S.
N
STEEL
. REINFORCEMEN CONCRET other
ITEMS QTY. unit rate Amount
T QTY(TONS) E (Cu.m) qty
(TONS)
1 Channels,I-
sections,rods,pipes, tie
plates,angles( beams,
columns, truss,
bracings) 90.95 1,25,000.00 1,13,68,220.81
2 Connections( plates)
5
1,25,000.00 6,25,000.00
3 Bolts( including anchor
4.5
bolts) 2,50,000.00 11,25,000.00
4 Deck slab steel
8.00
1,45,000.00 11,60,000.00
mezannine floor
5.8
1,15,000.00 6,67,000.00
5 Roof truss
5.16
1,25,000.00 6,44,738.08
6 a) CGI sheet
700
m2 1205.12 8,43,584.00
b)Gutter
61.57
m 350.00 21,549.36
c)Ridge plate
33
m 175.00 5,775.00
7 H-section sheets( for
outer walls) 1543 m2 1205.12 18,59,500.16
8 Concrete
9 a) RCC in superstructure
130.00
15000 19,50,000.00
23.50
115000 27,02,500.00
b) RCC in foundation
70.00
15000 10,50,000.00
3.50 115000 402500
c) PCC 110 m3 14500 1595000
d)Brickwork 12.5 m3 14994 187425
e)plastering 200000
10 Metal staircase ton
8 s 135000 1080000
11 Dismantalling 1 nos 50000 50000
12 Road works
a) subbase(150 mm) 105 m3 4000 420000
b)base(100 mm) 70 m3 5000 350000
c)Black-topped
road(40mm) 1 nos 800000 800000
13 Stone Masonry 102 m3 6684.2 681788.4
14 Soil transport and land
alignment 1 nos 300000 300000
15 General electrification 1 nos 100000 100000
16 Air Vent Turbine 20 nos 20000 400000
17 Doors , 100 series 325 sqft 70 22750
17 Windows, 90 series 325 sqft 65 21125
18 Brick soling in 4.8 m3 2998.8 14394.24
foundation
19 Bricksoiling on first floor 16 m3 2998.8 47980.8
20 Earthwork excavation
for footing 142 m3 635.04 90175.68
TOTAL 3,07,86,006.53