proposed:-


(a) ror rnlernar races ano on printh area
"r,uffised i

(b) For external faces only Rs.225lm2 based on plinth area

[Link]
Chief Engineer (hd
-*..d-\f,
enier leufrain{s1.i
ngs), Chennai lRegion i
Chief Engineer (G eral), PWD, Chennai-5
G.;
6\$

6
ANNEXURE-II
OPTIONAL ITEMS

Rate in
sl. Description of work Rupees per
Area to which
No. applicable
one sq.m.

1 False Ceiling using GI Channel Sections etc., (if proposed):-


(a) False Ceiling with Plain Gypsum Board 1150 Ceiling area proposed

(b) False Ceiling with Perforated Gypsum Board using GI Channel Sections etc.,

(i) Without Glass Wool 1325 Ceiling area proposed

( ii)
With Glass Wool 50mm thick below AC
1595 Ceiling area proposed
sheet rooflng

iii)
With Glass Wool 25mm thick below RCC
1460
( Ceiling area proposed
roofing

2
Wall Paneling using GI Channel Sections etc., (with cypsum Board)
if proposed:-

(a)
Wall Paneling with Perforated Gypsum
1325
Wall Paneling area
Board with Glass Wool of 25mm thick proposed

(b) Wall Paneling with Plain Gypsum Board


1060
Wall Paneling area
without Glass Wool proposed

ro,.ns{X2
chief Engineer (dd
affi1,trI
GfGf (Buildinss!, I
ngs), Chennai nEgion a
/
Chief Engineer (Gc 3ral), PWD, Chefinai-5

d-
#\a

7
ANNEXURE-III
ELECTRICAL, WATER SUPPLY AND SANITARY ITEMS OF WORKS

s1, Rate in
Description of work Rupees per Area to which
No. applicable
one sq,m,
1
AC Provision for office Buildings and in Hospit"l..-
(if proposed):-
(a) Fornon-ductableACUnits ffi
(b) For ductable type AC Plants 5505 Floor area proposed
Note! The above rates are not inclusive of civil works such as aonstruction
of plant room, false ceiling, etc.

2 Lift (if proposed):-


Passenger Lift
SS Body-304 Grade - Gearless) With Machine Without
(a) Machine Room
having speed 1m / second includ ing Room (G+3)
power mains (c+3)
B Persons capacity
(i) Rs. 16.59 la khs Rs.17.39 lakhs
(upto Ground + Three Floors)
10 Persons capacity
( ii) (upto Ground + Three Floors) Rs.17.35 lakhs Rs.18.19 lakhs

13 Persons capacity
( iii) Rs.19.30 lakhs Rs.20.20 Iakhs
(upto Ground + Three Floors)

iv)
20 Persons capacity
(
(upto Ground + Three Floors) Rs.24.00 lakhs Rs.25.50 lakhs

Bed-cum-Passenger Lift
(SS Body-304 Grade - Gearless) With Machine Without
(b) Machine Room
having speed 1m / second including Room (G+3)
(G+3)
power mains

(i) 15 Persons capacity


(upto Ground + Three Floors) Rs.20.50 lakhs Rs.21.80 lakhs

20 Persons capacity
( ii) Rs.24.50 lakhs Rs.25.50 lakhs
(upto Ground + Three Floors)
26 Persons capacity
( iii) Rs.25.50 lakhs Rs.27.50 lakhs
(upto Ground + Three Floors)

(c) Dump Lift


(upto Ground + Three Floors) Rs.6.76 lakhs

a
Note:
1. Provision for civil works such as construction of Lift Pit, Shaft, Machine
Room, etc., are not included in the above rates.
2. For Passenger Lift and Bed-cum-Passenger Lift - For every
additional floor over the Ground + Three Floors an extra at
Rs.1,00,000/- shall be allowed for each floor.
3. For Dump Lift - For every additional floor over the Ground + Three
Floors an extra at Rs.44,970/- shall be allowed for each floor.
4. For Lift Pit an extra at Rs.12,840/- per sq.m. of lift well sectional
area shall be allowed.
5. Comprehensive servlcing and maintenance of lifts for further perlod of
2 years beyond free warranty period of one year from the date of
commissionlng of llfts will be paid at the rate of 5o/o of capital cost of
tift.
6. For Passenger Lift and Bed-cum-Passenger Lift - Add extra
Rs.50,000/- per Lift for Earthing, Shaft, Machine Power Mains as per
CEIG Norms shall be allowed.
7. Safety Certificate for Lift has to be obtalned by Supplier from CEIG.

sl. Description of work


No. Rate as
High Tension Supply per SOR, Atlied works Total
(3) (including Erection, Testing, 20t7-lft
Commissioning and Allied Works)
Rs.2.50
HT/LT Cable
lakhs
Rs.2.00
MV Panel
lakhs
Rs.6.31 Safety Rs.0.30 Rs.13. 11
(i) With Transformer upto 250 KVA
lakhs Accessories la khs la khs
Rs.2.00
APFC Panel
lakhs
Rs.6.8O
Sub-Total
lakhs
Rs.2.7 5
HT/LT Cable
lakhs
Rs.4.00
MV Panel
Iakhs
( ii) With Transformer upto 500 KVA
Rs.8.89 Safety Rs.0.30 Rs.17.94
lakhs Accessories lakhs lakhs
Rs.2.00
APFC Panel
lakhs
Rs.9.O5
Sub-Total lakhs

9
sl. Description of work
No. Rate as
per SOR, AIlied works Total
High Tension SUPPIY
(3) (including Erection, Testing, 20L7-ta
Commissioning and Allied Works)
Rs.3.00
HT/LT Cable lakhs
Rs.5.00
MV Panel
lakhs
Rs.12.91 Safety Rs.0.30 Rs.23.21
( iii) With Transformer uPto 1000 KVA lakhs Accessories lakhs lakhs
Rs.2.00
APFC Pane|
lakhs
Rs.1O.3O
sub-Tota I
lakhs

Note:
1. Provision for civil works such as/ construction of Transformer Room, MV Panel
Room, etc., are not included in the above rates'
2. Add extra for Service Connection Charges payable to TNEB and approval
charges payable to CEIG.
3. If necessary, as per the approved design based on the site condition and CEIG
Norms, add extra for the provision of Vacuum Circuit Breaker Panel and Ring
Main Gear adopting Schedule of Rates, 2017-2018 shall be allowed.

4 Generator Set with AMF Panel:


(i) 100 KVA capacity Rs.B.00 lakhs
(ii) 125 KVA capacitY Rs.9.20 lakhs
Rs.12.50 lakhs
( iir)
""r-160 KVA capacity
- (iv) I 250 KVA caPacity I as.r7.20 lakhs
Note:
1. Cost of construction of Generator Room not included in the above rates
2. Add extra of Rs.1,60,00O/- for Erection, Testing, Commissioning,
Power Mains and Charges for CEIG approval shall be allowed'

5 Cold Storage facilities for Mortuary:


r-
(i) 9 Bodies Capacity - I ns.r2.85 lakhs

( ii) 12 Bodies Capacity Rs.16.06 lakhs


Note:
1. Cost of Mortuary Building not included in the above rates'

Public Address System: Rs.2.60 lakhs


For Mini Conference Hall / Meeting Hall

10
7 Intercom with EPABX arrangements uPto 300 lines Rs.15.60 lakhs

8 Lightning Arrester (For more than 5 storeys)


Allied Works as per SOR Total
Description I tJf' Mounting
I
Rs.0.24 L
Structu re
Down Conductor Rs.0.07 L
Lightning (50 metres)
(i) Arrester Rs.0.90 L Test Link Rs.0.059 L
(Lar9e) Earth Electrode Rs.o.109 L
Surqe Protection Rs.o.229 L

Sub-Total Rs,O.707 L Rs,1.607 lakhs


Iv10 u nting
Rs.0.24 L
Structure
Down Conductor Rs.o.07 L
(50 metres)
Lightning Rs.0.059
Test Link L
( ii) Arrester Rs.0.80 L
(Sma ll) Earth Electrode Rs.o.109 L

Surge Protection Rs.0.229 L

Sub-Total Rs.O,707 L Rs.1.507 lakhs

Note:
Add extra for additional down conductor at Rs.140/- per RM for the
more than 5 storeYed buildings.

9
Civil Aviation Lights for buildings more than B
Rs.1.31 lakhs
storeys

10 -a*t-, *"*. *rppl" sanitary Arrangements &


Electrical Arrangements
Water SupPlY Sanitary i Electrical
sl. Type of Arrangements Arrangements I Arrangements
No. Bui ld ings
Rate in rupees Per one sq'm.
(1) Residential s30 4L5 800

(2) Non-Residential 4t5 320 700

(3) Hospita I 530 4t5 825


Note:
1. Add extra for provision of LED Lightings for Rs.120/- per sqm' of plinth
area shall be allowed'
2. Add extra for provision of Computer Plugs for Rs.15/- per sqm' of plinth
area shall be allowed'
3. Add extra for provision of Power Plugs for Rs.20/- per sqm' of plinth
area shall be allowed.

11
External Water Supply, sanitary Arrangements &
11
Electrical Arrangements
Water SupplY Sanitary Electrical
Arrangements Arrangements Arrangements

Within Within Within


sl. Type of existing NeW
existing New
existing NeW
well
No. Building well
campus
well
campus
developed
campus
developed developed
campus campus campus

Rate in rupees per one sq.m.

(1) Residential 325 635 L20 200 265 535

(2) Non-Resldential 325 635 120 200 265 535

(3) Hospital 325 63s L20 200 265 535

Note:
1. The above rate is applicable only for ground and first floors on plinth area
basis.
2. For every upper floor over the basic ground and first floor, 50o/o of
respective floor area alone shall be taken into account for making
provision towards external water supply and sanitary arrangements'
3. For every upper floor over the basic ground and first floor, 2Oo/o of
respective floor area alone shall be taken into account, for making
provision towards external electrification arrangements. i I
P ..--."'- )

,"rffi,\
chief Ensineei1B
Chief Engineer (
ings), Chennai 'Region
reral), PWD, Chennai-5

&

L2
ANNEXURE - IV
OTHER PROVISIONS
st.
No, Description of work Rate

Construction of compound wall to a normal


1 height of 1.5Om from ground level with required
number of gates, grills, etc.,
(a) With stub column, plinth beam, etc., Rs.1950/RM

(b)
With load bearing foundation wlth brick work in
Rs.2840lRM
cement mortar 1 :5
2 Approach Road
Forming approach road in layers of 450mm thick sand
gravel mix of ratio 1:1 as base layer, WBM Laid in
(a) two layers of 75 mm thick each (total 150 mm thick) Rs.52O/sq m.
including cost of small culverts come across, forming
berms, etc.,

Black topping over WBM including tack coat and seal


(b) Rs.151/sqm.
coat

3 Pavement all-round the building


(a) For a width of 1.2m Rs.965/RM
(b) For a width of 2.0m Rs.1560/RM
Note:
1. Pavement all-round the building is to be done for a width of 1.20m if the sub
soil is of ordinary nature; and it is to be done for a width of 2.0m, if the sub soil
is of expansive soil.
2. The above rates include provision for earth work excavation to a depth of
450mm, PCC [Link], sand filling, kerb wall with Brick work in cement mortar at
external face of pavement, one impervious layer, cost of precast pavement slab
of specifled shape with pointing etc.,

4 Finishing the Elevation

(a) For all buildings


Not exceeding 17o of total value of
Building

(b) For Prestigious / Heritage Buildings Not exceeding 21/zo/o of total value
of building
5 Soil Investigation (minimum) Rs.30,650/-
Note
1. If [he area is more, hlgher provision towards soil investigation may be allowed.

13
Provislon is to be made depending
6 Advertisement Charges on the norms prescribed by
Government time to time for
publication in Newspapers.

Provision for foundation stone To be made only for works costing


7 over Rs.10.00 lakhs at Rs.13,000/-
laying and inaugural function (Rs.3,000/- + Rs. 10,000/-)

B Rain Water Harvesting Rs.13,020/- per pit

9 Provision for Lawn (Optional)

(a) Residential @ 1.5 % of building cost

(b) Hospital & Non- Residential @ 3.0 o/o of buildlng cost

10 La bour Welfare Fund @ 1.0 o/o of buildlng cost

Unforeseen ltems, Petty


11 Supervision Charges and @ )\ o/o of building cost
Contingencies

Provision can be included for Price


5.0 % of building cost
72 Adjustment Clause for works @ Per one year of period of completion
costing Rs.100.00 lakhs and above

for Engin
chief Engineer
-A[\&
i:Chief ( Bdildi{r9s),'
dings), Chenndi Region
Enqinec (Geheral),
Chief Engineer neral ), PWD, Chennai-5

As
?\

L4
ANNEXURE-V
PLINTH AREA RATE FOR SUPER STRUCTURE
oF EARTH QUAKE RESISTANT STRUCTURES
TRICHY, SALEM, CH EN NAI,
ERODE, MADURAI, VELLORE,
sl. Type of building
MOFFUSIL TIRUNELVELI & COIMBATORE &
No. THOOTHUKUDI TIRUPPUR
DISTRICTS DISTRICTS
RATE IN RUPEES PER 1SQ.M. FOR EVERY FLOOR
I RESTDENTIAL
(a) Load bearing (upto G + 2) 7600 8000 8390
(b) Framed Structure
(i) Upto Two Floors 9880 10370 10860
( ii) 3 & 4tn Floors 9880 10370 10860
( iii) 5 & 6tn Floors 10870 11400 Lt940
( iv) 7 & 8tn Floors 10870 11400 11940
(v) Above Btn Floor 10870. 11400 t1940
(vi) Stilt Floor 6900 6960 7580
2 NON RESIDENTIAL
(a) Load bearlng (upto G + 2) 6460 6780 7100
(b) Framed Structure
(i) Upto Two Floors 7420 7780 8160
( ii) 3 & 4th Floors 7420 77aO 8160
( iii) 5 & 6th Floors 8140 8540 8970
(iv) 7 & 8th Floors 8140 8540 8970
(v) Above 8th Floor 8510 8930 9360
(vi) Stilt Floor 5120 5430 5680
3 HOSPITAL
(a) Load bearing (upto G + 2) 7230 7590 7950
(b) Framed Structure
(i) Upto Two Floors 10250 10370 11400
( ii) 3 & 4th Floors 11410 L7970 12550
( iii) 5 & 6th Floors 11410 rt970 12550
(iv) 7 & 8th Floors L2450 13060 13680
(v) Above Bth Floor t2450 13060 13680
(vi) Stilt Floor 7240 7600 7980
NOTE:
1. For calculating the rates, the respective floor area has to be considered.
2. For woks in special tracts like Jails, Reserve Forest, Hill Areas etc., the respective
extra percentage over the Moffusil rate is to be given. .'

for I
x-4;{$161
f-'fue{i"t ( eu itdi ngs l,
Chief Engi |tfliklings), Chennai Rdsion
Chief En! (Ger{eral), PWD, Chennai-5

15

You might also like