Construction Work Orders

The document contains several letters from a construction bureau director notifying construction companies of work orders and design changes for various construction projects in Addis Ababa. The letters reference contracts the companies have to construct and maintain buildings like the Mayor's House and Meles Zenawi Leadership Academy. The companies are instructed to execute construction works according to attached designs and submit price proposals or payment of fees.

Uploaded by

fekadu alemu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
406 views21 pages

Construction Work Orders

The document contains several letters from a construction bureau director notifying construction companies of work orders and design changes for various construction projects in Addis Ababa. The letters reference contracts the companies have to construct and maintain buildings like the Mayor's House and Meles Zenawi Leadership Academy. The companies are instructed to execute construction works according to attached designs and submit price proposals or payment of fees.

Uploaded by

fekadu alemu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

To: - D F G Construction P. L. C.

Addis Ababa

Subject: - work order-no-1


According to the contract Agreement Your Company has under taken the construction of
Mayor’s House Maintenance Work.
This is to notify your firm that to execute the door works according to the attached
design from design sub core process.
With regards!

Attach
 One page of letter
 One pages of drawing

C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Construction Core process
 To Construction sub Core process
 To Construction Bid and contract Administration Team
 To Construction Bid and contract Administrator (Abebech)
 To construction supervision engineer (Fekadu)
Construction Bureau
 To City Government of A/A of the Mayor.
Addis Ababa

To: - D F G Construction P. L. C.
Addis Ababa

Subject: - work order-no-3


According to the contract Agreement Your Company has under taken the construction of
Mayor’s House Maintenance Work.
This is to notify your firm that to execute the demolishing of furnace works according to
the attached design from design sub core process.
With regards!

Yared Tadese
Civil Engineering Directorate Director

Attach
 One page of letter
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Construction Core process
 To Construction sub Core process
 To Construction Bid and contract Administration Team
 To Construction Bid and contract Administrator (Abebech)
 To construction supervision engineer (Fekadu)
Construction Bureau
 To City Government of A/A of the Mayor.
Addis Ababa

To: - Ethiopia Construction Works Corporation


Addis Ababa

Subject: - Work Order for Window & Door Schedule


According to the contract Agreement Your Company has under taken the construction of
Meles Zenawi Lidership Academy Work.
This is to notify your firm that to execute the Window and Door works according to the
attached approved design from design directorate director.
With regards!

Yared Tadese
Civil Engineering Directorate Director
Attach
 Two pages of letter
 Four pages of A-4 design
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate Director
 To Civil Engineering Team
 To Construction Bid and contract Team
 To construction Coordinator (Fekadu)
 To construction supervision engineer (Selam)
Construction Bureau
 To Meles Zenawi Lidership Academy.
Addis Ababa

To: - Ethiopia Construction Works Corporation


Addis Ababa

Subject: - Work Order for Revised Design for Canteen Block


According to the contract Agreement Your Company has under taken the construction of
Meles Zenawi Lidership Academy Work.
This is to notify your firm that to execute the Canteen Block works according to the
attached revised approved design from design directorate director.
With regards!

Yared Tadese
Civil Engineering Directorate Director
Attach
 Two pages of letter
 Four pages of A-4 design
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate Director
 To Civil Engineering Team
 To Construction Bid and contract Team
 To construction Coordinator (Fekadu)
 To construction supervision engineer (Selam)
Construction Bureau
 To Meles Zenawi Lidership Academy.
Addis Ababa

To: - F.D.R.E Ministry of Defense


Defense Construction Enterprise
Addis Ababa

Subject: - Work Order


According to the contract Agreement Your Company has under taken the construction of
Ras Hailu International Work.
This is to notify your firm that to execute the pit and roofing works according to the
attached design from design directorate and also you have to submit your price proposal.
With regards!

Yared Tadese
Civil Engineering Directorate Director
Attach
 Four pages of BOQ with summary
 Two pages of A-3 design
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate
 To Civil Engineering Team
 To Construction Bid and contract Team
 To construction Coordinator (Fekadu)
 To construction supervision engineer (Lishan)
Construction Bureau
 F.D.R.E Ministry of Defense, Defense Construction Enterprise.
Addis Ababa
ለአዲስ አበባ ከተማ አስተዳደር ወጣቶችና ስፖርት ቢሮ
አ .አ

ጉዳዩ፡- የራስ ሃይሉ መዋኛ ገንዳ ግንባታን ይመለከታል፡፡


እንደሚታወቀው ቢሮአችሁ በቢሮአችን አማካሪነት ለሚያሰራው የራስ ሃይሉ መዋኛ
ገንዳ ስራ ግንባታ ለማከናወን ከመከላከያ ኮንስትራክሽን ጋር ውለታ ፈፅሞ የግንባታ ስራው
እየተከናወነ መሆኑ ይታወቃል፡፡
በመሆኑም ስራ ተቋራጩ ድርጅት ከዚህ በፊት ለፕሮጀክቱ አገልግሎት የሚውል የውሃ
መስመር በእናንተ በኩል እንዲገባላቸው በተደጋጋሚ ጠይቀው የነበረና እስካሁን ድረስ ምንም
ምላሽ አለማግኘታቸውን እና ሙከራ (Test) ለማድረግ የተቸገሩ መሆናቸውን ገልፀው በድጋሚ
የውሃ መስመር እንዲገባ የጠየቁ ስለሆነ በእናንተ በኩል አስቸኳይ መፍትሔ እንዲሰጥበት
እየጠየቅን ስራ ተቋራጩ ድርጅት የጠየቀበትን ደብዳቤ አያይዘን የላክን መሆኑን እንገልፃለን፡፡
ከሠላምታ ጋር!
ግልባጭ
 ለኮንስትራክሽን ቢሮ ኃላፊ
 ለመ/ኮ/ ም/ቢሮ ኃላፊ
 ለሲቪል ድህንድስና ዳይሬክቶሬት
 ለሲቪል ድህንድስና ቡድን
 ለግንባታ ጨረታና ውለታ አስተዳደር ቡድን
 ለግንባታ አስተባባሪ መሓንዲስ (ፍቃዱ)
 ለግንባታ ክትትልና ቁጥጥር መሓንዲስ (ሊሻን)
ኮ.ቢሮ
ለአዲስ አበባ ከተማ አስተዳደር
ለፐብሊክ ሰርቪስ ቢሮ
አ.አ
ጉዳዩ፡- የቢሮአችሁን ፓርቲሽን ስራ ይመለከታል፡፡

ቢሮአችሁ ከዛምራ ኮንስትራክሽን ኀ/የተ/የግ/ማህበር ጋር በመዋዋል የቢሮ ፓርቲሽን ስራ


ሲሰራ የቆየ እንደነበር ለመገንዘብ ችለናል፡፡
ስለሆነም ስራ ተቃራጩ ድርጅት የህንኑ ስራ የተመለከተ የሰራ ክፍያ እንዲሁም የ 2.5%

የመያዥያ ገንዘብ እንዲከፈለው ለቢሮኣችን በቁጥር ZCO/6311/07/19 በ ቀን 05/07/2019

G.C በጻፈዉ ደብዳቢ ጠይቀል፡፡ ነገርግን ስራ ተቃራጩ ድርድት ስራውን ከመጀመሩ በፊት
የሳይት ርክክብ ሳይፈጽም እንዲሁም ስራዉን የሚከታተል ባለሞያ ከቢሮኣችን ሳይመደብ
የተሰራ ስራ ስለሆነ የክፍያ ሰርተፊከት አዘጋጅተንና ኣረጋግጠን ለመላክ የምንቸገር በመሆኑ
የተሰራዉን ሰራ መጠን ለማረጋገጥ ከቢሮኣችን ባለሞያ ተመድቦ ባቀረበዉ ሪፖርት
ተመስርታችሁ በዉላቹ መሰረት ክፈያዉን መፈጸም የምትችሉ መሆኑን እያሳወቅን የስራዉን
መጠን የሚያሳይ ቴክኦፍ (takeoff sheet) ____ ገጽ ከዚህ ደብዳቤ ጋር አባሪ አድርገን የላክን
መሆኑን እንገልፃለን፡፡

ከሠላምታ ጋር!

ግልባጭ

 ለኮንስትራክሽን ቢሮ
 ለመንግስት ኮንስትራክሽን ዘርፍ ምክትል ቢሮ
 ለሲቪል ድህንድስና ዳይሬክቶሬት
 ለሲቪል ድህንድስና ቡድን
 ለግንባታ ጨረታና ውለታ አስተዳደር ቡድን
 ለግንባታ አስተባባሪ መሓንዲስ (ፍቃዱ)
 ለኮን/ኢ/ል/ቁ/ዋና ሥራ ሂደት
ኮ.ቢሮ
 ለዛምራ ኮንሰትራክሽን ኀ/የተ/የግ/ማህበር
አ.አ

ለግንባታ ጨረታና ውለታ አስተዳደር ቡድን


ኮ .ቢ

ጉዳዩ፡ - ሪፖርት ማድረግን ይመለከታል፡፡

እንደሚታወቀው በቢሮአችን አማካሪነት ወጣቶችና ስፖርት ቢሮ ለሚያሰራው


የአበበ ቢቂላ ስታዲየም የዙሪያ ሼድ ፣ የትራክ እና ከፊል የጥገና ስራ ግንባታ ለማሰራት
ከዞሃንግሚ ኢንጂነሪንግ ጋር ውለታ ፈፅሞ ወደስራ መግባቱ ይታወቃል፡፡
በመሆኑም ከዚህ በፊት ስራ ተቋራጩ ድርጅት በቀን 24/07/2017 G.C በተፃፈ ደብዳቤ
Mr. He Meijie የፕሮጀክቱ ስራ አስኪያጅ አድርጎ ከአባሪ ዶክመንቶች ጋር ልኮ የነበረ ሲሆን
ከላይ የተጠቀሰው ግለሰብ ደብዳቤው ለቢሮአችን ከገባበት ቀን ጀምሮ በሳይቱ ላይ
በፕሮጀክት አስኪያጅነት እየሰራ የሚገኝ መሆኑን ለመግለፅ እወዳለሁ፡፡
ከሠላምታ ጋር!

ግልባጭ
 ለሲቪል ድህንድስና ዳይሬክቶሬት
 ለሲቪል ድህንድስና ቡድን
 ለጨረታና ውለታ አስተዳደር መሓንዲስ (መቆያ)
To: - ZHONGMEI ENGINEERING GROUP LIMITED
Addis Ababa

Subject: - Request your Proposed Rate

According to the contract Agreement No ET-PCSU/AACA-YSB/113/2017 Your Company is under


taken the construction of Abebe Bikila Stadium Roof Cover, Truck and Partial Stadium Maintenance
Works.
This is to request your firm that the to submit your proposed unit price for the PA System & Video
Capturing System works which are mentioned on the attached BOQ from design sub core process.
With regards!
Attach:
 Two pages of BOQ.
Yared Tadese
Civil Engineering Directorate Director

C.C
 To Construction Bureau Head
 To Construction Bureau core Head process
 To Construction Core process (with copy)
 To Construction sub Core process
 To Construction Bid and contract Administration Team
 To Sport projects coordinator(Fekadu)
Construction Bureau
 To A/A C A SPORT Bureau.
Addis Ababa

4 ሀ/አአ/አከ/ኮ.ቢ/7.5/ /11

31/10/2018

To: - F.D.R.E Ministry of Defense


Defense Construction Enterprise
Addis Ababa

Subject: - Work Order


According to the contract Agreement Your Company has under taken the construction of
Ras Hailu International Work.
This is to notify your firm that to execute the Generator house work according to the
attached design from design directorate and also you have to submit your price proposal.
With regards!
Yared Tadese
Civil Engineering Directorate Director
Attach
 Four pages of BOQ with summary
 One page of A-3 design

C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate
 To Civil Engineering Team
 To Construction Bid and contract Team
 To Sport projects coordinator (Fekadu)
Construction Bureau
 To A/A C A SPORT Bureau.
 To Defense Construction Enterprise, Ras Hailu Project.
Addis Ababa

4 ሀ/አአ/አከ/ኮ.ቢ/7.5/ /11

27/02/2011 ዓ.ም
To: - F.D.R.E Ministry of Defense
Defense Construction Enterprise
Addis Ababa

Subject: - Work Order


According to the contract Agreement Your Company has under taken the construction of
Ras Hailu International Work.
This is to notify your firm that to execute the works which are mentioned on the attached
letter from design directorate.
With regards!
Yared Tadese
Civil Engineering Directorate Director

Attach
 One page of letter
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate
 To Civil Engineering Team
 To Construction Bid and contract Team
 To Sport projects coordinator (Fekadu)
Construction Bureau
 To A/A C A SPORT Bureau.
 To Defense Construction Enterprise, Ras Hailu Project.
Addis Ababa

4 ሀ/አአ/አከ/ኮ.ቢ/7.5/ /11

27/02/2011 ዓ.ም

ለኢትዮጵያ ኮንስትራክሽን ስራዎች ኮርፖሬሽን


አ.አ

ጉዳዩ፡ - ማሳሰቢያ መስጠትን ይመለከታል፡፡


እንደሚታወቀው ድርጅታችሁ በቢሮአችን አማካሪነት ከመለስ ዜናዊ አካዳሚ አመራር
ጋር ተገጣጣሚ ህንፃ ለመስራት በመዋዋል የግንባታ ስራው እየተከናወነ ይገኛል፡፡
ይሁንና በሳይት ተቆጣጣሪዋ ባለሙያ በተደረገ ሪፖርት መሠረት በቢሮአችን ያልፀደቁና
ከውለታ ሰነዱ ውጪ የሆኑ ስራዎች እየተሠሩ መሆናቸውን ለመገንዘብ ችለናል፡፡ ስለሆነም
እነዚህን ስራዎች ከመስራታችሁ በፊት በቢሮአችን በኩል እንታፀድቁ እያሳሰብን ከዚህ ውጪ
ለሚደረግ ግንባታ እውቅና ለመስጠት የምንቸገር መሆናችንን እንገልፃለን፡፡
ከሠላምታ ጋር!
ያሬድ ታደሰ
የሲቪል ምህንድስና ዳይሬክቶሬት
ዳይሬክተር
ግልባጭ
 ለኮንስትራክሽን ቢሮ
 ለመንግስት ኮንስትራክሽን ዘርፍ ምክትል ቢሮ
 ለሲቪል ድህንድስና ዳይሬክቶሬት
 ለሲቪል ምህንድስና ቡድን
 ለግንባታ ጨረታና ውለታ አስተዳደር ቡድን
 ለግንባታ አስተባባሪ መሓንዲስ (ፍቃዱ)
 ለጨረታና ውለታ አስተዳደር መሓንዲስ (መቆያ)
ኮ.ቢሮ
 ለመለስ ዜናዊ አካዳሚ አመራር
አ.አ

4 ሀ/አአ/አከ/ኮ.ቢ/7.5/ /11

30/02/2011 ዓ.ም
To: - Zamra Construction
Addis Ababa

Subject: - Work Order


According to the contract Agreement Your Company has under taken the construction of
Akaki Kality Zonal Stadium Work.
This is to notify your firm that to execute the partition & window door works according
to the attached drawing from design directorate.
With regards!

Yared Tadese
Civil Engineering Directorate Director
Attach
 One page of letter
 11 pages of A-3 drawing
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate
 To Civil Engineering Team
 To Construction Bid and contract Team
 To Sport projects coordinator (Fekadu)
Construction Bureau
 To A/A C A SPORT Bureau.
Addis Ababa

4 ሀ/አአ/አከ/ኮ.ቢ/7.5/ /11

04/03/2011 ዓ.ም
To: - Zamra Construction
Addis Ababa

Subject: - Work Order No-08


According to the contract Agreement Your Company has under taken the construction of
Akaki Kality Zonal Stadium Work.
This is to notify your firm that to execute the Geo-synthetic works according to the
attached BOQ & drawing from design directorate.
With regards!

Yared Tadese
Civil Engineering Directorate Director

Attach
 One page of BOQ & letter
 01 pages of A-3 drawing
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate
 To Civil Engineering Team
 To Construction Bid and contract Team
 To Sport projects coordinator (Fekadu)
 To construction supervision engineer (Hilina)
Construction Bureau
 To A/A C A SPORT Bureau.
Addis Ababa

4 ሀ/አአ/አከ/ኮ.ቢ/7.5/ /11

04/03/2011 ዓ.ም

To: - Defense Construction Enterprise, Ras Hailu Project


Addis Ababa

Subject: - Work Order


According to the contract Agreement Your Company has under taken the construction of
Ras Hailu International Work.
This is to notify your firm that to execute the Ditch works according to the attached
drawing from design directorate.
With regards!

Yared Tadese
Civil Engineering Directorate Director

Attach
 One page of letter
 One page of A-4 drawing
C.C
 To Construction Bureau Head
 To Construction Bureau vise Head
 To Civil Engineering Directorate
 To Civil Engineering Team
 To Construction Bid and contract Team
 To Sport projects coordinator (Fekadu)
 To construction supervision engineer (Lishan)
Construction Bureau
 To A/A C A SPORT Bureau.
Addis Ababa
ለአቶ ያሬድ ተስፋዬ
ጉዳዩ፡ -ከአመት ፈቃድ ወደ ስራ መመለስን ይመለከታል ፡፡
በቢሮአችን ባለው የስራ መደራረብ ብዛት ምክንያት እርስዎ ከወጡበት የአመት ፈቃድ አቋርጠው
ወደ ስራ እንዲመለሱ እና የቀሮትን የአመት ፈቃድ በቀጣይ ጊዜ እንዲወጡ የሚደረግ መኆኑን እንገልፃለን፡

ከሠላምታ ጋር!

ግልባጭ
 ለኮንስትራክሽን ምክትል ቢሮ ሀላፊ
ለሲቪል ምህድስና ዳይሬክቶሬት
 ለሲቪል ምህድስና ቡድን መሪ
 ለሰው ሀብት አስተዳደር ዳይሬክቶራት
ኮ.ቢሮ
ለአዲስ አበባ ከተማ አስተዳደር ከንቲባ ጽ/ቤት
አዲስ አበባ
መስርያ ቤታችሁ በቢሮአችን አማካሪነት እቴቴ ኮንስትራክሽን ጋር በመዋዋል የፅ/ቤቱን የእድሳት ስራ
እያከናወነ መሆኑ ይታወቃል፡፡
በመሆኑም ይህንኑ ሥራ አስመልክቶ ተቋራጩ ድርጅት የአንደኛ ዙር የሥራ ክፍያ እንዲከፈለው
ጠይቋል፡፡ በዚሁ መሰረት ለተቋራጩ ድርጅት የአንደኛ ዙር የሥራ ክፍያ በባለሙያ ተዘጋጅቶ በሲቪል
ምህንድስና ቡድን መሪ የተረጋገጠ ብር 2,714,996.35 (ሁለት ሚሊዬን ሰባት መቶ አስራ አራት ሺህ ዘጠኝ
መቶ ዘጠና ስድስት ብር ከሰላሳ አምስት ሳንቲም) እንዲከፈለው በክፍያ ምስክር ወረቀት ቁጥር 01 ሁለት ገፅ
በሁለት ኮፒ እና ----ገፅ የስፍር ምስክር ወረቀት ቁጥር 01 የተላከ መሆኑን እየገለፅን የተጨማሪ እሴት ታክስ
ብር 428,683.63 (አራት መቶ ሃያ ስምንት ሺህ ስድስት መቶ ሰማንያ ሶስት ብር ከስልሳ ሶስት ሳንቲም)
በእናንተ በኩል ለሚመለከተው መ/ቤት ገቢ እንድታደርጉ እናሳስባለን፡፡
ከሠላምታ ጋር!

አፈወርቅ ንጉሴ
የመንግስት ኮንስትራክሽን ዘርፍ
ምክትል ቢሮ ኃላፊ
ግልባጭ
 ለኮንስትራክሽን ቢሮ
 ለኮንስትራክሽን ምክትል ቢሮ
 ለሲቪል ምህድስና ዳይሬክቶሬት
 ለሲቪል ምህድስና ቡድን
 ለግንባታ ውለታ አስተዳደር ቡድን
 ለግንባታ ክትትልና ቁጥጥር መሃንዲስ (ያሬድ ተስፋዬ)
 ለኮን/ኢ/ል/ቁ/ዋና ሥራ ሂደት
ኮ.ቢሮ
 ለእቴቴ ኮንስትራክሽን
አ.አ
ለፋይናንስና ኢኮኖሚ ልማት ቢሮ
አ.አ

ጉዳዩ፡ - ከአራዳ ህንፃ እድሳት የፈረሱ ማታሪሎችን ይመለከታል ይመለከታል

ቢሮአችን በባለቤትነት ለሚያሰራው ፋይናንስና ኢኮኖሚ ልማት ቢሮ የሚገኝበትን የአራዳ ህንጻ የእድሳት
ስራ ከዛምራ ኮንሰስትራክሽን ጋር ውል በመዋዋል ወደ ስራ መግባቱ ይታወቃል ፡፡ ሆኖም ግን በሳይቱ ላይ
የፈረሱ ማንኛውንም የኮንስትራክሸን ማቴሪያሎች የሚረከበውና ለሚመለከተው የሚያስተላልፈው
ኮንስትራክሽን ቢሮ ስለሆነ በሳይቱ ላይ የፈረሱ ማንኛውንም የኮንስትራክሸን ማቴሪያሎች ለማንኛውም
አካል እንዳታስተላልፉብን ስንል እናሳስባለን፡፡

ከሠላምታ ጋር!

ግልባጭ
 ለኮንስትራክሽን ቢሮ (scan document)
 ለኮንስትራክሽን ምክትል ቢሮ (scan document)
 ለሲቪል ምህድስና ዳይሬክቶሬት
 ለሲቪል ምህድስና ቡድን (scan document)
 ለግንባታ ውለታ አስተዳደር ቡድን (scan document)
 ለግንባታ ክትትልና ቁጥጥር መሃንዲስ (ያሬድ ተስፋዬ)

ለሲቪል ምህንድስና ዳይሬክተር

ጉዳዩ፡ - የ 2009 አ.ም የሚቃጠል የአመት ፈቃድን ይመለከታል

ከታች ስማቸው የተዘረዘሩ ባለሙያዎቸች የ 2009 አ.ም የሚቃጠል የአመት ፈቃድ ያላቸው ሲሆኑ
የሚወጡት ወይም ወደ ገንዘብ የሚቀየርላቸው የባለሙዎች አስተያየት የያዘ እና የባለሙያ ፍላጎትን
ያማከለ እንዲሁም ሀላፊው በሚስጠው አስተያየት መሰረት የባለሙያዎች ስም ዝርዝር ያላክን ሲሆን
በተቻለ መጠን ውሳኔውን እንዲገለፅን ስንል እንጠይቃለን፡፡

ከሠላምታ ጋር!
ግልባጭ
 ለኮንስትራክሽን ቢሮ ሀላፊ (scan document)
 ለኮንስትራክሽን ምክትል ቢሮ ሀላፊ (scan document)
ለሲቪል ምህድስና ዳይሬክቶሬት
 ለስው ሀብት ዳይሬክቶሬት

ተ.ቁ ስም ዝርዝር ያለው ቀን የባለሙያው የቅርብ ሀላፊው አስተያየት


ብዛት አስተያየት
1 አድሀኖም ወ/ጻዲቅ 30
2 ደረጄ መገርሳ 30
3 ቴዎድሮስ ታጠቅ 30
4 ዮብዳር እድማአልም 30
5 ያሬድ ተስፋዬ 30
6 ሙሉጌታ ኮሬ 30
7 ገብረሀና በለጠ 5
8 ፍቃዱ አለሙ 20
9 አዳነ ሞላ 14
10 አማረ ዘለቀ 30
11 ፋሲል ዳዊት 20
12 አዲሱ ንጉሴ 20
13 ሂይወት አረጋዊ 20
14 ሸዋቀና ሽብሩ 20
15 መክት አሰፋ 20
16 ብርቱካን ለገሰ 20
17 ቢኒያም ስንቅነህ 20
18 ሰላማዊት እንግዳ 18
19 ሃኖክ መለስ 20
20 ማሀሌት ሰለሞን 12
21 ህሊና ልብሰጸሀይ 20
22 ወንደሰን ከበደ 21
23 ደጀና ሲማ 20
24 አበባው ግዛቸው 20
25 ሰላም ፍፁም 11
26 ሀጎስ ተመስገን 21
27 ጽጋረዳ እቁባይ 21
28 ታሪክ ስለሺ 15
29 ተስፋዬ አይዛ 21
30 ሀጎስ ገብሬ 15
31 ቢላል ተማም 21
32 ጉርሜሳ ረታ 15
33 ክብሮም ሀይሌ 21
34 ማርያማዊት ታችበላሌ 21
35 አቡበከር ከድር 20
36 ኤልያስ አብደላ 20
37 እስራኤል መስፍን 5
38 አቤል በፍቃዱ 11
38 አብርሀሌ ወ/ሩፋኤል 11
ስም ዝርዝር ያለዉ የ 209 የባለሙያው የቅርብ ሀላፊው አስተያየት
ዓ.ም ረፍት አስተያየት
ቀን
1 አድሀኖም ወ/ጻዲቅ 30
2 ደረጄ መገርሳ 30
3 ቴዎድሮስ ታጠቅ 30
4 ዮብዳር እድማአልም 30
5 ያሬድ ተስፋዬ 30
6 ሙሉጌታ ኮሬ 30
7 ገብረሀና በለጠ 5
8 ፍቃዱ አለሙ 20
9 አዳነ ሞላ 14
10 አማረ ዘለቀ 30
11 ፋሲል ዳዊት 20
12 አዲሱ ንጉሴ 20
13 ሂይወት አረጋዊ 20
14 ሸዋቀና ሽብሩ 20
15 መክት አሰፋ 20
16 ብርቱካን ለገሰ 20
17 ቢኒያም ስንቅነህ 20
18 ሰላማዊት እንግዳ 18
19 ሃኖክ መለስ 20
20 ማሀሌት ሰለሞን 12
21 ህሊና ልብሰጸሀይ
22 ወንደሰን ከበደ
23 ደጀና ሲማ
24 አበባው ግዛቸው
25 ሰላም ፍፁም 11
26 ሀጎስ ተመስገን
27 ጽጌሬዳ እቁባይ 21
28 ታሪክ ስለሺ
29 ተስፋዬ አይዛ
30 ሀጎስ ገብሬ 15
31 ቢላል ተማም 21
32 ጉርሜሳ ረታ 15
33 ክብሮም ኃይሌ 20
34 ኤልያስ አብደላ 20
35 ማርያማዊት ታችበሌ 21
36 እስራኤል መስፍን 5
37
38
39
40
41
ቃለ ጉባኤ

የከንቲባ ጽ/ቤ ከእቴቴ ኮንስትራክሰሽን ጋር ውል በመዋዋል የእድሳት ስራውን እያከናወነ መሆኑ


ይታወቃል፡፡ እናም አሁን ስራው የተጠናቀቀ በመሆኑ ከእድሳት ስራው የፈራረሱና በድጋሚ አገልግሎት ላይ
ሊይውሉ የሚችሉትን ማታሪያሎች ባለቤት አማካሪና ተቃራጩ ባሉበት በቀን 5/9/2011 ያስረከብኩኝ
መሆኑን አሳውቃለሁ፡፡

አስረካቢ ተረካቢ አረካካቢ

ቃለ ጉባኤ

የአዲስ አበባ ኮንስትራክሰሽን ቢሮ ከዛመራ ኮንስትራክሽን ጋር ውል በመዋዋል ፋይናንስና ኢኮኖሚ ልማት


ቢሮ የሚገኝበትን የአራዳ ህንፃን የእድሳት ስራ እያከናወነ መሆኑ ይታወቃል፡፡ እናም አሁን ስራው የ 1 ኛ
ፍሎር የተጠናቀቀ በመሆኑ ከስራው የፈራረሱና በድጋሚ አገልግሎት ላይ ሊይውሉ የሚችሉትን
ማታሪያሎች ከህንፃው ባለቤት ከተወከሉና ከተቃራጩ ጋር በመሆን በቀን 5/9/2011 ርክክብ የፈጸምን
መሆኑን አሳውቃለሁ፡፡