Byco SWUF PVC Joint Report

This document summarizes the PVC pipe joints for a SWUF project. It lists 34 joints of various diameters that were cleaned with thinner and fitted satisfactorily. All joints were given 5 minutes of press time after cementing and 5 minutes of cooling time before acceptance. The joints were inspected and approved by representatives from FTI and Byco.

Uploaded by

Talha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views2 pages

Byco SWUF PVC Joint Report

This document summarizes the PVC pipe joints for a SWUF project. It lists 34 joints of various diameters that were cleaned with thinner and fitted satisfactorily. All joints were given 5 minutes of press time after cementing and 5 minutes of cooling time before acceptance. The joints were inspected and approved by representatives from FTI and Byco.

Uploaded by

Talha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Fluid Technology International Pvt. Ltd.

Project: Byco SWUF Project Code: 1612

PVC JOINT Client:


Date:
Byco
12/10/2018
Location:
Dwg No.
FTI Workshop
-

REPORT
Doc. No: FTI-1612-PVC-0001 P&ID No.: 1612-FTI-0102-S1
Rev.: - Isometric No.: FTI-1612-ISO-01
Page No.: 1 of 1
Press Time After
Line No. Joint No. Joint Type Diameter Pipe Shedule Pre-Join Treatment FitUp Cooling Time FTI Byco
Cementing
5D J1 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J2 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J3 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J4 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J5 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J6 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J7 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J8 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J9 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J10 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J11 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J12 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J13 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J14 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J15 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J16 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J17 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J18 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J19 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J20 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J21 B 08" 80 Cleaned With Thinner Satisfactory 5min 5min
5D J22 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J23 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J24 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J25 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J26 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J27 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J28 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J29 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J30 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J31 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J32 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J33 B 80 Cleaned With Thinner Satisfactory 5min 5min
5D J34 B 80 Cleaned With Thinner Satisfactory 5min 5min
Remarks:

Project In charge QA/QC Client


Name: M. Shuja Azhar Name: Talha Alam Khan Name: Basit Sultan Ahmed
Sign: Sign: Sign:

Date Date Date: