0% found this document useful (0 votes)
201 views10 pages

Civil Engineer with 20 Years Experience

The document is a curriculum vitae for K.RAMESH KUMAR, who has over 20 years of experience in construction projects in several countries. He has a B.E. in Civil Engineering and experience as a Project Manager, Deputy Project Manager, and Senior Construction Manager on hospitals, rail projects, apartments, villas and other construction. He is proficient in Microsoft Office and has skills in project management, quality control, cost estimation, and construction site management.

Uploaded by

Bhavesh Popat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
201 views10 pages

Civil Engineer with 20 Years Experience

The document is a curriculum vitae for K.RAMESH KUMAR, who has over 20 years of experience in construction projects in several countries. He has a B.E. in Civil Engineering and experience as a Project Manager, Deputy Project Manager, and Senior Construction Manager on hospitals, rail projects, apartments, villas and other construction. He is proficient in Microsoft Office and has skills in project management, quality control, cost estimation, and construction site management.

Uploaded by

Bhavesh Popat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Curriculum vitae

K.RAMESH KUMAR., B.E, M.I.S.T.E.,


Chennai ,Tamil Nadu,India

Education

 B.E (Civil Engg.) from Bharathiyar University (1994 –1998)

 Register No : 9427A0096 in civil Engineer Bharathiyar University

 20 Years of Experience in Construction filed.

 Saudi ARAMCO & LIDCO ( Construction of High Rise Buildings, Hotel Project(Saudi
Arabia), Hospital Project (Qatar), Apartments, Villas ,National Stadium Projects, Qatar
Rail Doha Metro Project & Undergrounds Cabling ,Oil& Gas field, Duct Bank works &
laying of pipe line works) Working Experience and Certified Person

 US - ARMY VICTAROY BASE (Construction of Pre fabricated Buildings & Steel


Buildings) Working Experience and Certified Person

 TWAD ( Tamilnadu Water board Department ) Experience and Certified by govt. of


Tamilnadu

 Graduation Certificate was certified by Govt. of India,

 Completed Management Training course in Project Management at


Cuddalore in Tamilnadu state conducted by Ministry of Small Scale Industries,
Govt of India.

 JOB Responsibilities: Site Executions, Site Managements, Site Planning arrangements


(Preparation of Schedule & Preparation Progress), Preparation of Project Estimation &
Costing, Bill checking and Qa/Qc job responsibility, Managements of time lines and
quality of project.

Computer Literacy – I AM COMFORTABLE WITH MS-WORD, MS-EXCEL, M S- PROJECTS

Current Location: Chennai

Skills and Strength


Project Management, quality management, Quality assurance & Planning, Cost of Estimation,
Contract finalization & Tendering ,Structural Designing, Construction of Residential, Industrial,
Commercial Buildings, Road works and all kind of Civil works.

Inspection, Planning, Supervision, Documentation & Procedures, Engineering approvals,


Tendering, Sub contract coordination arrangements etc.

Site Mobilization, Resource planning & allocation, Sub contractors selection & contract
finalization, On-site quality assurance and control meetings, Progress review meetings, Progress
monitoring & certification for construction/ installation; Safety analysis & Safety systems
implementations worked cohesively with multinational,multi cultural individuals in
team/colleagues and succeeded with excellent results on overall scale

o Excellent communication, co-ordination & customer management skills.

o Well versed with standards ; Public Works Departments in Govt of India

o Well versed with standards; Saudi ARAMCO, Indian, Saudi SCECO in KSA Standards.

Professional expertise

1. Company Name : Hi-Tech Engineering Construction

Position: Project Manager From 17/12/2017 to Present

I am working as a Project manager in construction Department. I am working with a team of


Construction Manager,Executive Engineer & Sr.Engineers / Supervisor /Site inspectors. The
work followed by Planning,Site Execution, Cost of Project Estimation and Construction Site
management.

Project name: Construction of Hospital Project in Cuddalore.

2. Company Name : Shapoorji Pallonji Mideast LLC-OMAN

Position: Dy.Project Manager From 25/10/2015 to 28/10/2017

I worked as a Dy.Project Manager in construction Department. I worked with a team of


Construction Manager,Executive Engineer & Sr.Engineers / Supervisor /Site inspectors. The
work followed by Planning,Site Execution, Cost of Project Estimation and Construction Site
management.

Project name: Construction of Royal Oman Hospital Project in Muscat.

Role & Responsibilities:

 Safety analysis & Safety systems implementations


 Maintain the quality work as per contract specifications and client satisfaction.
 Inspection Arrangements
 Planning & Site Supervision, Maintaining the Documentation & Procedures,
 Engineering approvals & Sub contract coordination arrangements etc.
 Site Mobilization as per Contract aggrement.Resource planning & allocation,
 Sub contractors selection & contract finalization, On-site quality assurance and
control meetings,
 Progress review meetings, Progress monitoring & certification for construction/
installation.
 Properly read the drawings / site &Plan the activities, schedule bar charts jointly
with planning manager.
 Identify resource requirement – Machinery, Manpower, Material etc.
 Prepare & Arrangements of the material requirement as per the schedule.

 Proper allocation of manpower, materials and machinery.


 Monitoring the utilization of resources and reduce cost wastage.
 Providing timely data to billing and planning engineers regarding extra items, joint
measurements, holds, additions and alterations etc.
 Maintaining the Proper communication to sub Contractors.
 Snag list Identifying and attend the snag points and handing over.
 Proactive communication with client representative on day to day progress and
issues.
 Understand client priorities and respond appropriately.
 Timely preparation and submission of bills of sub agencies.
 Facilitate attention towards welfare of sub agencies and their workforce.
 Proper co-ordination with other agencies engaged by the client.
 Observe each member at work and guide them to work more effectively.
 Inspect and ensure good housekeeping in line with safety checklists.
 Ensure adherence to safety manual in all respects.
 Documenting learning’s from the recent project and identifies areas of
improvement.
 Take necessary steps to avoid recurrence of similar problems.
 Make recommendations for improved methods and procedures.

3. Company Name : Group3 Trading & Contracting -QATAR

Position: Project Manager From 28/09/2011 to 10/10/2015

I Worked as a Project manager in construction Department. I worked with a team of


Construction Manager,Executive Engineer & Sr.Engineers / Supervisor /Site inspectors. The
work followed by Planning,Site Execution, Cost of Project Estimation and Construction Site
management.

Project Name :

 Construction of Qatar Rail Doha Metro Project & Undergrounds Cabling.


 Construction of Hamad Medical City (Hospital Project) in Doha & Alkhor Health Centre
in Alkhor.
 Pediatric Emergency Centre & Women's Hospital in Alkhor.
 Construction of 15 No’s of Apartments in Alkhor.
 Construction of 50 No’s of villas in Alkhor.

Role & Responsibilities:

 Safety analysis & Safety systems implementations


 Maintain the quality work as per contract specifications and client satisfaction.
 Inspection Arrangements
 Planning & Site Supervision, Maintaining the Documentation & Procedures,
 Engineering approvals & Sub contract coordination arrangements etc.
 Site Mobilization as per Contract aggrement.Resource planning & allocation,
 Sub contractors selection & contract finalization, On-site quality assurance and
control meetings,
 Progress review meetings, Progress monitoring & certification for construction/
installation.
 Properly read the drawings / site &Plan the activities, schedule bar charts jointly
with planning manager.
 Identify resource requirement – Machinery, Manpower, Material etc.
 Prepare & Arrangements of the material requirement as per the schedule.

 Proper allocation of manpower, materials and machinery.


 Monitoring the utilization of resources and reduce cost wastage.
 Providing timely data to billing and planning engineers regarding extra items, joint
measurements, holds, additions and alterations etc.
 Maintaining the Proper communication to sub Contractors.
 Snag list Identifying and attend the snag points and handing over.
 Proactive communication with client representative on day to day progress and
issues.
 Understand client priorities and respond appropriately.
 Timely preparation and submission of bills of sub agencies.
 Facilitate attention towards welfare of sub agencies and their workforce.
 Proper co-ordination with other agencies engaged by the client.
 Observe each member at work and guide them to work more effectively.
 Inspect and ensure good housekeeping in line with safety checklists.
 Ensure adherence to safety manual in all respects.
 Documenting learning’s from the recent project and identifies areas of
improvement.
 Take necessary steps to avoid recurrence of similar problems.
 Make recommendations for improved methods and procedures.

3). Company Name : LIDCO —Libya

Position: Sr.Construction Manager From 09/02/2010 to 02/07/2011


I Worked as a Sr.Construction manager in construction Department. I worked with a team of
Construction Manager,Executive Engineer & Sr.Engineers / Supervisor /Site inspectors. The
work followed by Planning,Site Execution, Cost of Project Estimation and Construction Site
management.

Responsible for implementation Civil & Mechanical works involved in the construction of
buildings works etc, I had worked as a Projects coordinator for all the civil & mechanical
projects involved in LIDCO group, a leading maintenance & construction contractor of projects.
And this duration I have involved directly in the following works of this organization.

Project name : Construction of administration building (7 Stored) Bab Tarablus at Tripoli gate.

Role & Responsibilities:

 Safety analysis & Safety systems implementations


 Maintain the quality work as per contract specifications and client satisfaction.
 Inspection Arrangements
 Planning & Site Supervision, Maintaining the Documentation & Procedures,
 Engineering approvals & Sub contract coordination arrangements etc.
 Site Mobilization as per Contract aggrement.Resource planning & allocation,
 Sub contractors selection & contract finalization, On-site quality assurance and
control meetings,
 Progress review meetings, Progress monitoring & certification for construction/
installation.
 Properly read the drawings / site &Plan the activities, schedule bar charts jointly
with planning manager.
 Identify resource requirement – Machinery, Manpower, Material etc.
 Prepare & Arrangements of the material requirement as per the schedule.

 Proper allocation of manpower, materials and machinery.


 Monitoring the utilization of resources and reduce cost wastage.
 Providing timely data to billing and planning engineers regarding extra items, joint
measurements, holds, additions and alterations etc.
 Maintaining the Proper communication to sub Contractors.
 Snag list Identifying and attend the snag points and handing over.
 Proactive communication with client representative on day to day progress and
issues.

4).Company: SMI (Solution Managers International) in Kuwait


From 22-06-2008 to 15-01-2010

Position: Construction manager(Project & Estimation)

I Worked as a Construction manager in construction Department. I worked with a team of


Executive Engineer & Sr.Engineers / Supervisor /Site inspectors. The work followed by
Planning,Site Execution, Cost of Project Estimation and Construction Site management.
I was also responsible for implementation Civil & Mechanical works involved in the construction
of Pre fabricated buildings, laying of cables, laying pipe lines for water lines, Constrictions of
communities hall & Construction of road works etc, I had worked as a Projects coordinator for
all the civil & mechanical projects involved in SMI group, a leading maintenance & construction
contractor of the projects. And this duration I have involved directly in the following works of
this organization.

Role & Responsibilities:

 Follow the safety systems & rules.


 Inspect and ensure good housekeeping in line with safety checklists.

 Ensure adherence to safety manual in all respects.


 Documenting learning’s from the recent project and identifies areas of
improvement.
 Take necessary steps to avoid recurrence of similar problems.
 Make recommendations for improved methods and procedures.
 Maintain the quality work as per contract specifications and client satisfaction.
 Inspection Arrangements
 Planning & Site Supervision, Maintaining the Documentation & Procedures,
 Properly read the drawings / site &Plan the activities, schedule bar charts jointly
with planning manager.
 Identify resource requirement – Machinery, Manpower, Material etc.
 Prepare & Arrangements of the material requirement as per the schedule.
 Proper allocation of manpower, materials and machinery.
 Monitoring the utilization of resources and reduce cost wastage.
 Providing timely data to billing and planning engineers regarding extra items, joint
measurements, holds, additions and alterations etc.
 Maintaining the Proper communication to sub Contractors.

Project name :

 Construction of Administration (9 Stored building) Mayer cell building at camp slayer.

 Construction of cement road (1500 m long 4m wide) at camp victory.

 Construction of Welding Work Shop & Wear house area at R/4 (Camp Liberty).

 Construction of clinic building (1800 Sq.ft) at KBR (Camp parker).

 Construction of large area maintenance structure installation (7500 Sq.ft) at Camp


striker.

5).Company: ASAMCO in Saudi Arabia: ( AL-SALEH AND MASSOUD CO )


Position: Sr.Project Engineer. From 15-05-2006 to 19-05-2008

I worked as a Sr.Project engineer for the construction . I worked with a team of civil
engineers/supervisors/site inspectors and work followed by Planning, Surveying Drafting, Cost
of Estimation, Structural Designing, Construction of Residential, Industrial and commercial
Buildings etc.

Project name :

 Construction of AL SAFA HOTEL .


 Upgrade Power and Cooling for Tower (Administration Building) Computer Centre
in SAUDI ARAMCO –Dhahran.

Role & Responsibilities:

 Follow the safety systems & rules.


 Maintain the good housekeeping in line with safety checklists.
 Preparation of daily progress report.

 Preparation of daily progress schedule.


 Take necessary steps to avoid recurrence of similar problems.
 Prepare the method of statements.
 Maintain the quality work as per contract specifications and client satisfaction.
 Prepare & Submit the Inspection Reports
 Planning & Site Supervision, Maintaining the Documentation & Procedures,
 Properly read the drawings / site &Plan the activities, schedule bar charts jointly
with planning manager.
 Identify resource requirement – Machinery, Manpower, Material etc.
 Prepare & Arrangements of the material requirement as per the schedule.
 Proper allocation of manpower, materials and machinery.
 Monitoring the utilization of resources and reduce cost wastage.
 Maintaining the Proper communication to sub Contractors.
 Proactive communication with client representative on day to day progress and
issues.
 Understand client priorities and respond appropriately.
 Timely preparation and submission of bills of sub agencies.

I was also responsible for implementation civil & mechanical works involved in the construction
of sub stations buildings, laying of cables, laying pipe lines for water, construction of tower
foundations, Construction of road for an stretch of 10 km over gas pipe lines etc,

I had worked as a Projects coordinator for all the civil & mechanical projects involved in
ASAMCO group, a leading maintenance & construction contractor of, Saudi SCECO & Saudi
ARAMCO in K.S.A. In this duration I have involved directly in the following works of this
organization.
I was resposible in preparation & submission of bid for short form contracts as well as long-
term contracts, which have originated from the customer inquiry. I was preparing bar charts
from minor & major works of the contracts and submitting periodical reports to the
management of client I was also issuing purchase orders & monitoring on time delivery of
materials and monitoring revenue collection vis-à-vis expansé control.

6).Company: Hi-Tech Construction From 08-08-2002 to 10-04-2006

Position: Project Engineer.

I Worked as a Project engineer for the construction . I was worked with a team of civil
engineers/supervisor/site inspector and work followed by Planning, Surveying, Drafting, Cost of
Estimation, Structural Designing, Construction of Residential, Industrial and commercial
Buildings etc.

 T-SUNAMI (300 Nos)Construction of Villas (Group House) in Alamparai kottai


Kanchipuram District Chennai.

 Construction of community hall (350 Sq.m) Ammapettai at Cuddalore District.

 Construction of school building (2400 Sq.ft) 4 no’s at Cuddalore District

 T-SUNAMI (80 Nos)Construction of Villas at Thevanam pattanam Cuddalore District

 Formation of new asphalt road (high ways) 4000m length .in K.K District

 7000 m length 8m wide new asphalt road in karikkalam pakkam ( Pondy)

I was conducting preparatory phase meettings/ intial phase meetings/follow ups for the
activities of the work i.e implenation of three phase policy in quality sysem and weekly/
monthly meeting with project manager/client/consutants on the progress / Defiency of the
running works

I was responsible for the checking, preparation and submission of the submittals for all which
were related to the project, progress of work as per schedule and cross checking of the bill of
quantities/ payments as per the contract.

7).Company: Public Works Departments From 02.07.2001 to 01.07.2002

Position: Engineer

I was worked as a Engineer for PWD Department. I was working with a team of Engineers /site
inspecters and work followed by Planning, Surveying, Drafting, Cost of Estimation, Structural
Designing, Construction of Residential, Industrial and commercial Buildings, Road works
Specified All types of Tanks, Construction and Maintenances ( Hospitals) &
Reservoirs and Channel works,Sliuce Works & Road works and all kind of Civil works.

Working areas:

 Construction and Maintenance of Hospital works at Cuddalore Govt


hospital.

 Construction & maintenance of Pallipalayam tank at Cuddalore district

 Construction and maintenance of Valliodai tank at Cuddalore district &


sluice Works.

Hi-Tech Construction

Position: CIVIL ENGINEER. From 27-05-1998 to 13-06-2001

I Worked as a Civil Engineer for the construction. I was worked with a team of civil
engineers/supervisor/site inspecter and work followed by Planning,Surveying, Drafting, Cost of
Estimation, Construction of Residential, and commercial Buildings, Road works .

Civil Structural works (include interiors) for the following projects,

 Construction of Villas (30 Nos)

 Three stored Commercial building (3 Nos) in Cuddalore ,

 12 km Asphalt Road works in Madhakadipet.,

Our composite contract included works like General Civil, Architectural, Sanitary & Plumbing,
Piping, Equipment supply & its erection for HVAC, modern kitchen. The above projects were
successfully commissioned ahead of schedule with a good quality.

Personal Details

Date of Birth : 31.O5.1976

Nationality : Indian

Status : Married

Driving License : Indian, Oman


Language Proficiency : English, Hindhi, Tamil,Malayalam & Telugu

You might also like