Facility Layout
Problem Name: Production Method: Sequence
Number Depts.: 10 Layout: Aisle
Length(cells): 15 Fill Departments: No
Width(cells): 15 Measure: Rectilinear
Area (cells): 225 Number Aisles: 3
Cost: 876 Dept. Width: 5
876
Department Color Area-requiredArea-defined x-centroid y-centroid Sequence
Receiving 1 10 10 2.5 8 10 1
D'back 2 25 25 2.5 11.5 3 2
Picking 3 35 35 2.5 3.5 6 3
Sorting 4 30 30 6.66666651 12.833333 2 4
Seaming 5 15 15 7.5 8.5 4 5
Chill Tank 6 20 20 7.5 5 7 6
Pasteurization 7 30 30 12.5 11 5 7
Coding 8 20 20 12.5 6 9 8
Packing 9 10 10 12.5 3 1 9
Cold Storage 10 25 25 9.5 1.29999995 8 10
11
12
13
14
15
Opt. Form Optimize
Random Layout Evaluate Show Flows
Solve Switch Change Facility Init. Cost 1295
No improving switches available. Iterations:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Index Init. Seq. Iter.
3 3 3 3 3 10 10 10 10 10 10 10 10 10 10 1 10 1
3 3 3 3 3 10 10 10 10 10 10 10 10 10 10 2 3 2
3 3 3 3 3 10 10 10 10 10 9 9 9 9 9 3 6 3
3 3 3 3 3 6 6 6 6 6 9 9 9 9 9 4 2 4
3 3 3 3 3 6 6 6 6 6 8 8 8 8 8 5 4 5
3 3 3 3 3 6 6 6 6 6 8 8 8 8 8 6 7 6
3 3 3 3 3 6 6 6 6 6 8 8 8 8 8 7 5
1 1 1 1 1 5 5 5 5 5 8 8 8 8 8 8 9
1 1 1 1 1 5 5 5 5 5 7 7 7 7 7 9 1
2 2 2 2 2 5 5 5 5 5 7 7 7 7 7 10 8
2 2 2 2 2 4 4 4 4 4 7 7 7 7 7
2 2 2 2 2 4 4 4 4 4 7 7 7 7 7
2 2 2 2 2 4 4 4 4 4 7 7 7 7 7
2 2 2 2 2 4 4 4 4 4 7 7 7 7 7
4 4 4 4 4 4 4 4 4 4 0 0 0 0 0
Optimize Objective Feasible
Name E_Product Dir. Min State 1
Search Method Random Value 876 Value 0
Problem Permute Algorithm
[Link]!eval_layoutcomb
Variables 1 2 3 4 5 6
Name x1 x2 x3 x4 x5 x6
Permutation 10 3 6 2 4 7
6
Type Action Cost Obj. Terms 0 0 0 0 0 0
Switch:3 and 9 1077
Switch:1 and 7 951
Switch:1 and 5 937
Switch:1 and 4 899
Switch:6 and 9 892
Switch:10 and 9 876
Best Obj.: 1E+38
Search time: 0 seconds
Runs: 0Enum.: 0 Imp.: 0
Complete: 0%
7 8 9 10 Stop Interval: 10
x7 x8 x9 x10
5 9 1 8 Sorted Feasible Solutions
Run Obj. x1 x2 x3 x4
0 0 0 0
x5 x6 x7 x8 x9 x10
Layout Data
Problem Name: Production
Number Depts.: 10 Define Facility
Fixed Points: 0
Dimension: m
Facility Information
Scale-m/unit 1 Cells
Length-m 15 15
Width-m 15 15
Area-sq.m 225 225
Department Information
Name F/V Area Cells
Dept. 1 Receiving V 10 10
Dept. 2 D'back V 25 25
Dept. 3 Picking V 35 35
Dept. 4 Sorting V 30 30
Dept. 5 Seaming V 15 15
Dept. 6 Chill Tank V 20 20
Dept. 7 Pasteurization V 30 30
Dept. 8 Coding V 20 20
Dept. 9 Packing V 10 10
Dept. 10 Cold Storage V 25 25
220
Flow Matrix
TO
FROM Receiving D'back Picking Sorting Seaming Chill Tank
Receiving 5 4 3 2 1
D'back 5 4 3 2
Picking 5 4 3
Sorting 5 4
Seaming 5
Chill Tank
Pasteurization
Coding
Packing
Cold Storage
Cost Matrix
TO
FROM Receiving D'back Picking Sorting Seaming Chill Tank
Receiving 1 1 1 1 1 1
D'back 1 1 1 1 1 1
Picking 1 1 1 1 1 1
Sorting 1 1 1 1 1 1
Seaming 1 1 1 1 1 1
Chill Tank 1 1 1 1 1 1
Pasteurization 1 1 1 1 1 1
Coding 1 1 1 1 1 1
Packing 1 1 1 1 1 1
Cold Storage 1 1 1 1 1 1
Pasteurization Coding Packing Cold Storage
1
2 1
3 2 1
4 3 2 1
5 4 3 2
5 4 3
5 4
5
Pasteurization Coding Packing Cold Storage
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1