The document provides a bill of quantities for foundations for multiple structures including a pelling foundation, 2 layer dryer foundation, and 3 layer dryer foundation. It includes item descriptions, units, dimensions, quantities, rates, and total amounts for excavation, concrete work, reinforcement bars, shuttering, and other items. The total amount for all listed foundations is over 11 million rupees.

Uploaded by

Michael Michael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
554 views16 pages

Foundations For M

The document provides a bill of quantities for foundations for multiple structures including a pelling foundation, 2 layer dryer foundation, and 3 layer dryer foundation. It includes item descriptions, units, dimensions, quantities, rates, and total amounts for excavation, concrete work, reinforcement bars, shuttering, and other items. The total amount for all listed foundations is over 11 million rupees.

Uploaded by

Michael Michael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Bill of Quantities - Pelling Foundation

[Link] Item Description Units Length Width Depth/Height


1 Peeling Foudation
Excavation Cub 9.9 4.3 0.91
Backfilling Cub 37.82 0.5 0.6
2 PCC
Laying of PCC Cub 8.9 2.7 0.1
0.68 2.25 0.1
Deductions:
1 Cub 3.2 0.76 0.1
Total PCC to be Laid after deduction=
3 RCC Cub 8.7 2.51 1.4
Cub 0.58 2.05 1.4
Deductions for outer Part:
1 Cub 3.2 0.762 1.4
Deductions for Foundation Bolts Openings
1. For 0.3 x 0.3 Openings Cub 14 0.33 0.33 1.4
2. For 0.735*0.25 Opening Cub 2 0.76 0.25 1.4

Total RCC to be Laid after deduction=


4 Reinforcement - Bottom Matt
Along longer span-10mm @ 150mm C/C Kgs 13.05 11.2 0.88
Along Shorter span-10mm @ 150mm C/C Kgs 44 5.01 0.88
5 Reinforcement - Top Matt
Along longer span-12mm @ 150mm C/C Kgs 13.05 11.2 0.88
Along Shorter span-12mm @ 150mm C/C Kgs 44 5.01 0.88

Along longer span-12mm @ 150mm C/C Kgs 2 3.5 4.55 0.88


Along Shorter span-12mm @ 150mm C/C Kgs 2 10.75 1.85 0.88

Total Steel for Complete Foundations


6 Shuttering
Shuttering for PCC Sqm 26 0.1
Shuttering for Rcc Raft Sqm 25.1 1.4
Shuttering for Holes Sqm 14 1.32 1.4
Shuttering for Holes Sqm 2 2.02 1.4
Total Shuttering
Total Amou
undation
Quantity Total Quantity Rate Amount Remarks

38.7387 38.7 7000 271,170.9


11.346 11.3 7000 79,422.0

2.403
0.153

0.2432
2.3 100000 231,280.0
30.5718
1.6646

3.41376

2.13444
0.532

24.5 105000 2,571,618.0

128.6208
193.9872

128.6208
193.9872

28.028
35.002

582.2 200 116,437.2

2.6
35.14 37.7 5500 207,570.0
25.872
5.656 31.5 8000 252,224.0
-
Total Amount For Foundations= 3,729,722.1
Bill of Quantities - 2 Layer Dryer Foundation
[Link] Item Description Units Length Width Depth/Height
1 Clipper Foundation
Excavation Cub 4 4.05 2.55 0.65
Laying of RCC Cub 4 3.65 2.15 0.2
Shuttering Sqm 4 11.6 0.2 -
Polythene Sqm 4 3.65 2.15 -
Brickwork Sqm 4 10 0.45 -
Plastering Sqm 4 9.4 0.45 -
2 RCC Foundation
Excavation Cub 2 1.615 34.16 0.475
Laying of PCC Cub 2 1.015 33.56 0.075
Laying of RCC Cub 2 0.865 33.41 0.78
Shuttering - PCC Sqm 2 69.15 0.075 -
Shuttering - RCC Sqm 2 68.55 0.78 -
Flooring PCC Cub 33.41 3.35 0.1
Polythene for flooring Sqm 33.41 3.35 -
Steel For RCC Foundation - U bar Kgs 168 2 2.125 0.617
Steel For RCC Foundation - U bar Kgs 2 34.67 10 0.617
3 Brick wall at gates Sqm 4 2.75 0.15 0.4
Plastering Sqm 4 2.75 2 0.4
Total Amou
r Foundation
Quantity Total Quantity Rate Amount Remarks

26.8515 26.9 7000 187,960.5


6.278 6.3 105000 659,190.0
9.28 9.3 5500 51,040.0
31.39 31.4 400 12,556.0
18 18.0 15000 270,000.0
16.92 16.9 4500 76,140.0

52.40998 52.4 7000 366,869.9


5.10951 5.1 100000 510,951.0
45.08345 45.1 105000 4,733,762.7
10.3725 10.4 5500 57,048.8
106.938 106.9 5500 588,159.0
11.19235 11.2 100000 1,119,235.0
111.9235 111.9 400 44,769.4
440.538 440.5 200 88,107.6
427.8278 427.8 200 85,565.6
4.4 4.4 15000 66,000.0
8.8 8.8 4500 39,600.0
Total Amount For Foundations= 8,956,955.3
Bill of Quantities - 3 Layer Dryer Foundation - Old work
[Link] Item Description Units Length Width Depth/Height
Excavation for clipping Cub 2 8.66 3.7 0.5
Laying of RCC Cub 2 8.06 3.1 0.2
Shuttering Sqm 2 22.32 0.2 -
Polythene Sqm 2 8.06 3.1 -
Steel For RCC Foundation Kgs 2 3 4 0.617
Steel For RCC Foundation Kgs 2 7.96 16 0.617
Excavation for centre Cub 1 1.75 2 1
Total Amou
ndation - Old work
Quantity Total Quantity Rate Amount Remarks
32.042 32.0 7000 224,294.0
9.9944 10.0 105000 1,049,412.0
8.928 8.9 5500 49,104.0
49.972 50.0 400 19,988.8
14.808 14.8 200 2,961.6
157.1622 157.2 200 31,432.4
3.5 3.5 7000 24,500.0
Total Amount For Foundations= 1,401,692.8
Bill of Quantities - 3 Layer Dryer Foundation
[Link] Item Description Units Length Width Depth/Height
1 Clipper Foundation
Excavation Cub 2 8.66 3.7 0.5
Laying of RCC Cub 2 8.06 3.1 0.2
Shuttering Sqm 2 22.32 0.2 -
Polythene Sqm 2 8.06 3.1 -
Brickwork Sqm 2 21.32 0.45 -
Plastering Sqm 2 20.72 0.45 -
Steel - shorter span Kgs 2 3 4 0.617
Steel - Longer Span Kgs 2 7.96 16 0.617
2 RCC Foundation
Excavation Cub 2 27.8 1.95 0.325
Excavation Cub 1 4.17 1.95 0.325
Laying of PCC Cub 2 27.2 1.35 0.075
Laying of PCC Cub 1 2.615 1.2 0.075
Laying of PCC Cub 1 1.555 0.9 0.075
Laying of RCC Cub 2 27.05 1.2 0.7
Laying of RCC Cub 1 2.615 1.05 0.7
Laying of RCC Cub 1 1.555 0.75 0.7
Shuttering - PCC Sqm 2 57.1 0.075 -
Shuttering - RCC Sqm 2 56.5 0.7 -
Shuttering - RCC Sqm 1 5.23 0.7 -
Shuttering - RCC Sqm 1 3.11 0.7 -
Laterite filling at slopes Cub 2 27.05 1.5 0.4
Flooring PCC at slopes Cub 2 27.05 1.5 0.1
Steel For RCC Foundation - U bar Kgs 2 2.3 136 0.617
Steel For RCC Foundation - U bar Kgs 2 28.15 12 0.617
Steel For RCC Foundation - U bar Kgs 1 2.15 13 0.617
Steel For RCC Foundation - U bar Kgs 1 3.815 10 0.617
Steel For RCC Foundation - U bar Kgs 1 2.7 9 0.617
Steel For RCC Foundation - U bar Kgs 1 1.85 8 0.617
3 Brick wall at gates Sqm 4 3.25 0.15 0.4
Plastering Sqm 4 3.25 2 0.4
Brick wall for steps Sqm 10 1 0.15 1
Plastering for steps Sqm 10 1 1 1
Total Amou
r Foundation
Quantity Total Quantity Rate Amount Remarks

32.042 32.0 7000 224,294.0


9.9944 10.0 105000 1,049,412.0
8.928 8.9 5500 49,104.0
49.972 50.0 400 19,988.8
19.188 19.2 15000 287,820.0
18.648 18.6 4500 83,916.0
14.808 14.8 200 2,961.6
157.1622 157.2 200 31,432.4

35.2365 35.2 7000 246,655.5


2.642738 2.6 7000 18,499.2
5.508 5.5 100000 550,800.0
0.23535 0.2 100000 23,535.0
0.104963 0.1 100000 10,496.3
45.444 45.4 105000 4,771,620.0
1.922025 1.9 105000 201,812.6
0.816375 0.8 105000 85,719.4
8.565 8.6 5500 47,107.5
79.1 79.1 5500 435,050.0
3.661 3.7 5500 20,135.5
2.177 2.2 5500 11,973.5
32.46 32.5 8500 275,910.0
8.115 8.1 100000 811,500.0
385.9952 386.0 200 77,199.0
416.8452 416.8 200 83,369.0
17.24515 17.2 200 3,449.0
23.53855 23.5 200 4,707.7
14.9931 15.0 200 2,998.6
9.1316 9.1 200 1,826.3
5.2 5.2 15000 78,000.0
10.4 10.4 4500 46,800.0
10 10.0 15000 150,000.0
10 10.0 4500 45,000.0
Total Amount For Foundations= 9,753,093.0
Bill of Quantities - Boiler Foundations
[Link] Item Description Units Length Width Depth/Height
1 Boiler Foundations
Excavation (a) Cub 1 5.9 6.8 0.85
Excavation (b) Cub 1 4.2 4.4 0.85
Laying of PCC - a Cub 1 5.1 6.35 0.1
Laying of PCC - b Cub 1 3.8 4.1 0.1
Laying of RCC - a Cub 1 4.9 6.15 0.3
Laying of RCC - b Cub 1 3.9 3.7 0.3
Laying of RCC Wall - a Cub 1 18.3 0.55 0.6
Laying of RCC Wall - b Cub 1 3.14 0.98 2.26
Laying of PCC for Top Slab - a Cub 1 3.4 4.65 0.075
Laying of RCC for Top Slab - a Cub 1 5.75 4.5 0.2
Laying of RCC for Top Slab - b Cub 1 3.14 3.02 0.1
Shuttering - PCC -a Sqm 2 11.5 0.09 -
Shuttering - PCC -b Sqm 2 7.9 0.09 -
Shuttering RCC - Raft - a Sqm 2 11.2 0.27
Shuttering RCC - Raft - b Sqm 2 7.6 0.27
Shuttering Wall - a Sqm 2 18.3 0.6
Shuttering Wall - b 1 Sqm 2 3.14 1.74 2.11
Shuttering Wall - b 2 Sqm 2 3.14 1.435 2.11
Shuttering Top Wall - a Sqm 1 20.5 0.2 0
Steel -12mm dia - furnance raft Kgs 2 5.1 42 0.88
Steel -10mm dia - furnance raft Kgs 2 33 6.5 0.617
Steel - wall for furnance Main - a - 10mm Kgs 2 123 1.4 0.617
Steel - wall for furnance Dist. - a - 10mm Kgs 2 20 5 0.617
Steel - wall for furnance Main topslab - a - 10mm Kgs 2 30 5.85 0.617
Steel - wall for furnance Dist. Top slab- a - 10mm Kgs 2 38 4.6 0.617
Steel - for Heat Excanger Raft- main a - 12mm Kgs 2 23 4.1 0.88
Steel - for Heat Excanger Raft- dist a - 10mm Kgs 2 26 3.7 0.617
Steel - for Heat Excanger wall- main a - 10mm Kgs 2 74 2.8 0.617
Steel - for Heat Excanger wall- main a - 10mm Kgs 2 11 10.9 0.617
Backfilling with Laterite for furnance Cub 1 3.4 4.65 0.525
Backfilling with Laterite for Heat Excanger Cub 2 3.14 1.435 0.45

2 Chimeney
Excavation Cub 1 7 7 3
Laying of PCC Cub 1 3.14 6 0.15
Laying of RCC Raft Cub 1 3.14 5.43 0.6
Brickwork - 15cm Sqm 2 3.14 1.73 2.65
Laying of RCC inside Cub 1 3.14 3 2.65
Shuttering - PCC Sqm 2 3.14 2.45 0.15
Shuttering - RCC raft Sqm 2 3.14 2.33 0.6
Steel For RCC Foundation - Raft Kgs 4 5.23 0.88 0
Steel For RCC Foundation - Raft Kgs 8 5.22 0.88 0
Steel For RCC Foundation - Raft Kgs 8 5.19 0.88 0
Steel For RCC Foundation - Raft Kgs 8 5.14 0.88 0
Steel For RCC Foundation - Raft Kgs 8 5.07 0.88 0
Steel For RCC Foundation - Raft Kgs 8 4.97 0.88 0
Steel For RCC Foundation - Raft Kgs 8 4.86 0.88 0
Steel For RCC Foundation - Raft Kgs 8 4.78 0.88 0
Steel For RCC Foundation - Raft Kgs 8 4.547 0.88 0
Steel For RCC Foundation - Raft Kgs 8 4.345 0.88 0
Steel For RCC Foundation - Raft Kgs 8 4.105 0.88 0
Steel For RCC Foundation - Raft Kgs 8 3.817 0.88 0
Steel For RCC Foundation - Raft Kgs 8 3.468 0.88 0
Steel For RCC Foundation - Raft Kgs 8 3.032 0.88 0
Steel For RCC Foundation - Raft Kgs 8 2.445 0.88 0
Steel For RCC Foundation - Raft Kgs 8 1.407 0.88 0
Steel For RCC Foundation - Wall Main 12mm Kgs 73 4 0.88 0
Steel For RCC Foundation - Wall Dist. 12mm Kgs 17 10.23 0.617 0
Backfilling Cub 1 166.6 35.15 0
T

3 Pump Foundation
Excavation Manual Cub 1 2.7 1.5 0.35
Laying of PCC Cub 1 2.1 1.15 0.1
Laying of RCC Raft Cub 1 1.9 0.95 0.95
Shuttering - PCC Sqm 2 3.25 0.1 0
Shuttering - RCC raft Sqm 2 2.85 0.95 0
Shuttering - Pockets Sqm 6 0.6 0.35
Steel For 10mm Kgs 10 3.8 0.617 0
Steel For 10mm Kgs 10 5.8 0.617 0

Tota
4 Fluid Heater Foundation / ID Fan
Excavation Manual Cub 1 2.56 3.36 0.35
Laying of PCC Cub 1 1.96 2.76 0.1
Laying of RCC Raft Cub 1 1.76 2.56 0.8
Shuttering - PCC Sqm 2 4.72 0.1 0
Shuttering - RCC raft Sqm 2 4.32 0.8 0
Shuttering - Pockets Sqm 11 0.6 0.35
Steel For 10mm Kgs 13 5.12 0.617 0
Steel For 10mm Kgs 4 8.64 0.617 0
Steel For 10mm Kgs 9 6.32 0.617 0
Tota

5 FD Fan Foundation
Excavation Manual Cub 1 1.965 1.47 0.35
Laying of PCC Cub 1 1.565 1.07 0.1
Laying of RCC Raft Cub 1 1.365 0.87 0.8
Shuttering - PCC Sqm 1 5.27 0.1 0
Shuttering - RCC raft Sqm 1 4.47 0.8 0
Shuttering - Pockets Sqm 6 0.6 0.35
Steel For 10mm Kgs 7 2.17 0.617 0
Steel For 10mm Kgs 4 2.665 0.617 0
Steel For 10mm Kgs 7 1.17 0.617 0
Steel For 10mm Kgs 4 1.665 0.617 0
Steel For 10mm Kgs 4 4.07 0.617 0

6 Oil Tank Foundations


Excavation Cub 1 7.2 4.5 1.35
Laying of PCC Cub 1 6.2 3.5 0.1
Laying of RCC Raft Cub 1 6 3.3 0.4
Deduction in RCC Cub 1 3 0.85 0.4
Total RCC Laid=
Rcc for Columns Cub 4 0.6 0.6 1
Rcc for Tie Beams Cub 1 10 0.25 0.4
Shuttering - PCC Sqm 1 9.4 0.1 0
Shuttering - RCC raft Sqm 1 25.17 0.4 0
Shuttering - columns Sqm 4 2.4 1
Shuttering - Beam Sqm 2 10 0.4
Bolt Fixing Nos 4
Steel For raft 10mm - Main Kgs 84 1.7 0.617 0
Steel For 10mm - Dist. Kgs 2 10 6.2 0.617
Steel For 12mm - for column Kgs 4 1.8 12 0.88
Steel - stirrups For 8mm - for column Kgs 4 2.2 10 0.395
Back filling Cub 43.7 11.51 0

7 Water Tank Foundations


Excavation Manual Cub 1 8.7 4.5 1.2
Laying of PCC Cub 1 7.7 3.5 0.1
Deduction: in PCC Cub 1 5.3 0.6 0.1
Total PCC Laid=
Laying of RCC Raft Cub 1 7.5 3.3 0.35
Deduction in RCC Cub 1 5.5 0.8 0.35
Total RCC Laid=
Rcc for Columns Cub 8 0.35 0.35 0.75
Shuttering - PCC Sqm 1 34.2 0.1 0
Shuttering - RCC raft Sqm 1 34.2 0.35 0
Shuttering - columns Sqm 8 1.4 0.75
Bolt Fixing Nos 8
Steel For raft 10mm - Main Kgs 111 1.5 0.617 0
Steel For 10mm - Dist. Kgs 2 7.8 8 0.617
Steel For 10mm - Dist. Kgs 2 1.2 8 0.617
Steel For 12mm - Main - Column. Kgs 8 1.5 8 0.88
Steel - stirrups For 8mm - for column Kgs 8 1.2 10 0.395
Tota

8 RCC Concrete flooring - Boiler Entrance Slab


i) Soil filling / Cutting M3 1 7 6 0.35
ii) Laterite filling 0.25m M3 1 6.5 6 0.25
iii) Polythene under concrete M2 1 6 6 -
iv) RCC concrete M3 1 6 6 0.2
v) Reinforcement 10mm dia. 300m c/c both ways
a) short span direction Kg 21 6 10mm dia.
b) Long span direction Kg 21 6 10mm dia.
vi) Overlaps at 6% of total quantity Kg 1

Powe trowel Sqm 6 6

9 RCC Concrete flooring between Main Shed and boiler shed


i) Soil filling / Cutting M3 1 16 3 0.2
ii) Laterite filling 0.25m M3 1 16 3 0.2
iii) Polythene under concrete M2 1 16 3 -
iv) RCC concrete M3 1 16 3 0.2
v) Reinforcement 10mm dia. 300m c/c both ways
a) short span direction Kg 54 3 10mm dia.
b) Long span direction Kg 11 16 10mm dia.
vi) Overlaps at 6% of total quantity Kg 1

Powe trowel Sqm 6 6


Brick work on Both sides Sqm 36.6 0.2

T
undations
Quantity Total Quantity Rate Amount Remarks

34.102 34.1 7000 238,714.0


15.708 15.7 7000 109,956.0
3.2385 3.2 100000 323,850.0
1.558 1.6 100000 155,800.0
9.0405 9.0 105000 949,252.5
4.329 4.3 105000 454,545.0
6.039 6.0 105000 634,095.0
6.954472 7.0 105000 730,219.6
1.18575 1.2 100000 118,575.0
5.175 5.2 105000 543,375.0
0.94828 0.9 105000 99,569.4
2.07 2.1 5500 11,385.0
1.422 1.4 5500 7,821.0
6.048 6.0 5500 33,264.0
4.104 4.1 5500 22,572.0
21.96 22.0 5500 120,780.0
23.05639 23.1 5500 126,810.2
19.0149 19.0 5500 104,581.9
4.1 4.1 5500 22,550.0
376.992 377.0 200 75,398.4
264.693 264.7 200 52,938.6
212.4948 212.5 200 42,499.0
123.4 123.4 200 24,680.0
216.567 216.6 200 43,313.4
215.7032 215.7 200 43,140.6
165.968 166.0 200 33,193.6
118.7108 118.7 200 23,742.2
255.6848 255.7 200 51,137.0
147.9566 148.0 200 29,591.3
8.30025 8.3 8500 70,552.1
4.05531 4.1 8500 34,470.1
Total Amount for Boiler= 5,332,371.9

147 147.0 7000 1,029,000.0


2.826 2.8 100000 282,600.0
10.23012 10.2 105000 1,074,162.6
28.79066 28.8 15000 431,859.9
24.963 25.0 105000 2,621,115.0
2.3079 2.3 5500 12,693.5
8.77944 8.8 5500 48,286.9
18.4096 18.4 200 3,681.9
36.7488 36.7 200 7,349.8
36.5376 36.5 200 7,307.5
36.1856 36.2 200 7,237.1
35.6928 35.7 200 7,138.6
34.9888 35.0 200 6,997.8
34.2144 34.2 200 6,842.9
33.6512 33.7 200 6,730.2
32.01088 32.0 200 6,402.2
30.5888 30.6 200 6,117.8
28.8992 28.9 200 5,779.8
26.87168 26.9 200 5,374.3
24.41472 24.4 200 4,882.9
21.34528 21.3 200 4,269.1
17.2128 17.2 200 3,442.6
9.90528 9.9 200 1,981.1
256.96 257.0 200 51,392.0
107.3025 107.3 200 21,460.5
104.68 104.7 7000 732,760.0
Total Amount For Chimeny= 6,396,865.9

1.4175 1.4 7000 9,922.5


0.2415 0.2 100000 24,150.0
1.71475 1.7 105000 180,048.8
0.65 0.7 5500 3,575.0
5.415 5.4 5500 29,782.5
1.26 1.3 5500 6,930.0
23.446 23.4 200 4,689.2
35.786 35.8 200 7,157.2
Total Amount For Pump= 266,255.2
Total Amount For Pump 2 nos= 532,510.3

3.01056 3.0 7000 21,073.9


0.54096 0.5 100000 54,096.0
3.60448 3.6 105000 378,470.4
0.944 0.9 5500 5,192.0
6.912 6.9 5500 38,016.0
2.31 2.3 5500 12,705.0
41.06752 41.1 200 8,213.5
21.32352 21.3 200 4,264.7
35.09496 35.1 200 7,019.0
Total Amount For Fluid Heater= 529,050.5

1.010993 1.0 7000 7,076.9


0.167455 0.2 100000 16,745.5
0.95004 1.0 105000 99,754.2
0.527 0.5 5500 2,898.5
3.576 3.6 5500 19,668.0
1.26 1.3 5500 6,930.0
9.37223 9.4 200 1,874.4
6.57722 6.6 200 1,315.4
5.05323 5.1 200 1,010.6
4.10922 4.1 200 821.8
10.04476 10.0 200 2,009.0
Total Amount For FD Fan= 160,104.5

43.74 43.7 7000 306,180.0


2.17 2.2 100000 217,000.0
7.92
1.02
6.9 6.9 105000 724,500.0
1.44 1.4 105000 151,200.0
1 1.0 105000 105,000.0
0.94 0.9 5500 5,170.0
10.068 10.1 5500 55,374.0
9.6 9.6 5500 52,800.0
8 8.0 5500 44,000.0
4 4.0 10000 40,000.0
88.1076 88.1 200 17,621.5
76.508 76.5 200 15,301.6
76.032 76.0 200 15,206.4
34.76 34.8 200 6,952.0
32.2 32.2 7000 225,610.0
Total Amount For oil Tank= 1,981,915.5

46.98 47.0 7000 328,860.0


2.695
0.318
2.377 2.4 100000 237,700.0
8.6625
1.54
7.1225 7.1 105000 747,862.5
0.735 0.7 105000 77,175.0
3.42 3.4 5500 18,810.0
11.97 12.0 5500 65,835.0
8.4 8.4 5500 46,200.0
8 8.0 10000 80,000.0
102.7305 102.7 200 20,546.1
77.0016 77.0 200 15,400.3
11.8464 11.8 200 2,369.3
84.48 84.5 201 16,980.5
37.92 37.9 200 7,584.0
Total Amount For Water tank= 1,665,322.7

14.70 14.70 4150.00 61,005.00


9.75 9.75 8500.00 82,875.00
36.00 36.00 400.00 14,400.00
7.20 7.20 105000.00 756,000.00

77.74
77.74
9.33
164.81 200.00 32,962.61
36.00 36.00 1750.00 63,000.00
Total Amount for RCC Flooring = 1,010,242.61

9.60 9.60 4150.00 39,840.00


9.60 9.60 8500.00 81,600.00
48.00 48.00 400.00 19,200.00
9.60 9.60 105000.00 1,008,000.00

99.95
108.59
12.51
221.06 200.00 44,211.75
36.00 36.00 1750.00 63,000.00
7.32 7.32 15000.00 109,800.00
Total Amount for RCC Flooring = 1,255,851.75

Total Amount of All Works= 18,864,235.6