0% found this document useful (0 votes)
406 views2 pages

Geotechnical Report for Engineers

1) The report summarizes a bearing capacity analysis for a shallow foundation on reinforced fill soil resting on natural ground to support a 30m ground-based monopole structure. 2) Key parameters of the reinforced fill soil and natural ground are provided, including soil densities, friction angles, and unreinforced bearing capacity. 3) The analysis calculates the tie forces and pullout resistance of 4 reinforcement layers at depths of 0.3m, 0.5m, 0.7m, with all values meeting the required factors of safety.

Uploaded by

sam09132
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
406 views2 pages

Geotechnical Report for Engineers

1) The report summarizes a bearing capacity analysis for a shallow foundation on reinforced fill soil resting on natural ground to support a 30m ground-based monopole structure. 2) Key parameters of the reinforced fill soil and natural ground are provided, including soil densities, friction angles, and unreinforced bearing capacity. 3) The analysis calculates the tie forces and pullout resistance of 4 reinforcement layers at depths of 0.3m, 0.5m, 0.7m, with all values meeting the required factors of safety.

Uploaded by

sam09132
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Geotechnical Investigation Report

Annexure

Bearing Capacity Analysis for Shallow Foundation on Reinforced fillup Soil resting on Natural Ground

Structure : 30 m Ground Based Monopole


Location : BH-1, Dummulapeta, Kakinada, East Godavari, A.P
Filledup soil above G.L F.S.L. = 2.000 m

-
Fondation Level FL = 1.000 m B = 5.0 m

1.5 x B
Reinforced soil

Description Notation Value Unit


General Data:
R.L of the Borehole/Ground Level considered - 0.000 m
Thickness of filledup soil above O.G.L t 2.00 m
Foundation depth from top surface of foundation fill (D) D 1.00 m
Description of Strata of the Natural Ground Very Soft Silty Clay

Description of Filledup Soil Strata Densly Compacted Granular Bed


SBC (q0) of unreinforced Ground (Available) q0 4 t/m2
Required SBC (q) q 8 t/m2
Bearing Capacity Ratio (q/q0) = B.C.R B.C.R 2.00 -
Density of Filledup Soil (ɣ) ɣ 1.80 t/m2
Angle of internal friction of Filledup soil(φ) φ 36.00 Deg
Type of foundation - Isolated -
Shape of foundation - Rectangle -
Width of foundation (B) B 5.0 * m
Length of foundation (L) L 5.0 * m
Reinforcement Details
Reinforcement Grade/ Strength per meter run 60 kN/m
Yield Strength of Reinforcement 6 Ton/m
F.O.S for Rupture F.O.S 1.84 -
Design Tensile/Rupture strength of reinforcement 3.26 Ton/m
Interface Friction angle between soil and Reinforcement (δ) 26.0 deg
Width of Reinforcement strip used (If full sheet used place '-') 1.00 m
Linear Density of Reinforcement (Total Width of Reinforcement/m) 100.0 %
No of Strips in each layer 1.0
Total Width of Reinforcement Per meter run 1.00 -
Depth of Reinforcement Provided below Foundation base (U) 0.30 m
Vertical spacing between Reinforcement (ᴧZ) 0.20 m
Number of Reinforcement Layers (N) 4.00* -
Length of Reinforcement Provided in each layer 7.00 m

Analysis

Tie force in each layer, TD {Z, N} 1/N X [ J {Z/B} X B - I {Z/B} X ᴧH] x q0 x [ q/q0 - 1]

J{Z/B} (Fig- I {Z/B} (Fig- TD


[Link] Layer no. qo/N[q/qo-1] Z (m) Z/B JxB
1) 1) I x ᴧH J x B - I x ᴧH (Ton/m)
1 1 1.00 0.30 0.06 0.3 1.5 0.29 0.06* 1.44* 1.44
2 2 1.00 0.50 0.1 0.3 1.5 0.29 0.06* 1.44* 1.44
3 3 1.00 0.70 0.14 0.3 1.5 0.29 0.06* 1.44* 1.44
Check for rupture (applied force < Design Strength) OK

Pullout Resistance of Each Layer, T f {Z} 2 X tan (δ) LDR [ M{Z/B} x B x q0 x BCR + ɣ (L0- X0) X (Z+D)]

Quantity Layer-1 Layer-2 Layer-3 - -

2 x tan (δ) x LDR 0.98 0.98 0.98 -


Geotechnical Investigation Report
Annexure

M (Fig-1) 0.12 0.12 0.12 - -


M X B x q0 X BCR 4.8 4.8 4.8 #VALUE!
Z (m) 0.30 0.50 0.70 0.00
Z/B 0.06 0.10 0.14 0.00
L0 (m), (Fig-2) 0.9 0.9 0.9 -
X0 (m), (Fig-2) 0.35 0.35 0.35 -
L0 - X0 0.55 0.55 0.55 #VALUE!
Z+D 1.30 1.50 1.70 1.00
ɣ X (L0-X0) X (Z+D) 1.287 1.485 1.683 #VALUE!
Tf (kN/m) 5.94 6.13 6.32 #VALUE!

FSf (F.O.S For pullout >2.5) 4.12 4.25 4.39 #VALUE!


Check ok ok ok #VALUE!

Min. Required Length of Reinforcement = 6.80 m


Actual Length of reinforcement provided = 7.00 m