0% found this document useful (0 votes)
484 views3 pages

School Procurement Guidelines

This document outlines the procurement process for a school. It details 5 key activities: 1) Preparing a purchase request, 2) Preparing a request for quotation, 3) Posting the RFQ in PhilGEPS, 4) Awarding the bid to the lowest bidder and issuing relevant notices, and 5) Preparing a purchase order for the winning bidder. The objective is to improve the procurement process to ensure efficient and accurate purchasing. Responsible parties include the School Head, Property Custodian, Bids and Awards Committee, and Disbursing Officer. Associated documents include the Annual Procurement Plan, Quarterly Cash Program and relevant forms.

Uploaded by

RaulJunioRamos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
484 views3 pages

School Procurement Guidelines

This document outlines the procurement process for a school. It details 5 key activities: 1) Preparing a purchase request, 2) Preparing a request for quotation, 3) Posting the RFQ in PhilGEPS, 4) Awarding the bid to the lowest bidder and issuing relevant notices, and 5) Preparing a purchase order for the winning bidder. The objective is to improve the procurement process to ensure efficient and accurate purchasing. Responsible parties include the School Head, Property Custodian, Bids and Awards Committee, and Disbursing Officer. Associated documents include the Annual Procurement Plan, Quarterly Cash Program and relevant forms.

Uploaded by

RaulJunioRamos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Effectivity Date 01 – 06 – 2020

PROCUREMENT PROCESS
Revision 00

Document Code: P1XXX-QP-008 Page Number Page 1 of 3

Document History

Rev. Author Description/Change Page Number


No.

00 Initial Issuance -

REVIEW AND APPROVAL

SIGNATURE OVER PRINTED NAME POSITION

PREPARED
BY

REVIEWED
BY

APPROVED
BY

DISTRIBUTION:

This document is updated and


controlled if it bears the BLUE
“CONTROLLED COPY” stamp
Otherwise, please refer to the
Overall Document Control
( ODC) for your updated copy.

This document is a property of ____________ and the contents are treated in strict confidentiality. Therefore, unauthorized reproduction is strictly prohibited, unless
otherwise, permitted by ____________. All inquiries regarding this procedure shall be directed to the Management who is responsible for its control.
Effectivity Date 01 – 06 – 2020
PROCUREMENT PROCESS
Revision 00

Document Code: P1XXX-QP-008 Page Number Page 2 of 3

1.0 OBJECTIVE
1.1 To improve and sustain streamlined procurement process that shall be made
simple yet accurate in order to ensure effective and efficient purchasing
methods.

1.0 SCOPE
2.1 This procedure focuses mainly in improving and sustaining streamlined
purchasing process that is accurate and efficient.

2.0 ASSOCIATED DOCUMENTS


3.1 RA 9184. Government Procurement Reform Act
3.2 Handbook on Property and Supply Management

4.0 DEFINITION OF TERMS

4.1 Annual Procurement Plan (APP). Provide information on significant


procurements the school plan to undertake over the next twelve months.

4.2 Quarterly Cash Program (QCP). Provide information on significant


procurements the school plan to undertake over the next three months.

4.3 Procurement. This refers to the acquisition of goods, consulting services and
contracting for infrastructure projects by the procuring entity.

4.4 Property Custodian. This refers to a person responsible for managing and
ensuring safe-keeping of equipment and supplies, checking the quality and
recording the items delivered by suppliers, and; preparing procurement plan and
inventory reports.

4.5 Purchase Request. This refers to a document, which tells the


purchasing department or manager exactly what items and services
are requested, the quantity, source and associated costs.

5.0 PROCEDURE DETAILS

ACTIVITY RESPONSIBLE INTERFACE


DOCUMENT
PERSON

1.0 Prepare the purchase request to be signed School Head / Purchase


by the Property Custodian and School Property Request
Head. Please note that purchase should Custodian
be aligned with the APP and QCP. Check
if there are stocks. If there are no available
stocks, forward the Purchase Request to
the Bids and Awards Committee to
prepare the Request for Quotation.

This document is a property of ____________ and the contents are treated in strict confidentiality. Therefore, unauthorized reproduction is strictly prohibited, unless
otherwise, permitted by ____________. All inquiries regarding this procedure shall be directed to the Management who is responsible for its control.
Effectivity Date 01 – 06 – 2020
PROCUREMENT PROCESS
Revision 00

Document Code: P1XXX-QP-008 Page Number Page 3 of 3

2.0 Prepare the Request for Quotation signed


by School Head. Write down the
complete specifications, especially when Bids and Awards Price Quotation
purchasing electronic equipment. The Committee
approved budget should be based on
submitted QCP.

3.0. Post the RFQ in PhilGEPS. If purchase is


lower than Php 50,000.00, you can do
Property Price Quotation
shopping in accredited suppliers.
Custodian Form

4.0 Three days after posting, the BAC shall


award to the winning bidder with the
lowest calculated and responsive bid. Price Quotation
Bids and Awards
The BAC shall issue a Notice to Award, Form
Committee
Notice to Proceed and BAC Resolution
to notify the winning bidder and continue
to the procurement. If there is no bidder
after 3 days, the RFQ shall be posted for
another 3 days. Maximum of three (3)
posting, if there is no bidder, shopping to
the accredited supplies is the alternative
procurement.

5.0 Prepare the Purchase Order for the


Property Purchase Order
lowest bidder. Submit it to the Disbursing
Custodian Form
Officer for the Disbursement Voucher,
Taxes and funding. The PO, DV and BIR
Forms (if required) must be approved Disbursement
and signed by the School Head. Voucher and
Funds
6.0 After giving the Purchase Order to the
supplier, the supplier shall deliver the Supplier/Winning Inspection and
purchased items and check by inspection Bidder Acceptance Form
team if all the items purchased are
delivered. Let them acknowledge the
purchase by signing in the PO and DV.
Secure the Official Receipt and/or Sales
Invoice.

END OF PROCEDURE

This document is a property of ____________ and the contents are treated in strict confidentiality. Therefore, unauthorized reproduction is strictly prohibited, unless
otherwise, permitted by ____________. All inquiries regarding this procedure shall be directed to the Management who is responsible for its control.

You might also like