0% found this document useful (0 votes)
107 views30 pages

Aerospace & Defense Hub Plan India

The document proposes creating an aerospace and defense industrial hub in India over 3 phases: 1) Short term (6 months) - Air charter, STC helicopter certification, components manufacturing with $300M investment and 150 jobs. 2) Medium term (18 months) - Aerospace lab, EBW facility with $900M investment and 1,000 jobs, generating $500M annual revenue. 3) Long term (24 months) - MRO, aircraft assembly with $2.8B investment and 6,000 jobs, generating $3B annual revenue. The hub aims to integrate expertise across aerospace, defense, logistics and manufacturing over 6,000 acres with economic and tax

Uploaded by

Bhavesh Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views30 pages

Aerospace & Defense Hub Plan India

The document proposes creating an aerospace and defense industrial hub in India over 3 phases: 1) Short term (6 months) - Air charter, STC helicopter certification, components manufacturing with $300M investment and 150 jobs. 2) Medium term (18 months) - Aerospace lab, EBW facility with $900M investment and 1,000 jobs, generating $500M annual revenue. 3) Long term (24 months) - MRO, aircraft assembly with $2.8B investment and 6,000 jobs, generating $3B annual revenue. The hub aims to integrate expertise across aerospace, defense, logistics and manufacturing over 6,000 acres with economic and tax

Uploaded by

Bhavesh Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Business Direction Plan

Creating a Industrial
Hub with Integrated
expertise for Aerospace
& Defence Parks

Initiative by TAAIL
Promoted & Presented By
K.Giri Kumar CMD
www.taail.com
Aerospace & Defense Hub in Territory of India

6,000 Defense Logistic


FTZ Aero Park
Park Park
Acres

Seeking Land Approval In the process of In the process of In the process of


from Govt Awaited Master Plan Master Plan Master Plan
K. Giri Kumar Benton Semykhodskyy
Alexander

Vadym Dinesh Vijay


Alexey

M.S. Rao Raj


Titan Aviation & Aerospace
India Ltd

Chairman of the Board

CEO COO CPO CTO CFO

Director Director Director


Administration Business Finance &
Development Legal Services

Head of Head of Head of Head of


Operations Maintenance Production IT Services
MRO
Antonov
Aircraft
MRO Mi
Airbase
Helicopters

. Assembly
Township Plant
Aerospace Antonov
FTZ

Logistic Assembly
Plant MSB
Park Helicopters

Components
& Engine STC
Manufacturin Helicopter
g Facility
Surbana Jurong
for Airport
Planning

KPMG
Corporate Singapore
SCP for Urban Advisory Technologies for
Planning Air Traffic
Services Control

Reveron &
Bentley for BIM
Standards
TAAIL

Titan Titan Titan


Titan
FED Avia Patton /
Antonov
Services Yuzhmash

Titan Titan Titan


Motor Sich Rostvertol Charters
Aircraft Manufacturing Component Engine
Manufacturing Manufacturing

Heli Manufacturing Heli Simulators


Heli Manufacturing

Space- Missile Plant Welding Institute LSARP


National Aviation
University

IPMS
Revenue: INR Revenue: INR 8000
1000 Crores PA Crores PA
TAAIL Proposed Aerospace lab and
Scope of Investment: INR 400 Crores componentMedium Term
manufacturing facility Scope of Investment: INR 10,000 Crores
18months
Direct Employment: 150 Personnel Direct Employment: 6000 Personnel

• Air Charter • EBW • Air base


• STC Helicopter • Aerospace Lab • MRO
• Assembly Shops
Short Term Scope of Investment: INR 3000 Crores
6 months
s
Direct Employment: 1000 Personnel Long Term
24 months
Revenue : INR 5000
Crores PA
Landing Gears & Precision Casting Components
TAAIL Phase III Proto Type
An 158

An 148
Motor Sich Engines

Motor Sich Boguslaev Mi 8 Helicopter


VIP Cabin

Passenger
Variant
Defense Park
Assembly of T-72 Tanks
Defense Park

Titanium Air Balloons


Defence Park

VIP Level 3A

Metal Inserts Level 4A


Defence Park
Manufacturing Facilities of Bomb Blankets
and Body Armor Jackets by using KEVLAR & TWARON
Down Stream: Aerospace R&D Lab

Mid Stream: Component Manufacturing

Up Stream: MRO for RW & FW


Acres (in thousands)
Cargo Hub Freight Forwarding

MRO Services Industrial Park

Terminal Buildings Business Park

2 Runways 10 Km x 100 W Convention Centre for Air Shows & Expos


General Benefits
General 100% FDI Allowed through Approval Route
Benefits 100% FDI Allowed for Aviation Infrastructure
Free to retain entire Forex Earnings

Tax Benefits
Tax 10 years Tax Holiday in 15 years Time Frame
Benefits Duty free Capital Inputs
No Excise and Customs Duties for Raw Material & Machinery

Aviation Benefits
Aviation Duty Free Refueling with a Benefit of 40%
Benefits Import of Duty Free Spares
No Service Tax for MRO
Exposure to Adoption of
International markets Villages

Power Plant
Hospitals
Proposed Project Site

Employment to Water Treatment


local People Plant
Effluent
Treatment Plants
Inland
Container
Depot

Surface & Air Bonded Customs


Transport Logistic Park Warehouse

Freight Forwarding
With Compound Annual Growth

Aviation Aerospace
15% 35%

Aviation 15%

Aerospace 35%

Titanium 20% Titan Group Titanium


Business 20%
Trading 12%

Log Park 18%

Log Park
Trading 12%
18%
Revenue: USD Revenue: USD 3 Bn PA
200 Mn PA

Scope of Investment: USD 300 Mn Medium Term Scope of Investment: USD 2.8 Bn
18 months
Direct Employment: 150 Personnel Direct Employment: 6000 Personnel

• Air Charter • EBW • Air base


• STC Helicopter • Aerospace Lab • MRO
• Assembly Shops
Short Term Scope of Investment: USD 900 Mn
6 months
s
Direct Employment: 1000 Personnel Long Term
24 months
Revenue: USD 4 Bn PA

You might also like