Septic Vault Layout and Details

The document describes the construction details of a sewage system, including dimensions for concrete blocks, rebar spacing, piping details and connections to street sewers. Key specifications include 100mm thick concrete block walls with vertical rebar every 0.5m and horizontal rebar every third layer, a 100mm thick inlet pipe, and a 10mm outlet pipe connected to the street sewer after verification.

Uploaded by

DJ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
315 views1 page

Septic Vault Layout and Details

The document describes the construction details of a sewage system, including dimensions for concrete blocks, rebar spacing, piping details and connections to street sewers. Key specifications include 100mm thick concrete block walls with vertical rebar every 0.5m and horizontal rebar every third layer, a 100mm thick inlet pipe, and a 10mm outlet pipe connected to the street sewer after verification.

Uploaded by

DJ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2.

00
2.00
0.65 0.60 0.75
0.65 0.60 0.75
0.10 0.50 0.10 0.50 0.10 0.60 0.10
0.10 0.50 0.10 0.50 0.10 0.60 0.10 0.10
10mm. O
/ BARS @
0.20mm. O.C. B.W. 0.05 0.40 0.05 0.05 0.40 0.05 0.05 0.40 0.05
100mm. O/ PVC OUTLET 10mm. O
/ HORIZONTAL
PIPE TO STREET SEWER BARS
( VERIFY CONNECTION )

0.10
0.10

CO CO

0.30
0.20

AIR SPACE
OUTLET 300mm.
CO CO CO INLET
100mm. THK. CHB WALL WITH
10mm. O/ VERT. BAR SPACED
@ 0.50m. O.C. & 10mm. O/ HOR.
LEVEL OF BAR @ EVERY 3RD. LAYER OF
SCUM CHB IN PLAIN PLASTER FIN.
WITH CEMENTITOUS
WATERPROOFING
MANHOLE MANHOLE MANHOLE MANHOLE
0.90

0.50
1.10

OUTLET

100mm. O
/ PVC SP

1.60
DIGESTIVE LEACHING LEACHING

1.00
CHAMBER CHAMBER 1 CHAMBER 2
0.20

GRAVEL BED
0.10

0.15
1 SEPTIC VAULT PLAN
P-2 SCALE : 1 : 10 MTS.

0.20
100mm. THK. CONCRETE SLAB WITH
10mm. O/ RSB SPACED @ 0.25m.
O.C. BOTHWAYS
2.00

0.65 0.60 0.75 50mm. GRAVEL FILL


0.30 0.30
0.10 0.50 0.10 0.50 0.10 0.60 0.10 0.10

3 SEPTIC VAULT SECTION DETAIL


P-2 SCALE : 1 : 10 MTS.
100mm. THK. CONCRETE SLAB WITH
0.10

10mm. O/ RSB SPACED @ 0.20m.


O.C. BOTHWAYS
0.20

0.40

0.30
75mm. THK. CONCRETE
0.40 TOPPING WITH 10mm. O/ RSB
75mm. THK. CONCRETE
MH COVER 0.30

0.075
10mm. THK. CHB WITH
MANHOLE MANHOLE MANHOLE 10mm. O
/ RSB
0.90

0.50
1.10

INLET PIPE

0.37
OUTLET P

0.40

0.30
IPE

0.10

0.05
0.20

0.075
5 100mm. O
/ PVC DRAIN PIPE
1 - 10mm. O
/ EXTRA 1 - 10mm. O
/ EXTRA
0.10

DIAGONAL BAR @ EVERY DIAGONAL BAR @ EVERY


MANHOLE CORNER MANHOLE CORNER

4 CATCH BASIN DETAIL


P-2 SCALE : 1 : 10 MTS.
2 SEPTIC VAULT LAYOUT DETAIL
P-2 SCALE : 1 : 10 MTS.

PROJECT TITLE : Republic of the Philippines ARCHITECT / ENGINEER DESIGNED: PLIBARDALOZA CHECKED: RGRAMOS SHEET NO.
MUNICIPALITY OF TIGAON Office of the President
Tigaon, Camarines Sur DRAWN: PLIBARDALOZA DATE:
NATIONAL HOUSING AUTHORITY
CHECKED BY RECOMMENDING APPROVAL SHEET CONTENT District II, VGH, Concepcion Grande, Naga City

HOUSE MODEL ( 33sqm. R.H. ) REVIEWED BY RECOMMENDING APPROVAL APPROVED BY P-2


SEPTIC VAULT DETAILS
TIGAON RES. PROJECT Phase I APPROVED BY
DESIGNATION
REVISIONS DATE:

LOCATION : Engr. CRISTINA A. CABANGON Engr. ALBERT A. PERFECTO MARCELINO P. ESCALADA JR. 13 13
REG No.: DATE: PROJECT MANAGER, DISTRICT II - REGION V ACTING REGIONAL MANAGER, REGION V GENERAL MANAGER, NHA
BRGY. SALVACION, TIGAON, CAMARINES SUR Hon.
MUNICIPAL MAYOR PTR No.: PLACE: